Detail Letting Schedule for Bexar County (FY 2018)
Bexar County (FY 2018) |
CCSJ: 0016-08-036 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | SL 368 | Let Status: | Actual |
Project ID: | NH 1802(611) | CSJ: | 0016-08-036 |
Description: | INTERSECTION OPERATIONAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT N. NEW BRAUNFELS INTERSECTION | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,157,510 |
Length: | 0.2 | Actual | $1,081,603 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | SL 368 | Let Status: | Actual |
Project ID: | ROW 16-8-40 | CSJ: | 0016-08-040 |
Description: | ROW UTILITY ADJUSTMENTS | Handling Code: | |
Limits From: | AT N. NEW BRAUNFELS INTERSECTION | Fund Cat: | ROW |
Limits To: | . | ESTIMATE: | $386,251 |
Length: | 0.2 | Actual | $264,077 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Back... | Totals for 0016-08-036 | ||
---|---|---|---|
Length: | 0.4 | ||
Estimate: | $1,543,761 | ||
Actual: | $1,345,680 | ||
CCSJ: 0017-01-024 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | SL 353 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 0017-01-024 |
Description: | PROFILE EDGELINE/CENTERLINE MARKINGS | Handling Code: | |
Limits From: | PITLUK RD | Fund Cat: | 8 |
Limits To: | CASSIN RD | ESTIMATE: | $96,964 |
Length: | 2.3 | Actual | $13,175 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | US 181 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 0100-03-082 |
Description: | PROFILE EDGELINE/CENTERLINE MARKINGS | Handling Code: | |
Limits From: | BEXAR/WILSON COUNTY LINE | Fund Cat: | 8 |
Limits To: | 1.4 MI N OF SH 97 | ESTIMATE: | $250,410 |
Length: | 9.7 | Actual | $105,613 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 0143-03-048 |
Description: | MILLED CENTERLINE RUMBLE STRIPS | Handling Code: | |
Limits From: | BEXAR/WILSON COUNTY LINE | Fund Cat: | 8 |
Limits To: | CR 361 | ESTIMATE: | $6,078 |
Length: | 3.1 | Actual | $4,984 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | SH 46 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 0216-02-063 |
Description: | PROFILE EDGELINE PAVEMENT MARKINGS | Handling Code: | |
Limits From: | COMAL/GUADALUPE COUNTY LINE | Fund Cat: | 8 |
Limits To: | FM 78 | ESTIMATE: | $106,757 |
Length: | 8.8 | Actual | $52,655 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 0291-06-055 |
Description: | PROFILE EDGELINES/CENTERLINE MARKINGS | Handling Code: | |
Limits From: | 4.218 MI E OF SH 173 | Fund Cat: | 8 |
Limits To: | 5.23 MI E OF SH 173 | ESTIMATE: | $18,662 |
Length: | 1.0 | Actual | $7,920 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | FM 99 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 0348-07-017 |
Description: | PROFILE EDGELINE/CENTERLINE MARKINGS | Handling Code: | |
Limits From: | 2.00 MI EAST OF FM 1099 | Fund Cat: | 8 |
Limits To: | FM 1099 | ESTIMATE: | $36,514 |
Length: | 2.0 | Actual | $15,925 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | SH 173 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 0421-08-035 |
Description: | PROFILE EDGELINE/CENTERLINE MARKINGS | Handling Code: | |
Limits From: | CR 241 | Fund Cat: | 8 |
Limits To: | CR 441 | ESTIMATE: | $79,373 |
Length: | 5.4 | Actual | $35,897 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | FM 3350 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 0421-09-018 |
Description: | INSTALL EDGE MARKING, PROFILE CENTERLINE MARKINGS | Handling Code: | |
Limits From: | FM 3510 | Fund Cat: | 8 |
Limits To: | FM 476 | ESTIMATE: | $16,107 |
Length: | 1.5 | Actual | $13,194 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | RM 32 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 0511-02-022 |
Description: | PROFILE EDGELINE/CENTERLINE MARKINGS | Handling Code: | |
Limits From: | BLANCO COUNTY LINE | Fund Cat: | 8 |
Limits To: | HAYS COUNTY LINE | ESTIMATE: | $277,694 |
Length: | 12.8 | Actual | $117,995 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | FM 1340 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 0829-04-033 |
Description: | PROFILE EDGELINE/CENTERLINE MARKINGS | Handling Code: | |
Limits From: | SH 41 | Fund Cat: | 8 |
Limits To: | SH 39 | ESTIMATE: | $507,808 |
Length: | 21.3 | Actual | $214,951 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | FM 476 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 0853-01-015 |
Description: | PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM 2504 | Fund Cat: | 8 |
Limits To: | FM 1333 | ESTIMATE: | $57,510 |
Length: | 3.1 | Actual | $25,093 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | FM 476 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 0853-01-016 |
Description: | PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM 1333 | Fund Cat: | 8 |
Limits To: | SH 16 | ESTIMATE: | $62,697 |
Length: | 3.3 | Actual | $27,338 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | FM 476 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 0853-02-031 |
Description: | PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS | Handling Code: | |
Limits From: | RED BARN RD | Fund Cat: | 8 |
Limits To: | YELLOWSTONE ST | ESTIMATE: | $83,843 |
Length: | 4.9 | Actual | $36,971 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | FM 306 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 0857-01-033 |
Description: | PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS | Handling Code: | |
Limits From: | RM 484 | Fund Cat: | 8 |
Limits To: | FM 3424 | ESTIMATE: | $57,080 |
Length: | 2.8 | Actual | $24,449 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | FM 536 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 1009-01-040 |
Description: | PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS | Handling Code: | |
Limits From: | CR 104 | Fund Cat: | 8 |
Limits To: | LP 181 | ESTIMATE: | $124,457 |
Length: | 5.7 | Actual | $53,712 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | FM 1303 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 1548-01-016 |
Description: | PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM 775 | Fund Cat: | 8 |
Limits To: | FM 536 | ESTIMATE: | $166,385 |
Length: | 7.2 | Actual | $70,176 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | RM 2722 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 2666-01-013 |
Description: | PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM 2673 | Fund Cat: | 8 |
Limits To: | SH 46 | ESTIMATE: | $164,228 |
Length: | 7.7 | Actual | $71,644 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | FM 306 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 3106-01-015 |
Description: | PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS | Handling Code: | |
Limits From: | US 281 | Fund Cat: | 8 |
Limits To: | RM 484 | ESTIMATE: | $190,798 |
Length: | 9.3 | Actual | $80,514 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | SH 211 | Let Status: | Actual |
Project ID: | STP 1802(612)HES | CSJ: | 3544-02-006 |
Description: | PROFILE EDGELINE/CENTERLINE MARKINGS | Handling Code: | |
Limits From: | SH 16 | Fund Cat: | 8 |
Limits To: | MEDINA COUNTY LINE | ESTIMATE: | $119,109 |
Length: | 5.5 | Actual | $50,678 |
Proposal Request List Showing Order Bid List Bid Tabulations Back... | Totals for 0017-01-024 | ||
Length: | 117.4 | ||
Estimate: | $2,422,475 | ||
Actual: | $1,022,882 | ||
CCSJ: 0017-09-098 |
|||
District: | SAN ANTONIO | Let Date: | Sep 2017 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 2018(062)HESG | CSJ: | 0017-09-098 |
Description: | INSTALL WARNING/GUIDE SIGNS-OVERHEAD ADVANCE FLASHERS & | Handling Code: | |
Limits From: | 0.3 MI S OF IH 10 | Fund Cat: | 8 |
Limits To: | 0.3 MI N OF IH 10 | ESTIMATE: | $158,893 |
Length: | 0.6 | Actual | $139,639 |
District: | SAN ANTONIO | Let Date: | Sep 2017 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | STP 2018(063)HESG | CSJ: | 0073-08-182 |
Description: | INSTALL WARNING/GUIDE SIGNS -OVERHEAD ADVANCED FLASHERS; | Handling Code: | |
Limits From: | 0.5 MI S OF IH 10 | Fund Cat: | 8 |
Limits To: | 0.4 MI N OF IH 10 | ESTIMATE: | $89,264 |
Length: | 0.9 | Actual | $99,802 |
District: | SAN ANTONIO | Let Date: | Sep 2017 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | STP 2018(064)HESG | CSJ: | 0521-06-139 |
Description: | INSTALL WARNING/GUIDE SIGNS -OVERHEAD ADVANCE FLASHERS & | Handling Code: | |
Limits From: | 0.4 MI E OF IH 37 | Fund Cat: | 8 |
Limits To: | 0.4 MI W OF IH 37 | ESTIMATE: | $79,222 |
Length: | 0.8 | Actual | $90,246 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 0017-09-098 | ||
Length: | 2.3 | ||
Estimate: | $327,379 | ||
Actual: | $329,687 | ||
CCSJ: 0017-09-104 |
|||
District: | SAN ANTONIO | Let Date: | May 2018 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | NH 2018(801) | CSJ: | 0017-09-104 |
Description: | LANDSCAPE PLANTING AND IRRIGATION | Handling Code: | |
Limits From: | 0.25 MILES S OF S ZARZAMORA ST | Fund Cat: | 10 |
Limits To: | 0.25 MILES N OF S ZARZAMORA ST | ESTIMATE: | $387,594 |
Length: | 0.5 | Actual | $482,084 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0017-09-104 | ||
Length: | 0.5 | ||
Estimate: | $387,594 | ||
Actual: | $482,084 | ||
CCSJ: 0017-10-267 |
|||
District: | SAN ANTONIO | Let Date: | Apr 2018 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | NH 2018(065) | CSJ: | 0017-10-267 |
Description: | REPAIR / REPLACE BRIDGE EXPANSION JOINTS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS ON IH 35 | Fund Cat: | 1 |
Limits To: | LAREDO ST TO 0.2 MI W OF IH 37 | ESTIMATE: | $3,401,470 |
Length: | 2.6 | Actual | $3,038,450 |
District: | SAN ANTONIO | Let Date: | Apr 2018 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2018(065) | CSJ: | 0072-12-194 |
Description: | REPAIR / REPLACE BRIDGE EXPANSION JOINTS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS ON IH 10 | Fund Cat: | 1 |
Limits To: | MULBERRY TO POPLAR ST | ESTIMATE: | $2,241,500 |
Length: | 1.8 | Actual | $1,793,200 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 0017-10-267 | ||
Length: | 4.4 | ||
Estimate: | $5,642,970 | ||
Actual: | $4,831,650 | ||
CCSJ: 0017-10-275 |
|||
District: | SAN ANTONIO | Let Date: | Jun 2018 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-10-275 | CSJ: | 0017-10-275 |
Description: | SPOT BASE REPAIR, MILL, OVERLAY AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | AUSTIN ST. | Fund Cat: | 1 |
Limits To: | CRESTWAY/RANDOLPH | ESTIMATE: | $9,183,778 |
Length: | 9.1 | Actual | $7,362,618 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0017-10-275 | ||
Length: | 9.1 | ||
Estimate: | $9,183,778 | ||
Actual: | $7,362,618 | ||
CCSJ: 0017-10-280 |
|||
District: | SAN ANTONIO | Let Date: | May 2018 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 2018(860)MM | CSJ: | 0017-10-280 |
Description: | CONSTRUCT SIDEWALKS ALONG FRONTAGE ROADS | Handling Code: | |
Limits From: | IH 37/US 281 | Fund Cat: | 1 |
Limits To: | WALTERS ST. | ESTIMATE: | $621,157 |
Length: | 1.7 | Actual | $635,284 |
District: | SAN ANTONIO | Let Date: | May 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2018(859)MM | CSJ: | 0915-12-586 |
Description: | CONSTRUCT CURB RAMPS, SIDEWALKS AND OTHER PEDESTRIAN RELATED | Handling Code: | |
Limits From: | VARIOUS LOCATIONS IN BEXAR COUNTY | Fund Cat: | 7 |
Limits To: | ON STATE SYSTEM | ESTIMATE: | $4,433,854 |
Length: | 0.0 | Actual | $3,926,557 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0017-10-280 | ||
Length: | 1.7 | ||
Estimate: | $5,055,011 | ||
Actual: | $4,561,841 | ||
CCSJ: 0017-10-286 |
|||
District: | SAN ANTONIO | Let Date: | Jul 2018 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | NH 1802(386) | CSJ: | 0017-10-286 |
Description: | LANDSCAPE PLANTING AND IRRIGATION | Handling Code: | |
Limits From: | PINE ST | Fund Cat: | 10 |
Limits To: | UNION PACIFIC RAILROAD | ESTIMATE: | $553,222 |
Length: | 1.8 | Actual | $542,994 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 0017-10-286 | ||
Length: | 1.8 | ||
Estimate: | $553,222 | ||
Actual: | $542,994 | ||
CCSJ: 0017-10-287 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 1802(438)HES | CSJ: | 0017-10-287 |
Description: | WRONG WAY DRIVER ADVANCED TECHNOLOGIES | Handling Code: | |
Limits From: | US 281 | Fund Cat: | 8 |
Limits To: | IH 410 | ESTIMATE: | $454,693 |
Length: | 8.9 | Actual | $247,299 |
Proposal Request List Showing Order Bid List Bid Tabulations Back... | Totals for 0017-10-287 | ||
Length: | 8.9 | ||
Estimate: | $454,693 | ||
Actual: | $247,299 | ||
CCSJ: 0025-02-160 |
|||
District: | SAN ANTONIO | Let Date: | May 2018 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 25-2-160 | CSJ: | 0025-02-160 |
Description: | EXPAND FROM 4 TO 6 LANE EXPRESSWAY | Handling Code: | |
Limits From: | IH 410 | Fund Cat: | 1 |
Limits To: | LOOP 1604 | ESTIMATE: | 112,476,087 |
Length: | 6.2 | Actual | 108,886,144 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0025-02-160 | ||
Length: | 6.2 | ||
Estimate: | $112,476,087 | ||
Actual: | $108,886,144 | ||
CCSJ: 0025-02-216 |
|||
District: | SAN ANTONIO | Let Date: | Jul 2018 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 25-2-216 | CSJ: | 0025-02-216 |
Description: | UPGRADE ILLUMINATION | Handling Code: | |
Limits From: | IH 35 | Fund Cat: | 1 |
Limits To: | IH 37 | ESTIMATE: | $5,420,967 |
Length: | 2.6 | Actual | $5,251,366 |
District: | SAN ANTONIO | Let Date: | Jul 2018 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | C 73-8-192 | CSJ: | 0073-08-192 |
Description: | UPGRADE ILLUMINATION | Handling Code: | |
Limits From: | FAIR AVENUE | Fund Cat: | 1 |
Limits To: | IH 35 | ESTIMATE: | $952,855 |
Length: | 4.1 | Actual | $916,543 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 0025-02-216 | ||
Length: | 6.7 | ||
Estimate: | $6,373,823 | ||
Actual: | $6,167,909 | ||
CCSJ: 0072-07-070 |
|||
District: | SAN ANTONIO | Let Date: | Jul 2018 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 1802(387) | CSJ: | 0072-07-070 |
Description: | CONSTRUCT GRADE SEPARATION AT BALCONES CREEK ROAD | Handling Code: | |
Limits From: | BEXAR/KENDALL COUNTY LINE | Fund Cat: | 1 |
Limits To: | FAIR OAKS | ESTIMATE: | $31,132,030 |
Length: | 1.8 | Actual | $33,344,173 |
District: | SAN ANTONIO | Let Date: | Jul 2018 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2018(482) | CSJ: | 0072-07-074 |
Description: | ROW UTILITIES ADJUSTMENTS | Handling Code: | |
Limits From: | BEXAR/KENDALL COUNTY LINE | Fund Cat: | ROW |
Limits To: | FAIR OAKS | ESTIMATE: | $843,570 |
Length: | 1.2 | Actual | $1,316,216 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 0072-07-070 | ||
Length: | 3 | ||
Estimate: | $31,975,600 | ||
Actual: | $34,660,389 | ||
CCSJ: 0072-12-198 |
|||
District: | SAN ANTONIO | Let Date: | May 2018 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2018(862) | CSJ: | 0072-12-198 |
Description: | INTERSECTION AND OPERATIONAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT WURZBACH ROAD | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,462,423 |
Length: | 0.3 | Actual | $1,598,613 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0072-12-198 | ||
Length: | 0.3 | ||
Estimate: | $1,462,423 | ||
Actual: | $1,598,613 | ||
CCSJ: 0073-08-193 |
|||
District: | SAN ANTONIO | Let Date: | Jun 2018 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | NH 1802(204) | CSJ: | 0073-08-193 |
Description: | LANDSCAPE PLANTING AND IRRIGATION | Handling Code: | |
Limits From: | AT E. CESAR CHAVEZ BLVD | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $99,554 |
Length: | 0.1 | Actual | $107,738 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0073-08-193 | ||
Length: | 0.1 | ||
Estimate: | $99,554 | ||
Actual: | $107,738 | ||
CCSJ: 0073-08-194 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | NH 1802(615) | CSJ: | 0073-08-194 |
Description: | LANDSCAPE PLANTING AND IRRIGATION | Handling Code: | |
Limits From: | 0.25 MILES N OF SP 122 | Fund Cat: | 10 |
Limits To: | 0.25 MILES S OF US 181 | ESTIMATE: | $999,969 |
Length: | 1.2 | Actual | $771,555 |
Proposal Request List Showing Order Bid List Bid Tabulations Back... | Totals for 0073-08-194 | ||
Length: | 1.2 | ||
Estimate: | $999,969 | ||
Actual: | $771,555 | ||
CCSJ: 0253-04-138 |
|||
District: | SAN ANTONIO | Let Date: | Jul 2018 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | NH 1802(390) | CSJ: | 0253-04-138 |
Description: | EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE RDS -4 GENERAL | Handling Code: | |
Limits From: | 0.8 MI.NORTH OF STONE OAK | Fund Cat: | 2M |
Limits To: | BEXAR / COMAL COUNTY LINE | ESTIMATE: | 177,790,871 |
Length: | 4.8 | Actual | 168,848,816 |
District: | SAN ANTONIO | Let Date: | Jul 2018 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | ROW 253-4-149 | CSJ: | 0253-04-149 |
Description: | ROW ACQUISITION, RELOCATION ASSISTANCE & UTILITY ADJUSTMENTS | Handling Code: | |
Limits From: | 0.8 MI.NORTH OF STONE OAK | Fund Cat: | ROW |
Limits To: | BEXAR / COMAL COUNTY LINE | ESTIMATE: | |
Length: | 4.8 | Actual | $9,534,676 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 0253-04-138 | ||
Length: | 9.6 | ||
Estimate: | $177,790,871 | ||
Actual: | $178,383,492 | ||
CCSJ: 0521-05-145 |
|||
District: | SAN ANTONIO | Let Date: | Feb 2018 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | NH 2018(533) | CSJ: | 0521-05-145 |
Description: | OVERLAY & PAVEMENT MARKING ON FRONTAGE ROADS | Handling Code: | |
Limits From: | 1.4 MI SOUTH OF US 90 | Fund Cat: | 1 |
Limits To: | 0.9 MI SOUTH OF FM 2536 | ESTIMATE: | $3,132,053 |
Length: | 3.7 | Actual | $2,494,814 |
List Showing Order Proposal Request Bid List Bid Tabulations Award Status Back... | Totals for 0521-05-145 | ||
Length: | 3.7 | ||
Estimate: | $3,132,053 | ||
Actual: | $2,494,814 | ||
CCSJ: 0521-06-144 |
|||
District: | SAN ANTONIO | Let Date: | May 2018 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | C 521-6-144 | CSJ: | 0521-06-144 |
Description: | HIGH MAST AND CONTINUOUS ILLUMINATION | Handling Code: | |
Limits From: | IH 37 | Fund Cat: | 1 |
Limits To: | W.W. WHITE ROAD | ESTIMATE: | $1,449,247 |
Length: | 2.0 | Actual | $1,310,013 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0521-06-144 | ||
Length: | 2 | ||
Estimate: | $1,449,247 | ||
Actual: | $1,310,013 | ||
CCSJ: 0915-00-168 |
|||
District: | SAN ANTONIO | Let Date: | May 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2018(865) | CSJ: | 0915-00-168 |
Description: | CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN ATASCOSA, | Handling Code: | |
Limits From: | VARIOUS LOCATIONS IN ATASCOSA, | Fund Cat: | 10 |
Limits To: | FRIO & MEDINA COUNTIES | ESTIMATE: | $1,413,507 |
Length: | 0.0 | Actual | $1,394,064 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0915-00-168 | ||
Length: | 0 | ||
Estimate: | $1,413,507 | ||
Actual: | $1,394,064 | ||
CCSJ: 0915-00-179 |
|||
District: | SAN ANTONIO | Let Date: | May 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2018(866) | CSJ: | 0915-00-179 |
Description: | CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN BANDERA AND | Handling Code: | |
Limits From: | VARIOUS LOCATIONS IN BANDERA | Fund Cat: | 10 |
Limits To: | AND UVALDE COUNTIES | ESTIMATE: | $1,504,865 |
Length: | 0.0 | Actual | $1,236,777 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0915-00-179 | ||
Length: | 0 | ||
Estimate: | $1,504,865 | ||
Actual: | $1,236,777 | ||
CCSJ: 0915-00-181 |
|||
District: | SAN ANTONIO | Let Date: | Feb 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2018(318) | CSJ: | 0915-00-181 |
Description: | DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2018 | Handling Code: | |
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2018 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,470,896 |
Length: | 0.0 | Actual | $1,424,652 |
List Showing Order Proposal Request Bid List Bid Tabulations Award Status Back... | Totals for 0915-00-181 | ||
Length: | 0 | ||
Estimate: | $1,470,896 | ||
Actual: | $1,424,652 | ||
CCSJ: 0915-00-182 |
|||
District: | SAN ANTONIO | Let Date: | Apr 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2018(733) | CSJ: | 0915-00-182 |
Description: | DISTRICTWIDE GUIDESIGNS FY18 | Handling Code: | |
Limits From: | DISTRICTWIDE GUIDESIGNS FY18 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,961,791 |
Length: | 0.0 | Actual | $1,921,529 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0915-00-182 | ||
Length: | 0 | ||
Estimate: | $1,961,791 | ||
Actual: | $1,921,529 | ||
CCSJ: 0915-00-199 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | VA | Let Status: | Tentative |
Project ID: | STP 1809(759) | CSJ: | 0915-00-199 |
Description: | DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 2018 | Handling Code: | XX |
Limits From: | DISTRICTWIDE ITS FY 2018 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $2,000,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-00-199 | ||
Length: | 0 | ||
Estimate: | $2,000,000 | ||
Actual: | |||
CCSJ: 0915-00-205 |
|||
District: | SAN ANTONIO | Let Date: | Apr 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2018(682) | CSJ: | 0915-00-205 |
Description: | DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2018 | Handling Code: | |
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2018 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,516,445 |
Length: | 0.0 | Actual | $1,479,469 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0915-00-205 | ||
Length: | 0 | ||
Estimate: | $1,516,445 | ||
Actual: | $1,479,469 | ||
CCSJ: 0915-00-206 |
|||
District: | SAN ANTONIO | Let Date: | Jul 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2018(899) | CSJ: | 0915-00-206 |
Description: | DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2018 | Handling Code: | |
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2018 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,547,528 |
Length: | 0.0 | Actual | $391,447 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0915-00-206 | ||
Length: | 0 | ||
Estimate: | $1,547,528 | ||
Actual: | $391,447 | ||
CCSJ: 0915-12-533 |
|||
District: | SAN ANTONIO | Let Date: | Jan 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2014(912) | CSJ: | 0915-12-533 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: | |
Limits From: | MILLER RD AT MARTINEZ CREEK | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $1,159,061 |
Length: | 0.1 | Actual | $882,312 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0915-12-533 | ||
Length: | 0.1 | ||
Estimate: | $1,159,061 | ||
Actual: | $882,312 | ||
CCSJ: 0915-12-545 |
|||
District: | SAN ANTONIO | Let Date: | Nov 2017 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1702(419)MM | CSJ: | 0915-12-545 |
Description: | RECONSTRUCT ROADWAY WITH SIDEWALKS AND BIKE LANES | Handling Code: | LC |
Limits From: | ON BINZ ENGLEMAN; FROM SPRINGFIELD | Fund Cat: | 3 |
Limits To: | 0.4 MI EAST OF ACKERMAN RD | ESTIMATE: | $2,119,072 |
Length: | 1.5 | Actual | $2,199,696 |
Back... | Totals for 0915-12-545 | ||
Length: | 1.5 | ||
Estimate: | $2,119,072 | ||
Actual: | $2,199,696 | ||
CCSJ: 0915-12-558 |
|||
District: | SAN ANTONIO | Let Date: | Oct 2017 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1702(676)TP | CSJ: | 0915-12-558 |
Description: | CONSTRUCTION OF A TWO-WAY CYCLE TRACK, PEDESTRIAN FACILITIES | Handling Code: | LC |
Limits From: | IN SAN ANTONIO ON FLOYD CURL FROM | Fund Cat: | 3 |
Limits To: | LOUIS PASTEUR TO FAWN MEADOW | ESTIMATE: | $5,816,000 |
Length: | 1.9 | Actual | $4,738,345 |
Back... | Totals for 0915-12-558 | ||
Length: | 1.9 | ||
Estimate: | $5,816,000 | ||
Actual: | $4,738,345 | ||
CCSJ: 0915-12-577 |
|||
District: | SAN ANTONIO | Let Date: | Apr 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2018(598)MM | CSJ: | 0915-12-577 |
Description: | INSTALL ITS DYNAMIC GUIDE SIGNS/DYNAMIC MESSAGE BOARDS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS ON IH 10, IH 35, | Fund Cat: | 1 |
Limits To: | IH 37, IH 410, US 90 AND US 281 | ESTIMATE: | $4,900,623 |
Length: | 0.0 | Actual | $2,897,981 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0915-12-577 | ||
Length: | 0 | ||
Estimate: | $4,900,623 | ||
Actual: | $2,897,981 | ||
CCSJ: 0915-12-583 |
|||
District: | SAN ANTONIO | Let Date: | Nov 2017 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1702(677)MM | CSJ: | 0915-12-583 |
Description: | CONSTRUCT NEW DRAINAGE STRUCTURE AND WIDEN SIDEWALKS | Handling Code: | LC |
Limits From: | IN LEON VALLEY, ON EVERS RD. | Fund Cat: | 3 |
Limits To: | FROM POSS RD. TO ALLEY-KINMAN RD. | ESTIMATE: | $1,716,000 |
Length: | 0.1 | Actual | $2,302,291 |
Back... | Totals for 0915-12-583 | ||
Length: | 0.1 | ||
Estimate: | $1,716,000 | ||
Actual: | $2,302,291 | ||
CCSJ: 1479-01-024 |
|||
District: | SAN ANTONIO | Let Date: | Jun 2018 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | STP 2018(972) | CSJ: | 1479-01-024 |
Description: | EXPAND FROM 2 LANES TO 4 LANE DIVIDED | Handling Code: | |
Limits From: | US 281 | Fund Cat: | 2M |
Limits To: | FM 1937 | ESTIMATE: | $13,699,070 |
Length: | 2.7 | Actual | $16,036,626 |
District: | SAN ANTONIO | Let Date: | Jun 2018 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | ROW 1479-1-25 | CSJ: | 1479-01-025 |
Description: | ROW UTILITY ONLY | Handling Code: | |
Limits From: | US 281 | Fund Cat: | ROW |
Limits To: | FM 1937 | ESTIMATE: | $1,952,532 |
Length: | 1.9 | Actual | $87,533 |
District: | SAN ANTONIO | Let Date: | Jun 2018 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | STP 2018(972) | CSJ: | 2255-01-083 |
Description: | EXPAND FROM 2 LANES TO 4 LANE DIVIDED | Handling Code: | |
Limits From: | FM 1937 | Fund Cat: | 2M |
Limits To: | FM 1303 | ESTIMATE: | $21,036,047 |
Length: | 5.4 | Actual | $22,262,740 |
District: | SAN ANTONIO | Let Date: | Jun 2018 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | ROW 2255-1-85 | CSJ: | 2255-01-085 |
Description: | UTILITY ONLY | Handling Code: | |
Limits From: | FM 1937 | Fund Cat: | ROW |
Limits To: | FM 1303 | ESTIMATE: | $5,257,923 |
Length: | 5.1 | Actual | $2,011,734 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 1479-01-024 | ||
Length: | 15.1 | ||
Estimate: | $41,945,572 | ||
Actual: | $40,398,632 | ||
CCSJ: 2230-01-013 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | FM 1560 | Let Status: | Actual |
Project ID: | STP 1802(618) | CSJ: | 2230-01-013 |
Description: | EXPAND FROM 2 TO 4 LANES WITH RAISED MEDIANS, BIKE LANES AND | Handling Code: | |
Limits From: | SH 16 | Fund Cat: | 1 |
Limits To: | LOOP 1604 | ESTIMATE: | $13,328,940 |
Length: | 2.1 | Actual | $13,272,869 |
District: | SAN ANTONIO | Let Date: | Aug 2018 |
Highway: | FM 1560 | Let Status: | Actual |
Project ID: | ROW 2230-1-14 | CSJ: | 2230-01-014 |
Description: | ACQUISITION & ADJUSTMENT OF UTILITIES | Handling Code: | |
Limits From: | SH 16 | Fund Cat: | ROW |
Limits To: | LOOP 1604 | ESTIMATE: | $5,888,319 |
Length: | 2.1 | Actual | $4,537,342 |
Proposal Request List Showing Order Bid List Bid Tabulations Back... | Totals for 2230-01-013 | ||
Length: | 4.2 | ||
Estimate: | $19,217,259 | ||
Actual: | $17,810,211 | ||
CCSJ: 2452-02-118 |
|||
District: | SAN ANTONIO | Let Date: | Jun 2018 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | NH 2018(868) | CSJ: | 2452-02-118 |
Description: | INTERSECTION OPERATIONAL IMPROVEMENTS- EB TO WB TURNAROUND | Handling Code: | |
Limits From: | AT FM 1535 | Fund Cat: | 2M |
Limits To: | . | ESTIMATE: | $495,314 |
Length: | 0.3 | Actual | $493,119 |
District: | SAN ANTONIO | Let Date: | Jun 2018 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | STP 2018(869)HES | CSJ: | 2452-02-120 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: | |
Limits From: | AT FM 1535 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $312,335 |
Length: | 0.2 | Actual | $313,178 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 2452-02-118 | ||
Length: | 0.5 | ||
Estimate: | $807,649 | ||
Actual: | $806,297 | ||
CCSJ: 2452-02-119 |
|||
District: | SAN ANTONIO | Let Date: | Jun 2018 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | NH 2018(870) | CSJ: | 2452-02-119 |
Description: | INTERSECTION OPERATIONAL IMPROVEMENTS- CONSTRUCT 4 | Handling Code: | |
Limits From: | BITTERS RD | Fund Cat: | 2M |
Limits To: | HUEBNER RD | ESTIMATE: | $4,875,012 |
Length: | 1.5 | Actual | $4,085,811 |
District: | SAN ANTONIO | Let Date: | Jun 2018 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | NH 2018(870) | CSJ: | 2452-03-120 |
Description: | INTERSECTION OPERATIONAL IMPROVEMENTS- EB TO WB TURNAROUND | Handling Code: | |
Limits From: | AT FM 2252 | Fund Cat: | 2M |
Limits To: | . | ESTIMATE: | $2,387,655 |
Length: | 0.1 | Actual | $2,168,184 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 2452-02-119 | ||
Length: | 1.6 | ||
Estimate: | $7,262,667 | ||
Actual: | $6,253,995 | ||
CCSJ: 2452-03-112 |
|||
District: | SAN ANTONIO | Let Date: | Jun 2018 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | NH 2018(973) | CSJ: | 2452-03-112 |
Description: | EXPAND FROM 4 LANE DIVIDED TO 4 LANE EXPRESSWAY | Handling Code: | |
Limits From: | IH 35 | Fund Cat: | 1 |
Limits To: | FM 78 | ESTIMATE: | $46,366,578 |
Length: | 3.1 | Actual | $45,888,889 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 2452-03-112 | ||
Length: | 3.1 | ||
Estimate: | $46,366,578 | ||
Actual: | $45,888,889 | ||
CCSJ: 2452-03-118 |
|||
District: | SAN ANTONIO | Let Date: | Jun 2018 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | STP 2018(871) | CSJ: | 2452-03-118 |
Description: | RECONFIGURE RAMPS, CONSTRUCT TURNAROUNDS AT BULVERDE | Handling Code: | |
Limits From: | REDLAND RD | Fund Cat: | 1 |
Limits To: | BULVERDE RD. | ESTIMATE: | $9,074,769 |
Length: | 1.7 | Actual | $6,006,287 |
District: | SAN ANTONIO | Let Date: | Jun 2018 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | C 2452-3-119 | CSJ: | 2452-03-119 |
Description: | BASE REPAIR, SEALCOAT, OVERLAY AND PAVEMENT MARKINGS ON | Handling Code: | |
Limits From: | 0.3 MI W OF REDLAND | Fund Cat: | 1 |
Limits To: | 0.4 MI E OF GREEN MOUNTAIN | ESTIMATE: | $6,217,926 |
Length: | 5.4 | Actual | $4,841,326 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 2452-03-118 | ||
Length: | 7.1 | ||
Estimate: | $15,292,695 | ||
Actual: | $10,847,613 | ||
CCSJ: 3508-01-028 |
|||
District: | SAN ANTONIO | Let Date: | May 2018 |
Highway: | SH 151 | Let Status: | Actual |
Project ID: | C 3508-1-28 | CSJ: | 3508-01-028 |
Description: | OVERLAY & PAVEMENT MARKINGS ON FRONTAGE ROADS | Handling Code: | |
Limits From: | WISEMAN | Fund Cat: | 1 |
Limits To: | CASTROVILLE ROAD | ESTIMATE: | $10,221,196 |
Length: | 9.1 | Actual | $7,394,842 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 3508-01-028 | ||
Length: | 9.1 | ||
Estimate: | $10,221,196 | ||
Actual: | $7,394,842 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |