Letting Schedule for July, 2015 (FY 2015)

Last Update: Tuesday, September 29, 2015
July, 2015 (FY 2015) (see Links)
SEP 2014 | OCT 2014 | NOV 2014 | DEC 2014 | JAN 2015 | FEB 2015 | MAR 2015 | APR 2015 | MAY 2015 | JUN 2015 | JUL 2015 | AUG 2015
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0911-00-074 Angelina/
Lufkin
VA Actual $1,038,186 10 CONSTRUCT CURB RAMPS IN SAN AUGUSTINE AND SHELBY COUNTIES
1410-01-024 Austin/
Yoakum
FM 1456 Actual $24,000 10 CRX RR GRADE CROSSING REPLANKING
0471-05-039 Bastrop/
Austin
SH 21 Actual $790,877 8 INSTALL CONTINUOUS TURN LANE
0447-03-039 Bee/
Corpus Christi
SH 202 Actual $8,641,470 1 SPOT BASE REPAIR AND OVERLAY
0836-03-061 Bell/
Waco
FM 439 Actual $28,000 10 RAILROAD REPLANKING
0072-07-066 Bexar/
San Antonio
IH 10 Actual $31,159,120 ROW CONSTRUCT GRADE SEPARATION AT OLD FREDRICKSBURG, RECONFIGURE
2255-03-006 Bexar/
San Antonio
FM 327 Actual $24,064 10 REPLANKING AT FM 327 AND UPRR DOT 764280P
0218-02-045 Bowie/
Atlanta
IH 369 Actual $433,802 6 DECK CRACK SEAL
2436-01-028 Brown/
Brownwood
FM 2525 Actual $16,000 10 REPLANKING
0700-05-007 Burnet/
Austin
SS 191 Actual $785,220 6 REPLACE BRIDGE AND APPROACHES
2206-01-015 Burnet/
Austin
RM 2341 Actual $3,547,717 8 SATETY TREATMENTS, ADD PAVE WIDTH
0153-01-012 Caldwell/
Austin
US 183 Actual $54,144 10 REPLACE CONCRETE GRADE CROSSING
0039-07-247 Cameron/
Pharr
IH 69E Actual $81,000 10 UPGRADE RAILROAD CROSSING PLANKING
0331-01-041 Cameron/
Pharr
SH 100 Actual $1,139,116 1 OVERLAY
0630-02-041 Cameron/
Pharr
FM 106 Actual $12,406,043 6 BRIDGE REHABILITATION
2965-01-010 Cameron/
Pharr
FM 2893 Actual $42,112 10 UPGRADE RAILROAD CROSSING
0218-04-114 Cass/
Atlanta
US 59 Actual $755,933 6 REPLACE BRIDGE AND APPROACH RAILING
0919-00-071 Cass/
Atlanta
VA Actual $781,005 1 2015 DISTRICT SEAL COAT PAVEMENT MARKINGS
1571-01-016 Cass/
Atlanta
FM 74 Actual $30,080 10 RAILROAD REPLANKING
0508-02-112 Chambers/
Beaumont
IH 10 Actual $1,813,850 1 RELOCATE EASTBOUND EXIT RAMP MOVING IT TO THE WEST
1233-01-013 Childress/
Childress
FM 1033 Actual $48,000 10 RR REPLANKING
0091-09-015 Collin/
Dallas
BS 289C Actual $32,000 10 RAILROAD GRADE CROSSING REPLANKING
0619-03-059 Collin/
Dallas
FM 544 Actual $172,800 10 RAILROAD GRADE CROSSING REPLANKING
3205-02-022 Colorado/
Yoakum
FM 3013 Actual $40,608 10 CRX RR GRADE CROSSING REPLANKING
0918-47-092 Dallas/
Dallas
VA Actual $184,082 3 CBD SIGNAGE & WAYFINDING
0918-47-101 Dallas/
Dallas
CS Actual $802,955 3 INSTALL TRAFFIC SIGNAL
0081-04-040 Denton/
Dallas
US 377 Actual $323,544 10 LANDSCAPE DEVELOPMENT TO INLCUDE TREE AND SHRUB PLANTING AND
1785-01-035 Denton/
Dallas
FM 407 Actual $498,172 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING & IRRIGATION
0359-03-026 Dewitt/
Yoakum
SH 119 Actual $5,170,039 8 SAFETY TREAT FIXED OBJECTS, WIDEN PAVEMENT SHOULDER
1270-01-026 Dimmit/
Laredo
FM 1019 Actual $3,036,840 1 REHABILITATION OF EXISTING ROAD
0542-04-031 Duval/
Laredo
US 59 Actual $8,814,671 1 REHABILITATION OF EXISTING HIGHWAY
0906-00-169 Ector/
Odessa
VA Actual $3,256,207 1 TRAFFIC SIGNAL
2224-01-093 Ector/
Odessa
SL 338 Actual $3,581,787 1 REHABILITATION OF EXISTING ROAD
0002-14-042 El Paso/
El Paso
FM 258 Actual $457,012 6 REPLACE STRUCTURE
0924-00-081 El Paso/
El Paso
VA Actual $1,472,226 1 FY 2015 STRIPING PROJECT
0924-06-311 El Paso/
El Paso
CS Actual $15,520,544 3 BUILD 2 - LANES UNDIVIDED W / GRADE SEPERATED OVERPASS
0568-01-049 Ellis/
Dallas
SH 34 Actual $30,080 10 RAILROAD GRADE CROSSING REPLANKING
0596-02-042 Ellis/
Dallas
FM 66 Actual $2,085,056 8 ADD LEFT TURN LANE
0596-02-043 Ellis/
Dallas
FM 66 Actual $4,255,416 1 WIDEN, SAFETY TREAT FIXED OBJECTS AND CENTERLINE TEXTURING
1051-01-050 Ellis/
Dallas
FM 664 Actual $36,000 10 RAILROAD GRADE CROSSING REPLANKING
2945-01-009 Fannin/
Paris
FM 409 Actual $6,204,246 1 REHAB
0192-04-104 Galveston/
Houston
SH 6 Actual $3,198,544 1 BASE REPAIR, SEAL COAT AND 1.5 IN PFC ACP O / L
0912-73-182 Galveston/
Houston
CS Actual $2,020,484 3 SCARIFY OR MILL 2 INCH OF EXISTING PAVEMENT AND PLACE 2 INCH
0912-73-185 Galveston/
Houston
VA Actual $625,000 3 PREVENTATIVE MAINTENANCE IN CITY OF GALVESTON (YEAR 2)
0912-73-203 Galveston/
Houston
VA Actual $1,529,400 10 RENOVATION OF GALVESTON - BOLIVAR FERRY MAINTENANCE BUILDING
0045-19-050 Grayson/
Paris
US 82 Actual $12,500,127 4 CONSTRUCT MAIN LANES OF A 4 - LANE SECTION WITH DEPRESSED
0910-07-066 Gregg/
Tyler
VA Actual $389,221 11 PLANT TREES & / OR SHRUBS ON STATE ROW
2458-01-013 Grimes/
Bryan
FM 379 Actual $30,080 10 RAILROAD GRADE CROSSING REPLANKING, 2015 REPLANKING PROGRAM
2710-01-017 Guadalupe/
San Antonio
FM 725 Actual $48,128 10 REPLANKING AT FM 725 AND UPRR DOT 7426543
3107-02-034 Guadalupe/
San Antonio
FM 3009 Actual $3,240,270 1 CONSTRUCT SIDEWALKS
0028-02-091 Harris/
Houston
US 90 Actual $1,983,175 1 LANDSCAPE DEVELOPMENT
0271-14-232 Harris/
Houston
IH 610 Actual $828,677 10 LANDSCAPE DEVELOPMENT
0912-00-488 Harris/
Houston
VA Actual $1,394,257 3 UPGRADE CONTROLLER COMMUNICATIONS HARDWARE, INSTALL WIRELESS
0912-72-289 Harris/
Houston
CS Actual $2,336,637 3 CONSTRUCTING A PEDESTRIAN BRIDGE AT BRINGHURST STREET IN
0912-72-312 Harris/
Houston
CS Actual $2,576,940 3 TRANSIT ACCESS IMPROVEMENTS AND PEDESTRIAN ENHANCEMENTS
0912-72-331 Harris/
Houston
VA Actual $5,663,625 3 DESIGN AND CONST NEW SIDEWALKS TO ENHANCE PEDESTRIAN SAFETY,
2941-02-050 Harris/
Houston
FM 2920 Actual $2,999,794 1 BASE REPAIR, MILL, CRACK SEAL, 1.0 INCH THIN OVERLAY MIX,
3256-01-106 Harris/
Houston
SL 8 Actual $875,731 10 LANDSCAPE DEVELOPMENT
0062-07-086 Harrison/
Atlanta
US 59 Actual $5,747,430 1 RECONSTRUCT INTERSECTION WITH CONCRETE PAVING
0683-05-012 Hays/
Austin
RM 12 Actual $1,059,478 1 CONSTRUCT 1 TO 4FT PAVED SHOULDERS & INSTALL CONTINUOUS TURN
2985-01-015 Hemphill/
Amarillo
RM 2758 Actual $48,000 10 2015 CRX REPLANKING PROGRAM DOT #014515D
0039-02-040 Hidalgo/
Pharr
US 83 Actual $87,222,198 1 CONSTRUCT NEW 4 LANE DIVIDED RURAL HIGHWAY FACILITY
0039-04-123 Hidalgo/
Pharr
BU 83-S Actual $2,750,348 6 CONCRETE OVERLAY & REPLACE RAIL
1803-02-028 Hidalgo/
Pharr
FM 1925 Actual $2,891,653 2M WIDEN TO 4 LANE DIVIDED URBAN
0121-02-058 Hill/
Waco
SH 22 Actual $54,144 10 RAILROAD REPLANKING
0121-03-054 Hill/
Waco
SH 22 Actual $6,520,301 ROW WIDEN FROM TWO LANE TO FOUR LANE WITH LEFT TURN LANE
0909-37-060 Hill/
Waco
CR Actual $535,345 6 REPLACE BRIDGE AND APPROACHES
0108-09-047 Hopkins/
Paris
SH 19 Actual $1,584,000 10 UPGRADE RXR CROSSING PLANKING
0117-07-040 Houston/
Lufkin
SH 21 Actual $11,462,865 1 RECONSTRUCT PAVEMENT AND ADD PASSING LANES
0002-07-046 Hudspeth/
El Paso
IH 10 Actual $727,181 6 BRIDGE MAINTENANCE - WB
0374-05-025 Hudspeth/
El Paso
US 62 Actual $3,121,216 1 ADD PASSING LANES
1282-02-018 Hudspeth/
El Paso
RM 1111 Actual $1,291,694 6 REPLACE STRUCTURE
1623-02-018 Hutchinson/
Amarillo
FM 1551 Actual $84,000 10 2015 CRX REPLANKING PROGRAM DOT #016983E
0077-02-031 Irion/
San Angelo
US 67 Actual $30,896,540 1 ADD PASSING LANES
0346-01-037 Jackson/
Yoakum
SH 111 Actual $100,800 10 CRX RR GRADE CROSSING REPLANKING
0420-02-046 Jackson/
Yoakum
SH 172 Actual $36,096 10 CRX RR GRADE CROSSING REPLANKING
0667-02-109 Jefferson/
Beaumont
FM 366 Actual $129,600 10 REPLANK RR CROSSING
0667-02-110 Jefferson/
Beaumont
FM 366 Actual $288,000 10 RAILROAD GRADE CROSSING REPLANKING
0739-02-155 Jefferson/
Beaumont
IH 10 Actual $29,990,330 2U RECONSTRUCT INTERCHANGE
1088-01-022 Jim Wells/
Corpus Christi
FM 70 Actual $4,764,524 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0080-05-029 Johnson/
Fort Worth
US 377 Actual $120,000 10 2015 RAILROAD XING REPLANKING PROGRAM
0017-08-097 La Salle/
Laredo
IH 35 Actual $30,080 10 RR REPLANKING
0017-08-098 La Salle/
Laredo
IH 35 Actual $30,080 10 RR REPLANKING
0483-01-046 La Salle/
Laredo
SH 97 Actual $2,157,787 1 CONCRETE INTERSECTION
0852-02-012 La Salle/
Laredo
FM 469 Actual $30,080 10 RR REPLANKING
0922-20-017 La Salle/
Laredo
VA Actual $2,001,776 11 REPLACE BRIDGE AND APPROACH RAIL OR ADD SAFETY END TREATMENT
1545-02-021 La Salle/
Laredo
FM 468 Actual $9,571,742 1 REHABILITATION OF EXISITNG HIGHWAY
2022-02-019 La Salle/
Laredo
SH 44 Actual $30,080 10 RR REPLANKING
0688-02-058 Lamar/
Paris
FM 79 Actual $60,000 10 UPGRADE RXR CROSSING PLANKING TO CONCRETE
0901-29-065 Lamar/
Paris
CR Actual $656,785 6 REPLACE BRIDGE AND APPROACHES
0114-07-075 Lee/
Austin
US 290 Actual $4,110,150 8 INSTALL CONTINUOUS TURN LANE AND CONSTRUCT PAVED SHOULDERS
0388-03-079 Liberty/
Beaumont
SH 146 Actual $156,416 10 RAILROAD GRADE CROSSING REPLANKING
0052-11-005 Lubbock/
Lubbock
SL 388 Actual $16,000 10 RAILROAD GRADE CROSSING REPLANKING PROGRAM
0905-00-086 Lubbock/
Lubbock
VA Actual $880,616 11 REHABILITATION OF EXISTING ROAD
0675-05-082 Madison/
Bryan
IH 45 Actual $3,642,171 1 UPGRADING OF A FREEWAY FACILITY CONSISTING OF GRADING,
0913-21-045 Matagorda/
Yoakum
CR Actual $333,384 6 REPLACE BRIDGE AND APPROACHES
0567-05-019 McLennan/
Waco
FM 107 Actual $60,000 10 RAILROAD REPLANKING
0906-32-049 Midland/
Odessa
CS Actual $6,205,048 3 WIDEN NON - FREEWAY
1081-01-017 Midland/
Odessa
FM 715 Actual $315,584 8 CURB AND GUTTER, SEALCOAT, PAVEMENT MARKING,
0185-03-029 Milam/
Bryan
US 190 Actual $117,702 8 MISCELLANEOUS CONSTRUCTION CONSISTING OF BASE, GRADING,
0092-06-101 Navarro/
Dallas
IH 45 Actual $58,762,184 1 WIDEN FREEWAY FROM 4 TO 6 LANES
0093-01-098 Navarro/
Dallas
IH 45 Actual $71,994,840 1 WIDEN FREEWAY FROM 4 TO 6 LANES
0102-01-106 Nueces/
Corpus Christi
SH 44 Actual $16,390,153 1 CONSTRUCT OVERPASS AT FM 3386 - MCKINZIE RD.
0916-00-066 Nueces/
Corpus Christi
VA Actual $839,270 3 PRELIMINARY ENGINEERING & ENVIRONMENTAL STUDY
0916-35-172 Nueces/
Corpus Christi
VA Actual $24,208,830 3 CONSTRUCT RAILROAD TRACK ALONG JOE FULTON CORRIDOR
1558-03-028 Nueces/
Corpus Christi
FM 70 Actual $722,831 6 REPLACE BRIDGE AND APPROACHES
1558-03-035 Nueces/
Corpus Christi
FM 70 Actual $2,830,324 8 ADD PASSING LANES
0063-11-058 Panola/
Atlanta
US 79 Actual $64,000 10 RAILROAD REPLANKING
0247-01-054 Panola/
Atlanta
BU 79-G Actual $72,000 10 RAILROAD REPLANKING
0902-38-075 Parker/
Fort Worth
CS Actual $7,269,141 3 INTERSEC.IMPROVE. AT LAKESHORE DR, US 180, & IH 20 FR RD;CONS.
0076-01-025 Pecos/
Odessa
US 67 Actual $381,100 6 BRIDGE MAINTENANCE
0140-17-018 Pecos/
Odessa
BI 10G Actual $204,000 10 INSTALL RR CROSSING REPLANKING FOR CROSSING DOT# 018977H
0911-04-059 Polk/
Lufkin
CR Actual $1,215,874 6 REPLACE BRIDGE AND APPROACHES
0275-01-166 Potter/
Amarillo
IH 40 Actual $26,403,959 1 RELOCATE ENTRANCE AND EXIT RAMPS, MISC CONSTRUCTION
0798-01-026 Roberts/
Amarillo
FM 282 Actual $60,000 10 2015 CRX REPLANKING PROGRAM DOT #014531M
0049-07-062 Robertson/
Bryan
US 79 Actual $72,192 10 RAILROAD GRADE CROSSING REPLANKING, 2015 REPLANKING PROGRAM
1651-02-022 Runnels/
San Angelo
FM 1692 Actual $324,000 10 REPLANK RAILROAD CROSSING
0064-11-014 Sabine/
Lufkin
FM 1 Actual $3,634,869 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0087-03-030 San Patricio/
Corpus Christi
SH 359 Actual $4,114,175 8 ADD PASSING LANES
0180-06-096 San Patricio/
Corpus Christi
SH 35 Actual $36,096 10 REPLANK RAILROAD CROSSING_ON EAST FRONTAGE ROAD
0738-04-015 San Patricio/
Corpus Christi
FM 3284 Actual $48,128 10 REPLANK RAILROAD CROSSING
0039-01-087 Starr/
Pharr
US 83 Actual $270,000 10 UPGRADE RAILROAD PLANKING
0013-10-070 Tarrant/
Fort Worth
BU 287P Actual $823,423 1 INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL AND
0353-03-095 Tarrant/
Fort Worth
SH 114 Actual $410,000 10 TREE PLANTING ALONG CORRIDOR
0016-01-114 Travis/
Austin
IH 35 Actual $630,022 10 LANDSCAPING AND IRRIGATION
0114-02-100 Travis/
Austin
US 290 Actual $834,000 10 LANDSCAPING AND IRRIGATION
0440-06-014 Travis/
Austin
SH 130 Actual $642,322 10 LANDSCAPING AND IRRIGATION
0380-11-023 Upton/
Odessa
SH 349 Actual $9,077,499 1 SUPER - 2 HIGHWAY
0018-06-168 Webb/
Laredo
IH 35 Actual $210,473 8 IMPROVE TRAFFIC SIGNAL ON FRONTAGE ROAD
0037-09-030 Webb/
Laredo
US 83 Actual $335,122 8 TEXTURING SHOULDERS AND CENTERLINE
0266-06-046 Wharton/
Yoakum
SH 71 Actual $122,400 10 CRX RR GRADE CROSSING REPLANKING
0266-13-015 Wharton/
Yoakum
FM 653 Actual $72,000 10 CRX RR GRADE CROSSING REPLANKING
0030-09-047 Wheeler/
Childress
US 83 Actual $9,018,908 1 WIDENING OF A NON FREEWAY FACILITY
0489-01-020 Wheeler/
Childress
FM 48 Actual $5,491,234 1 WIDENING & OVERLAY
3203-01-009 Wichita/
Wichita Falls
FM 3429 Actual $81,000 10 REPLANK EXISTING RAILROAD CROSSING
0313-01-057 Wise/
Fort Worth
FM 51 Actual $30,080 10 2015 RAILROAD XING REPLANKING PROGRAM
1310-03-027 Wise/
Fort Worth
FM 2264 Actual $16,000 10 2015 RAILROAD XING REPLANKING PROGRAM
3454-01-013 Wise/
Fort Worth
FM 3259 Actual $36,096 10 2015 RAILROAD XING REPLANKING PROGRAM
1937-02-026 Zavala/
Laredo
FM 2691 Actual $3,007,204 1 RESTORATION AND ADD SHOULDERS


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract