SP000-1224 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0177-14-039 in Montgomery County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1223 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-27-078 in Victoria County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1222 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0610-07-097 in Bowie County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1221 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0915-47-039 in Bandera County. Notification of unclear right of way within project limits.
One-Time Use.
|
SP000-1220 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0619-03-061 in Collin County. Utilities within the project limits have not been cleared and the operator of the railroad has not completed the railroad agreement.
One-Time Use.
|
SP000-1219 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0212-03-050 in Brazos County. Notification of unclear utilities and right-of-way within project limits.
One-Time Use.
|
SP000-1218 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0545-01-014 in Gregg County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1217 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0188-04-035 in Brazoria County. Utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-1216 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0335-02-035 in Houston County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1215 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0026-06-032 in Colorado County. Notification of unclear utilities and right of way within project limits.
One-Time Use.
|
SP000-1214 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0176-02-118 in Angelina County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1213 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0904-02-047 in Potter County. Notification on unclear utilities within project limits.
One-Time Use.
|
SP000-1212 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 3049-01-022 in Galveston County. Notification of unclear utilities, right of way, encroachments, and relocations within the project limits.
One-Time Use.
|
SP000-1211 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-28-078 in Fayette County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1210 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0833-02-020 in Bosque County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1209 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-09-106 in Wharton County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1208 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0128-01-111 in Brown County. Utilities within the project limits have not been cleared. In addition, the railroad agreements with Texas Rock Crushers Railway have not been completed.
One-Time Use.
|
SP000-1207 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0176-04-056 in Polk County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1206 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0176-04-056 in Polk County. Railroad coordination is complete, but an agreement has not been executed with the appropriate railroad.
One-Time Use.
|
SP000-1205 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2552-02-028 in El Paso County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1204 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0172-01-054 in Tarrant County. Notification for unclear right of way within project limits.
One-Time Use.
|
SP000-1203 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0479-03-016 in Loving County. Utility relocations within the project limits have not been cleared.
One-Time Use.
|
SP000-1202 |
PDF |
RTF |
Important Notice to Contractors - For project 0291-10-114 in Bexar County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1201 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0116-03-066 in Burleson County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1200 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1524-01-076 in Brazoria County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1199 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0942-02-011 in Gonzales County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1198 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0922-20-020 in LaSalle County. Temporary easements within the project limits have not been cleared.
One-Time Use.
|
SP000-1197 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0179-04-100 in Matagorda County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1196 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0005-14-100 in Midland County. Utilities relocations within the project limits have not been cleared.
One-Time Use.
|
SP000-1195 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0519-02-019 in Hill County. Right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-1194 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0188-09-051 in Fort Bend County. Utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-1193 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0921-06-311 in Cameron County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1192 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0919-03-063 in Harrison County. Railroad coordination is complete, but an agreement has not been executed with the appropriate railroad.
One-Time Use.
|
SP000-1191 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-20-093 in Austin County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1190 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0912-72-406 in Harris County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1189 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0911-00-122 in Angelina County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1188 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0113-02-062 in Gillespie County. Notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-1187 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0095-04-069 in Kaufman County. Notification of utilities within the project limits have not been cleared and the railroad agreement has not been executed.
One-Time Use.
|
SP000-1186 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0739-02-140 in Jefferson County. Notification of unclear utilities within the project limits and railroad agreement has not been executed.
One-Time Use.
|
SP000-1185 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0111-03-063 in Fort Bend County. Notification, agreement with the Union Pacific Railroad Company (UPRR) within the project limits has not been executed.
One-Time Use.
|
SP000-1184 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0919-03-064 in Harrison County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1183 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0102-04-097 in Kleberg County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1182 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0910-07-072 in Gregg County. Notification, the railroad agreement with Union Pacific Railroad has not been completed.
One-Time Use.
|
SP000-1181 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0051-02-108 in Harris County. Notification, railroad agreement (Maintenance Consent Letter - MCL) has not been executed.
One-Time Use.
|
SP000-1180 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-09-109 in Wharton County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1179 |
PDF |
RTF |
Important Notice to Contractors - For project 0923-00-068 in Brown County. The railroad agreements with Union Pacific Railroad have not been completed.
One-Time Use.
|
SP000-1178 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0015-13-077 in Travis County. Utilities and right of way, within the project limits have not been cleared.
One-Time Use.
|
SP000-1177 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0051-03-117 in Galveston County. Railroad certification within the project limits have not been cleared.
One-Time Use.
|
SP000-1176 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0130-05-085 in Lubbock County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1175 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-00-121 in DeWitt County. Notification of unclear railroad agreement within the project limits.
One-Time Use.
|
SP000-1174 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0446-04-014 in Colorado County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1173 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0072-08-144 in Bexar County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1172 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1539-02-034 in Travis County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1171 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2121-01-094 in El Paso County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1170 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0901-19-205 in Grayson County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1169 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0134-05-034 in Jack County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1168 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0716-02-045 in Colorado County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1167 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0079-01-038 in Brown County. Notification of railroad agreements that have not been completed.
One-Time Use.
|
SP000-1166 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0914-33-064 in Hays County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1165 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0048-04-094 in Ellis County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1164 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1245-02-049 in Potter County. A utility within the project limits has not been cleared.
One-Time Use.
|
SP000-1163 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-18-033 in Jackson County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1162 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0916-26-022 in Goliad County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1161 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0038-06-045 in Starr County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1160 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 3256-03-094 in Harris County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1159 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0118-08-075 in Nacogdoches County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1158 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0573-01-034 in Bastrop County. Notification of unclear utilities and incomplete railroad agreements within project limits.
One-Time Use.
|
SP000-1157 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0009-06-052 in Grayson, Hopkins, Hunt, Lamar Counties. Notification of outstanding railroad execution agreement within project limits.
One-Time Use.
|
SP000-1156 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0113-13-166 in Travis County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1155 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0867-01-017 in Hamilton County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1154 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0110-05-126 in Harris County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1153 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0463-03-052 in Midland County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1152 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2296-02-026 in Midland County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1151 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0849-01-055 in Bexar County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1150 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0921-06-252 in Cameron County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1149 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2374-04-085 in Dallas County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1148 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0809-04-057 in San Augustine County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1147 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0675-03-100 in Leon County. The railroad agreement with Union Pacific Railroad has not been completed.
One-Time Use.
|
SP000-1146 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0155-02-029 in Goliad County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1145 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0026-02-037 in Fayette County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1144 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0273-04-046 in Williamson County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1143 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-29-052 in Lavaca County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1142 |
PDF |
RTF |
DESCRIPTION OF PROJECT, SCOPE OF CONTRACT, SEQUENCE OF WORK - For project 0027-09-104 in Harris County. The work to be performed on this project consists of furnishing, installing, testing, and interconnecting a Computerized Transportation Management System covering US 90A from Fortbend county line to IH 610 S.
One-Time Use.
|
SP000-1141 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0049-09-087 in Brazos County. Notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-1140 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0300-01-105 in Maverick County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1139 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0185-06-012 in Milam County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1138 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0921-06-311 in Cameron County. Notification of railroad agreements that have not been completed.
One-Time Use.
|
SP000-1137 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0515-05-016 in Jackson County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1136 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0025-03-097 in Guadalupe County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1135 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0908-00-110 in Taylor County. Notification of railroad agreements that have not been completed.
One-Time Use.
|
SP000-1134 |
PDF |
RTF |
Important Notice to Contractors - For project 0026-06-035 in Colorado County. The operator of the railroad has not completed the railroad agreement within the project limits.
One-Time Use.
|
SP000-1133 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0921-06-311 in Cameron County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1132 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 3098-01-016 in Hidalgo County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1131 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2121-01-094 in El Paso County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1130 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0912-72-353 in Harris County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1129 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0087-04-041 in San Patricio County. Notification of railroad agreements that have not been completed.
One-Time Use.
|
SP000-1128 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0049-09-088 in Brazos County. Notification of railroad agreements that have not been completed.
One-Time Use.
|
SP000-1127 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0049-15-014 in Robertson County. Notification of railroad agreements that have not been completed.
One-Time Use.
|
SP000-1126 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0074-01-058 in Live Oak County. Notification of railroad agreements within project limits.
One-Time Use.
|
SP000-1125 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1186-01-091 in Travis County. Notification of unclear utilities within project limits.
One-Time Use.
|