CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0047-06-133 US 75 Approved MAY 2015 $42,886,705 3 WIDEN D - C FROM PGBT TO NB US 75 & SB US 75 TO PGBT; EXT DART
0135-11-018 US 380 Actual NOV 2014 $57,978,706 3 WIDEN 4 TO 6 LANES DIVIDED, ADD NEW 4 / 6 LANE ACCESS ROADS AT
0135-12-029 FM 3537 Approved JUN 2015 $800,000 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND
0549-03-025 SH 121 Approved JUN 2015 $16,000,000 8 CONSTRUCTION OF SH 160 GRADE SEPARATION
0549-03-027 SH 121 Approved MAY 2015 $38,276,053 3 WIDEN TWO LANE RURAL HIGHWAY TO FOUR LANE DIVIDED ROADWAY
0619-01-023 FM 6 Approved JUN 2015 $2,513,499 6 REPLACE BRIDGE AND APPROACHES
0918-24-177 CS Actual OCT 2014 $633,000 3 REDESIGN CROSSWALK AND TRAFFIC CALMING DEVICES
0918-24-203 VA Tentative AUG 2015 $250,000 3 ON STREET BICYCLE FACILITIES;SIGNAGE;MARKINGS
0918-24-204 CS Tentative AUG 2015 $903,895 3 12' WIDE CONCRETE TRAIL; DRAINAGE FEATURES; RETAINING WALLS;
1392-01-040 FM 1378 Actual DEC 2014 $2,696,579 8 BASE REPAIR AND OVERLAY
2056-01-048 FM 2551 Actual OCT 2014 $373,100 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND
2351-01-020 FM 2478 Tentative AUG 2015 $7,265,146 3 WIDEN FOUR LANE DIVIDED URBAN ROADWAY TO SIX LANES
2461-01-008 FM 2170 Tentative AUG 2015 $359,140 3 INTERSECTION IMPROVEMENTS
2679-03-010 FM 2514 Actual MAR 2015 $6,339,339 3 REALIGN HIGHWAY FROM FM 1378 SOUTHEAST TO NEAR LAVON PARKWAY
3392-01-008 FM 2786 Actual DEC 2014 $15,799,703 3 WIDEN 2 TO 4 LANE DIVIDED (SIX LANE ULTIMATE) WITH

Dallas County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0009-02-045 SH 78 Actual FEB 2015 $7,779,617 5 9 INTERSECTION IMPROVEMENTS
0009-02-063 SH 78 Actual MAR 2015 $2,560,389 1 MILL, CONCRETE FULL DEPTH REPAIR, OVERLAY & PAVEMENT MARKINGS
0048-01-061 SH 342 Actual FEB 2015 $842,515 1 REHABILITATION OF TRAFFIC SIGNALS
0091-06-058 SH 289 Approved APR 2015 $2,235,938 1 MILL, CONCRETE FULL DEPTH REPAIR, OVERLAY & PAVEMENT MARKINGS
0092-02-123 SH 310 Approved MAY 2015 $4,021,782 6 PAINTING OF BRIDGE AND CONCRETE STRUCTURE REPAIR
0095-02-114 US 80 Approved APR 2015 $872,066 8 INSTALL PROTECTION
0095-10-053 US 80 Actual DEC 2014 $1,322,288 1 CONCRETE FULL DEPTH REPAIR ON JUGHANDLES AND FRONTAGE ROADS
0196-03-270 IH 35E Tentative AUG 2015 $200,000 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING & IRRIGATION
0197-02-108 US 175 Actual SEP 2014 $96,431,455 ROW EXTEND US 175;RECONSTRUCT INTERCHANGE WITH SM WRIGHT / SH
0353-04-098 SS 348 Approved APR 2015 $519,741 1 FULL DEPTH REPAIR CONCRETE PAVEMENT
0353-05-082 SL 12 Approved MAY 2015 $5,942,316 8 INTERSECTION IMPROVEMENTS
0581-01-140 SL 12 Actual OCT 2014 $268,951 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SCHRUB PLANTING
0581-02-141 SL 12 Actual MAR 2015 $2,761,595 1 FULL DEPTH REPAIR CONCRETE PAVEMENT AND OVERLAY ON FRONTAGE
0918-00-183 VA Tentative JUL 2015 $300,000 1 REFURBISH ITS EQUIPMENT
0918-00-208 VA Tentative JUL 2015 $300,000 7 CONDUCT STATED PREFERENCE SURVEY TO ASSESS POTENTIAL
0918-00-211 VA Tentative JUL 2015 $450,000 7 DEPARTMENTAL STREAMLINING POLICIES AND PROCEDURES
0918-00-213 NR Actual FEB 2015 $3,300,000 7 PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY
0918-00-214 VA Tentative JUL 2015 $2,108,648 7 REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN
0918-00-231 VA Tentative AUG 2015 $1,500,000 5 FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2015 FUNDING;
0918-00-237 VA Tentative AUG 2015 $625,000 5 NCTCOG - - 511 TRAVELER INFORMATION SYSTEM; DEVELOP 511 SYSTEM
0918-00-249 VA Tentative AUG 2015 $5,280,000 5 PURCHASE OF TRANSIT VEHICLES, BUSES, TO EXPAND SERVICE
0918-00-252 VA Actual JAN 2015 $3,590,680 3 ON - SYSTEM FRONTAGE ROAD SIGNAL IMPROVEMENTS FOR INCIDENT
0918-00-253 VA Actual JAN 2015 $1,612,120 3 OFF - SYSTEM FRONTAGE ROAD SIGNAL IMPROVEMENTS FOR INCIDENT
0918-00-255 VA Tentative AUG 2015 $500,000 5 REGIONAL IMPLEMENTATION OF INNOVATIVE EMISSIONS REDUCTION
0918-00-256 VA Approved JUL 2015 $500,000 5 ALTERNATIVE FUEL VEHICLE DEPLOYMENT INITIATIVES; INCL.INCENT
0918-00-257 VA Approved JUL 2015 $500,000 5 IDLE - FREE SCHOOL ZONES; EDUCATION STRATEGIES AND
0918-45-791 CS Approved JUN 2015 $726,528 6 REHAB BRIDGE AND APPROACHES
0918-47-062 CS Approved JUN 2015 $558,447 6 REPLACE BRIDGE AND APPROACHES
0918-47-073 CS Tentative AUG 2015 $380,000 3 CONSTRUCT HIKE AND BIKE TRAIL
0918-47-076 VA Tentative AUG 2015 $22,382,585 3 DFW INTERNATIONAL AIRPORT LIGHT RAIL TRANSIT CONNECTION
0918-47-086 CS Tentative AUG 2015 $15,000,000 3 PH 2 - COLORADO / BECKLEY TO ZANG / DAVIS; CONSTRUCT DALLAS CBD
0918-47-087 CS Tentative AUG 2015 $7,872,531 3 PH 3 - UNION STATION / HOUSTON ST TO YOUNG / INWOOD @ CONVENTION
0918-47-088 VA Tentative AUG 2015 $8,000,000 3 RAIL VEHICLE PURCHASE
0918-47-092 VA Tentative AUG 2015 $210,485 3 CBD SIGNAGE & WAYFINDING
0918-47-097 CS Tentative AUG 2015 $1,187,500 3 HIKE AND BIKE TRAIL, 12' SIDEPATH, TRAILHEADS, LANDSCAPING
0918-47-098 CS Tentative AUG 2015 $6,112,133 3 BICYCLE AND PEDESTRIAN TRAIL WITH AMENITIES;LANDSCAPING;
0918-47-099 CS Tentative AUG 2015 $2,760,000 3 BIKE AND PEDESTRAIN FACILITY; CONCRETE TRAIL; LIGHTING AND
0918-47-100 VA Actual MAR 2015 $3,464,886 10 CONSTRUCT CURB RAMPS ALONG IH 20, IH 45, SL 12, SL 310,
0918-47-101 CS Approved JUL 2015 $535,333 8 INSTALL TRAFFIC SIGNAL
0918-47-102 CS Approved APR 2015 $137,805 3 INSTALL LED FLASHING CHEVRONS AND HIGH FRICTION SURFACE
0918-47-134 CS Tentative AUG 2015 $7,060,000 3 WIDEN 2 LANE TO 4 LANE DIVIDED URBAN
2374-01-172 IH 635 Approved APR 2015 $3,723,601 5 ITS INSTALLATION
2374-01-176 IH 635 Actual FEB 2015 $6,763,281 5 CONVERT HOV LANES TO EXPRESS LANES
2374-03-077 IH 20 Approved JUN 2015 $6,743,958 7 CONSTRUCT FRONTAGE ROADS AND RAMPS CONNECTING IH 20

Denton County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0081-04-040 US 377 Approved JUL 2015 $290,000 10 LANDSCAPE DEVELOPMENT TO INLCUDE TREE AND SHRUB PLANTING AND
0081-06-037 US 377 Approved MAY 2015 $1,107,255 1 TRAFFIC SIGNAL IMPROVEMENTS
0081-13-051 IH 35W Actual NOV 2014 $375,631 1 INSTALL GUIDE SIGNS
0135-10-053 US 377 Actual SEP 2014 $256,066 1 TRAFFIC SIGNAL INSTALLATION
0353-02-063 SH 114 Actual FEB 2015 $30,580,029 3 CONSTRUCT INTERCHANGE
0619-05-036 FM 544 Actual SEP 2014 $35,390,958 7 REPLACE BRIDGE AND APPROACHES
0718-01-064 FM 156 Tentative AUG 2015 $27,585,692 3 WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN CROSS SECTION
0918-46-259 CS Actual OCT 2014 $1,328,511 3 CONSTRUCT BIKE TRAIL WITHIN RAIL ROW CONNECTING HEBRON,
0918-46-269 PW Approved APR 2015 $1,660,956 10 REHABILITATE PARK ROADS, PARKING LOTS AND CAMPSITE PULLOUTS
0918-46-271 CS Tentative AUG 2015 $1,795,204 3 BICYCLE AND PEDESTRIAN FACILITY; CONCRETE TRAIL; BRIDGE; ADA
0918-46-273 CS Tentative AUG 2015 $1,677,021 3 BICYCLE AND PEDESTRIAN FACILITY; PEDESTRIAN BRIDGE; CONCRETE
1315-01-025 FM 1385 Actual SEP 2014 $9,063,184 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1785-01-035 FM 407 Approved JUL 2015 $600,000 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING & IRRIGATION
1950-01-036 FM 407 Actual FEB 2015 $1,063,701 1 FULL - DEPTH CONCRETE PAVEMENT REPAIR AND PAVEMENT MARKINGS
2681-01-022 FM 2499 Approved MAY 2015 $517,337 3 LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING & IRRIGATION

Ellis County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0048-03-087 US 77 Actual DEC 2014 $268,750 1 REHABILITATION OF TRAFFIC SIGNALS
0048-04-079 IH 35E Tentative AUG 2015 138,003,608 1 RECONSTRUCT AND WIDEN FROM 4 LANES TO 6 LANES
0092-03-048 IH 45 Approved MAY 2015 $826,477 1 INSTALL GUIDE SIGNS
0568-01-046 SH 34 Actual JAN 2015 $199,164 1 TEXTURE SHOULDERS AND CENTER LINE TEXTURING
0596-02-037 FM 66 Approved JUN 2015 $1,806,039 6 REPLACE BRIDGE AND APPROACHES
0596-02-038 FM 66 Actual SEP 2014 $1,798,062 6 REPLACE BRIDGE AND APPROACHES
0596-02-039 FM 66 Approved JUN 2015 $1,766,512 6 REPLACE BRIDGES AND APPROACHES
0596-02-042 FM 66 Approved JUL 2015 $1,603,700 8 ADD LEFT TURN LANE
0596-02-043 FM 66 Approved JUL 2015 $3,226,181 1 WIDEN, SAFETY TREAT FIXED OBJECTS AND CENTERLINE TEXTURING
0918-22-086 CR Approved APR 2015 $918,204 6 REPLACE BRIDGE AND APPROACHES
0918-22-141 CR Approved JUN 2015 $826,626 6 REPLACE BRIDGE AND APPROACHES
0918-22-152 CS Tentative AUG 2015 $510,531 3 BIKE AND PEDESTRIAN TRAIL; 10'WIDE TRAIL; WITH 2'SHOULDERS
1051-01-042 FM 664 Actual MAR 2015 $11,142,221 1 REPAIR, ADD SAFETY SHOULDERS AND RESURFACE ROADWAY
1051-02-017 FM 876 Actual FEB 2015 $1,721,378 6 REPLACE BRIDGE AND APPROACHES
1159-01-022 FM 875 Approved JUN 2015 $3,008,670 6 REPLACE BRIDGE AND APPROACHES
1159-02-032 FM 879 Approved JUN 2015 $4,766,904 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1211-01-018 FM 984 Actual JAN 2015 $2,333,447 6 REPLACE BRIDGE AND APPROACHES
1451-01-020 FM 55 Approved MAY 2015 $2,049,975 6 REPLACE BRIDGES AND APPROACHES
1451-01-023 FM 55 Actual MAR 2015 $4,975,102 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1451-01-025 FM 55 Tentative AUG 2015 $1,355,422 6 REPLACE BRIDGE AND APPROACHES

Kaufman County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0095-11-008 FM 688 Approved APR 2015 $882,894 1 SPOT BASE REPAIR, MILLING, OVERLAY AND PAVEMENT MARKING.
0095-14-023 IH 20 Actual SEP 2014 $10,697,870 1 INSIDE AND OUTSIDE SHOULDERS AND RAMPS
0173-04-047 SH 34 Approved JUN 2015 $2,154,768 1 REHABILITATION OF EXISTING FOUR LANE DIVIDED ROADWAY
0173-05-037 SH 34 Approved APR 2015 $1,325,658 1 TEXTURIZE SHOULDERS WITH PROFILE PAVEMENT MARKERS,
0173-10-001 SH 34 Approved MAY 2015 $800,000 3 INSTALL CONTINUOUS ILLUMINATION ON EXISTING HIGHWAY
0197-04-078 US 175 Actual MAR 2015 $278,867 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING & IRRIGATION
0197-08-007 SH 243 Approved JUL 2015 $2,321,811 1 MILLING, BASE REPAIR, OVERLAY, AND PAVEMENT MARKINGS
0495-01-060 SS 557 Actual FEB 2015 $6,239,596 3 CONSTRUCT PHASE 1 (4 - LANES) OF ULTIMATE 8 LANE BRIDGE PLUS
0697-03-027 FM 429 Actual DEC 2014 $207,203 8 TEXTURIZE SHOULDERS (PROFILE PAVEMENT MARKERS) , CENTERLINE
0918-11-085 CS Tentative AUG 2015 $400,000 3 PEDESTRIAN FACILITIES AND AMENITIES; CONSTRUCT SIDEWALK
0918-11-086 CS Tentative AUG 2015 $488,625 3 PEDESTRIAN FACILITY; MULITLEVEL SIDEWALK; ACCESSIBLE CURBS
1092-01-017 FM 741 Actual FEB 2015 $4,550,316 1 PROVIDE ADDITIONAL PAVEMENT SURFACE AND OVERLAY
1397-01-030 FM 1836 Tentative AUG 2015 $6,947,498 1 REHABILITATION OF EXISTING ROADWAY
1494-02-008 FM 1565 Actual JAN 2015 $1,652,146 1 PROVIDE ADDITIONAL PAVEMENT SURFACE AND OVERLAY
2512-03-007 FM 2728 Actual SEP 2014 $4,288,102 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
2588-01-015 FM 548 Actual NOV 2014 $204,935 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING AND
3146-01-006 FM 148 Approved JUL 2015 $1,372,725 1 REHABILITATE EXISTING ROADWAY AND ADD SHOULDERS

Navarro County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0092-06-101 IH 45 Approved JUL 2015 $90,545,000 1 WIDEN FREEWAY FROM 4 TO 6 LANES
0093-01-098 IH 45 Approved JUL 2015 $88,861,700 1 WIDEN FREEWAY FROM 4 TO 6 LANES
0122-01-039 US 287 Approved MAY 2015 $4,357,871 1 WIDEN PAVEMENT FROM 42' TO 57' AND CONSTRUCT LEFT TURN LANE
0162-04-055 SH 31 Actual DEC 2014 $4,312,719 1 FULL DEPTH CONCRETE REPAIR, LEVEL - UP AND OVERLAY
0162-11-001 SH 31 Approved JUL 2015 $95,597,736 1 CONSTRUCT NEW LOCATION RELIEF ROUTE; ULTIMATE FOUR LANE

Rockwall County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0009-12-072 IH 30 Actual SEP 2014 $30,192,588 3 RECONSTRUCT INTERCHANGE AT FM 3549 INCLUDING FRONTAGE ROADS
0009-12-209 IH 30 Actual NOV 2014 $190,692 8 INSTALLATION OF SAFETY LIGHTING
1015-01-022 FM 3549 Actual FEB 2015 $2,576,275 1 REHABILITATE EXISTING ROADWAY
1015-01-025 FM 549 Approved JUN 2015 $5,648,909 8 PROVIDE ADDITIONAL PAVEMENT SURFACE AND OVERLAY


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract