Detail Letting Schedule for Webb County (FY 2019)

Last Update: Monday, December 16, 2019

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Webb County (FY 2019)

CCSJ: 0018-03-058

District:LAREDOLet Date:May 2019
Highway:IH 35Let Status:Actual
Project ID:STP 2019(607)HESCSJ:0018-03-058
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:1.086 MI S OF SAN ROMANFund Cat:8
Limits To:1.300 MI N OF SAN ROMANESTIMATE:$393,525
Length:2.5Actual$335,086
 
District:LAREDOLet Date:May 2019
Highway:IH 35Let Status:Actual
Project ID:STP 2019(607)HESCSJ:0018-03-059
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:0.35 MI SOUTH OF BI35BFund Cat:8
Limits To:0.15 MI NORTH OF BI35BESTIMATE:$177,832
Length:0.5Actual$168,281
 
Proposal Request
List Showing Order
Bid List
Addenda
Bid Tabulations
Award Status
Back...
Totals for 0018-03-058
Length:3
Estimate:$571,357
Actual:$503,367

CCSJ: 0018-04-056

District:LAREDOLet Date:Sep 2018
Highway:IH 35Let Status:Actual
Project ID:NH 2019(033)CSJ:0018-04-056
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:1.298 MI NORTH OF US 83 (WFR)Fund Cat:1
Limits To:0.907 MI NORTH OF CALLAGHAN INTCHGESTIMATE:$335,715
Length:8.4Actual$623,919
 
District:LAREDOLet Date:Sep 2018
Highway:IH 35Let Status:Actual
Project ID:NH 2019(033)CSJ:0018-05-093
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:0.287 MI N OF UNIROYAL DR (EFR)Fund Cat:1
Limits To:US 83ESTIMATE:$102,297
Length:5.0Actual$114,705
 
District:LAREDOLet Date:Sep 2018
Highway:US 83Let Status:Actual
Project ID:NH 2019(062)CSJ:0037-03-085
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:2.261 MI SOUTH OF FM 1025Fund Cat:1
Limits To:DIMMIT/ZAVALA COUNTY LINEESTIMATE:$324,170
Length:6.9Actual$360,260
 
District:LAREDOLet Date:Sep 2018
Highway:FM 117Let Status:Actual
Project ID:STP 2019(034)CSJ:0236-03-026
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:FM 1025Fund Cat:1
Limits To:FRIO COUNTY LINEESTIMATE:$436,769
Length:12.4Actual$433,745
 
District:LAREDOLet Date:Sep 2018
Highway:US 57Let Status:Actual
Project ID:STP 2019(034)CSJ:0276-03-043
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:MAVERICK COUNTY LINEFund Cat:1
Limits To:US 83ESTIMATE:$767,097
Length:16.0Actual$854,425
 
District:LAREDOLet Date:Sep 2018
Highway:SL 480Let Status:Actual
Project ID:NH 2019(062)CSJ:0299-14-030
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:FM 1021Fund Cat:1
Limits To:EAGLE PASS INTERNATIONAL BRIDGE IIESTIMATE:$243,542
Length:5.1Actual$270,006
 
District:LAREDOLet Date:Sep 2018
Highway:FM 649Let Status:Actual
Project ID:STP 2019(034)CSJ:0329-03-022
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:1.785 MI SOUTH OF SH 359Fund Cat:1
Limits To:6.269 MI SOUTH OF SH 359ESTIMATE:$124,377
Length:4.5Actual$133,823
 
District:LAREDOLet Date:Sep 2018
Highway:SH 131Let Status:Actual
Project ID:STP 2019(034)CSJ:0375-03-015
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:MAVERICK/KINNEY COUNTY LINEFund Cat:1
Limits To:US 277ESTIMATE:$422,007
Length:16.7Actual$415,654
 
District:LAREDOLet Date:Sep 2018
Highway:SH 339Let Status:Actual
Project ID:STP 2019(034)CSJ:0623-02-031
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:SH 359Fund Cat:1
Limits To:FM 716ESTIMATE:$419,409
Length:13.5Actual$460,247
 
District:LAREDOLet Date:Sep 2018
Highway:FM 190Let Status:Actual
Project ID:STP 2019(034)CSJ:0963-01-034
Description:RESURFACE OF EXISTING HWYHandling
Code:
 
Limits From:0.387 MI WEST OF US 83Fund Cat:1
Limits To:US 83ESTIMATE:$45,868
Length:1.4Actual$49,570
 
District:LAREDOLet Date:Sep 2018
Highway:FM 716Let Status:Actual
Project ID:STP 2019(034)CSJ:1083-03-014
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:FM 1329Fund Cat:1
Limits To:JIM WELLS COUNTY LINEESTIMATE:$89,783
Length:2.6Actual$89,273
 
District:LAREDOLet Date:Sep 2018
Highway:FM 1472Let Status:Actual
Project ID:C 2150-3-27CSJ:2150-03-027
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:6.655 MI S OF BEG OF ROADFund Cat:1
Limits To:SH 255ESTIMATE:$312,233
Length:7.9Actual$310,663
 
District:LAREDOLet Date:Sep 2018
Highway:FM 2644Let Status:Actual
Project ID:STP 2019(034)CSJ:2636-02-009
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:9.089 MI EAST OF COUNTY LINEFund Cat:1
Limits To:US 83ESTIMATE:$161,226
Length:5.8Actual$159,611
 
Proposal Request
List Showing Order
Bid List
Addenda
Bid Tabulations
Award Status
Back...
Totals for 0018-04-056
Length:106.2
Estimate:$3,784,493
Actual:$4,275,901

CCSJ: 0018-05-095

District:LAREDOLet Date:Jan 2019
Highway:IH 35Let Status:Actual
Project ID:NH 2019(375)CSJ:0018-05-095
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:1.190 MILES S OF CARRIER RD (EFR)Fund Cat:1
Limits To:0.169 MILES N OF UNIROYAL DR (EFR)ESTIMATE:$2,251,703
Length:1.9Actual$1,539,296
 
District:LAREDOLet Date:Jan 2019
Highway:SH 359Let Status:Actual
Project ID:STP 2017(586)CSJ:0086-09-036
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:0.60 MI N OF FM 716Fund Cat:1
Limits To:4.00 MI WEST OF FM 2295ESTIMATE:$4,109,069
Length:8.2Actual$3,920,839
 
District:LAREDOLet Date:Jan 2019
Highway:SH 16Let Status:Actual
Project ID:STP 2019(383)CSJ:0517-09-017
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:FM 2295Fund Cat:1
Limits To:JIM HOGG COUNTY LINEESTIMATE:$5,125,996
Length:15.2Actual$5,663,900
 
District:LAREDOLet Date:Jan 2019
Highway:BU 59ZLet Status:Actual
Project ID:NH 2019(375)CSJ:0542-01-090
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:BUENA VISTAFund Cat:1
Limits To:EJIDOESTIMATE:$375,119
Length:0.8Actual$382,647
 
District:LAREDOLet Date:Jan 2019
Highway:SH 255Let Status:Actual
Project ID:STP 2019(383)CSJ:3586-01-006
Description:RESURFACE OF EXISTING HIGHWAYHandling
Code:
 
Limits From:GSA (EB AND WB)Fund Cat:1
Limits To:FM 1472ESTIMATE:$683,408
Length:1.0Actual$749,794
 
Proposal Request
Bid List
List Showing Order
Bid Tabulations
Award Status
Back...
Totals for 0018-05-095
Length:27.1
Estimate:$12,545,295
Actual:$12,256,476

CCSJ: 0018-06-197

District:LAREDOLet Date:Aug 2019
Highway:IH 35Let Status:Actual
Project ID:CRX 18-6-197CSJ:0018-06-197
Description:RAILROAD CROSSING IMPROVEMENTSHandling
Code:
XX
Limits From:KCS DOT# 793561C 2017 PROGRAMFund Cat:10
Limits To:.ESTIMATE:$86,400
Length:0.1Actual$86,400
 
Back...
Totals for 0018-06-197
Length:0.1
Estimate:$86,400
Actual:$86,400

CCSJ: 0037-09-033

District:LAREDOLet Date:Oct 2018
Highway:US 83Let Status:Actual
Project ID:NH 2019(048)CSJ:0037-09-033
Description:REHABILITATION OF EXISTING HIGHWAYHandling
Code:
 
Limits From:DIMMIT CO. LINEFund Cat:1
Limits To:3.442 MILES SOUTH OF SH 44ESTIMATE:$58,068,760
Length:16.5Actual$48,720,817
 
Proposal Request
List Showing Order
Bid List
Addenda
Bid Tabulations
Award Status
Back...
Totals for 0037-09-033
Length:16.5
Estimate:$58,068,760
Actual:$48,720,817

CCSJ: 0037-10-037

District:LAREDOLet Date:Aug 2019
Highway:US 83Let Status:Actual
Project ID:NH 2019(047)CSJ:0037-10-037
Description:REHABILITATE EXISTING ROADWAYHandling
Code:
 
Limits From:3.442 MILES SOUTH OF SH 44Fund Cat:11
Limits To:IH35/US83 INTERSECTION WEST FRTG RDESTIMATE:$58,118,757
Length:0.0Actual$66,776,633
 
District:LAREDOLet Date:Aug 2019
Highway:IH 35Let Status:Actual
Project ID:NH 2019(049)CSJ:0018-05-099
Description:REHABILITATE EXISTING ROADWAYHandling
Code:
 
Limits From:IH35/US83 INTERSECTION WEST FRTG RDFund Cat:1
Limits To:0.37 MI SOUTH OF US83/IH35 INTESTIMATE:$1,629,255
Length:0.0Actual$1,796,261
 
Proposal Request
List Showing Order
Bid List
Addenda
Bid Tabulations
Award Status
Back...
Totals for 0037-10-037
Length:0
Estimate:$59,748,012
Actual:$68,572,893

CCSJ: 0086-14-073

District:LAREDOLet Date:Apr 2019
Highway:US 59Let Status:Actual
Project ID:STP 2019(608)HESCSJ:0086-14-073
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT DEL MAR BLVDFund Cat:8
Limits To:.ESTIMATE:$132,089
Length:0.2Actual$117,536
 
District:LAREDOLet Date:Apr 2019
Highway:US 83Let Status:Actual
Project ID:STP 2019(608)HESCSJ:0037-05-055
Description:INTERCONNECT SIGNALSHandling
Code:
 
Limits From:FM 1407(S)Fund Cat:8
Limits To:US 277ESTIMATE:$23,123
Length:1.8Actual$26,687
 
District:LAREDOLet Date:Apr 2019
Highway:US 83Let Status:Actual
Project ID:STP 2019(608)HESCSJ:0037-06-102
Description:INSTALL INTERSECTION FLASHING BEACONHandling
Code:
 
Limits From:@ FM 1557Fund Cat:8
Limits To:.ESTIMATE:$40,718
Length:0.2Actual$46,889
 
District:LAREDOLet Date:Apr 2019
Highway:US 83Let Status:Actual
Project ID:STP 2019(608)HESCSJ:0038-01-092
Description:ROAD CLOSUREHandling
Code:
 
Limits From:@ HALL STFund Cat:8
Limits To:.ESTIMATE:$19,601
Length:0.2Actual$58,342
 
District:LAREDOLet Date:Apr 2019
Highway:US 59Let Status:Actual
Project ID:STP 2019(608)HESCSJ:0086-14-074
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AT INTERNATIONAL BLVDFund Cat:8
Limits To:.ESTIMATE:$59,163
Length:0.0Actual$51,326
 
District:LAREDOLet Date:Apr 2019
Highway:US 59Let Status:Actual
Project ID:STP 2019(608)HESCSJ:0237-05-046
Description:IMPROVE TRAFFIC SIGNALHandling
Code:
 
Limits From:AT THE INTERSECTION OF SH 16Fund Cat:8
Limits To:.ESTIMATE:$83,413
Length:0.2Actual$79,995
 
District:LAREDOLet Date:Apr 2019
Highway:FM 1472Let Status:Actual
Project ID:STP 2019(608)HESCSJ:2150-04-068
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT FLECHA LANEFund Cat:8
Limits To:.ESTIMATE:$64,627
Length:0.2Actual$63,775
 
District:LAREDOLet Date:Apr 2019
Highway:FM 1472Let Status:Actual
Project ID:STP 2019(608)HESCSJ:2150-04-069
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT KILLAM BLVDFund Cat:8
Limits To:.ESTIMATE:$74,160
Length:0.2Actual$72,401
 
District:LAREDOLet Date:Apr 2019
Highway:FM 1472Let Status:Actual
Project ID:STP 2019(608)HESCSJ:2150-04-075
Description:INSTALL INTERSECTION FLASHING BEACONHandling
Code:
 
Limits From:@ VERDE BLVDFund Cat:8
Limits To:.ESTIMATE:$57,411
Length:0.2Actual$62,979
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 0086-14-073
Length:3.2
Estimate:$554,306
Actual:$579,929

CCSJ: 0922-00-065

District:LAREDOLet Date:Jul 2019
Highway:VALet Status:Actual
Project ID:STP 1902(188)CSJ:0922-00-065
Description:REMOVE/REPLACE BRIDGE RAILHandling
Code:
 
Limits From:DISTRICTWIDEFund Cat:11
Limits To:.ESTIMATE:$2,137,964
Length:0.1Actual$2,894,261
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 0922-00-065
Length:0.1
Estimate:$2,137,964
Actual:$2,894,261

CCSJ: 0922-00-068

District:LAREDOLet Date:Oct 2018
Highway:VALet Status:Actual
Project ID:STP 2019(145)CSJ:0922-00-068
Description:THERMOPLASTIC RE-STRIPINGHandling
Code:
 
Limits From:DISTRICTWIDEFund Cat:11
Limits To:.ESTIMATE:$806,541
Length:0.1Actual$630,091
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 0922-00-068
Length:0.1
Estimate:$806,541
Actual:$630,091

CCSJ: 0922-00-069

District:LAREDOLet Date:Nov 2018
Highway:VALet Status:Actual
Project ID:STP 2019(346)CSJ:0922-00-069
Description:THERMOPLASTIC RE-STRIPING DIMMIT, ZAVALA, MAVERICK, KINNEY AHandling
Code:
 
Limits From:DISTRICTWIDEFund Cat:11
Limits To:.ESTIMATE:$839,242
Length:0.1Actual$638,114
 
List Showing Order
Proposal Request
Bid List
Bid Tabulations
Award Status
Back...
Totals for 0922-00-069
Length:0.1
Estimate:$839,242
Actual:$638,114

CCSJ: 0922-33-163

District:LAREDOLet Date:Dec 2018
Highway:CSLet Status:Actual
Project ID:STP 2019(300)HESCSJ:0922-33-163
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:MCPHERSON FROM SAUNDERS (US 59)Fund Cat:3
Limits To:BOB BULLOCK LOOP (LP 20)ESTIMATE:$911,000
Length:5.9Actual$361,930
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 0922-33-163
Length:5.9
Estimate:$911,000
Actual:$361,930

CCSJ: 0922-33-170

District:LAREDOLet Date:Oct 2018
Highway:CSLet Status:Actual
Project ID:STP 2017(298)TPCSJ:0922-33-170
Description:ZACATE CREEK MULTI-USE ALTERNATIVE TRANSPORTATION TRAILHandling
Code:
LC
Limits From:AT ZACATE CREEKFund Cat:3
Limits To:.ESTIMATE:$1,600,555
Length:1.9Actual$1,146,072
 
Back...
Totals for 0922-33-170
Length:1.9
Estimate:$1,600,555
Actual:$1,146,072

CCSJ: 0922-33-180

District:LAREDOLet Date:Apr 2019
Highway:VALet Status:Actual
Project ID:CBI 1902(038)CSJ:0922-33-180
Description:FEASIBILITY STUDYHandling
Code:
XX
Limits From:NORTHWEST WEBB COUNTYFund Cat:3
Limits To:(IH35, FM1472, SH255, US83)ESTIMATE:$634,658
Length:0.1Actual$635,658
 
Back...
Totals for 0922-33-180
Length:0.1
Estimate:$634,658
Actual:$635,658

CCSJ: 2150-04-077

District:LAREDOLet Date:Aug 2019
Highway:FM 1472Let Status:Actual
Project ID:STP 1902(255)HESCSJ:2150-04-077
Description:INSTALL/UPGRADE ROADWAY LIGHTINGHandling
Code:
 
Limits From:FM 3338Fund Cat:11
Limits To:VERDE BLVDESTIMATE:$647,027
Length:1.7Actual$552,802
 
District:LAREDOLet Date:Aug 2019
Highway:US 90Let Status:Actual
Project ID:STP 1902(255)HESCSJ:0022-10-072
Description:INSTALL/UPGRADE ROADWAY LIGHTINGHandling
Code:
 
Limits From:AT AGARITA DRFund Cat:11
Limits To:.ESTIMATE:$24,759
Length:0.2Actual$25,471
 
District:LAREDOLet Date:Aug 2019
Highway:US 90Let Status:Actual
Project ID:STP 1902(255)HESCSJ:0023-01-097
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:OLD HAMILTON ROADFund Cat:11
Limits To:NORTH CHARLES DRESTIMATE:$356,866
Length:1.2Actual$337,449
 
District:LAREDOLet Date:Aug 2019
Highway:US 83Let Status:Actual
Project ID:STP 1902(255)HESCSJ:0038-01-093
Description:INSTALL/UPGRADE ROADWAY LIGHTINGHandling
Code:
 
Limits From:0.2 MI S OF ESPEJO MOLINAFund Cat:11
Limits To:0.657 MI S OF ESPEJO MOLINAESTIMATE:$169,373
Length:0.5Actual$159,018
 
District:LAREDOLet Date:Aug 2019
Highway:SL 20Let Status:Actual
Project ID:STP 1902(255)HESCSJ:0086-16-014
Description:INSTALL/UPGRADE ROADWAY LIGHTINGHandling
Code:
 
Limits From:0.019 M S OF AGUANIEVE DRFund Cat:11
Limits To:0.189 M S OF AGUANIEVE DRESTIMATE:$40,115
Length:0.2Actual$36,905
 
District:LAREDOLet Date:Aug 2019
Highway:US 277Let Status:Actual
Project ID:STP 1902(255)HESCSJ:0299-01-072
Description:INSTALL/UPGRADE ROADWAY LIGHTINGHandling
Code:
 
Limits From:0.1 MI E BRODBENT DRFund Cat:11
Limits To:0.1 MI W BRODBENT DRESTIMATE:$25,598
Length:0.2Actual$23,644
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 2150-04-077
Length:4
Estimate:$1,263,739
Actual:$1,135,289

CCSJ: 3532-02-011

District:LAREDOLet Date:Apr 2019
Highway:FM 3338Let Status:Actual
Project ID:C 3532-2-11CSJ:3532-02-011
Description:REHABILITATION OF EXISTING HIGHWAYHandling
Code:
 
Limits From:FM 1472Fund Cat:1
Limits To:SH 255ESTIMATE:$22,611,599
Length:8.2Actual$23,429,429
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Award Status
Back...
Totals for 3532-02-011
Length:8.2
Estimate:$22,611,599
Actual:$23,429,429

Handling CodeDefinition
XXProject not processed through statewide letting
TRTransfer of funds
LCProject let through local entity
LCProject not charged against district apportionment



Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract