Letting Schedule for September, 2018 County (FY 2019)

Last Update: Monday, July 16, 2018
September, 2018 (FY 2019)(see Links)
SEP 2018 | OCT 2018 | NOV 2018 | DEC 2018 | JAN 2019 | FEB 2019 | MAR 2019 | APR 2019 | MAY 2019 | JUN 2019 | JUL 2019 | AUG 2019 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
DescriptionDBE Goal
0042-03-042Armstrong/
Amarillo
US 287Approved$7,427,9121OVERLAY0.0
0017-13-010Atascosa/
San Antonio
SH 132Approved$2,936,4588IMPROVE TRAFFIC SIGNAL AND SAFETY LIGHTING AT INTERSECTION0.0
0573-01-037Bastrop/
Austin
SH 304Approved$727,7258PROFILE EDGELINE MARKINGS AND PROFILE CENTERLINE MARKINGS0.0
0909-36-157Bell/
Waco
CSApproved$2,375,1013CONSTRUCT HIKE AND BIKE TRAIL AND SIDEWALKS WITH LANDSCAPING0.0
0017-10-277Bexar/
San Antonio
IH 35Approved$141,9208WRONG WAY DRIVER ADVANCED TECHNOLOGIES0.0
0143-01-055Bexar/
San Antonio
US 87Approved$2,869,5261RESTORE EXISTING ROADWAY0.0
0025-02-217Bexar/
San Antonio
IH 10Approved$2,061,7276CLEAN AND PAINT STEEL TRUSS, BRIDGE REPAIR, MILL, OVERLAY0.0
0016-08-037Bexar/
San Antonio
SL 368Approved$3,854,5948IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION0.0
0914-23-012Blanco/
Austin
VAApproved$881,4923INSTALL BIKE AND PEDESTRIAN PATHWAY/SIDEWALKS0.0
0587-01-063Brazoria/
Houston
FM 1495Approved$1,227,7371MILLING, 1.5" ACP OVERLAY AND PAVEMENT MARKINGS0.0
0482-02-033Brooks/
Pharr
SH 285Approved$2,933,4571SEAL COAT0.0
1425-03-061Cameron/
Pharr
FM 106Approved$1,978,2411SEAL COAT0.0
0275-03-066Carson/
Amarillo
IH 40Approved$16,191,5051EBL - MILL, REHAB AND OVERLAY0.0
0062-03-042Cass/
Atlanta
SH 8Approved$1,844,4098PROFILE EDGELINE MARKINGS0.0
0816-04-050Collin/
Dallas
FM 455Approved$3,744,3556REPLACE BRIDGE AND APPROACHES0.0
1272-01-019Comal/
San Antonio
FM 1101Approved$262,9338PROFILE EDGELINE & CENTERLINE MARKINGS0.0
1187-01-029Coryell/
Waco
FM 929Approved$8,219,8851SEAL COAT0.0
2451-02-012Culberson/
El Paso
RM 652Approved$21,464,54011FULL DEPTH REHAB0.0
0918-47-115Dallas/
Dallas
VAApproved$2,313,57310CONSTRUCT CURB RAMPS IN THE CITY OF DALLAS, ALONG SH 78,0.0
0913-00-104Dewitt/
Yoakum
VAApproved$2,476,3151PAVEMENT MARKINGS0.0
0106-01-039Dickens/
Childress
SH 70Approved$1,856,7606REPLACEMENT OF EXISTING BRIDGE0.0
0271-05-044Fort Bend/
Houston
IH 10Approved$349,0291INSTALL PAVEMENT MARKINGS0.0
0915-18-024Frio/
San Antonio
CRApproved$700,0006REPLACE BRIDGE & APPROACHES0.0
0912-73-206Galveston/
Houston
CSApproved$499,9933CONSTRUCT DOWNTOWN PEDESTRIAN TRANSIT CONNECTIVITY0.0
0389-06-108Galveston/
Houston
SH 146Approved$2,499,7241BASE REPAIR, MILLING, 1" CAM AND 1.5" ACP OVERLAY0.0
0839-01-014Gonzales/
Yoakum
FM 443Approved$1,570,3966REPLACE BRIDGE AND APPROACHES0.0
0424-02-046Gregg/
Tyler
SH 31Approved$725,5278IMPROVE & INTERCONNECT TRAFFIC SIGNALS, INSTALL FLASHING0.0
0067-06-057Hale/
Lubbock
IH 27Approved$1,635,6751TRAFFIC CONTROL DEVICES0.0
0271-16-140Harris/
Houston
IH 610Approved$113,844,8801RECONSTRUCT MAINLANES, FRONTAGE ROAD AND CONSTRUCT OVERPASS0.0
0912-72-314Harris/
Houston
VAApproved$5,839,9153CONSTRUCT MULTI-USE PATH0.0
0255-09-094Hidalgo/
Pharr
UP 281Approved$22,697,7961REHABILITATE ROADWAY0.0
0921-02-333Hidalgo/
Pharr
CSApproved$9,000,0003IMPROVEMENTS AT SOUTHBOUND INSPECTION FACILITY AT THE0.0
0083-02-051Hopkins/
Paris
SH 11Approved$4,822,8271REHAB WITH SHOULDERS0.0
0254-07-007Jim Wells/
Corpus Christi
US 281Approved$6,300,0001SPOT BASE REPAIR AND OVERLAY0.0
1094-04-016Johnson/
Ft Worth
FM 731Approved$1,974,1441REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS0.0
0033-04-063Jones/
Abilene
US 83Approved$11,222,2601CONSTRUCT SUPER TWO0.0
0197-04-080Kaufman/
Dallas
US 175Approved$6,531,7701MILL OVERLAY AND PAVEMENT MARKINGS (MAINLANES ONLY)0.0
0032-06-038King/
Childress
US 83Approved$3,341,1171ASPHALTIC CONCRETE PAVEMENT OVERLAY0.0
0102-10-030Kleberg/
Corpus Christi
FM 1898Approved$2,000,0001MILL AND INLAY0.0
0177-03-096Liberty/
Beaumont
US 59Approved$101,503,2611WIDEN TO 6 MAIN LANES WITH FRONTAGE ROADS0.0
0028-05-054Liberty/
Beaumont
US 90Approved$9,876,3531SEAL COAT (WEST BOUND)0.0
0577-04-022Llano/
Austin
SH 71Approved$1,376,5771SEAL COAT0.0
0905-06-098Lubbock/
Lubbock
VAApproved$1,810,00011REHABILITATION OF EXISTING ROAD0.0
0483-02-021Mcmullen/
San Antonio
SH 72Approved$28,667,1331REHAB AND WIDEN ROADWAY TO PROVIDE PASSING LANES AND6.0
0915-45-051Medina/
San Antonio
CRApproved$426,9066REPLACE BRIDGE AND APPROACHES0.0
0005-14-089Midland/
Odessa
IH 20Approved$850,00011IH 20 AT MIDKIFF RD JOINT UTILITY DUCT BANK BORE0.0
0177-05-113Montgomery/
Houston
IH 69Approved$800,0001CONSTRUCT DETENTION POND0.0
0911-08-047Nacogdoches/
Lufkin
CRTentative$08INSTALL NEW LIGHTS & GATES0.0
2839-01-012Palo Pinto/
Ft Worth
SH 337Approved$149,0408MILLED EDGELINE & CENTERLINE RUMBLE STRIPS0.0
0441-07-071Pecos/
Odessa
IH 10Approved$7,492,2271FACILITY UPGRADES TO MEET FREEWAY STANDARDS0.0
0911-04-092Polk/
Lufkin
CSTentative$08INSTALL NEW LIGHT & GATES0.0
0213-04-048Polk/
Lufkin
US 190Tentative$08INSTALL NEW LIGHTS & GATES0.0
0904-00-171Potter/
Amarillo
VAApproved$734,2961CRACK SEAL0.0
0003-05-050Reeves/
Odessa
IH 20Approved$10,000,0001SEAL COAT0.0
1290-03-024Rockwall/
Dallas
SH 276Approved$1,666,8311MILL, OVERLAY, FULL DEPTH REPAIR AND PAVEMENT MARKINGS0.0
1934-02-006Smith/
Tyler
FM 2015Approved$3,500,0001CONSTRUCT TURN LANES0.0
0364-01-148Tarrant/
Ft Worth
SH 121Approved$19,889,6051RECONSTRUCT SHOULDER FOR PEAK HOUR UTILIZATION5.0
0018-04-056Webb/
Laredo
IH 35Approved$3,885,8551RESURFACE OF EXISTING HIGHWAY0.0
0922-33-149Webb/
Laredo
CSApproved$1,400,0003CONSTRUCTION OF A PEDESTRIAN TRAIL AT CHACON CREEK0.0
0914-05-191Williamson/
Austin
VAApproved$1,449,8383CONSTRUCT 10 FT WIDE SHARED USE PATH IN ROUND ROCK WITH0.0
0914-05-190Williamson/
Austin
VAApproved$320,4853SHARED USE PATH: ADJACENT TO ROADWAY0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract