Letting Schedule for August, 2019 County (FY 2019)

Last Update: Monday, February 11, 2019
August, 2019 (FY 2019)(see Links)
SEP 2018 | OCT 2018 | NOV 2018 | DEC 2018 | JAN 2019 | FEB 2019 | MAR 2019 | APR 2019 | MAY 2019 | JUN 2019 | JUL 2019 | AUG 2019 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
DescriptionDBE Goal
2115-01-018Angelina/
Lufkin
FM 2251Tentative$010REPLANK EXISTING RAILROAD CROSSING SURFACE0.0
0507-04-057Aransas/
Corpus Christi
SL 70Tentative$4210REPLACE SMALL SIGNS AND SUPPORT ASSEMBLIES DAMAGED BY HURRIC0.0
0180-07-020Aransas/
Corpus Christi
SL 70Tentative$4210REPLACE SMALL SIGNS AND SUPPORT ASSEMBLIES DAMAGED BY HURRIC0.0
0507-04-060Aransas/
Corpus Christi
SH 188Tentative$51,87210REPLACE SMALL SIGNS AND SUPPORT ASSEMBLIES DAMAGED BY HIGH0.0
0507-04-061Aransas/
Corpus Christi
SH 188Tentative$4,48210REPLACE SMALL SIGNS AND SUPPORT ASSEMBLIES DAMAGED BY HIGH0.0
0507-04-058Aransas/
Corpus Christi
FM 1069Tentative$98,24810REPLACE SMALL SIGNS AND SUPPORT ASSEMBLIES DAMAGED BY HIGH0.0
1549-01-052Aransas/
Corpus Christi
FM 1781Tentative$5,23910EMERGENCY WORK REPAIR FOR SMALL SIGNS AND MAILBOXES BY TXDOT0.0
0180-04-136Aransas/
Corpus Christi
BS 35-LTentative$27,92010REPAIR OR REPLACE SIGNALS DAMAGED BY HIGH WINDS0.0
2607-01-018Aransas/
Corpus Christi
SH 188Tentative$1,79310REPLACE SMALL SIGNS AND SUPPORT ASSEMBLIES DAMAGED BY HIGH0.0
2607-01-017Aransas/
Corpus Christi
SH 188Tentative$20,74910REPLACE SMALL SIGNS AND SUPPORT ASSEMBLIES DAMGAED BY HIGH0.0
1549-02-017Aransas/
Corpus Christi
FM 1069Tentative$38,20710REPLACE SMALL SIGNS AND SUPPORT ASSEMBLIES DAMAGED BY HIGH0.0
2023-01-017Aransas/
Corpus Christi
FM 2165Tentative$4,80410REPAIR OR REPLACE SIGNALS DAMAGED BY HGIH WINDS0.0
0073-03-065Atascosa/
San Antonio
US 281Tentative$70,0001REMOVE CANTILEVERS AND INSTALL MEDIAN GATES AT0.0
0271-02-049Austin/
Yoakum
IH 10Tentative$140,800,0001ADD LANES FOR 6-LANE FACILITY0.0
3409-01-006Bell/
Waco
FM 3481Tentative$1,552,5001ADD TURN LANES0.0
0909-36-164Bell/
Waco
CSTentative$250,0008UPGRADE RR CROSSING SIGNALS FEDERAL SAFETY PROGRAM (FSP)0.0
1835-02-056Bell/
Waco
FM 1741Tentative$3,000,0001MILL AND OVERLAY0.0
0915-12-609Bexar/
San Antonio
CSTentative$1,000,0003MULTIMODAL PLANNING STUDY ON ONE ARTERIAL TO ACCOMMODATE0.0
0915-12-544Bexar/
San Antonio
CSTentative$7,323,3513EXPAND FROM 2 TO 4 LANES, INCLUDING DRAINAGE IMPROVEMENTS,0.0
3544-04-002Bexar/
San Antonio
SH 211Tentative$18,100,0013CONSTRUCT TWO LANE RURAL HIGHWAY ON NEW LOCATION0.0
0915-00-199Bexar/
San Antonio
VATentative$2,000,0001DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 20180.0
0915-00-200Bexar/
San Antonio
VATentative$2,000,0001DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 20190.0
0915-12-601Bexar/
San Antonio
VATentative$1,500,0003INTELLIGENT TRANSPORTATION SYSTEMS - ENHANCEMENTS;0.0
0915-00-195Bexar/
San Antonio
NRTentative$300,0003ALAMO AREA COMMUTE SOLUTION PGM-FY 2019-20210.0
0915-12-595Bexar/
San Antonio
VATentative$6,000,0003EXTEND THE ALAZAN CREEK SECTION OF THE GREENWAY TRAIL SYSTEM0.0
0915-12-509Bexar/
San Antonio
CRTentative$8,097,4803RECONSTRUCT AND WIDEN TO 4 LANES WITH SHOULDER, PEDESTRIAN0.0
0915-12-543Bexar/
San Antonio
NRTentative$100,0007ALAMO AREA COMMUTE SOLUTION PGM-FY 20180.0
0915-12-578Bexar/
San Antonio
CSTentative$8,632,5613WIDEN TO PROVIDE OPERATIONAL IMPROVEMENTS, BIKE LANES,0.0
0915-00-212Bexar/
San Antonio
VATentative$2,500,0001SAFETY SERVICE PATROL ON CONTROLLED ACCESS HIGHWAYS IN0.0
0025-02-219Bexar/
San Antonio
IH 10Tentative$55,000,0001EXPAND FROM 4 LANE TO 6 LANE EXPRESSWAY & FROM 4 TO 4 FR0.0
0915-12-605Bexar/
San Antonio
CSTentative$250,0008INSTALL RAILROAD SIGNAL WITH GATES ON FRATT RD AT UPRR DOT0.0
0915-12-607Bexar/
San Antonio
CSTentative$250,0008RELOCATE RAIL SIGNALS ON STAHL AT UPRR DOT 432 491U0.0
0915-12-606Bexar/
San Antonio
CSTentative$250,0008REPLACE RAILROAD SIGNAL AND CANTILEVER GATE ON EISENHAUER0.0
0915-12-602Bexar/
San Antonio
VATentative$4,000,0001UPGRADE TRANSGUIDE FACILITY0.0
2872-01-007Bosque/
Waco
FM 2840Tentative$31,14410REPLACE CONCRETE CROSSING SURFACE0.0
0919-19-081Bowie/
Atlanta
CSTentative$250,0008RAILROAD CROSSING UPGRADES0.0
1231-01-071Bowie/
Atlanta
FM 989Tentative$250,0008RAILROAD CROSSING UPGRADES0.0
0179-02-086Brazoria/
Houston
SH 35Tentative$7,73010REMOVAL OF THE EXISTING ASPHALT SHOULDER AND REWORK SUBGRADE0.0
0111-08-122Brazoria/
Houston
BS 288BTentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0178-03-157Brazoria/
Houston
SH 35Tentative$122,22510STABILIZE DITCH0.0
0188-06-055Brazoria/
Houston
SH 36Tentative$294,50010INSTALL NEW GROUPS OF PILES AND REINSTALL DOLPHINS0.0
0587-01-065Brazoria/
Houston
FM 1495Tentative$010REPLANK EXISTING RR CROSSING SURFACE0.0
2524-02-025Brazoria/
Houston
FM 2611Tentative$9,628,4001ADD SHOULDERS, SEAL COAT AND 1.5 IN ACP OVERLAY0.0
1414-02-017Brazoria/
Houston
FM 528Tentative$010REMOVE EXISTING RIP RAP BRINGING IN FILL MATERIAL TO REPAIR0.0
1524-01-083Brazoria/
Houston
SH 288Tentative$391,83710BENCH SLOPE FAILURE,INSTALL SUITABLE FILL MATERIAL AND0.0
1003-01-099Brazoria/
Houston
FM 523Tentative$010REPLANK EXISTING RR CROSSING SURFACE0.0
1003-01-100Brazoria/
Houston
FM 523Tentative$010REPLANK EXISTING RR CROSSING SURFACE0.0
0587-01-066Brazoria/
Houston
FM 1495Tentative$010REPLANK EXISTING RR CROSSING SURFACE0.0
0128-01-112Brown/
Brownwood
US 377Tentative$250,0008INSTALL PROTECTIVE DEVICES0.0
0923-06-081Brown/
Brownwood
VATentative$250,0008INSTALL PROTECTIVE DEVICES0.0
0457-01-064Burleson/
Bryan
FM 50Tentative$47,36810CULVERT AND SCOUR REPAIR0.0
0506-04-024Burleson/
Bryan
FM 2155Tentative$28,50010PAVEMENT AND CULVERT REPAIR0.0
0955-01-028Burleson/
Bryan
FM 166Tentative$16,80010CULVERT AND SCOUR REPAIR0.0
0648-03-071Burleson/
Bryan
FM 60Tentative$30,29810SCOUR REPAIR0.0
0914-22-061Caldwell/
Austin
VATentative$2,120,6487CALDWELL COUNTY STPMM SET-ASIDE0.0
0471-04-030Caldwell/
Austin
SH 21Tentative$12,944,8311PROVIDE SUPER 2 PASSING LANES0.0
0144-04-043Calhoun/
Yoakum
SH 238Tentative$2,000,0001REHABILITATE ROADWAY0.0
0921-06-315Cameron/
Pharr
CSTentative$1,786,5157PE & ROW ACQ FOR CONSTR0.0
1065-02-040Cameron/
Pharr
FM 1846Tentative$010UPGRADE RAILROAD CROSSING PLANKING0.0
1801-02-017Cameron/
Pharr
FM 1847Tentative$16,808,3461REHABILITATE ROADWAY0.0
0921-06-314Cameron/
Pharr
CSTentative$350,00074 LNNE URBAN ROADWAY0.0
0921-06-291Cameron/
Pharr
CSTentative$500,0003NEW 4 LANE ROADWAY.0.0
0921-06-304Cameron/
Pharr
CSTentative$812,8623CONSTRUCT BUS FACILITY CONSIST OF PAVING, CURB & GUTTER,0.0
2218-01-035Carson/
Amarillo
FM 2373Tentative$7,300,0006REPLACE EXISTING BRIDGE0.0
0788-01-020Carson/
Amarillo
FM 294Tentative$250,0008DOT#014566N FED RAILROAD SIGNAL PROGRAM0.0
0919-14-027Cass/
Atlanta
CRTentative$250,0008RAILROAD CROSSING UPGRADES0.0
0242-06-020Chambers/
Beaumont
FM 1985Tentative$27,44110TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
1024-01-042Chambers/
Beaumont
FM 565Tentative$5,932,61711RECONSTRUCT AND REALIGN EXISTING ROADWAY3.5
0199-01-084Cherokee/
Tyler
US 69Tentative$1,027,38210CONSTRUCT SIDEWALKS FOR PEDESTRIAN NETWORK IN JACKSONVILLE0.0
2405-02-015Clay/
Wichita Falls
FM 2393Tentative$010REPLANKING EXISTING RR CROSSING0.0
0918-24-240Collin/
Dallas
CRTentative$250,0008INSTALL GRADE CROSSING WARNING DEVICES0.0
0271-01-079Colorado/
Yoakum
IH 10Tentative$2,214,6278IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0915-17-066Comal/
San Antonio
CSTentative$1,516,7113CONSTRUCT SIDEWALKS, RAMPS, & OTHER PEDESTRIAN RELATED0.0
0915-17-068Comal/
San Antonio
VATentative$200,0007PURCHASE OF CONTROL SOFTWARE FOR TRAFFIC SIGNALS0.0
0918-00-291Dallas/
Dallas
CSTentative$21,281,2503ENGINEERING/ENVIRONMENTAL FOR COTTON BELT REGIONAL RAIL0.0
0918-00-258Dallas/
Dallas
VATentative$2,737,9993FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2018 FUNDING;0.0
0918-47-142Dallas/
Dallas
CSTentative$2,220,1093DELAWARE CREEK TRAIL CONNECTOR - CONSTRUCT HIKE & BIKE TRAIL0.0
2964-06-024Dallas/
Dallas
SH 190Tentative$22,14410INSTALL RAILROAD CROSSING SURFACE0.0
0918-47-245Dallas/
Dallas
VATentative$1,000,0003DEVELOP A STRATEGIC MOBILITY PLAN FOR THE CITY OF DALLAS0.0
0918-47-168Dallas/
Dallas
CSTentative$28,042,7803RECONSTRUCT 6/8 LN TO 6 LN WITH BIKE/PEDESTRIAN IMPROVEMENTS0.0
0918-47-099Dallas/
Dallas
CSTentative$3,900,0003BIKE AND PEDESTRAIN FACILITY; CONCRETE TRAIL; LIGHTING AND0.0
0918-00-292Dallas/
Dallas
CSTentative$12,500,0005COTTON BELT #4: COTTON BELT REGIONAL RAIL PROJECT0.0
0918-46-304Denton/
Dallas
CRTentative$250,0008INSTALL GRADE CROSSING WARNING DEVICES0.0
0228-06-081Ector/
Odessa
US 385Tentative$17,700,00011CONSTRUCT NEW INTERCHANGE0.0
0005-01-114Ector/
Odessa
BI 20-ETentative$14,284,8008INSTALL MEDIAN BARRIER0.0
0924-06-537El Paso/
El Paso
VATentative$1,000,00052ND YEAR OF DYER BRT-RTS OPERATIONS0.0
0924-06-538El Paso/
El Paso
VATentative$1,800,0005PROCUREMENT OF 3 BUSES (FOR SERVICES AROUND THE MONTECILLO D0.0
0924-06-064El Paso/
El Paso
CSTentative$1,482,9143PED AND BIKE ENHANCEMENTS0.0
0924-06-552El Paso/
El Paso
VATentative$1,000,0005OPERATING ASSISTANCE FOR FIRST YEAR OF NEW TRANSIT SERVICE0.0
0924-06-550El Paso/
El Paso
VATentative$1,000,0005FIRST YEAR OF ALAMEDA BRT-RTS OPERATIONS0.0
0902-49-071Erath/
Ft Worth
CSTentative$082017 FEDERAL RR SIGNAL PROGRAM0.0
0258-01-030Erath/
Ft Worth
SH 6Tentative$0102017 RAILROAD GRADE CROSSING REPLANKING PROGRAM0.0
1440-01-020Fayette/
Yoakum
FM 957Tentative$1,200,0006REPLACE BRIDGE AND APPROACHES0.0
0807-03-036Fayette/
Yoakum
FM 153Tentative$23,18010EMERGENCY REPAIR-FHWA ER0.0
0912-34-198Fort Bend/
Houston
CRTentative$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 743731H)0.0
0912-34-194Fort Bend/
Houston
VATentative$3,500,0005REIMBURSEMENT FOR FORT BEND COUNTY TRANSNIT ADMINISTRATION0.0
0027-12-155Fort Bend/
Houston
IH 69Tentative$18,65810HAUL IN MATERIAL TO FILL IN ERODED AREAS0.0
0543-03-077Fort Bend/
Houston
FM 762Tentative$497,51110REPLACE CULVERT & EROSION REPAIR0.0
0027-12-154Fort Bend/
Houston
IH 69Tentative$62,27210RAISE ROADWAY ELEVATION BACK TO GRADE0.0
3048-01-017Fort Bend/
Houston
FM 2977Tentative$2,461,0001ADD LEFT TURN LANE AT SOME LOCATIONS, 1.5 IN ACP OVERLAY AND0.0
0188-09-042Fort Bend/
Houston
FM 723Tentative$6,000,0002MWIDEN FROM 2 TO 4 LANES0.0
1176-01-013Franklin/
Paris
SS 423Tentative$250,0008INSTALL LIGHTS AND GATES0.0
1380-01-018Franklin/
Paris
FM 1448Tentative$702,8938IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED0.0
0915-18-032Frio/
San Antonio
CRTentative$250,0008INSTALL RAILROAD SIGNAL WITH GATES ON CR 4201 AT UPRR DOT0.0
0389-11-060Galveston/
Houston
SL 197Tentative$302,40010REPLANK EXISTING RR CROSSING SURFACE0.0
0367-06-062Galveston/
Houston
SH 87Tentative$6,65510REPLACE DAMAGED LIGHTNING ROD PROTECTION AND MICROWAVE0.0
0367-06-063Galveston/
Houston
SH 87Tentative$815,00010LANDSCAPE DEVELOPMENT0.0
0192-04-107Galveston/
Houston
SH 6Tentative$18,06610REMOVED AND INSTALLED NEW CABINET AND BBS0.0
0192-04-108Galveston/
Houston
SH 6Tentative$11,00010REPLACED TRAFFIC SIGNAL CABINET0.0
0051-03-118Galveston/
Houston
SH 3Tentative$187,20010REPLANK EXISTING RR CROSSING SURFACE0.0
3595-01-019Galveston/
Houston
SH 275Tentative$1,535,2073REHABILITATION OF EXISTING RD AND INTERSECTION IMPROVEMENTS0.0
3595-01-021Galveston/
Houston
SH 275Tentative$010REPLANK EXISTING RR CROSSING SURFACE0.0
1844-02-023Galveston/
Houston
FM 2351Tentative$11,45510REMOVE AND INSTALL NEW CABINET AND RISER0.0
0051-03-112Galveston/
Houston
SH 3Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0500-04-105Galveston/
Houston
IH 45Tentative$140,000,0002MRECONSTRUCT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE ROADS0.0
0978-01-041Galveston/
Houston
FM 517Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0978-02-080Galveston/
Houston
FM 517Tentative$010REPLANK EXISTING RR CROSSING SURFACE0.0
0912-73-208Galveston/
Houston
VATentative$2,454,0003CONSTRUCT PARK AND RIDE WITH 400 AUTO AND 40 BUS PARKING0.0
0978-01-040Galveston/
Houston
FM 517Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0155-04-057Goliad/
Corpus Christi
US 183Tentative$1,67310REPAIR OR REPLACE SMALL SINGS ASSEMBLIES DAMAGED BY HURRICAN0.0
1133-02-031Gonzales/
Yoakum
FM 794Tentative$30,080102017 RAILROAD REPLANKING PROGRAM0.0
0715-01-022Gonzales/
Yoakum
FM 108Tentative$13,600,8078SAFETY TREAT FIXED OBJECTS0.0
0287-03-032Gonzales/
Yoakum
SH 80Tentative$10,580,0006REPLACE BRIDGE AND APPRAOCHES0.0
2455-01-031Grayson/
Paris
FM 1417Tentative$24,842,9591WIDEN FROM 2-LN TO 4-LN WITH A CONTINUOUS LEFT TURN LANE0.0
2073-01-009Gregg/
Tyler
FM 2206Tentative$15,100,0001WIDEN 2 LN ROAD TO 4 LANE DIVIDED ROADWAY W/FLUSH MEDIAN0.0
3465-02-011Gregg/
Tyler
FM 3272Tentative$5,563,8841REPAIR & RESURFACE ROADWAY0.0
0944-01-024Grimes/
Bryan
FM 362Tentative$23,79510PAVEMENT REPAIR0.0
2021-02-018Guadalupe/
San Antonio
FM 1044Tentative$450,0008INSTALL PREEMPTED TRAFFIC SIGNAL ON FM 1044 AT UPRR DOT 7420.0
0800-05-028Hale/
Lubbock
FM 400Tentative$250,0008RAIL HWY CROSSING SIGNALS/STRUCTURES0.0
0067-04-053Hale/
Lubbock
IH 27Tentative$250,0008RAIL HWY CROSSING SIGNALS/STRUCTURES0.0
3184-01-011Hardeman/
Childress
FM 2568Tentative$010RR REPLANKING0.0
0200-10-085Hardin/
Beaumont
US 69Tentative$30,20310TS HARVEY EMERGENCY REPAIRS DONE WITH 47Y002790.0
0065-06-066Hardin/
Beaumont
US 69Tentative$18,68110TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0065-05-147Hardin/
Beaumont
US 96Tentative$1,269,23610EMERGENCY REPAIRS TO ADDRESS DAMAGE CAUSED BY TROPICAL STORM0.0
0912-72-434Harris/
Houston
CRTentative$17,25210REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-439Harris/
Houston
CRTentative$17,25210REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-424Harris/
Houston
CRTentative$010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-70-152Harris/
Houston
CSTentative$31,68210REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND0.0
0912-72-435Harris/
Houston
CRTentative$17,25210REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-438Harris/
Houston
CRTentative$17,28910REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-437Harris/
Houston
CRTentative$28,26810REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-427Harris/
Houston
CRTentative$010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-436Harris/
Houston
CRTentative$17,25210REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-70-147Harris/
Houston
CRTentative$21,18510INSTALL NEW CMP (NBI#121020A49377001)0.0
0912-00-547Harris/
Houston
VATentative$2,400,0003METRO STAR VANPOOL PROGRAM (FY 2018)0.0
0500-03-624Harris/
Houston
IH 45Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0500-03-621Harris/
Houston
IH 45Tentative$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-70-154Harris/
Houston
CSTentative$58,44710REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND0.0
0912-72-428Harris/
Houston
CRTentative$010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0271-16-150Harris/
Houston
IH 610Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0110-05-131Harris/
Houston
IH 45Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0110-06-146Harris/
Houston
IH 45Tentative$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0508-01-367Harris/
Houston
IH 10Tentative$11,00010REMOVED DAMAGED CABINET AND INSTALLED NEW CABINET0.0
0912-70-131Harris/
Houston
CSTentative$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0508-01-371Harris/
Houston
IH 10Tentative$6,177,97610RECONSTRUCT FRONTAGE ROAD,DRAINAGE AND REPAIR BRIDGE0.0
0508-01-370Harris/
Houston
IH 10Tentative$57,46810REMOVED UNDERWATER DEBRIS0.0
0912-00-562Harris/
Houston
VATentative$3,750,0003REGIONAL VANPOOL PROGRAM- STP FY 190.0
0720-03-142Harris/
Houston
SH 249Tentative$010REMOVE AND INSTALL NEW CABINET AND RISER0.0
0500-03-631Harris/
Houston
IH 45Tentative$350,00010LANDSCAPE DEVELOPMENT0.0
0912-00-556Harris/
Houston
VATentative$8,000,0003REGIONAL FREEWAY INCIDENT MANAGEMENT - MOTORIST ASSISTANCE,0.0
0598-01-103Harris/
Houston
SH 288Tentative$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-70-149Harris/
Houston
CSTentative$25,16910REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND0.0
0912-70-150Harris/
Houston
CSTentative$8,28310REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND0.0
0912-00-539Harris/
Houston
VATentative$8,000,0007REGIONAL FREEWAY INCIDENT MANAGEMENT-TOWINIG (FY2017/2018)0.0
0177-07-116Harris/
Houston
IH 69Tentative$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0177-06-088Harris/
Houston
IH 69Tentative$86,24310MOVE AND REPLACE CTB TO ITS ORIGINAL LOCATION0.0
0912-70-151Harris/
Houston
CSTentative$133,31710REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND0.0
0912-72-430Harris/
Houston
CRTentative$010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0177-06-087Harris/
Houston
IH 69Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0912-72-429Harris/
Houston
CRTentative$27,15010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-70-153Harris/
Houston
CSTentative$80,94410REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND0.0
0912-00-546Harris/
Houston
VATentative$3,750,0003METRO STAR VANPOOL PROGRAM (FY 2017)0.0
0271-16-148Harris/
Houston
IH 610Tentative$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0271-14-238Harris/
Houston
IH 610Tentative$1,579,49010INSTALL SHEET PILING TO PROTECT THE SLOPE0.0
0178-09-029Harris/
Houston
SS 5Tentative$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-00-534Harris/
Houston
VATentative$1,000,0001REHAB DMS BOARDS0.0
0178-01-039Harris/
Houston
SH 35Tentative$30,00010REMOVE DAMAGED BOX CULVERTS AND RIP RAP,BRINGING IN FILL0.0
0720-03-145Harris/
Houston
SH 249Tentative$18,52110REMOVED AND INSTALLED NEW CABINET AND BBS0.0
0912-00-541Harris/
Houston
VATentative$2,000,0007REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIES0.0
0912-72-426Harris/
Houston
CRTentative$010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-432Harris/
Houston
CRTentative$17,20110REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-425Harris/
Houston
CRTentative$010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-70-157Harris/
Houston
CSTentative$18,53610REPLACED THE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS,0.0
0912-72-423Harris/
Houston
CRTentative$010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-433Harris/
Houston
CRTentative$17,24510REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-70-120Harris/
Houston
CSTentative$622,8028FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 517X)0.0
0912-70-122Harris/
Houston
CSTentative$583,5908FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 518E)0.0
0028-01-104Harris/
Houston
BU 90-UTentative$18,06610REMOVED CABINET AND BBS AND INSTALLED NEW CABINET0.0
0508-01-372Harris/
Houston
IH 10Tentative$300,14110RECONSTRUCT FRONTAGE ROAD,DRAINAGE AND REPAIR BRIDGE0.0
0912-70-123Harris/
Houston
CRTentative$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 089370C)0.0
0051-02-107Harris/
Houston
SH 3Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0912-00-563Harris/
Houston
VATentative$1,250,0003REGIONAL VANPOOL PROGRAM- CMAQ FY190.0
0912-70-126Harris/
Houston
CRTentative$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758192R)0.0
0028-02-096Harris/
Houston
US 90Tentative$18,53610REPLACE TRAFFIC SIG091272521ET, ELECTRICAL COMPONENTS, AND0.0
0912-72-431Harris/
Houston
CRTentative$010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0027-09-106Harris/
Houston
US 90ATentative$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0027-09-108Harris/
Houston
US 90ATentative$18,53610REPLACED THE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS,0.0
0028-01-102Harris/
Houston
BU 90-UTentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0028-01-103Harris/
Houston
BU 90-UTentative$1,302,42810REPAIR RIPRAP AND SLOPE FAILURES0.0
0027-10-074Harris/
Houston
US 90ATentative$988,69510INSTALL NEW SHEET PILE PROTECTION0.0
0027-13-233Harris/
Houston
IH 69Tentative$46,64610REBUILD RETAINING WALL AND REPLACE FILL BEHIND DRILL SHAFT0.0
0912-72-548Harris/
Houston
CRTentative$32,25010REPLACE GUARD RAIL0.0
0912-72-549Harris/
Houston
CRTentative$68,67210REPAIR WASHOUTRAIL0.0
0912-72-547Harris/
Houston
CRTentative$52,24610REPAIR ROADWAY0.0
0912-72-545Harris/
Houston
CRTentative$106,71910REPAIR PUMP AND CONTROL PANEL0.0
0912-72-546Harris/
Houston
CRTentative$57,37910REPAIR TOLL BOOTH AND PUMP0.0
0912-72-550Harris/
Houston
CRTentative$310,58610EROSION REPAIR (NBI 12102AA0234002)0.0
0912-72-555Harris/
Houston
VATentative$52,28310IMPLEMENTATION OF ROADWAY DETOURS AND SIGNAL TIMING BECAUSE0.0
0912-72-556Harris/
Houston
VATentative$15,88310REPAIR FIBER DAMAGE0.0
0912-72-554Harris/
Houston
VATentative$60,56610REPAIR TRAFFIC SIGNAL CONTROL CABINETS0.0
0912-72-551Harris/
Houston
CRTentative$72,60510EROSION REPAIR (NBI 12102AA0143001 & 12102AA0143002)0.0
0912-72-552Harris/
Houston
CRTentative$147,04610EROSION REPAIR (NBI 12102AA2111008)0.0
0912-72-544Harris/
Houston
CRTentative$27,62210REPAIR PUMP AND PLAZA0.0
0912-72-529Harris/
Houston
CRTentative$010REPLACE TRAFFIC SIGNAL CONTROLLER AND ALL ITS COMPONENTS0.0
0912-72-530Harris/
Houston
CRTentative$010REPLACE TRAFFIC SIGNAL CONTROLLER AND ALL ITS COMPONENTS0.0
0912-72-528Harris/
Houston
CSTentative$010REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-72-526Harris/
Houston
CSTentative$010REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-72-527Harris/
Houston
CSTentative$010REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-72-531Harris/
Houston
CRTentative$55,8013EROSION REPAIR (NBI #121020AA2430001 & 121020AA2430002)0.0
0912-72-538Harris/
Houston
CRTentative$1,010,70310REPAIR ROAD AND PUMP 20.0
0912-72-540Harris/
Houston
CRTentative$1,714,38710REPAIR WASHOUT0.0
0912-72-537Harris/
Houston
CRTentative$745,57210REPAIR TOLL BOOTHS0.0
0912-72-532Harris/
Houston
CRTentative$82,1093EROSION REPAIR (NBI 121020AA0756002)0.0
0912-72-536Harris/
Houston
CRTentative$3,538,3603REHABILITATION OF EXISTING FERRY AND BERTHING FACILITIES.0.0
0912-72-562Harris/
Houston
CSTentative$37,80010REPLACE FIBER OPTIC CABLE0.0
3256-01-117Harris/
Houston
SL 8Tentative$156,85010SOUND WALL AND SLOPE FAILURE REPAIR0.0
3256-03-099Harris/
Houston
SL 8Tentative$11,00010REMOVED DAMAGED CABINET AND INSTALLED NEW CABINET0.0
3256-01-116Harris/
Houston
SL 8Tentative$147,26210SINK HOLE REPAIR AND REMOVAL OF DEBRIS0.0
1685-05-131Harris/
Houston
SH 6Tentative$18,52010REMOVED CABINET AND BBS AND INSTALLED NEW CABINET0.0
3256-01-114Harris/
Houston
SL 8Tentative$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
3256-03-100Harris/
Houston
SL 8Tentative$160,57610RESTORE SATELLITE BUILDING0.0
3510-06-017Harris/
Houston
SH 99Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
3510-06-016Harris/
Houston
SH 99Tentative$11,45510REMOVE AND INSTALL NEW CABINET WITH RISER0.0
3256-03-101Harris/
Houston
SL 8Tentative$20,98210REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND0.0
3510-05-043Harris/
Houston
SH 99Tentative$16,000,0003INSTALL HIGH MAST LIGHTING0.0
1685-05-129Harris/
Houston
SH 6Tentative$18,06510REMOVED DAMAGED CABINET AND BBS AND INSTALLED NEW CABINET0.0
0981-01-112Harris/
Houston
NASA 1Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0981-01-113Harris/
Houston
NASA 1Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0981-01-111Harris/
Houston
NASA 1Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0912-72-563Harris/
Houston
CSTentative$33,70510REPAIR WASHOUT & HEADWALLS OF WOOD TIMBER BRIDGE AND0.0
0976-01-040Harris/
Houston
FM 865Tentative$329,2498ADD LEFT TURN LANE0.0
0981-01-114Harris/
Houston
FM 528Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
1685-03-102Harris/
Houston
FM 1960Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
1685-05-120Harris/
Houston
SH 6Tentative$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
1685-02-051Harris/
Houston
FM 1960Tentative$18,06610REMOVED AND INSTALLED NEW CABINET AND BBS0.0
0981-01-115Harris/
Houston
FM 528Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0981-01-116Harris/
Houston
FM 528Tentative$11,00010REMOVE AND INSTALL NEW CABINET0.0
0912-72-442Harris/
Houston
CRTentative$16,37910REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-458Harris/
Houston
CRTentative$010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-459Harris/
Houston
CRTentative$17,20110REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-452Harris/
Houston
CRTentative$010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-443Harris/
Houston
CRTentative$28,26810REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-451Harris/
Houston
CRTentative$28,26810REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-440Harris/
Houston
CRTentative$15,43410REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-441Harris/
Houston
CRTentative$18,73710REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-460Harris/
Houston
CSTentative$17,20110REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-516Harris/
Houston
CSTentative$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-517Harris/
Houston
CSTentative$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-518Harris/
Houston
CSTentative$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-513Harris/
Houston
CSTentative$18,53610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-514Harris/
Houston
CSTentative$18,53610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-515Harris/
Houston
CSTentative$22,46310REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-523Harris/
Houston
CSTentative$010REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-72-524Harris/
Houston
CSTentative$010REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-72-525Harris/
Houston
CSTentative$010REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-72-519Harris/
Houston
CSTentative$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-521Harris/
Houston
CSTentative$18,53610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-522Harris/
Houston
CSTentative$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-506Harris/
Houston
CSTentative$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-507Harris/
Houston
CSTentative$18,53610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-505Harris/
Houston
CSTentative$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-520Harris/
Houston
CSTentative$18,53610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-501Harris/
Houston
CSTentative$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-508Harris/
Houston
CSTentative$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-511Harris/
Houston
CSTentative$18,53610REMOVE DAMAGED TRAFFIC SIGNAL AND INSTALL NEW SIGNAL0.0
0912-72-510Harris/
Houston
CSTentative$18,53610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-509Harris/
Houston
CSTentative$22,46310REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-512Harris/
Houston
CSTentative$21,03610REMOVE DAMAGED TRAFFIC SIGNAL AND INSTALL NEW SIGNAL0.0
0919-03-061Harrison/
Atlanta
CRTentative$250,0008RAILROAD CROSSING UPGRADES0.0
0495-08-117Harrison/
Atlanta
IH 20Tentative$1,011,6316BRIDGE PREVENTATIVE MAINTENANCE0.0
0471-02-070Hays/
Austin
SH 21Tentative$17,421,8991PROVIDE SUPER 2 PASSING LANES0.0
0285-03-059Hays/
Austin
RM 12Tentative$400,0023ENGINEERING, DESIGN, AND ROW PURCHASE TO ADD TURN LANES AND0.0
0921-02-352Hidalgo/
Pharr
CSTentative$14,679,9683CONSTRUCT 4 LANE URBAN ROADWAY0.0
0921-02-155Hidalgo/
Pharr
VATentative$1,000,0003TRAFFIC SIGNAL HARDWARE IMPROVEMENTS0.0
0039-17-175Hidalgo/
Pharr
IH 2Tentative$150,000,00111INTERCHANGE IMPROVEMENTS0.0
0864-01-078Hidalgo/
Pharr
FM 494Tentative$113,40010UPGRADE RAILROAD CROSSING PLANKING0.0
0921-02-390Hidalgo/
Pharr
VATentative$150,0003VISION ZERO PLANNING STUDY0.0
1804-01-068Hidalgo/
Pharr
FM 1926Tentative$516,8453ADDITION OF NORTH AND SOUTH BOUND CENTER TURN LANES0.0
1804-01-079Hidalgo/
Pharr
SS 115Tentative$328,0006ABUTMENT CAP REPLACEMENT0.0
0039-02-072Hidalgo/
Pharr
US 83Tentative$2,360,0948INSTALL MEDIAN CABLE BARRIER0.0
0039-14-011Hidalgo/
Pharr
FM 886Tentative$81,00010UPGRADE RAILROAD CROSSING PLANKING0.0
2631-01-006Hood/
Ft Worth
FM 3450Tentative$1,300,0001REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS0.0
0005-05-114Howard/
Abilene
IH 20Tentative$8,306,3888MEDIAN CABLE BARRIER0.0
0901-22-114Hunt/
Paris
VATentative$1,200,0007UPDATE HUNT CO TRANS PLAN TO ID IMPROVEMENTS TO IH 30, SH 660.0
1945-01-022Jackson/
Yoakum
FM 1822Tentative$86,400102017 RAILROAD REPLANKING PROGRAM0.0
0244-07-007Jasper/
Beaumont
FM 1747Tentative$37,12210TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0028-06-086Jefferson/
Beaumont
US 90Tentative$769,83010TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0200-14-092Jefferson/
Beaumont
US 69Tentative$22,44610TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0200-14-091Jefferson/
Beaumont
US 69Tentative$22,44610TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0920-00-120Jefferson/
Beaumont
VATentative$1,200,0005REPLACE 15 TRANSIT BUSES WITH ALTERNATELY FUELED VEHICLES0.0
0601-02-025Jefferson/
Beaumont
SH 326Tentative$466,34610TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0920-38-261Jefferson/
Beaumont
CSTentative$5,087,4643CONSTRUCT OVERPASS INTO THE PORT OF BEAUMONT0.0
0920-38-259Jefferson/
Beaumont
CSTentative$250,0008PROTECTIVE DEVICES0.0
0368-03-035Jefferson/
Beaumont
SH 124Tentative$13,98010TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0601-02-024Jefferson/
Beaumont
SH 326Tentative$250,0008PROTECTIVE DEVICES0.0
0368-03-036Jefferson/
Beaumont
SH 124Tentative$14,89810TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0255-15-005Jim Wells/
Corpus Christi
US 281Tentative$68,540,49511CONSTRUCT A FOUR LANE RELIEF ROUTE ALONG US 281 AT PREMONT0.0
1513-02-042Johnson/
Ft Worth
FM 4Tentative$2,637,5408SAFETY TREAT FIXED OBJECTS, RESURFACING, CONSTRUCT PAVED SHO0.0
1181-02-036Johnson/
Ft Worth
FM 917Tentative$241,5188REALIGN INTERSECTION0.0
0100-12-009Karnes/
Corpus Christi
FM 2509Tentative$1,895,5088S,TRT,FIXED OBJECTS,MILLED EDGELINE RUMB. STRIPS,ADDITIONAL0.0
2512-01-014Kaufman/
Dallas
FM 2728Tentative$250,0008INSTALL GRADE CROSSING WARNING DEVICES0.0
0617-03-010Kleberg/
Corpus Christi
PR 22Tentative$65510EMERGENCY WORK REPAIR FOR ILLUMINATION, SMALL SIGNS AND TRAF0.0
0617-03-011Kleberg/
Corpus Christi
PR 22Tentative$7,53510EMERGENCY WORK REPAIR ILLUMINATION, SMALL SIGNS AND TRAFFIC0.0
0901-29-081Lamar/
Paris
CRTentative$441,6006BRIDGE REPLACEMENT0.0
0346-06-049Lavaca/
Yoakum
SH 111Tentative$963,6588SAFETY TREAT FIXED OBJECTS0.0
0114-07-084Lee/
Austin
US 290Tentative$250,0008UPGRADE WARNING DEVICES AND SAFETY FEATURES AT RAILROAD0.0
1912-03-010Liberty/
Beaumont
FM 2090Tentative$455,48610TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0813-01-104Liberty/
Beaumont
FM 787Tentative$7,45910TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0813-01-105Liberty/
Beaumont
FM 787Tentative$1,995,74010TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0916-29-014Live Oak/
Corpus Christi
CRTentative$1,100,0006REPLACE BRIDGE AND APPROACHES0.0
0905-06-112Lubbock/
Lubbock
CSTentative$250,0008RAIL HWY CROSSING SIGNALS/STRUCTURES0.0
0905-06-117Lubbock/
Lubbock
VATentative$50,0007TRANSPORTATION NON-ROADWAY0.0
0905-06-113Lubbock/
Lubbock
CSTentative$250,0008RAIL HWY CROSSING SIGNALS/STRUCTURES0.0
0062-06-058Marion/
Atlanta
US 59Tentative$2,267,1188INSTALL MEDIAN BARRIER0.0
0062-06-057Marion/
Atlanta
US 59Tentative$50,0003CONSTRUCT RIGHT TURN/DECELLERATION LANE0.0
0913-21-048Matagorda/
Yoakum
CRTentative$1,270,0006REPLACE BRIDGE AND APPROACHES0.0
2636-01-009Maverick/
Laredo
FM 2644Tentative$89,7468PROFILE EDGELINE MARKINGS,PROFILE CENTERLINE MARKINGS0.0
2506-01-041Mclennan/
Waco
FM 1695Tentative$66,40810REPLACE CONCRETE CROSSING SURFACE0.0
1547-01-048Medina/
San Antonio
FM 471Tentative$010REPLACE TWO AT-GRADE RAILROAD CROSSING SURFACES AT DOT0.0
0421-02-030Medina/
San Antonio
SH 173Tentative$010REPLACE AT-GRADE RAILROAD CROSSING SURFACE AT DOT 427 959N0.0
0005-09-021Midland/
Odessa
BI 20-ETentative$4,000,0008CORRIDOR INTERCONNECT FOR PRE-EMPTION0.0
2133-02-014Milam/
Bryan
FM 485Tentative$12,188,9921REHABILITATE EXISTING ROAD0.0
1767-04-031Montague/
Wichita Falls
FM 1125Tentative$010REPLANKING EXISTING RR CROSSING0.0
0912-37-236Montgomery/
Houston
CRTentative$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755882G)0.0
1912-01-023Montgomery/
Houston
FM 2090Tentative$11,45510REPLACED TRAFFIC SIGNAL CABINET0.0
1912-02-015Montgomery/
Houston
FM 2090Tentative$010REPLANK EXISTING RR CROSSING SURFACE0.0
0338-04-081Montgomery/
Houston
SH 105Tentative$11,00010REPLACED TRAFFIC SIGNAL CABINET0.0
0177-05-119Montgomery/
Houston
IH 69Tentative$92,14310INSTALL FLEXIBLE RIP RAP PROTECTION SYSTEM0.0
0912-37-234Montgomery/
Houston
CRTentative$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755879Y)0.0
0912-37-235Montgomery/
Houston
CRTentative$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755892M)0.0
1062-01-217Montgomery/
Houston
FM 1485Tentative$135,56010BRIDGE APPROACH SLAB REPAIR0.0
1416-03-019Montgomery/
Houston
FM 1486Tentative$010REPLANK EXISTING RR CROSSING SURFACE0.0
0177-05-117Montgomery/
Houston
IH 69Tentative$219,32210REPLACED TRAFFIC SIGNAL CABINET0.0
0911-08-047Nacogdoches/
Lufkin
CRTentative$08INSTALL NEW LIGHTS & GATES0.0
3325-01-015Navarro/
Dallas
FM 3243Tentative$22,14410INSTALL RAILROAD CROSSING SURFACE0.0
1300-02-030Newton/
Beaumont
FM 692Tentative$174,46510TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0326-03-096Nueces/
Corpus Christi
SH 286Tentative$4,35910REPAIR OR REPLACE SIGNALS DMAGED BY HIGH WINDS0.0
0074-06-245Nueces/
Corpus Christi
IH 37Tentative$46510REPLACEMENT OF OVERHEAD SIGNS BRIDGE STRUCTURES, SIGNS FOR0.0
0920-30-084Orange/
Beaumont
CSTentative$250,0008PROTECTIVE DEVICES0.0
0028-11-206Orange/
Beaumont
IH 10Tentative$21,62310TS HARVEY EMERGENCY REPAIRS DONE WITH 47Y002790.0
0028-11-204Orange/
Beaumont
IH 10Tentative$48,05510TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0784-04-024Orange/
Beaumont
FM 1131Tentative$24,67710TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0028-14-114Orange/
Beaumont
IH 10Tentative$101,56210TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0028-09-122Orange/
Beaumont
IH 10Tentative$42,50010TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0028-09-118Orange/
Beaumont
IH 10Tentative$46,25510TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0028-09-120Orange/
Beaumont
IH 10Tentative$92,71310TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0028-09-119Orange/
Beaumont
IH 10Tentative$183,02710TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0362-07-009Palo Pinto/
Ft Worth
FM 2951Tentative$5,100,0001WIDEN PAVEMENT, EXTEND CULVERTS, OVERLAY, PAVEMENT MARKINGS0.0
0717-01-025Parker/
Ft Worth
FM 113Tentative$1,905,0003REALIGNMENT OF ROADWAY0.0
3520-01-022Parmer/
Lubbock
FM 3333Tentative$250,0008RAIL HWY CROSSING SIGNALS/STRUCTURES0.0
7106-03-001Pecos/
Odessa
RL SOTentative$15,311,9493REHABILITATION OF SOUTH ORIENT RR TO 25 MPH TRACK SPEEDS0.0
7106-03-003Pecos/
Odessa
RL SOTentative$0RLREHABILITATION OF THE SOUTH ORIENT RAIL LINE INCLUDING RAIL,0.0
0177-01-108Polk/
Lufkin
US 59Tentative$430,59410REPLACE DAMAGED RIPRAP AND REPAIR SLOPE FAILURE NEXT TO RIPR0.0
0911-04-092Polk/
Lufkin
CSTentative$08INSTALL NEW LIGHT & GATES0.0
0177-01-112Polk/
Lufkin
US 59Tentative$155,4856STEEL PAINT WITH SYSTEM II0.0
0341-02-048Polk/
Lufkin
US 287Tentative$08UPGRADE LIGHTS & GATES0.0
0213-04-048Polk/
Lufkin
US 190Tentative$08INSTALL NEW LIGHTS & GATES0.0
0176-05-187Polk/
Lufkin
US 59Tentative$31,01810REESTABLISH THE SLOPE, GRADE EDGE OF CHANNEL TO PREVENT0.0
0904-02-044Potter/
Amarillo
CSTentative$250,0008DOT#014602G FED RAILROAD SIGNAL PROGRAM0.0
2635-01-038Potter/
Amarillo
SL 335Tentative$8,300,0001OVERLAY0.0
0139-04-050Reeves/
Odessa
US 285Tentative$010INSTALL RR CROSSING REPLANKING FOR CROSSING DOT#796 245N0.0
0003-05-054Reeves/
Odessa
IH 20Tentative$18,151,9048INSTALL MEDIAN BARRIER0.0
0738-01-061Refugio/
Corpus Christi
FM 136Tentative$18110REPAIR OR REPLACE SIGNS DAMAGED BY HIGH WINDS0.0
0180-02-045Refugio/
Corpus Christi
SH 35Tentative$2,83910REPAIR OR REPLACE FLASHERS DAMAGED BY HIGH WINDS0.0
0826-03-012Runnels/
San Angelo
FM 2133Tentative$72,00010REPLANK RAILROAD CROSSING0.0
0246-01-036Rusk/
Tyler
US 79Tentative$6,500,0001REPAIR & RESURFACE ROADWAY0.0
0403-01-047San Jacinto/
Lufkin
SH 156Tentative$2,71010EMERGENCY ROADWAY REPAIRS_- SLOPE FAILURES0.0
0403-01-049San Jacinto/
Lufkin
SH 156Tentative$53,07610RE-ESTABLISH THE SLOPE AND RESET GUARDRAIL. CONCRETE RIRAP W0.0
0177-02-102San Jacinto/
Lufkin
US 59Tentative$624,38610REPAIR PAVING EROSION, REPLACE DAMAGED MBGF AND REBUILD BACK0.0
0372-01-107San Patricio/
Corpus Christi
US 77Tentative$010REPAIR OR REPLACE SIGNALS DAMAGED BY HIGH WINDS ALONG US 770.0
0507-03-047San Patricio/
Corpus Christi
SH 188Tentative$7,18210REPLACE SMALL SIGNS AND SUPPORT ASSEMBLIES DAMAGED BY HIGH0.0
0507-02-054San Patricio/
Corpus Christi
FM 631Tentative$26810REPLACE SMALL SIGNS AND SUPPORT ASSEMBLIES DAMAGED BY HURRIC0.0
0372-01-108San Patricio/
Corpus Christi
US 77Tentative$13,98810REPAIR OR REPLACE SIGNALS DAMAGED BY HIGH WINDS AT 2 INTERS.0.0
0507-03-048San Patricio/
Corpus Christi
SH 188Tentative$62110REPLACE SMALL SIGNS AND SUPPORT ASSEMBLIES DAMAGED BY HIGH0.0
1209-02-020San Patricio/
Corpus Christi
FM 631Tentative$52010REPLACE SMALL SINGS AND SUPPORT ASSEMBLIES DAMAGED BY HURRIC0.0
2263-01-013San Patricio/
Corpus Christi
SH 361Tentative$4,29710REPLACE SMALL SIGNS AND SUPPORT ASSEMBLIES DAMAGED BY HIGH0.0
0916-28-075San Patricio/
Corpus Christi
CSTentative$6,26710REPAIR AND REPLACE SCHOOL ZONE BEACONS AND STOP SIGN WITH PO0.0
0916-28-074San Patricio/
Corpus Christi
CSTentative$6,00210REPAIR AND REPLACE SCHOOL ZONE BEACONS AND STOP SIGN WITH PO0.0
3474-01-011San Patricio/
Corpus Christi
FM 136Tentative$1,58410REPAIR OR REPLACE SIGNS DAMAGED BY HIGH WINDS0.0
0738-03-031San Patricio/
Corpus Christi
FM 136Tentative$1,58510REPAIR OR REPLACE SIGNS DAMAGED BY HIGH WINDS0.0
3026-01-030San Patricio/
Corpus Christi
FM 2986Tentative$180,29010REPAIR OR REPLACE SIGNALS DAMAGED BY HIGH WINDS AT 2 INTERS.0.0
0916-28-070San Patricio/
Corpus Christi
CSTentative$342,1069CONSTRUCT HIKE AND BIKE TRAIL0.0
0101-03-093San Patricio/
Corpus Christi
US 181Tentative$10,75010REPAIR OR REPLACE SIGNALS DAMAGED0.0
0101-04-113San Patricio/
Corpus Christi
US 181Tentative$4,045,8248IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS0.0
0101-03-092San Patricio/
Corpus Christi
US 181Tentative$103,02310REPAIR OR REPLACE SIGNALS DAMAGED BY HIGH WINDS AT 2 INTERS.0.0
0180-06-109San Patricio/
Corpus Christi
SH 35Tentative$165,60510REPLACEMENT OF SIGN FOUNDATION, SIGN POST, AND SIGN FOR SIGN0.0
0180-10-087San Patricio/
Corpus Christi
SH 361Tentative$117,44910REPLACE SMALL SIGNS AND SUPPORT ASSEMBLIES DAMAGED BY HIGH0.0
0180-06-111San Patricio/
Corpus Christi
BS 35-LTentative$12,04910REPAIR OR REPLACE SIGNALS DAMAGED BY HIGH WINDS AT 4 INTERS.0.0
1529-02-010Scurry/
Abilene
FM 1607Tentative$212,70810SIDEWALK ADA IMPROVEMENTS0.0
1361-03-029Scurry/
Abilene
SH 208Tentative$010REPLANK RAILROAD CROSSING0.0
0063-06-099Shelby/
Lufkin
US 96Tentative$1,033,1816DECK REPAIRS AND RESEAL JOINTS0.0
0378-03-017Smith/
Tyler
SH 135Tentative$7,500,0001WIDEN RDWY FOR PASSING LANES/SUPER2 & RESURFACE0.0
0172-02-076Tarrant/
Ft Worth
BU 287PTentative$1,537,6461REPLACE CONCRETE PAVEMENT AND STORM SEWER0.0
0094-01-040Tarrant/
Ft Worth
SH 183Tentative$7,566,4591REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS0.0
0171-05-098Tarrant/
Ft Worth
SH 199Tentative$1,121,3701REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS0.0
0363-03-053Tarrant/
Ft Worth
SH 121Tentative$685,9338REPAIR/REPLACE EXISTING METAL BEAM GUARD FENCE0.0
0363-01-144Tarrant/
Ft Worth
SH 26Tentative$675,2808INSTALL RAISED MEDIAN, PROFILE EDGELINE MARKINGS0.0
0902-00-163Tarrant/
Ft Worth
VATentative$2,000,0001CONCRETE PAVEMENT REPAIR, VARIOUS LOCATIONS FY 200.0
0014-15-075Tarrant/
Ft Worth
US 81Tentative$534,9318INSTALL MEDIAN CABLE BARRIER0.0
0353-03-102Tarrant/
Ft Worth
SH 114Tentative$62,3343RELOCATE ITS FIBER OPTIC CABLE DUE TO CONFLICT WITH TEX RAIL0.0
0008-07-034Tarrant/
Ft Worth
SH 180Tentative$305,7751CONSTRUCT DIVISION BIKE/PEDESTRIAN PROJECT0.0
0902-00-178Tarrant/
Ft Worth
VATentative$312,5007PROGRAM OVERSIGHT COORDINATION, INCLUDING DEPT STREAMLINING0.0
0902-90-093Tarrant/
Ft Worth
CSTentative$250,00082018 FEDERAL RR SIGNAL PROGRAM0.0
0902-90-094Tarrant/
Ft Worth
CSTentative$250,00082018 FEDERAL RR SIGNAL PROGRAM0.0
0902-90-101Tarrant/
Ft Worth
VATentative$1,720,0003CONDUCT PLANNING STUDIES FOR REGION'S GOODS MOVEMENT PROGRAM0.0
0902-90-090Tarrant/
Ft Worth
CSTentative$250,00082018 FEDERAL RR SIGNAL PROGRAM0.0
0902-90-091Tarrant/
Ft Worth
CSTentative$250,00082018 FEDERAL RR SIGNAL PROGRAM0.0
0902-90-092Tarrant/
Ft Worth
CSTentative$250,00082018 FEDERAL RR SIGNAL PROGRAM0.0
1603-03-038Tarrant/
Ft Worth
FM 1709Tentative$947,3658IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW0.0
3125-01-022Tarrant/
Ft Worth
FM 3029Tentative$58,2218IMPROVE TRAFFIC SIGNALS, ADD RIGHT TURN LANE0.0
1978-01-058Tarrant/
Ft Worth
FM 1938Tentative$2,523,7718INSTALL RAISED MEDIAN, PROFILE EDGELINE MARKINGS0.0
0902-90-116Tarrant/
Ft Worth
CSTentative$4,378,9933INTERSECTION AND SIGNAL IMPROVEMENTS ALONG TRINITY BLVD &0.0
0902-90-118Tarrant/
Ft Worth
VATentative$500,0005PILOT PROGRAM TO IMPLEMENT FIXED AND FLEXIBLE STOP ROUTE0.0
1068-02-137Tarrant/
Ft Worth
IH 30Tentative$265,0003LANDSCAPE MONUMENT ON NORTHSIDE0.0
0902-48-864Tarrant/
Ft Worth
CSTentative$2,240,4003SNIDER STREET EXTENSION/CONNECTION (2 LANES) WITH PEDESTRIAN0.0
0902-90-036Tarrant/
Ft Worth
CSTentative$2,085,3958INSTALL SIDEWALKS, INCREASE SUPER ELEVATION, CONSTRUCT0.0
0902-90-037Tarrant/
Ft Worth
CSTentative$200,4448REMOVE SPANWIRE SIGNAL, INSTALL PERMANENT MAST ARM SIGNAL0.0
0902-00-208Tarrant/
Ft Worth
VATentative$78,0007MULTIMODAL TRANSPORTATION OPTIONS, SCHOOL SITING, SAFETY AND0.0
0902-00-219Tarrant/
Ft Worth
VATentative$800,0001DEVELOPMENT OF A TRANSPORTATION SYSTEMS MANAGEMENT PROGRAM0.0
0902-00-220Tarrant/
Ft Worth
VATentative$1,700,0001MANAGED LANE SYSTEM, IMPLEMENT TECHNOLOGY TO DETECT AUTO0.0
0902-90-038Tarrant/
Ft Worth
CSTentative$447,1158INSTALL TRAFFIC SIGNAL & SAFETY LIGHTING AT INTERSECTION0.0
0902-90-074Tarrant/
Ft Worth
VATentative$5,000,0003COMPLETION OF THE DFW CORE EXPRESS HIGH SPEED RAIL PROJECT0.0
0902-90-088Tarrant/
Ft Worth
VATentative$670,00011INSTALLATION OF EMERGENCY/INCIDENT MANAGEMENT SIGNS0.0
0902-90-039Tarrant/
Ft Worth
CSTentative$703,4088REPLACE TRAFFIC SIGNALS AT TWO INTERSECTIONS, INSTALL ADA0.0
0902-90-042Tarrant/
Ft Worth
VATentative$25,0003DIRECT STATE CHARGES FOR TEX RAIL CONNECTION_PROJECTS0.0
0902-90-056Tarrant/
Ft Worth
VATentative$50,0007ITS QUALITY IMPLEMENTATION - ENSURE EFFECTIVE USE OF ITS0.0
0908-33-097Taylor/
Abilene
CRTentative$250,0008UPGRADE/INSTALL RR XING PROTECTION0.0
1378-01-040Travis/
Austin
RM 1431Tentative$856,5501CONSTRUCT LEFT & RIGHT TURN LANES @ BALCONES CANYONLANDS NWR0.0
0914-00-423Travis/
Austin
VATentative$312,5003CAPCOG SPONSORED FY 2019 COMMUTE SOLUTIONS PROGRAM0.0
0914-00-412Travis/
Austin
VATentative$1,000,0001FY 2018 NON-SITE SPECIFIC ITS IMPROVEMENTS_ON SL 1, IH 35 &0.0
1828-01-030Tyler/
Beaumont
FM 1943Tentative$37,12210TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0703-03-026Tyler/
Beaumont
FM 256Tentative$61,16610TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0703-03-025Tyler/
Beaumont
FM 256Tentative$48,85410TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
1237-01-036Tyler/
Beaumont
FM 1013Tentative$17,50610TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
1584-01-027Tyler/
Beaumont
FM 1745Tentative$14,19410TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0922-11-042Val Verde/
Laredo
CSTentative$250,0008FEDERAL RAILROAD SIGNAL PROGRAM (FSP)0.0
0022-10-070Val Verde/
Laredo
US 90Tentative$967,1408CONSTRUCTION OF CABLE BARRIER SYSTEM0.0
0922-11-032Val Verde/
Laredo
VATentative$3,306,0003REHABILITATION OF EXISTING HIGHWAY0.0
0161-01-030Val Verde/
Laredo
UP 277Tentative$102,3078IMPROVE TRAFFIC SIGNAL_& INSTALLATION OF SIDEWALKS0.0
0913-27-083Victoria/
Yoakum
VATentative$14,19410EMERGENCY REPAIR-FHWA ER0.0
0842-02-023Victoria/
Yoakum
FM 447Tentative$65,35510PERMANENT REPAIR-FHWA ER0.0
1402-01-035Walker/
Bryan
FM 2929Tentative$8,24010PAVEMENT AND SCOUR REPAIR0.0
2371-01-012Ward/
Odessa
PR 41Tentative$398,31510SEAL COAT PARK ROADS, PARKING LOTS, AND CAMPSITE PULLOUTS0.0
1370-01-021Ward/
Odessa
FM 1219Tentative$204,0738INSTALL PROTECTIVE DEVICES FOR CROSSING DOT# 864588J0.0
0354-02-029Ward/
Odessa
SH 115Tentative$010INSTALL RR CROSSING REPLANKING FOR DOT# 796 265B0.0
0004-02-060Ward/
Odessa
IH 20Tentative$18,877,1818INSTALL MEDIAN BARRIER0.0
0917-19-052Washington/
Bryan
CSTentative$250,0008FEDERAL RAILROAD SIGNAL PROGRAM0.0
0018-06-197Webb/
Laredo
IH 35Tentative$86,40010REPLANK EXISTING RR CROSSING SURFACE0.0
0922-33-176Webb/
Laredo
CRTentative$1,293,1266REPLACEMENT OF STRUCTURE ON EXISTING LOCATION0.0
0922-33-076Webb/
Laredo
CSTentative$1,810,4343NEW LOCATION TWO LANE HIGHWAY0.0
2150-04-077Webb/
Laredo
FM 1472Tentative$671,9408SAFETY LIGHTING0.0
0922-33-093Webb/
Laredo
CSTentative$16,242,0013CONSTRUCTION OF A GRADE SEPARATION INTERCHANGE3.0
0922-33-175Webb/
Laredo
CSTentative$1,634,2773PS&E INCLUDING ROW MAPPING ONLY0.0
0922-33-177Webb/
Laredo
CSTentative$815,7993RIVER VEGA MULTI-USE ALTERNATIVE TRANSPORTATION TRAIL0.0
0089-07-161Wharton/
Yoakum
US 59Tentative$5,280,1798INSTALL MEDIAN BARRIER0.0
0240-03-038Wharton/
Yoakum
SH 60Tentative$72,000102017 RAILROAD REPLANKING PROGRAM0.0
1303-01-019Wharton/
Yoakum
FM 1161Tentative$72,000102017 RAILROAD REPLANKING PROGRAM0.0
0685-01-032Wichita/
Wichita Falls
SS 325Tentative$5,500,0001RECONFIGURE RAMP0.0
0903-03-115Wichita/
Wichita Falls
CSTentative$2,124,4403CONSTRUCT HIKE & BIKE TRAIL0.0
0043-17-032Wichita/
Wichita Falls
BU 287JTentative$892,8838MILLED CENTERLINE RUMBLE STRIPS0.0
0832-02-028Wilbarger/
Wichita Falls
FM 925Tentative$010REPLANKING EXISTING RR CROSSING0.0
1371-01-021Winkler/
Odessa
FM 1232Tentative$250,0008INSTALL LIGHTS AND GATES FOR DOT# 864 593F0.0
0134-06-052Wise/
Ft Worth
FM 1810Tentative$8,002,9281WIDEN PAVEMENT, EXTEND CULVERTS, SEAL COAT, PAVEMENT MARKING0.0
0134-07-069Wise/
Ft Worth
US 380Tentative$2,163,1068IMPROVE EXIT RAMP FROM WEST BOUND US 380 TO NORTH BOUND0.0
1606-01-034Wise/
Ft Worth
FM 1658Tentative$91,6658INSTALL DRAGNET BARRIER AT BRIDGE ENDS0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract