SP000-577 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1051-01-037 in Ellis County. Notifies the contractor of unclear utilities located within the project limits.
One-Time Use.
|
SP000-576 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0816-04-050 in Collin County. Notifies the contractor of unclear utilities located within the project limits.
One-Time Use.
|
SP000-575 |
PDF |
RTF |
DESCRIPTION OF PROJECT, SCOPE OF CONTRACT, SEQUENCE OF WORK - For project 0028-02-092 in Harris County. Provides a description, scope, and sequence of work specific to this project.
One-Time Use.
|
SP000-574 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1015-01-023 in Rockwall County. Notifies the contractor of unclear utilities located within the project limits.
One-Time Use.
|
SP000-573 |
PDF |
RTF |
DESCRIPTION OF PROJECT, SCOPE OF CONTRACT, SEQUENCE OF WORK - For project 0508-01-356 in Harris County. Provides a description, scope, and sequence of work specific to this project.
One-Time Use.
|
SP000-572 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0917-29-120 in Brazos County. Notification of unclear right of way and utilities within the project limits.
One-Time Use.
|
SP000-571 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0139-02-025 in Reeves County. Notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-569 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1290-02-017 in Rockwall County. Notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-568 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0675-01-070 in Freestone County. Provides notification of unexecuted railroad agreement.
One-Time Use.
|
SP000-567 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0091-03-027 in Collin County. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-566 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0909-22-175 in McLennan County. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-565 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0227-06-024 in Hockley County. Notifies the contractor of unclear utilities located within the project limits.
One-Time Use.
|
SP000-564 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1400-04-037 in Montgomery County. Notice of unclear utilities within the project limits.
One-Time Use.
|
SP000-563 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0833-03-036 in McLennan County. Notifies the contractor of unclear utilities located within the project limits.
One-Time Use.
|
SP000-562 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0492-05-026 in Smith County. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by the Owners.
One-Time Use.
|
SP000-561 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0269-03-035 in Lavaca County. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-560 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0836-02-071 in Bell County. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-559 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-27-061 in Victoria County. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners
One-Time Use.
|
SP000-558 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0910-16-125 in Smith County. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by the Owners.
One-Time Use.
|
SP000-557 |
PDF |
RTF |
Important Notice to Contractors - For project 0209-07-045 in McLennan County. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-556 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1567-01-037 in Denton County. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-555 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0816-02-079 in Denton County. Notice of unclear utilities within the project limits.
One-Time Use.
|
SP000-554 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 3538-01-045 in Montgomery County. Notice of unclear utilities within the project limits.
One-Time Use.
|
SP000-553 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0522-03-026 in Van Zandt County. Notice of unclear utilities within the project limits.
One-Time Use.
|
SP000-552 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0142-05-080 in Kerr County. Notice of unclear utilities within the project limits.
One-Time Use.
|
SP000-551 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 3570-01-009 in Ector County. Notice of unclear utilities within the project limits.
One-Time Use.
|
SP000-550 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0909-00-049 in McLennan County. Notice of unclear utilities within the project limits.
One-Time Use.
|
SP000-549 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1077-01-025 in Falls County. Clearance of utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-548 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0912-72-413 in Harris County. Clearance of utilities and encroachments within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-547 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0774-03-014 in Hamilton County. Notification to unclear right of way, within the project limits.
One-Time Use.
|
SP000-546 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0408-02-046 in Austin County. Notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-545 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0275-01-180 in Potter County. Utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-544 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0006-15-034 in Nolan County. Utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-543 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2121-01-091 in El Paso County. As of November 06, 2017, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-542 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0515-01-068 in Jackson County. Utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-541 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0197-11-013 in Kaufman County. Utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-540 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0049-06-078 in Robertson County. Railroad agreements with the Union Pacific Railroad and BNSF Railway Company have not been executed. The Department anticipates the listed Railroads to execute all agreements by the dates listed below.
One-Time Use.
|
SP000-537 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2744-01-011 in Montgomery County. Notice of unclear utilities and right of way within the project limits.
One-Time Use.
|
SP000-536 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0909-38-076 in Falls County. Utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed.
One-Time Use.
|
SP000-535 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0116-04-100 in Brazos County. As of October 25, 2017, a railroad agreement with the BNSF Railway Company has not been executed. The Department anticipates the listed Railroad to execute the agreement by the date listed below.
One-Time Use.
|
SP000-534 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0543-03-067 in Fort Bend County. Clearance of utilities, right of way, and encroachments within the project limits have not been cleared. The Department anticipates clearance by the dates listed in the document.
One-Time Use.
|
SP000-533 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0008-13-221 in Tarrant County. Important Notice to Contractors
One-Time Use.
|
SP000-532 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 7107-04-001 in Crockett County. The Contractor's attention is directed to the fact that a technical prequalification is required for this project, prior to letting
One-Time Use.
|
SP000-531 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0786-01-083 in Jefferson County. Provides notification of unexecuted railroad agreement.
One-Time Use.
|
SP000-530 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0786-01-083 in Jefferson County. Notice of unclear utilities within the project limits.
One-Time Use.
|
SP000-529 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0543-03-067 in Fort Bend County. Provides clearance of utilities, right of way, and encroachments within the project limits
One-Time Use.
|
SP000-528 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 3256-01-109 in Harris County. Notice of unclear right of way within the project limits.
One-Time Use.
|
SP000-527 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0912-71-799 in Harris County. Notice of unclear right of way within the project limits.
One-Time Use.
|
SP000-526 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0919-21-029 in Camp County. Notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-525 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0008-13-221 in Tarrant County. Provides notification that utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-522 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0271-17-163 in Harris County. Provides notification of unclear utilities and encroachments within the project limits.
One-Time Use.
|
SP000-521 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2374-01-180 in Dallas County. Provides notification of unclear utilities and encroachments within the project limits.
One-Time Use.
|
SP000-520 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1708-02-012 in Fannin County. Provides notification of unexecuted railroad agreement.
One-Time Use.
|
SP000-519 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1708-02-012 in Fannin County. Notice of unclear utilities within the project limits.
One-Time Use.
|
SP000-518 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0027-10-071 in Harris County. Notice of unclear utilities within the project limits.
One-Time Use.
|
SP000-517 |
PDF |
RTF |
Important Notice to Contractors - For project 0057-02-037 in Freestone County. Notification of unexecuted railroad agreements.
One-Time Use.
|
SP000-516 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0111-03-031 in Fort Bend County. As of July 14, 2017, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed.
One-Time Use.
|
SP000-515 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0327-10-057 in Willacy County. As of July 31st, 2017, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed.
One-Time Use.
|
SP000-514 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0271-17-161 in Harris County. As of July 19, 2017, utilities and right of way within the project limits have not been cleared. The Department anticipates clearance by the dates listed.
One-Time Use.
|
SP000-513 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0027-06-051 in Fort Bend County. As of July 20, 2017, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed.
One-Time Use.
|
SP000-512 |
PDF |
RTF |
Important Notice to Contractors - For project 0104-10-006 in Presidio County. Important Notice to Contractors, informing contractors that project award is contingent to execution of Memorandum of Understanding.
One-Time Use.
|
SP000-511 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0918-47-114 in Dallas County. As of June 16, 2017, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed.
One-Time Use.
|
SP000-510 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0902-48-576 in Tarrant County. As of July14, 2017, utilities and right of way within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-509 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0015-13-382 in Travis County. Notification of unclear utilities, right of way, encroachments, and relocations within the project limits.
One-Time Use.
|
SP000-507 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0271-17-161 in Harris County. Provides notification of unclear utilities and right of way within the project limits.
One-Time Use.
|
SP000-506 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0843-07-016 in Harrison County. Notification to unclear right of way, within the project limits.
One-Time Use.
|
SP000-505 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0096-07-047 in Harrison County. Notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-504 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0094-02-121 in Tarrant County. Notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-503 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0905-06-086 in Lubbock County. Notification of unclear utilities and right of way located within the project limits.
One-Time Use.
|
SP000-502 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1163-01-022 in Smith County. As of June 16, 2017, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by the Owners.
One-Time Use.
|
SP000-501 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0104-10-006 in Presidio County. As of April 6, 2017, right of way within the project limits has not been cleared. The Department anticipates clearance by the dates listed below.
One-Time Use.
|
SP000-500 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0675-07-101 in Walker County. As of June 14, 2017, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below.
One-Time Use.
|
SP000-499 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0752-04-024 in Falls County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-497 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0262-07-033 in Milam County. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-496 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0921-02-212 in Hidalgo County. Provides notification of unclear right of way within the project limits.
One-Time Use.
|
SP000-495 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0912-71-386 in Harris County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-494 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0739-02-161 in Jefferson County. As of July 5, 2017, utilities within the proposed project limits have not been cleared.
One-Time Use.
|
SP000-493 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0914-04-227 in Travis County. As of June 6, 2017, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-492 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 3510-06-014 in Harris County. Provides notification of unclear utilities located within the project limits.
One-Time Use.
|
SP000-491 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2866-01-009 in Limestone County. Provides notification of unclear utilities located within the project limts.
One-Time Use.
|
SP000-490 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0917-29-129 in Brazos County. Provides notification of unclear utilities located within the project limits.
One-Time Use.
|
SP000-489 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0134-07-070 in Wise County. Provides notification of unexecuted rail road agreement.
One-Time Use.
|
SP000-488 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0216-01-036 in Comal County. Notification of unclear utilities located within the project limits.
One-Time Use.
|
SP000-487 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0327-10-057 in Willacy County. As of May 23rd, 2017, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-486 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0918-45-757 in Dallas County. Update Utility Table
One-Time Use.
|
SP000-483 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0011-07-051 in Stephens County. As of May 19, 2017 utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-482 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0128-04-035 in McMullen County. As of May 19, 2017 utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-481 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0912-31-221 in Brazoria County. Outstanding Right-of-Way and Utilities.
One-Time Use.
|
SP000-480 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1672-01-004 in Van Zandt County. As of May 12, 2017, utilities within the project limits have not been cleared. The Department anticipates clearance by the dates listed below.
One-Time Use.
|
SP000-477 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1586-01-069 in Hidalgo County. The contractor's attention is directed to the fact that certain Utility Adjustments, ROW Acquisitions and ROW Encroachments have not been completed.
One-Time Use.
|
SP000-476 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1673-01-008 in Van Zandt County. As of May 9, 2017, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-475 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0118-10-057 in San Augustine County. As of May 19, 2017, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-474 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0162-02-031 in Hill County. As of May 16, 2017, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-473 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1091-04-022 in Rockwall County. As of May 16, 2017 utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-472 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0911-39-038 in Shelby County. As of May 19, 2017, temporary construction easements and utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-470 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0266-08-011 in Colorado County. As of May 9, 2017 utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-469 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-29-033 in Lavaca County. As of 05/11/2017, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-468 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2054-02-015 in Denton County. Notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-467 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0751-03-037 in Kaufman County. As of May 9, 2017, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-466 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0179-14-008 in Matagorda County. Provides notification of unclear utilities located within the project limits.