Letting Schedule for August, 2013 (FY 2013)
August, 2013 (FY 2013) | (see Links) |
SEP 2012 | OCT 2012 | NOV 2012 | DEC 2012 | JAN 2013 | FEB 2013 | MAR 2013 | APR 2013 | MAY 2013 | JUN 2013 | JUL 2013 | AUG 2013 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0910-08-061 | Anderson/ Tyler |
CR | Actual | $240,129 | 8 | INSTALL RRX SIGNALS & GATES |
0156-05-048 | Archer/ Wichita Falls |
US 277 | Actual | $16,393,547 | 1 | UPGRADE TO 4 LANE DIVIDED FACILITY |
0357-02-023 | Armstrong/ Amarillo |
SH 207 | Actual | $28,000 | 10 | 2013 CRX REPLANKING PROGRAM |
0788-03-021 | Armstrong/ Amarillo |
FM 294 | Actual | $28,000 | 10 | 2013 CRX REPLANKING PROGRAM |
0915-13-025 | Atascosa/ San Antonio |
CR | Actual | $150,000 | 8 | INSTALL RAILROAD WARNING SIGNS AND PAVEMENT MARKINGS TO |
0905-16-011 | Bailey/ Lubbock |
CR | Actual | $164,560 | 8 | INSTALLATION OF STOP & WARNING SIGNS |
0752-07-013 | Bell/ Waco |
FM 1237 | Actual | $161,180 | 8 | INSTALL RAILROAD SIGNAL |
0909-36-141 | Bell/ Waco |
CR | Actual | $231,934 | 8 | INSTALL RAILROAD SIGNAL |
0909-36-142 | Bell/ Waco |
CR | Actual | $219,394 | 8 | INSTALL RAILROAD SIGNAL |
0915-12-492 | Bexar/ San Antonio |
VA | Actual | $321,400 | 3 | ALAMO AREA COMMUTE SOLUTION PGM - FY 2013 |
0915-12-527 | Bexar/ San Antonio |
CS | Actual | $7,500 | 8 | INSTALL WARNING LIGHTS AND GATES (DOT #764296L) |
0253-02-030 | Blanco/ Austin |
US 281 | Actual | $6,301,497 | 3 | UPGRADE TO SUPER 2 (ADD PASSING LANE) |
0121-01-048 | Bosque/ Waco |
SH 22 | Actual | $44,800 | 10 | RAILROAD REPLANKING |
0919-19-077 | Bowie/ Atlanta |
CR | Actual | $322,710 | 8 | INSTALL AUTOMATIC RR WARNING DEVICES |
0912-31-224 | Brazoria/ Houston |
CR | Actual | $14,518,736 | 3 | RECONSTRUCT AND WIDEN TO 4 LANES DIVIDED |
0912-31-270 | Brazoria/ Houston |
CS | Actual | $4,837,805 | 3 | CONSTRUCT 4 LANE DIVIDED ROADWAY WITH RAISED MEDIANS |
0917-00-041 | Brazos/ Bryan |
VA | Actual | $1,083,888 | 10 | INSTALL DMS & CCTV ON IH 45 AND FIBER TO BRYAN DISTRICT TMC |
0917-29-122 | Brazos/ Bryan |
VA | Actual | $30,000 | 10 | SUPPORT SERVICES FROM TXDOT'S DIIMS CONTRACTOR TO ASSIST IN |
0923-06-065 | Brown/ Brownwood |
CR | Actual | $173,721 | 8 | INSTALL RR SIGNALIZATION |
1025-02-028 | Brown/ Brownwood |
FM 586 | Actual | $28,000 | 10 | REPLANKING |
1850-01-013 | Caldwell/ Austin |
FM 1966 | Actual | $48,128 | 10 | 2013 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0921-06-258 | Cameron/ Pharr |
CS | Actual | $150,000 | 8 | UPDGRADE RRX WARNING DEVICES |
0921-06-259 | Cameron/ Pharr |
CS | Actual | $150,000 | 8 | UPGRADE RRX WARNING DEVICES |
0921-06-260 | Cameron/ Pharr |
CS | Actual | $150,000 | 8 | UPGRADE RRX WARNING DEVICES |
1137-02-037 | Cameron/ Pharr |
LP 499 | Actual | $81,216 | 10 | UPGRADE RAILROAD CROSSING PLANKING |
1425-03-055 | Cameron/ Pharr |
SP 206 | Actual | $78,508 | 10 | UPGRADE RAILROAD CROSSING PLANKING |
3510-10-014 | Chambers/ Beaumont |
SH 99 | Actual | $4,998,153 | 12 | INSTALL TOLLING EQUIPMENT |
0378-07-028 | Cherokee/ Tyler |
FM 347 | Actual | $42,112 | 10 | REPLANK RR CROSSING |
2407-02-008 | Cherokee/ Tyler |
FM 747 | Actual | $24,064 | 10 | REPLANK RR CROSSING |
2742-01-007 | Cherokee/ Tyler |
FM 2750 | Actual | $24,064 | 10 | REPLANK RR CROSSING |
0043-16-017 | Childress/ Childress |
FM 164 | Actual | $78,400 | 10 | RR REPLANKING |
0903-06-019 | Clay/ Wichita Falls |
CS | Actual | $832,803 | 3 | CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS |
0923-08-027 | Coleman/ Brownwood |
CR | Actual | $327,945 | 8 | INSTALL RR SIGNALIZATION |
2014-01-016 | Coleman/ Brownwood |
FM 2131 | Actual | $32,000 | 10 | REPLANKING |
0091-05-057 | Collin/ Dallas |
SH 289 | Actual | $4,443,534 | 3 | CONSTRUCT DUAL LEFT TURN LANES AND RIGHT LANES AT FIVE |
0918-24-178 | Collin/ Dallas |
CS | Actual | $487,776 | 3 | PEDESTRIAN WALKWAY IMPROVEMENTS |
0918-24-186 | Collin/ Dallas |
VA | Actual | $2,400,000 | 7 | COORDINATION OF PASSENGER RAIL & RDWY PLANNING ON NE TEXAS |
2679-03-014 | Collin/ Dallas |
FM 2514 | Actual | $35,200 | 10 | RAILROAD GRADE CROSSING REPLANKING PROGRAM |
1273-01-034 | Comal/ San Antonio |
FM 1102 | Actual | $30,080 | 10 | REPLACE CROSSING SURFACE AT RAILROAD CROSSING |
0923-17-073 | Comanche/ Brownwood |
CR | Actual | $1,075,961 | 6 | REPLACE BRIDGE AND APPROACHES |
0845-03-058 | Cooke/ Wichita Falls |
FM 922 | Actual | $22,400 | 10 | REPLANK EXISTING RAILROAD CROSSING |
0903-15-095 | Cooke/ Wichita Falls |
CR | Actual | $240,613 | 8 | 2013 FEDERAL SIGNAL PROGRAM |
0903-15-096 | Cooke/ Wichita Falls |
CR | Actual | $179,589 | 8 | 2013 FEDERAL SIGNAL PROGRAM |
0903-15-097 | Cooke/ Wichita Falls |
CS | Actual | $387,946 | 8 | 2013 FEDERAL SIGNAL PROGRAM |
0904-05-014 | Dallam/ Amarillo |
CR | Actual | $254,763 | 8 | GRADE CROSSING WARNING DEVICES |
1702-02-001 | Dallam/ Amarillo |
SS 24 | Actual | $3,075,605 | 11 | NEW LOCATION 2 LANE RDWY |
0196-03-264 | Dallas/ Dallas |
IH 35E | Actual | $166,733 | 3 | UPDATE OF SIGNS ON TXDOT FACILITIES WITH NTTA INTERCHANGES |
0442-02-152 | Dallas/ Dallas |
IH 35E | Actual | $1,434,180 | 1 | FULL DEPTH REPAIR OF MAINLANES |
0918-00-222 | Dallas/ Dallas |
VA | Actual | $3,055,492 | 7 | REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN |
0918-00-224 | Dallas/ Dallas |
VA | Actual | $2,013,334 | 7 | TRAVEL SURVEY AND DATA COLLECTION EFFORT FOR PROJECTS IN MPO |
0918-00-232 | Dallas/ Dallas |
VA | Actual | $306,891 | 3 | REGIONAL CONGESTION MANAGEMENT PLANNING & DATA COLLECTION - |
0918-00-241 | Dallas/ Dallas |
VA | Actual | $150,000 | 10 | NCTCOG TO IMPLEMENT FRAMEWORK TO ASSESS CLIMATE CHANGE AND |
0918-00-242 | Dallas/ Dallas |
VA | Actual | $7,600,100 | 3 | SAFETY PATROL PILOT PROGRAM; FOUR OBJECTIVES: DESIGN; |
0918-00-244 | Dallas/ Dallas |
VA | Actual | $225,000 | 10 | IMPLEMENTING ECO - LOGICAL FROM SHRP2 TO BRING EARLY CONSIDER - |
0918-47-075 | Dallas/ Dallas |
VA | Actual | $4,752,000 | 5 | CONSTRUCT 2ND TRACK ON TRINITY RAILWAY EXPRESS (TRE) |
0380-06-015 | Dawson/ Lubbock |
SH 349 | Actual | $18,313,515 | 3 | WIDEN NON - FREEWAY |
0904-01-014 | Deaf Smith/ Amarillo |
VA | Actual | $22,152 | 8 | 2013 FED RAILROAD SIGNAL PROGRAM |
0081-03-051 | Denton/ Dallas |
US 377 | Actual | $4,078,318 | 6 | REHABILITATE AND WIDEN BRIDGE AND APPROACHES |
0196-02-068 | Denton/ Dallas |
IH 35E | Actual | ***,***,*** | 11 | RECONST 6 TO 6 / 8 MNLNS, 6 / 8 COLLECTOR DISTRIBUTOR LN FROM_DAL |
0816-02-075 | Denton/ Dallas |
FM 455 | Actual | $22,400 | 10 | RAILROAD GRADE CROSSING REPLANKING PROGRAM |
1059-01-044 | Denton/ Dallas |
FM 1173 | Actual | $319,494 | 8 | INSTALL RAILROAD SIGNALS AND GATES |
0913-17-035 | Dewitt/ Yoakum |
CR | Actual | $334,220 | 6 | REPLACE BRIDGE AND APPROACHES |
0795-02-016 | Donley/ Childress |
FM 1260 | Actual | $22,400 | 10 | RR REPLANKING |
0228-06-082 | Ector/ Odessa |
US 385 | Actual | $3,139,216 | 1 | INTERSECTION IMPROVEMENTS, TURN LANES, SIGNALIZATION, |
0002-01-090 | El Paso/ El Paso |
SH 20 | Actual | $10,475,334 | ROW | ALAMEDA / PAISANO INTERSECTION IMPROVEMENTS |
0002-14-040 | El Paso/ El Paso |
FM 258 | Actual | $322,478 | 1 | REPLACE STRUCTURE |
0374-02-094 | El Paso/ El Paso |
US 62 | Actual | $5,714,604 | 3 | ROADWAY WIDENING (SHOULDER IMPROVE, SIDEWALKS, TRAFFIC |
0924-06-432 | El Paso/ El Paso |
CS | Actual | $1,279,752 | 3 | PASEO DEL NORTE IMPROVEMENTS |
0924-06-434 | El Paso/ El Paso |
CS | Actual | $194,824 | 12 | PURCHASE 2 PROPANE SCHOOL BUSES |
2121-04-092 | El Paso/ El Paso |
IH 10 | Actual | $24,887,784 | ROW | WESTBOUND BRAIDED RAMPS |
0834-01-013 | Ellis/ Dallas |
FM 308 | Actual | $3,096,481 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0918-22-145 | Ellis/ Dallas |
CR | Actual | $237,359 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-22-150 | Ellis/ Dallas |
CR | Actual | $281,298 | 8 | INSTALL RAILROAD SIGNALS AND GATES |
0079-08-003 | Erath/ Fort Worth |
US 67 | Actual | $12,608,804 | 11 | CONSTRUCT US 67 ON ALTERNATE ROUTE SOUTH AND WEST OF DUBLIN |
0908-23-027 | Fisher/ Abilene |
CR | Actual | $248,230 | 6 | REPLACE BRIDGE AND APPROACHES |
0908-23-029 | Fisher/ Abilene |
CR | Actual | $292,218 | 6 | REPLACE BRIDGE AND APPROACHES |
2379-01-010 | Fisher/ Abilene |
FM 608 | Actual | $176,468 | 8 | UPGRADE / INSTALL RR XING PROTECTION |
0187-05-050 | Fort Bend/ Houston |
SP 10 | Actual | $19,773,720 | 3 | CONSTRUCT 2 - LANE RURAL FACILITY ON A NEW LOCATION AND REMOVE |
0192-01-091 | Fort Bend/ Houston |
SH 6 | Actual | $36,096 | 10 | FY 2013 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0192-01-092 | Fort Bend/ Houston |
SH 6 | Actual | $30,080 | 10 | FY 2013 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0301-06-015 | Frio/ San Antonio |
SH 85 | Actual | $36,096 | 10 | REPLACE CROSSING SURFACE AT RAILROAD CROSSING |
0912-73-120 | Galveston/ Houston |
CR | Actual | $550,634 | 6 | REPLACE BRIDGE |
0976-03-100 | Galveston/ Houston |
FM 518 | Actual | $1,295,137 | 3 | ACCESS MANAGEMENT IMPROVEMENTS INCLUDING RAISED MEDIANS, |
2523-01-024 | Galveston/ Houston |
FM 2004 | Actual | $1,037,706 | 1 | INTERSECTION IMPROVEMENTS |
2523-01-025 | Galveston/ Houston |
FM 2004 | Actual | $50,400 | 10 | FY 2013 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
3595-01-016 | Galveston/ Houston |
SH 275 | Actual | $121,600 | 10 | FY 2013 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0445-03-023 | Gonzales/ Yoakum |
US 90A | Actual | $44,800 | 10 | 2013 CRX REPLANKING PROGRAM |
0047-03-076 | Grayson/ Paris |
US 75 | Actual | $8,342,651 | 3 | UPGRADE ASPHALT TO CONCRETE PAVEMENT |
0047-03-077 | Grayson/ Paris |
US 75 | Actual | $739,670 | 11 | RELOCATE EXISTING EXIT RAMP |
0138-01-095 | Gregg/ Tyler |
SH 31 | Actual | $189,035 | 10 | LANDSCAPING |
0138-16-003 | Gregg/ Tyler |
US 259 | Actual | $489,748 | 11 | CONSTRUCT LEFT TURN LANE |
0165-03-033 | Gregg/ Tyler |
US 271 | Actual | $54,144 | 10 | REPLANK RR CROSSING |
0393-01-096 | Gregg/ Tyler |
SH 149 | Actual | $66,176 | 10 | REPLANK RR CROSSING |
0424-03-024 | Gregg/ Tyler |
FM 349 | Actual | $1,065,975 | 3 | WIDEN 2 LN ROADWAY FOR CENTER TWO - WAY LEFT TURN LANE (TWLTL) |
0212-01-034 | Grimes/ Bryan |
SH 30 | Actual | $115,797 | 8 | RAILROAD GRADE CROSSING IMPROVEMENT |
0315-04-072 | Grimes/ Bryan |
SH 105 | Actual | $84,000 | 10 | REPLANK EXISTING AT - GRADE RAILROAD CROSSING UNDER THE 2013 |
0905-12-039 | Hale/ Lubbock |
CR | Actual | $151,052 | 8 | INSTALLATION OF STOP AND WARNING SIGNS |
0905-12-040 | Hale/ Lubbock |
CR | Actual | $180,390 | 8 | INSTALLATION OF STOP AND WARNING SIGNS |
2691-01-006 | Hale/ Lubbock |
FM 1767 | Actual | $33,600 | 10 | INSTALLATION OF RAILROAD REPLANKS |
0920-03-073 | Hardin/ Beaumont |
VA | Actual | $2,734,519 | 5 | CONSTRUCT A HIKE AND BIKE TRAIL |
2778-03-013 | Hardin/ Beaumont |
FM 2798 | Actual | $22,400 | 10 | REPLANK RR CROSSING |
0027-09-100 | Harris/ Houston |
US 90A | Actual | $1,190,807 | 8 | INSTALL SAFTY LIGHTING |
0051-02-079 | Harris/ Houston |
SH 3 | Actual | $1,755,644 | 1 | ADDITION OF RIGHT TURN LANE STORAGE, SIDEWALKS, RAILROAD |
0271-14-224 | Harris/ Houston |
IH 610 | Actual | $1,766,701 | 1 | ASPHALT OVERLAY OF IH 610 MAIN LANES AT IH 45 |
0508-01-343 | Harris/ Houston |
IH 10 | Actual | $1,881,416 | 6 | REHABILITATION OF BRIDGE DECK (NBI 12102050801223) |
0912-00-458 | Harris/ Houston |
VA | Actual | $3,500,000 | 1 | ITS SUPPORT (NON LETTING) |
0912-00-484 | Harris/ Houston |
VA | Actual | $557,850 | 1 | UPGRADE & MODERNIZE SIGNALS |
0912-70-064 | Harris/ Houston |
CS | Actual | $14,907,082 | 3 | RECONSTRUCT 4 - LN BOULEVARD W / PAVING, CURBS, STREET LIGHTING |
0912-70-096 | Harris/ Houston |
VA | Actual | $1,000,000 | 3 | HARRIS COUNTY SHERRIFF'S MOTORIST ASSISTANCE PROGRAM FY 2013 |
0912-71-005 | Harris/ Houston |
VA | Actual | $958,854 | 3 | INSTALL UPS / BATTERY BACKUPS AT VARIOUS LOCATIONS CITYWIDE |
0912-71-044 | Harris/ Houston |
VA | Actual | $10,394,415 | 7 | CONSTRUCT INTERMODAL TRANSIT TERMINAL |
0912-72-061 | Harris/ Houston |
CR | Actual | $736,542 | 6 | REPLACE BRIDGE (NBI# 121020AA0207001) |
0912-72-199 | Harris/ Houston |
VA | Actual | $2,561,453 | 3 | ITS FOR HIGH DEMAND ARTERIAL STREETS (RCTSS) HARRIS COUNTY |
0912-72-304 | Harris/ Houston |
CS | Actual | $271,428 | 8 | FY 2013 RR SIGNAL & WARNING DEVICES (BNSF DOT# 023 211L) |
0912-72-305 | Harris/ Houston |
CS | Actual | $355,951 | 8 | FY 2013 RR SIGNAL & WARNING DEVICES (BNSF DOT# 023 228P) |
0912-72-306 | Harris/ Houston |
CS | Actual | $381,522 | 8 | FY 2013 RR SIGNAL & WARNING DEVICES (BNSF DOT# 023 212T) |
1685-07-019 | Harris/ Houston |
BF1960A | Actual | $13,293,900 | 3 | BASE REPAIR, MILL, SEAL COAT, 1.5" ACP OVERLAY, |
2941-02-051 | Harris/ Houston |
FM 2920 | Actual | $89,600 | 10 | FY 2013 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0238-01-030 | Hartley/ Amarillo |
US 54 | Actual | $3,936,022 | 6 | REPLACE BRIDGE & APPR |
0904-41-005 | Hartley/ Amarillo |
VA | Actual | $158,166 | 8 | 2013 FED RAILROAD SIGNAL PROGRAM |
0016-02-133 | Hays/ Austin |
IH 35 | Actual | $11,422,054 | 3 | WIDEN EXISTING BRIDGE & ADD TURNAROUND BRDG @ CEMENT PLANT |
0285-03-053 | Hays/ Austin |
RM 12 | Actual | $1,923,900 | 3 | INSTALL CENTER TURN LANE & SHLDRS |
0286-01-053 | Hays/ Austin |
SH 80 | Actual | $4,699,339 | 3 | INTERSECTION IMPROVEMENTS |
0914-33-033 | Hays/ Austin |
CS | Actual | $6,518,625 | 3 | INTERSECTION, SIGNAL AND BICYCLE PEDESTRIAN IMPROVEMENTS |
0914-33-065 | Hays/ Austin |
VA | Actual | $595,570 | 3 | CONSTRUCT 2650 LF OF ADA SIDEWALK, CROSSWALKS, BICYCLE & |
2293-01-023 | Hays/ Austin |
FM 2439 | Actual | $2,961,890 | ROW | ADD CENTER TURN LANE & 2 - LANE DIVIDED SECTION WITH SHOULDERS |
0646-05-036 | Henderson/ Tyler |
FM 316 | Actual | $202,057 | 8 | INSTALL RRX SIGNALS & GATES |
0864-01-065 | Hidalgo/ Pharr |
FM 494 | Actual | $787,778 | 1 | SIGNAL RETIMING & ADD LANES @ US 83 |
0777-01-012 | Hood/ Fort Worth |
FM 56 | Actual | $51,200 | 10 | 2013 RAILROAD XING REPLANKING PROGRAM |
0108-09-043 | Hopkins/ Paris |
SH 19 | Actual | $1,364,788 | 1 | SEAL COAT AND RESTRIPE FOR SUPER 2 |
1282-03-008 | Hudspeth/ El Paso |
RM 1111 | Actual | $60,160 | 10 | RAILROAD GRADE CROSSING REPLANKING |
0135-07-041 | Hunt/ Paris |
SP 302 | Actual | $1,548,174 | 3 | CONSTRUCT SIDEWALKS, INSTALL SIGNS, INSTALL PAVEMENT MARKING |
0871-01-016 | Jeff Davis/ El Paso |
RM 505 | Actual | $30,380 | 10 | RAILROAD GRADE CROSSING REPLANKING |
0482-01-033 | Jim Hogg/ Pharr |
SH 16 | Actual | $69,300 | 10 | UPGRADE RAILROAD CORSSING PLANKING |
0019-01-139 | Johnson/ Fort Worth |
SH 174 | Actual | $308,495 | 3 | INSTALLATION OF FULL TRAFFIC ACTUATED TRAFFIC SIGNAL |
0902-50-108 | Johnson/ Fort Worth |
CR | Actual | $392,476 | 6 | REPLACE BRIDGE AND APPROACHES |
0902-50-111 | Johnson/ Fort Worth |
CR | Actual | $66,695 | 8 | RAILROAD GRADE CROSSING PROGRAM FY 13 |
0902-50-112 | Johnson/ Fort Worth |
CS | Actual | $44,274 | 8 | RAILROAD GRADE CROSSING PROGRAM FY13 |
1181-03-031 | Johnson/ Fort Worth |
FM 917 | Actual | $48,128 | 10 | 2013 RAILROAD XING REPLANKING PROGRAM |
0270-07-029 | Karnes/ Corpus Christi |
SH 72 | Actual | $16,740,119 | 1 | REHAB AND ADD PASSING LANES |
2588-01-014 | Kaufman/ Dallas |
FM 548 | Actual | $54,144 | 10 | RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0950-02-012 | King/ Childress |
FM 193 | Actual | $727,864 | 6 | UPGRADE BRIDGE RAILING AND APPROACH GUARD FENCE |
0102-10-028 | Kleberg/ Corpus Christi |
FM 1898 | Actual | $42,112 | 10 | REPLANK RAILROAD CROSSING |
0017-08-085 | La Salle/ Laredo |
IH 35 | Actual | $1,898,447 | 11 | FOR THE CONSTRUCTION OF CABLE MEDIAN BARRIER |
0483-01-048 | La Salle/ Laredo |
SH 97 | Actual | $48,128 | 10 | RAILROAD REPLANKING |
0136-06-052 | Lamar/ Paris |
SH 19 | Actual | $160,000 | 10 | UPGRADE RXR CROSSING PLANKING TO CONCRETE |
0905-05-009 | Lamb/ Lubbock |
CR | Actual | $212,876 | 8 | INSTALLATION OF STOP AND WARNING SIGNS |
0913-29-043 | Lavaca/ Yoakum |
CR | Actual | $333,625 | 6 | REPLACE BRIDGE AND APPROACHES |
0813-01-096 | Liberty/ Beaumont |
FM 787 | Actual | $1,341,288 | 6 | REPLACE BRIDGE AND APPROACHES |
0920-02-088 | Liberty/ Beaumont |
CR | Actual | $183,611 | 8 | UPGRADE RAILROAD SIGNAL |
1421-01-024 | Liberty/ Beaumont |
FM 1413 | Actual | $2,173,548 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH (WIDENING TO 28 FT.) |
0382-03-034 | Limestone/ Waco |
SH 7 | Actual | $84,224 | 10 | RAILROAD REPLANKING |
0909-40-067 | Limestone/ Waco |
CR | Actual | $297,924 | 8 | INSTALL RAILROAD SIGNAL |
0067-11-039 | Lubbock/ Lubbock |
IH 27 | Actual | $44,800 | 10 | INSTALLATION OF REPLANKS |
0067-11-040 | Lubbock/ Lubbock |
IH 27 | Actual | $44,800 | 10 | INSTALLATION OF RAILROAD PLANKS |
0905-06-084 | Lubbock/ Lubbock |
CR | Actual | $153,199 | 8 | INSTALLATION OF STOP AND WARNING SIGNS |
0905-06-085 | Lubbock/ Lubbock |
CR | Actual | $300,487 | 8 | INSTALLATION OF STOP AND WARNING SIGNS |
0917-31-026 | Madison/ Bryan |
CR | Actual | $398,259 | 8 | RAILROAD GRADE CROSSING IMPROVEMENT |
0179-04-091 | Matagorda/ Yoakum |
SH 35 | Actual | $151,200 | 10 | 2013 CRX REPLANKING PROGRAM |
0035-05-055 | Menard/ San Angelo |
US 83 | Actual | $8,121,710 | 1 | ADD PASSING LANES |
0454-03-040 | Mitchell/ Abilene |
SH 208 | Actual | $42,112 | 10 | REPLANK RAILROAD GRADE CROSSING |
0338-11-051 | Montgomery/ Houston |
LP 336 | Actual | $7,593,342 | 1 | WIDEN TO 4 LANES UNDIVIDED RURAL |
1062-03-048 | Montgomery/ Houston |
FM 1485 | Actual | $28,000 | 10 | FY 2013 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
2560-01-075 | Nacogdoches/ Lufkin |
LP 224 | Actual | $54,144 | 10 | REPLANK EXISTING RAILROAD CROSSING SURFACE |
0093-02-015 | Navarro/ Dallas |
SH 14 | Actual | $6,571,060 | 3 | REPLACE RAILROAD UNDERPASS |
0102-03-081 | Nueces/ Corpus Christi |
US 77 | Actual | $78,919,778 | 12 | CONSTRUCT MAIN LANES AND OVERPASSES |
0373-05-033 | Nueces/ Corpus Christi |
BS 44-C | Actual | $84,224 | 10 | REPLANK RAILROAD CROSSING |
0916-00-071 | Nueces/ Corpus Christi |
VA | Actual | $7,792,889 | 1 | INTERSECTION IMPROVEMENTS |
0916-00-073 | Nueces/ Corpus Christi |
VA | Actual | $1,596,653 | 1 | INTERSECTION IMPROVEMENTS |
0916-35-173 | Nueces/ Corpus Christi |
VA | Actual | $200,000 | 7 | FEASIBILITY STUDY FOR PEDESTRIAN IMPROVEMENTS |
2343-01-036 | Nueces/ Corpus Christi |
FM 2444 | Actual | $24,447,531 | 3 | CONSTRUCT ADDITIONAL LANES AND ACCESS MANAGEMENT |
0306-01-059 | Orange/ Beaumont |
SH 73 | Actual | $9,509,230 | 6 | REPAIR BRIDGE |
0919-13-016 | Panola/ Atlanta |
CR | Actual | $186,166 | 8 | INSTALL AUTOMATIC RR WARNING DEVICES |
3516-01-015 | Parker/ Fort Worth |
FM 3325 | Actual | $3,283,284 | 1 | WIDEN 2 - 12 LANES W / 8' SHOULDERS FROM FM 1886 TO WHITE |
3243-01-008 | Parmer/ Lubbock |
FM 3140 | Actual | $14,761 | 8 | INSTALLATION OF STOP AND WARNING SIGNS |
0904-11-055 | Randall/ Amarillo |
CS | Actual | $18,003 | 8 | 2013 FED RAILROAD SIGNAL PROGRAM |
1014-03-049 | Rockwall/ Dallas |
FM 740 | Actual | $12,967,453 | 3 | WIDEN 2 LANE TO 4 LANE DIVIDED URBAN |
1091-04-019 | Rockwall/ Dallas |
FM 740 | Actual | $1,049,079 | 3 | CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS AND INSTALL SCHOOL |
0910-42-037 | Rusk/ Tyler |
CR | Actual | $275,163 | 8 | INSTALL RRX SIGNALS & GATES |
0910-42-038 | Rusk/ Tyler |
CR | Actual | $243,596 | 8 | INSTALL RRX SIGNALS & GATES |
0916-28-058 | San Patricio/ Corpus Christi |
CS | Actual | $504,397 | 3 | CONSTRUCT 8, 000 LINEAR FT OF SIDEWALK NEAR SINTON ELEMENTARY |
2521-01-015 | San Patricio/ Corpus Christi |
FM 1068 | Actual | $1,251,857 | 8 | WIDEN ROADWAY |
0053-09-072 | Scurry/ Abilene |
US 84 | Actual | $2,709,930 | 6 | REPLACE BRIDGE & APPROACHES |
1195-01-029 | Shelby/ Lufkin |
FM 947 | Actual | $28,000 | 10 | REPLANK EXISTING RAILROAD CROSSING SURFACE |
0904-40-022 | Sherman/ Amarillo |
VA | Actual | $284,542 | 8 | 2013 FED RAILROAD SIGNAL PROGRAM |
0754-06-020 | Swisher/ Lubbock |
FM 145 | Actual | $100,800 | 10 | INSTALLATION OF RAILROAD PLANKS |
0364-06-011 | Tarrant/ Fort Worth |
SH 26 | Actual | $1,549,097 | 3 | GRAPEVINE LINKS HIKE AND BIKE TRAIL CONNECTION |
0718-02-065 | Tarrant/ Fort Worth |
FM 156 | Actual | $403,358 | 1 | CONSTRUCT RIGHT TURN LANE - SB SIDE ONLY |
0902-00-134 | Tarrant/ Fort Worth |
VA | Actual | $422,317 | 1 | NO TRUCKS LEFT LANE SIGN STRUCTURES TO IMPLEMENT |
0902-48-186 | Tarrant/ Fort Worth |
CS | Actual | $801,806 | 3 | INTERSECTION IMPROVEMENTS |
0902-48-539 | Tarrant/ Fort Worth |
CS | Actual | $10,487,665 | 12 | REPLACE BRIDGE |
0902-48-711 | Tarrant/ Fort Worth |
VA | Actual | $792,000 | 3 | DRAINAGE IMPROVEMENTS |
0902-48-848 | Tarrant/ Fort Worth |
CS | Actual | $167,815 | 8 | RAILROAD GRADE CROSSING PROGRAM FY13 |
0902-48-857 | Tarrant/ Fort Worth |
CS | Actual | $215,988 | 8 | 2013 FSP PROGRAM |
0902-48-858 | Tarrant/ Fort Worth |
VA | Actual | $3,014,716 | 3 | CONDUCT PLANNING STUDIES FOR REGION'S GOODS MOVEMENT PROGRAM |
0902-48-859 | Tarrant/ Fort Worth |
VA | Actual | $1,625,100 | 3 | IMPLE INIT / REG PROJ TRACK, MONITOR, ASSESS, & SOFTWARE DEVELOP |
1068-03-021 | Tarrant/ Fort Worth |
SS 341 | Actual | $124,998 | 3 | LANDSCAPE ENHANCEMENT IN WHITE SETTLEMENT |
1330-01-065 | Tarrant/ Fort Worth |
BF1187C | Actual | $67,200 | 10 | 2013 RAILROAD XING REPLANKING PROGRAM |
1330-01-066 | Tarrant/ Fort Worth |
FM 1187 | Actual | $25,600 | 10 | 2013 RAILROAD XING REPLANKING PROGRAM |
2079-01-041 | Tarrant/ Fort Worth |
FM 1220 | Actual | $5,878,133 | 1 | CONSTRUCT LEFT TURN BAYS, 10'SHLDERS, EXTEND CULVERTS, REPAIR |
0006-18-054 | Taylor/ Abilene |
BI 20-R | Actual | $1,242,845 | 3 | LANDSCAPING, SIDEWALKS, CURB AND GUTTER, ILLUMINATION, AND |
0699-03-017 | Taylor/ Abilene |
FM 613 | Actual | $2,058,773 | 8 | REHAB & WIDEN |
0908-33-092 | Taylor/ Abilene |
CR | Actual | $172,121 | 8 | UPGRADE / INSTALL RR XING PROTECTION |
0227-09-016 | Terry/ Lubbock |
US 385 | Actual | $57,600 | 10 | INSTALL RAILROAD PLANKS |
0380-04-022 | Terry/ Lubbock |
SH 137 | Actual | $108,800 | 10 | INSTALLATION OF REPLANKS |
0879-02-009 | Terry/ Lubbock |
FM 213 | Actual | $64,000 | 10 | INSTALLATION OF REPALNKS ON RAILROADS |
0010-09-007 | Titus/ Atlanta |
SP 185 | Actual | $25,600 | 10 | RAILROAD REPLANKING |
0264-06-040 | Tom Green/ San Angelo |
US 277 | Actual | $57,600 | 10 | REPLANK RAILROAD CROSSING |
0015-10-061 | Travis/ Austin |
IH 35 | Actual | $238,426 | 10 | LANDSCAPING AND IRRIGATION |
0015-13-362 | Travis/ Austin |
IH 35 | Actual | $2,412,039 | 3 | CONSTRUCT NB COLLECTOR - DISTRIBUTOR |
0015-13-375 | Travis/ Austin |
IH 35 | Actual | $140,036 | 10 | LANDSCAPING & IRRIGATION |
0015-13-376 | Travis/ Austin |
IH 35 | Actual | $184,835 | 10 | LANDSCAPING & IRRIGATION |
0114-02-096 | Travis/ Austin |
US 290 | Actual | $2,844,477 | ROW | EXTENSION OF GREGG MANOR ROAD AND RECONFIGURE SIGNALS |
0700-03-123 | Travis/ Austin |
SH 71 | Actual | $8,246,005 | ROW | ADD LEFT TURN LANE & SHOULDERS |
0914-00-337 | Travis/ Austin |
VA | Actual | $959,586 | 7 | DTA MODELING |
0914-00-357 | Travis/ Austin |
VA | Actual | $3,607,000 | 3 | ADVANCED TRAFFIC MANAGEMENT SYSTEM |
0914-00-361 | Travis/ Austin |
VA | Actual | $2,704,750 | 3 | HERO PROGRAM |
0914-00-363 | Travis/ Austin |
VA | Actual | $4,181,429 | 3 | FREIGHT RAIL BYPASS STUDY FOR LONE STAR RAIL DISTRICT TO |
0914-00-364 | Travis/ Austin |
VA | Actual | $5,818,771 | 3 | FREIGHT RAIL BYPASS STUDY FOR LONE STAR RAIL DISTRICT TO |
0914-00-374 | Travis/ Austin |
VA | Actual | $583,871 | 1 | IMPROVE TRAFFIC SIGNALS_ (SH 16, SH 29, RM 2244, RM 152 ETC.) |
0914-04-242 | Travis/ Austin |
CS | Actual | $6,599,215 | 3 | DESIGN AND CONST UPGRADE OF EXISTING 2 LANE RURAL ROADWAY |
1200-06-007 | Travis/ Austin |
SH 45 | Actual | $540,497 | 1 | INSTALL LTL & PAVED SHOULDERS |
3277-01-013 | Travis/ Austin |
FM 3177 | Actual | $3,616,127 | 1 | REALIGN RDWY |
0911-40-026 | Trinity/ Lufkin |
VA | Actual | $939,181 | 3 | CONSTRUCT SIDEWALKS AND RAMPS TO IMPROVE PEDESTRIAN ELEMENTS |
0023-05-083 | Uvalde/ San Antonio |
US 90 | Actual | $48,128 | 10 | REPLACE CROSSING SURFACE AT RAILROAD CROSSING |
0915-20-016 | Uvalde/ San Antonio |
CR | Actual | $150,000 | 8 | INSTALL RAILROAD WARNING SIGNS AND PAVEMENT MARKINGS TO |
0089-19-009 | Victoria/ Yoakum |
BU 59-T | Actual | $204,613 | 3 | ADD TURN LANE |
0913-27-053 | Victoria/ Yoakum |
CR | Actual | $208,593 | 6 | REPLACE BRIDGE AND APPROACHES |
0913-27-066 | Victoria/ Yoakum |
CS | Actual | $150,000 | 8 | 2013 FEDERAL SIGNAL PROGRAM |
0913-27-067 | Victoria/ Yoakum |
CS | Actual | $150,000 | 8 | 2013 FEDERAL SIGNAL PROGRAM |
0913-27-068 | Victoria/ Yoakum |
CS | Actual | $150,000 | 8 | 2013 FEDERAL SIGNAL PROGRAM |
0913-27-069 | Victoria/ Yoakum |
CR | Actual | $215,772 | 8 | 2013 FEDERAL SIGNAL PROGRAM |
0912-56-051 | Waller/ Houston |
CR | Actual | $150,000 | 8 | FY 2013 RR SIGNAL & WARNING DEVICES (UPRR DOT# 743 130Y) |
0354-02-025 | Ward/ Odessa |
SH 115 | Actual | $30,080 | 10 | RR GRADE CROSSING REPLANKING AT DOT# 796 265B |
0018-06-171 | Webb/ Laredo |
IH 35 | Actual | $1,824,452 | 11 | INSTALL DUAL LEFT TURN LANES |
0922-00-054 | Webb/ Laredo |
VA | Actual | $578,206 | 11 | METAL BEAM GUARD FENCE AND SGT UPGRADE |
0922-33-091 | Webb/ Laredo |
CR | Actual | $476,271 | 6 | FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING |
0922-33-135 | Webb/ Laredo |
CS | Actual | $4,937,713 | 3 | NEW LOCATION NON - FREEWAY ROAD |
0802-02-065 | Wichita/ Wichita Falls |
FM 369 | Actual | $37,800 | 10 | REPLANK EXISTING RAILROAD CROSSING |
0903-03-107 | Wichita/ Wichita Falls |
CR | Actual | $292,159 | 8 | 2013 FEDERAL SIGNAL PROGRAM |
2582-01-020 | Wichita/ Wichita Falls |
FM 890 | Actual | $46,400 | 10 | REPLANK EXISTING RAILROAD CROSSING |
0151-05-097 | Williamson/ Austin |
US 183 | Actual | $529,532 | 3 | CONSTRUCT DECELERATION LANE |
0151-05-102 | Williamson/ Austin |
US 183 | Actual | $1,908,325 | 3 | MANAGED LANES STUDY |
0151-05-103 | Williamson/ Austin |
US 183 | Actual | $344,399 | 3 | ADD RTL & DUAL LTL LANES |
0914-05-161 | Williamson/ Austin |
VA | Actual | $1,972,744 | 3 | CONST TRAIL |
0914-05-175 | Williamson/ Austin |
CS | Actual | $3,876,529 | 3 | WIDEN, ADD LTLS, SIDEWALKS & LIGHTING |
1202-01-016 | Williamson/ Austin |
FM 972 | Actual | $535,693 | 6 | REPLACE BRIDGE AND APPROACHES |
1378-02-039 | Williamson/ Austin |
RM 1431 | Actual | $3,965,955 | 3 | INNOVATIVE INTERSECTION IMPROVEMENTS |
1378-02-044 | Williamson/ Austin |
RM 1431 | Actual | $121,900 | 10 | 2013 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0013-08-127 | Wise/ Fort Worth |
US 81 | Actual | $12,119,453 | 1 | BU 81 (SOUTH) 4 LANE OVERPASS @ US81 / 287 |
1098-01-020 | Wise/ Fort Worth |
FM 718 | Actual | $4,598,916 | 1 | WIDEN ROADWAY TO 2 - 12' LANES WITH 6' SHOULDERS |
1179-01-039 | Wise/ Fort Worth |
FM 920 | Actual | $5,559,331 | 1 | REHABILITATE AND WIDEN ROADWAY WITH SHOULDERS |
|