Detail Letting Schedule for Webb County (FY 2015)
Webb County (FY 2015) |
CCSJ: 0018-04-051 | |||
District: | Laredo | Let Date: | FEB 2015 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | NH 2015(577) | CSJ: | 0017-08-092 |
Description: | RESURFACE OF EXISTING HIGHWAY | Handling Code: |
|
Limits From: | 8.5 MI SOUTH OF FRIO CL (NBML) | Fund Cat: | 1 |
Limits To: | FRIO COUNTY LINE (NBML) | Estimate: | $2,088,039 |
Length: | 8.5 Miles | Actual: | $1,734,373 |
District: | Laredo | Let Date: | FEB 2015 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | NH 2015(577) | CSJ: | 0018-03-050 |
Description: | RECONSTRUCTION OF AN EXISTING HIGHWAY | Handling Code: |
|
Limits From: | 1.546 MI NORTH OF CALLAGHAN(SBML) | Fund Cat: | 1 |
Limits To: | 8.161 MI N OF CALLAGHAN INTG (SBML) | Estimate: | $4,163,866 |
Length: | 6.6 Miles | Actual: | $3,345,162 |
District: | Laredo | Let Date: | FEB 2015 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | NH 2015(577) | CSJ: | 0018-04-051 |
Description: | RESURFACE OF EXISTING HIGHWAY | Handling Code: |
|
Limits From: | 1.1 MI NORTH OF US 83 (NBML) | Fund Cat: | 1 |
Limits To: | 8.25 MILES NORTH OF US 83 (NBML) | Estimate: | $2,677,168 |
Length: | 7.2 Miles | Actual: | $1,609,141 |
Back... |
Totals for 0018-04-051 | ||
---|---|---|---|
Length: | 22.3 Miles | ||
Estimate: | $8,929,073 | ||
Actual: | $6,688,676 | ||
CCSJ: 0018-06-168 | |||
District: | Laredo | Let Date: | JUL 2015 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 1502(517)HES | CSJ: | 0018-06-168 |
Description: | IMPROVE TRAFFIC SIGNAL ON FRONTAGE ROAD | Handling Code: |
|
Limits From: | @ US 59 INTERSECTION | Fund Cat: | 8 |
Limits To: | . | Estimate: | $97,344 |
Length: | 0.0 Miles | Actual: | $97,502 |
District: | Laredo | Let Date: | JUL 2015 |
Highway: | FM 1433 | Let Status: | Actual |
Project ID: | STP 1502(519)HES | CSJ: | 1424-02-014 |
Description: | INSTALL ADVANCE WARNING SIGNALS & SIGNS | Handling Code: |
|
Limits From: | 2.75 MILES NORTH OF US 83 | Fund Cat: | 8 |
Limits To: | 1.974 MILES NORTH OF US 83 | Estimate: | $15,037 |
Length: | 0.8 Miles | Actual: | $19,910 |
District: | Laredo | Let Date: | JUL 2015 |
Highway: | FM 1472 | Let Status: | Actual |
Project ID: | STP 1502(518)HES | CSJ: | 2150-04-057 |
Description: | IMPROVE TRAFFIC SIGNAL, INTERCONNECT SIGNALS, INSTALL OVER | Handling Code: |
|
Limits From: | @ SL 20 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $87,829 |
Length: | 0.0 Miles | Actual: | $93,061 |
Back... |
Totals for 0018-06-168 | ||
Length: | 0.8 Miles | ||
Estimate: | $200,210 | ||
Actual: | $210,473 | ||
CCSJ: 0037-09-030 | |||
District: | Laredo | Let Date: | JUL 2015 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2015(210)HESG | CSJ: | 0023-04-062 |
Description: | TEXTURING SHOULDERS AND CENTERLINE | Handling Code: |
|
Limits From: | 14.2 MI W OF UVALDE COUNTY LINE | Fund Cat: | 8 |
Limits To: | UVALDE COUNTY LINE | Estimate: | $98,963 |
Length: | 14.2 Miles | Actual: | $92,055 |
District: | Laredo | Let Date: | JUL 2015 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 2015(211)HESG | CSJ: | 0037-09-030 |
Description: | TEXTURING SHOULDERS AND CENTERLINE | Handling Code: |
|
Limits From: | DIMMIT COUNTY LINE | Fund Cat: | 8 |
Limits To: | SH 44 INTERSECTION | Estimate: | $157,938 |
Length: | 13.0 Miles | Actual: | $128,996 |
District: | Laredo | Let Date: | JUL 2015 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 2015(212)HESG | CSJ: | 0037-09-031 |
Description: | TEXTURING SHOULDERS AND CENTERLINE | Handling Code: |
|
Limits From: | SH 44 | Fund Cat: | 8 |
Limits To: | 3.442 MILES SOUTH OF SH 44 | Estimate: | $25,743 |
Length: | 3.4 Miles | Actual: | $21,614 |
District: | Laredo | Let Date: | JUL 2015 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 2015(213)HESG | CSJ: | 0037-10-034 |
Description: | TEXTURING SHOULDERS AND CENTERLINE | Handling Code: |
|
Limits From: | 3.442 MILES SOUTH OF SH 44 | Fund Cat: | 8 |
Limits To: | IH 35 | Estimate: | $112,862 |
Length: | 16.4 Miles | Actual: | $92,457 |
Back... |
Totals for 0037-09-030 | ||
Length: | 47.0 Miles | ||
Estimate: | $395,506 | ||
Actual: | $335,122 | ||
CCSJ: 0086-01-077 | |||
District: | Laredo | Let Date: | DEC 2014 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2015(203)HES | CSJ: | 0022-10-060 |
Description: | IMPROVE TRAFFIC SIGNALS INTERCONECT SIGNALS | Handling Code: |
|
Limits From: | KINGS WAY | Fund Cat: | 8 |
Limits To: | VETERANS/GIBBS INTERSECTION | Estimate: | $146,850 |
Length: | 3.0 Miles | Actual: | $31,955 |
District: | Laredo | Let Date: | DEC 2014 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2015(204)HES | CSJ: | 0023-01-086 |
Description: | IMPROVE TRAFFIC SIGNALS INTERCONECT SIGNALS | Handling Code: |
|
Limits From: | VETERANS/GIBBS INTERSECTION | Fund Cat: | 8 |
Limits To: | DE LA ROSA | Estimate: | $46,140 |
Length: | 1.4 Miles | Actual: | $12,081 |
District: | Laredo | Let Date: | DEC 2014 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 2015(205)HES | CSJ: | 0037-06-092 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | US 277 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $68,934 |
Length: | 0.1 Miles | Actual: | $76,542 |
District: | Laredo | Let Date: | DEC 2014 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 2015(206)HES | CSJ: | 0038-01-076 |
Description: | IMPROVE TRAFFIC SIGNALS INTERCONNECT SIGNALS | Handling Code: |
|
Limits From: | PALO BLANCO | Fund Cat: | 8 |
Limits To: | SH 359 | Estimate: | $80,055 |
Length: | 2.2 Miles | Actual: | $21,965 |
District: | Laredo | Let Date: | DEC 2014 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 2015(207)HES | CSJ: | 0038-01-077 |
Description: | IMPROVE TRAFFIC SIGNALS INTERCONNECT SIGNALS | Handling Code: |
|
Limits From: | CIELITO LINDO | Fund Cat: | 8 |
Limits To: | PALO BLANCO | Estimate: | $130,470 |
Length: | 3.0 Miles | Actual: | $51,204 |
District: | Laredo | Let Date: | DEC 2014 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 2015(208)HES | CSJ: | 0086-01-077 |
Description: | IMPROVE TRAFFIC SIGNALS INTERCONNECT SIGNALS | Handling Code: |
|
Limits From: | IH 35 | Fund Cat: | 8 |
Limits To: | SH 359 | Estimate: | $212,530 |
Length: | 2.1 Miles | Actual: | $112,317 |
District: | Laredo | Let Date: | DEC 2014 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | STP 2015(209)HES | CSJ: | 0542-01-079 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: |
|
Limits From: | IH 35 | Fund Cat: | 8 |
Limits To: | ARKANSAS | Estimate: | $120,000 |
Length: | 2.1 Miles | Actual: | $31,805 |
Back... |
Totals for 0086-01-077 | ||
Length: | 13.9 Miles | ||
Estimate: | $804,979 | ||
Actual: | $337,869 | ||
CCSJ: 0086-14-061 | |||
District: | Laredo | Let Date: | AUG 2015 |
Highway: | SL 20 | Let Status: | Actual |
Project ID: | STP 1502(617)MM | CSJ: | 0086-14-061 |
Description: | WIDEN OF EXISTING BRIDGE | Handling Code: |
|
Limits From: | SH 359 | Fund Cat: | 11 |
Limits To: | SPUR 400 | Estimate: | $8,834,808 |
Length: | 1.3 Miles | Actual: | $8,812,315 |
District: | Laredo | Let Date: | AUG 2015 |
Highway: | SL 20 | Let Status: | Actual |
Project ID: | NH 1502(616) | CSJ: | 0086-14-062 |
Description: | NEW NON FREEWAY FRONTAGE ROAD | Handling Code: |
|
Limits From: | 1.09 MI S OF SPUR 400 (MARIA LUISA) | Fund Cat: | 1 |
Limits To: | SPUR 400 | Estimate: | $17,434,555 |
Length: | 1.1 Miles | Actual: | $16,728,742 |
Back... |
Totals for 0086-14-061 | ||
Length: | 2.4 Miles | ||
Estimate: | $26,269,363 | ||
Actual: | $25,541,057 | ||
CCSJ: 0237-03-032 | |||
District: | Laredo | Let Date: | MAY 2015 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | NH 1502(156) | CSJ: | 0038-01-081 |
Description: | RESURFACE OF EXISTING HIGHWAY | Handling Code: |
|
Limits From: | CIELITO-LINDO BLVD. (NB) | Fund Cat: | 1 |
Limits To: | ESPEJO MOLINA ROAD (NB) | Estimate: | $1,839,362 |
Length: | 5.0 Miles | Actual: | $1,724,883 |
District: | Laredo | Let Date: | MAY 2015 |
Highway: | SH 44 | Let Status: | Actual |
Project ID: | STP 2015(215)HESG | CSJ: | 0237-02-017 |
Description: | TEXTURING SHOULDERS AND CENTERLINE | Handling Code: |
|
Limits From: | IH 35 | Fund Cat: | 8 |
Limits To: | WEBB/LASALLE E COUNTY LINE | Estimate: | $11,095 |
Length: | 3.4 Miles | Actual: | $11,400 |
District: | Laredo | Let Date: | MAY 2015 |
Highway: | SH 44 | Let Status: | Actual |
Project ID: | STP 2015(216)HESG | CSJ: | 0237-03-029 |
Description: | TEXTURING SHOULDERS AND CENTERLINE | Handling Code: |
|
Limits From: | LA SALLE COUNTY LINE SOUTH | Fund Cat: | 8 |
Limits To: | DUVAL COUNTY LINE | Estimate: | $137,895 |
Length: | 29.7 Miles | Actual: | $81,000 |
District: | Laredo | Let Date: | MAY 2015 |
Highway: | SH 44 | Let Status: | Actual |
Project ID: | STP 1502(157) | CSJ: | 0237-03-032 |
Description: | REHABILITATION OF EXISTING HIGHWAY | Handling Code: |
|
Limits From: | 13.947 MILES EAST OF LA SALLE CL | Fund Cat: | 1 |
Limits To: | DUVAL COUNTY LINE | Estimate: | $6,685,930 |
Length: | 15.7 Miles | Actual: | $5,892,816 |
District: | Laredo | Let Date: | MAY 2015 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 1502(157) | CSJ: | 0517-04-055 |
Description: | RESTORATION OF EXISTING HIGHWAY | Handling Code: |
|
Limits From: | DUVAL/MCMULLEN COUNTY LINE | Fund Cat: | 1 |
Limits To: | 0.308 MI NORTH OF US 59 / SH 44 | Estimate: | $3,687,398 |
Length: | 12.2 Miles | Actual: | $4,563,663 |
Back... |
Totals for 0237-03-032 | ||
Length: | 66.0 Miles | ||
Estimate: | $12,361,680 | ||
Actual: | $12,273,762 | ||
CCSJ: 0922-33-113 | |||
District: | Laredo | Let Date: | AUG 2015 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 1502(352) | CSJ: | 0922-33-113 |
Description: | FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING | Handling Code: |
|
Limits From: | ON LINCOLN RD AT BECERRA CREEK | Fund Cat: | 6 |
Limits To: | 17.60 MI N OF US 59 | Estimate: | $488,459 |
Length: | 0.5 Miles | Actual: | $492,063 |
District: | Laredo | Let Date: | AUG 2015 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 1502(522) | CSJ: | 0922-33-155 |
Description: | FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING | Handling Code: |
|
Limits From: | AT MINES ROAD AT ESPADA CREEK BRNHS | Fund Cat: | 6 |
Limits To: | . | Estimate: | $448,399 |
Length: | 0.0 Miles | Actual: | $363,531 |
Back... |
Totals for 0922-33-113 | ||
Length: | 0.5 Miles | ||
Estimate: | $936,858 | ||
Actual: | $855,594 | ||
CCSJ: 2150-04-060 | |||
District: | Laredo | Let Date: | MAY 2015 |
Highway: | FM 1472 | Let Status: | Actual |
Project ID: | STP 1502(158)HES | CSJ: | 2150-04-060 |
Description: | INSTALL RAISED MEDIAN | Handling Code: |
|
Limits From: | KILLAM INDUSTRIAL BLVD | Fund Cat: | 8 |
Limits To: | PELLEGRINO | Estimate: | $142,538 |
Length: | 0.3 Miles | Actual: | $137,712 |
Back... |
Totals for 2150-04-060 | ||
Length: | 0.3 Miles | ||
Estimate: | $142,538 | ||
Actual: | $137,712 | ||
CCSJ: 2150-04-061 | |||
District: | Laredo | Let Date: | MAY 2015 |
Highway: | FM 1472 | Let Status: | Actual |
Project ID: | STP 1502(159) | CSJ: | 2150-04-061 |
Description: | CONCRETE PAVEMENT | Handling Code: |
|
Limits From: | MULLER MEMORIAL BLVD (SB) | Fund Cat: | 1 |
Limits To: | PAN AMERICAN BLVD(SB) | Estimate: | $1,780,590 |
Length: | 0.8 Miles | Actual: | $1,965,359 |
District: | Laredo | Let Date: | MAY 2015 |
Highway: | FM 1472 | Let Status: | Actual |
Project ID: | NH 1502(160) | CSJ: | 2150-04-063 |
Description: | CONCRETE PAVEMENT | Handling Code: |
|
Limits From: | TRADE CENTER BLVD (SB) | Fund Cat: | 1 |
Limits To: | INTERAMERICA BLVD | Estimate: | $1,536,244 |
Length: | 1.3 Miles | Actual: | $1,680,316 |
Back... |
Totals for 2150-04-061 | ||
Length: | 2.1 Miles | ||
Estimate: | $3,316,834 | ||
Actual: | $3,645,675 | ||
CCSJ: 2150-04-062 | |||
District: | Laredo | Let Date: | JAN 2015 |
Highway: | BI 35-C | Let Status: | Actual |
Project ID: | STP 2015(499) | CSJ: | 0017-17-010 |
Description: | RESURFACE OF EXISTING HIGHWAY | Handling Code: |
|
Limits From: | IH35/BI35 INT (NORTH) | Fund Cat: | 1 |
Limits To: | NORTHEND NUECES RIVER BR | Estimate: | $1,656,770 |
Length: | 1.9 Miles | Actual: | $1,242,510 |
District: | Laredo | Let Date: | JAN 2015 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | NH 2015(497) | CSJ: | 0018-05-083 |
Description: | RESURFACE OF EXISTING HIGHWAY | Handling Code: |
|
Limits From: | 1.356 MI S OF CARRIERS DR (WFR) | Fund Cat: | 1 |
Limits To: | 0.019 MI S OF UNIROYAL DR (WFR) | Estimate: | $833,416 |
Length: | 1.9 Miles | Actual: | $657,340 |
District: | Laredo | Let Date: | JAN 2015 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | NH 2015(497) | CSJ: | 0018-06-176 |
Description: | RESURFACE OF EXISTING HIGHWAY | Handling Code: |
|
Limits From: | 0.42 MI NORTH OF SL20/IH35 (WFR) | Fund Cat: | 1 |
Limits To: | 0.779 MI N.OF TRES EQUIS BR (WFR) | Estimate: | $1,027,611 |
Length: | 1.6 Miles | Actual: | $831,940 |
District: | Laredo | Let Date: | JAN 2015 |
Highway: | BI 35-C | Let Status: | Actual |
Project ID: | STP 2015(499) | CSJ: | 0018-09-009 |
Description: | RESURFACE OF EXISTING HIGHWAY | Handling Code: |
|
Limits From: | SOUTHEND NUECES RIVER BR/COTULLA CL | Fund Cat: | 1 |
Limits To: | IH35/BI35 INT (SOUTH) | Estimate: | $164,218 |
Length: | 1.0 Miles | Actual: | $139,792 |
District: | Laredo | Let Date: | JAN 2015 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | NH 2015(497) | CSJ: | 0038-01-080 |
Description: | RESURFACE OF EXISTING HIGHWAY | Handling Code: |
|
Limits From: | CHACON CREEK BRIDGE (SB) | Fund Cat: | 1 |
Limits To: | PALO BLANCO STREET (SB) | Estimate: | $811,417 |
Length: | 1.5 Miles | Actual: | $767,681 |
District: | Laredo | Let Date: | JAN 2015 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2015(497) | CSJ: | 0237-05-038 |
Description: | RESURFACE OF EXISTING HIGHWAY | Handling Code: |
|
Limits From: | SH 16 | Fund Cat: | 1 |
Limits To: | 0.510 MILE EAST OF SH 16 | Estimate: | $357,126 |
Length: | 0.5 Miles | Actual: | $394,674 |
District: | Laredo | Let Date: | JAN 2015 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2015(497) | CSJ: | 0542-03-034 |
Description: | RESURFACE OF EXISTING HIGHWAY | Handling Code: |
|
Limits From: | SH 16 | Fund Cat: | 1 |
Limits To: | 0.316 MI W OF SH 16 | Estimate: | $193,439 |
Length: | 0.3 Miles | Actual: | $186,011 |
District: | Laredo | Let Date: | JAN 2015 |
Highway: | FM 1472 | Let Status: | Actual |
Project ID: | NH 2015(497) | CSJ: | 2150-03-024 |
Description: | RESURFACE OF EXISTING HIGHWAY | Handling Code: |
|
Limits From: | SH 255 (NB) | Fund Cat: | 1 |
Limits To: | 1.321 MI SOUTH OF SH 255 (NB) | Estimate: | $434,467 |
Length: | 1.3 Miles | Actual: | $418,503 |
District: | Laredo | Let Date: | JAN 2015 |
Highway: | FM 1472 | Let Status: | Actual |
Project ID: | NH 2015(497) | CSJ: | 2150-04-062 |
Description: | RESURFACE OF EXISTING HIGHWAY | Handling Code: |
|
Limits From: | 1.321 MI SOUTH OF SH 255 (NB) | Fund Cat: | 1 |
Limits To: | 0.226 MI N OF PAN AMERICAN BLVD(NB) | Estimate: | $5,146,792 |
Length: | 12.7 Miles | Actual: | $4,312,356 |
Back... |
Totals for 2150-04-062 | ||
Length: | 22.7 Miles | ||
Estimate: | $10,625,256 | ||
Actual: | $8,950,807 |
|