Letting Schedule for July, 2013 (FY 2013)

Last Update: Thursday, November 14, 2013
July, 2013 (FY 2013) (see Links)
SEP 2012 | OCT 2012 | NOV 2012 | DEC 2012 | JAN 2013 | FEB 2013 | MAR 2013 | APR 2013 | MAY 2013 | JUN 2013 | JUL 2013 | AUG 2013
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
2960-01-010 Angelina/
Lufkin
FM 1194 Actual $1,209,729 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0073-05-065 Atascosa/
San Antonio
IH 37 Actual $5,395,751 1 MILL, BASE REPAIR, SEAL COAT, OVERLAY, PAVEMENT MARKINGS
0914-18-089 Bastrop/
Austin
VA Actual $170,483 3 PED PATH, CROSSWALKS & SCHOOLZONE SIGNS
0017-10-261 Bexar/
San Antonio
IH 35 Actual $61,196,365 1 EXPAND FROM 6 TO 8 LANE EXPRESSWAY AND OPERATIONAL
0521-01-045 Bexar/
San Antonio
LP 13 Actual $1,693,779 ROW CONSTRUCT SIDEWALK
0218-01-090 Bowie/
Atlanta
US 59 Actual $614,076 1 INSTALL TRAFFIC SIGNAL & UPGRADE INTERSECTION
0111-09-041 Brazoria/
Houston
BS 288B Actual $509,258 3 RAISED MEDIAN IN ANGLETON
0178-03-149 Brazoria/
Houston
SH 35 Actual $1,695,830 8 ADD CROSSOVER LEFT TURN LANE
1414-03-039 Brazoria/
Houston
FM 1462 Actual $481,636 1 INTERSECTION IMPROVEMENTS
0049-12-086 Brazos/
Bryan
SH 6 Actual $4,175,998 3 INTERCHANGE CONSISTING OF GRADING, STRUCTURES, PAVEMENT,
1801-02-014 Cameron/
Pharr
FM 1847 Actual $3,465,083 1 REHAB AND WIDEN ROADWAY
0224-02-041 Clay/
Wichita Falls
US 287 Actual $864,215 6 REPLACE BRIDGE AND APPROACHES
2679-03-012 Collin/
Dallas
FM 2514 Actual $1,013,313 1 BASE REPAIR AND OVERLAY
0709-01-024 Colorado/
Yoakum
FM 102 Actual $3,248,433 8 PAVEMENT REPAIR & SHOULDER WIDENING
2992-01-010 Comanche/
Brownwood
FM 2861 Actual $545,815 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0092-07-045 Dallas/
Dallas
SH 356 Actual $448,138 6 REHABILITATE BRIDGE
0364-02-017 Dallas/
Fort Worth
SH 121 Actual $58,805,234 1 CONVERT 4 LN DIV TO 10 LANE FREEWAY WITH FRONTAGE ROADS
0918-00-220 Dallas/
Dallas
VA Actual $975,000 7 DEPARTMENTAL STREAMLINING POLICIES AND PROCEDURES
2374-03-081 Dallas/
Dallas
IH 20 Actual $399,272 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING,
2374-04-072 Dallas/
Dallas
IH 20 Actual $3,004,430 1 FULL DEPTH REPAIR, MILL AND INLAY OF MAINLANES
0195-02-066 Denton/
Dallas
IH 35 Actual $247,007 1 REHABILITATION OF TRAFFIC SIGNALS
0364-03-095 Denton/
Dallas
SH 121 Actual $19,999,737 3 CONSTRUCT GRADE SEPARATION OVER MAINLANES; ADJUST RAMPS;
0718-01-051 Denton/
Dallas
FM 156 Actual $7,732,000 1 ADD 10' SHOULDERS AND REHAB
1270-01-024 Dimmit/
Laredo
FM 1019 Actual $733,357 6 THE REPLACEMENT OF AN EXISTING BRIDGE
1270-01-025 Dimmit/
Laredo
FM 468 Actual $463,621 1 OVERLAY
0924-00-065 El Paso/
El Paso
VA Actual $656,177 1 FY 2013 SIGNING PROJECT
0924-00-086 El Paso/
El Paso
VA Actual $1,408,923 1 METAL BEAM GUARD FENCE AND SGT UPGRADES
0924-06-417 El Paso/
El Paso
CS Actual $14,079,213 3 CONTINUOUS LEFT TURN LANE, ADA RAMPS, ILLUMINATION, ITS,
0924-06-440 El Paso/
El Paso
CS Actual $4,810,421 7 WIDEN ROADWAY FROM 2 TO 4 - LANES DIVIDED
2326-01-025 El Paso/
El Paso
FM 2529 Actual $607,511 10 PLACEMENT OF NEW VEGETATION, SOIL MIX, IRRIGATION SYSTEM,
1159-02-031 Ellis/
Dallas
FM 879 Actual $889,808 6 REPLACE BRIDGE AND APPROACHES
0912-34-158 Fort Bend/
Houston
CR Actual $344,620 6 REPLACE BRIDGE AND APPROACHES (NBI# 12080AA0962002)
2105-01-046 Fort Bend/
Houston
FM 2234 Actual $8,068,060 3 RECONSTRUCT AND WIDEN FROM 2 LANES TO 4 - LANE DIVIDED RURAL
1007-02-017 Gonzales/
Yoakum
FM 532 Actual $8,097,589 8 ROADWAY WIDENING
0510-02-028 Grayson/
Paris
FM 902 Actual $4,317,753 1 2R REHABILITATION
0545-04-046 Gregg/
Tyler
SH 42 Actual $3,692,467 3 CONSTRUCT CENTER TWO - WAY LEFT TURN LANE (TWLTL)
0212-04-038 Grimes/
Bryan
SH 30 Actual $475,761 1 MISCELLANEOUS WORK CONSISTING OF GRADING, BASE, SURFACE,
0535-01-069 Guadalupe/
San Antonio
IH 10 Actual $3,594,953 3 RECONSTRUCT & RECONFIGURE RAMPS AND FRONTAGE ROAD
0909-29-045 Hamilton/
Waco
PW Actual $231,088 10 EXTEND AND CONSTRUCT ACCESS ROAD TO RIFLE RANGE AND
0027-09-099 Harris/
Houston
US 90A Actual $1,018,581 8 INSTALL MEDIAN BARRIER
0027-13-202 Harris/
Houston
US 59 Actual $13,885,131 1 SEAL COAT, CAM LEVEL UP, THIN ASPHALT OVERLAY AND PAVEMENT
0027-13-208 Harris/
Houston
US 59 Actual $1,616,027 11 RECONSTRUCTION OF NB BRIDGE SLAB
0271-16-130 Harris/
Houston
IH 610 Actual $1,733,013 1 HIGH MAST ILLUMINATION
0912-00-465 Harris/
Houston
VA Actual $2,000,000 5 REGIONAL VANPOOL PROGRAM (FY 2013)
0912-00-466 Harris/
Houston
VA Actual $3,750,000 3 REGIONAL VANPOOL PROGRAM (FY 2013)
0912-72-229 Harris/
Houston
CS Actual $600,782 6 REPLACE BRIDGE AND APPROACHES (NBI# 12102B02249004)
1258-04-056 Harris/
Houston
FM 1093 Actual $2,561,914 1 IMPLEMENTATION OF ACCESS MANAGEMENT (PHASE II) , SIDEWALKS
2941-01-021 Harris/
Houston
FM 2920 Actual $3,074,859 1 INTERSECTION IMPROVEMENTS
0366-01-068 Hays/
Austin
SH 123 Actual $791,190 8 ADD LEFT TURN LANE
0039-17-176 Hidalgo/
Pharr
US 83 Actual $35,990,314 11 INTERCHANGE IMPROVEMENTS
1802-02-009 Hidalgo/
Pharr
FM 3461 Actual $3,077,778 11 CONSTRUCT 4 LANE DIVIDED URBAN
0069-01-052 Howard/
Abilene
US 87 Actual $2,216,751 1 SPOT REPAIR / SEAL / OVERLAY
1282-03-007 Hudspeth/
El Paso
RM 1111 Actual $896,196 3 CONSTRUCTION OF SIDEWALKS AND ADA FACILITIES AND DRAINAGE IS
0200-11-100 Jefferson/
Beaumont
US 69 Actual $27,390,862 1 RAMP RELOCATION / RECONFIGURATION
0200-16-014 Jefferson/
Beaumont
US 69 Actual $1,456,177 6 REPLACE BRIDGE AND APPROACHES
0306-03-120 Jefferson/
Beaumont
SH 87 Actual $2,796,252 6 REPLACE BRIDGE AND APPROACHES
0920-00-115 Jefferson/
Beaumont
VA Actual $765,065 1 TEXTURIZE SHOULDERS AND CENTERLINE TEXTURING
0920-38-171 Jefferson/
Beaumont
VA Actual $198,219 5 CONSTRUCTION OF SIDEWALKS & ADA RAMPS
0749-01-054 Lamar/
Paris
FM 137 Actual $596,142 1 REHABILITATION OF EXISTING ROAD
0205-03-047 Leon/
Bryan
US 79 Actual $446,197 1 MISCELLANEOUS WORK CONSISTING OF GRADING, STRUCTURES, BASE,
0205-04-044 Leon/
Bryan
US 79 Actual $5,087,928 1 REHABILITATE EXISTING ROAD CONSISTING OF GRADING, STRUCTURES
1147-03-014 Leon/
Bryan
FM 977 Actual $691,407 6 REPLACEMENT OF AN EXISTING BRIDGE FACILITY CONSISTING OF
0068-01-066 Lubbock/
Lubbock
US 87 Actual $10,259,830 11 NEW INTERCHANGE
1102-01-041 McCulloch/
Brownwood
SH 71 Actual $12,668,778 6 WIDEN SUBGRADE, ADD PASSING LANES, STRUCTURE, AND SURFACE
0017-05-092 Medina/
San Antonio
IH 35 Actual $1,564,900 3 RELOCATE EXISTING ENTRANCE RAMP & CONSTRUCT PARTIAL
0923-23-026 Mills/
Brownwood
CS Actual $1,314,184 3 CONSTRUCT WELCOME CENTER
0523-10-034 Montgomery/
Houston
FM 1488 Actual $27,649,979 3 CONSTUCT RAILROAD GRADE SEPARATION OVER FM 149 AND BNSF RR
3158-01-035 Montgomery/
Houston
FM 3083 Actual $3,065,561 3 WIDEN TO 4 - LANE DIVIDED ROADWAY
0919-20-030 Morris/
Atlanta
CR Actual $214,837 6 REPLACE BRIDGE AND APPROACHES
0911-08-040 Nacogdoches/
Lufkin
VA Actual $414,097 8 CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS
0162-09-035 Navarro/
Dallas
FM 709 Actual $4,787,588 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0102-02-096 Nueces/
Corpus Christi
US 77 Actual $38,721,708 3 CONSTRUCT MAIN LANES AND OVERPASSES
0028-15-051 Orange/
Beaumont
BU 90-Y Actual $642,785 6 REPAIR BRIDGE SUBSTRUCTURE
0204-09-053 Robertson/
Bryan
US 79 Actual $1,018,766 1 MISCELLANEOUS WORK CONSISTING OF GRADING, STRUCTURES, BASE,
0009-12-078 Rockwall/
Dallas
IH 30 Actual $30,862,690 3 RECONSTRUCT FM 551 AT IH 30 INCLUDING FRONTAGE ROADS AND
0245-08-040 Rusk/
Tyler
SH 64 Actual $2,102,152 1 PROVIDE OPERATIONAL IMPROVEMENT TO ELIMINATE BOTTLENECK
0175-01-005 Shelby/
Lufkin
US 84 Actual $20,412,099 3 REPLACE ONE EXISTING BRIDGE WITH TWO PROPOSED BRIDGES
0353-03-091 Tarrant/
Fort Worth
SH 114 Actual $1,663,794 3 CONSTRUCT TURNAROUND BRIDGE FROM NB TO SB AND A LEFT TURN
0902-00-126 Tarrant/
Fort Worth
VA Actual $1,413,335 1 CONCRETE PAVEMENT REPAIR; SPOT REPAIR
0902-48-558 Tarrant/
Fort Worth
VA Actual $277,742 3 REDEVELOPMENT OF 7 PRIORITY CORRIDORS IN FORT WORTH
0902-48-849 Tarrant/
Fort Worth
VA Actual $2,687,139 1 BRIDGE JOINT REPAIRS
2681-02-007 Tarrant/
Fort Worth
FM 2499 Actual $97,605,651 12 RECONSTRUCT ARTERIAL ROADWAY TO 4 FREEWAY LANES WITH 4 / 6
7202-01-001 Tarrant/
Wichita Falls
RL BNSF Actual $3,467,877 RL SIGNAL TIMING IMPROVEMENTS ON THE BNSF RAILROAD
2284-01-028 Tom Green/
San Angelo
FM 388 Actual $2,261,709 3 WIDEN AND RESURFACE
0114-20-009 Travis/
Austin
LP 212 Actual $587,548 1 PAVEMENT REPAIR, MILL, SEAL & OVERLAY
0914-04-277 Travis/
Austin
VA Actual $1,920,000 3 BIKE SHARE / BIKE SAFETY PROGRAM GRANT & BICYCLE SAFETY
3136-01-107 Travis/
Austin
LP 1 Actual 197,600,001 3 PHASE 1: CONSTRUCT NB AND SB MANAGED LANES_ (TOLL)
0248-05-053 Upshur/
Atlanta
US 271 Actual $1,645,902 3 INSTALL LEFT TURN LANES
0520-02-037 Upshur/
Atlanta
SH 155 Actual $18,869,886 3 REPLACE BRIDGES AND APPROACHES
0235-05-030 Uvalde/
San Antonio
SH 55 Actual $2,960,802 ROW RECONSTRUCT ROADWAY TO IMPROVE DRAINAGE AND OPERATIONAL
0023-01-085 Val Verde/
Laredo
US 90 Actual $487,565 11 DRAINAGE IMPROVEMENTS
0088-05-090 Victoria/
Yoakum
US 59 Actual $7,826,113 6 REPLACE BRIDGES AND APPROACHES
0370-05-049 Victoria/
Yoakum
BU 77S Actual $28,849 10 LANDSCAPING - GREEN RIBBON
0912-56-046 Waller/
Houston
CR Actual $1,001,556 6 REPLACE BRIDGE (NBI# 12237AA0257001)
0186-06-077 Washington/
Bryan
SH 36 Actual $3,601,987 11 REHABILITATE EXISTING ROAD CONSISTING OF GRADING, STRUCTURES
0315-06-040 Washington/
Bryan
SH 105 Actual $416,279 1 MISCELLANEOUS WORK CONSISTING OF GRADING, STRUCTURES, BASE,
0018-06-170 Webb/
Laredo
IH 35 Actual $1,908,130 1 CONCRETE PAVEMENT DIAMOND GRINDING
0044-01-098 Wichita/
Wichita Falls
US 82 Actual $1,769,279 1 OVERLAY
0921-27-033 Willacy/
Pharr
CR Actual $1,407,139 6 REPLACE BRIDGE & RECONST APPROACHES
0334-01-030 Williamson/
Austin
FM 112 Actual $1,409,491 6 REPLACE BRIDGE & APPROACHES
0914-05-170 Williamson/
Austin
VA Actual $398,538 3 CONSTRUCT SIDEWALKS & CROSSWALKS
0038-03-034 Zapata/
Pharr
US 83 Actual $6,674,471 1 REHAB & WIDEN PAVEMENT (SUPER 2)


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract