2014 English Special Provisions by Item (All)
|
Specification Information
|
Search For a Special Provision or Specification
|
|
SP000-680 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0167-01-113 in El Paso County. As of October 8, 2018, Right of Way within the project limits have not been cleared.
One-Time Use.
|
SP000-679 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0167-01-113 in El Paso County. As of October 8, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-678 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0697-02-039 in Henderson County. Notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-677 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0114-05-037 in Bastrop County. As of 09/28/2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-676 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0508-02-120 in Chambers County. As of September 21, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-675 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0941-02-020 in DeWitt County. As of September 13, 2018, utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-674 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0007-03-092 in Eastland County. Notification of uncompleted railroad agreement.
One-Time Use.
|
SP000-673 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0092-13-024 in Navarro County. Notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-672 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0440-06-018 in Travis County. As of September 7, 2018, Capital Metro Transit Authority Railroad has not completed the railroad agreement.
One-Time Use.
|
SP000-671 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2552-03-058 in El Paso County. Notification of unclear Right of Way within the project limits.
One-Time Use.
|
SP000-670 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0083-02-051 in Hopkins County. Notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-669 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0114-05-037 in Bastrop County. As of August 27, 2018, utilities and right of way, within the project limits have not been cleared.
One-Time Use.
|
SP000-668 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1890-01-046 in Bexar County. As of August 27, 2018, the below identified encroachment within the project limits has not been cleared.
One-Time Use.
|
SP000-667 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2061-02-030 in McLennan County. As of August 27, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-666 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0177-03-096 in Liberty County. As of August 27, 2018, right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-665 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0177-03-096 in Liberty County. As of August 27, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-664 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0177-03-096 in Liberty County. As of August 27, 2018, encroachments within the project limits have not been cleared.
One-Time Use.
|
SP000-663 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0177-03-096 in Liberty County. As of August 24, 2018, right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-662 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0715-01-014 in Gonzales County. As of August 24, 2018, utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-661 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2552-03-058 in El Paso County. As of August 23, 2018, railroad within the project limits have not been cleared.
One-Time Use.
|
SP000-660 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0037-09-033 in Webb County. As of August 14, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-659 |
PDF |
RTF |
Notice of Contractor Performance Evaluations - In accordance with 43 TAC §9.26, this special provision notifies the contractor of the evaluation of contractor performance under §9.23. Required for all low-bid projects other than MMC and TMC projects.
Statewide Use.
|
SP000-658 |
PDF |
RTF |
Schedule of Liquidated Damages - VOID - DO NOT USE. Department implement additional disincentives to help ensure the timely completion of projects that have a significant impact to the traveling public. Required for all projects beginning the design phase in September 2018. However, may be used immediately at the districts' option. Anticipated full implementation with March 2019 letting. Will replace SP 000-001.
Replaces SP000-001 .Replaced by SP000-1243 . Statewide Use.
|
SP000-657 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0446-03-047 in Colorado County. As of August 3, 2018, utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-656 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0049-09-078 in Brazos County. As of August 10, 2018, railroad agreements with the Union Pacific Railroad, BNSF Railway Company, and TU Electric Big Brown Steam Electric Station Rail Spur have not been executed.
One-Time Use.
|
SP000-655 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0028-05-054 in Liberty County. As of August 7, 2018, Orange Port Terminal Railway, Union Pacific Railroad, Sabine River & Northern Railroad, and Kansas City Southern Railway have not completed the railroad agreement.
One-Time Use.
|
SP000-654 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2320-01-011 in Austin County. As of 8/2/2018, right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-653 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0497-05-038 in Victoria County. As of August 3, 2018, utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-652 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2061-02-030 in McLennan County. As of August 2, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-651 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2552-03-058 in El Paso County. As of August 2, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-650 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0374-08-021 in Culberson County. As of July 27, 2018, right of way within the project limits has not been cleared.
One-Time Use.
|
SP000-649 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0301-04-020 in Dimmit County. As of 7/25/18, utilities and relocations within the project limits have not been cleared.
One-Time Use.
|
SP000-648 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0002-01-095 in El Paso County. As of July 23, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-647 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0002-01-095 in El Paso County. A 90 day delay placed on the project start in order to allow for water season to end for the El Paso County Water Improvement District #1.
One-Time Use.
|
SP000-646 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0902-00-205 in Tarrant County. Notice of unclear utilities within the project limits.
One-Time Use.
|
SP000-645 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0068-08-065 in Howard County. As of July 12, 2018, Union Pacific Railroad has not completed the railroad agreement.
One-Time Use.
|
SP000-644 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0718-02-045 in Tarrant County. Notification of unclear utility adjustments and right of way acquisitions within the project limits.
One-Time Use.
|
SP000-641 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0080-11-001 in Hood, Johnson Counties. As of July 10, 2018, the following utility adjustments, Railroad Agreement, and right of way acquisitions within the project limits have not been cleared.
One-Time Use.
|
SP000-640 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1566-02-019 in Williamson County. As of July 9, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-639 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0016-03-103 in Hays County. As of July 9, 2018, utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-638 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0177-14-010 in Montgomery County. As of July 9, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-637 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 3026-01-026 in San Patricio County. As of July 5, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-636 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2230-01-013 in Bexar County. As of June 29, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-635 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 3158-01-032 in Montgomery County. As of June 27, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-634 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0252-02-054 in Burnet County. As of June 27, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-633 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0146-01-051 in Motley County. As of June 25, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-632 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0253-04-138 in Bexar County. As of June 22, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-631 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1281-02-007 in El Paso County. As of June 21, 2018, utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-630 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0327-10-062 in Kenedy, Willacy Counties. As of June 18, 2018, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-629 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0912-73-195 in Galveston County. Notice of utilities not cleared.
One-Time Use.
|
SP000-628 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0902-20-099 in Wise County. Provides notification of unclear utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-627 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0909-29-040 in Hamilton County. Provides notification of unclear utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-626 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0158-02-084 in Tom Green County. Provides notification of unclear utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-625 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0271-02-055 in Austin County. Provides notification of unclear utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-624 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0191-03-081 in Smith County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-623 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0271-16-140 in Harris County. Notice of right of way and utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-622 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2100-01-054 in Travis County. Provides notification of utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-621 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0739-02-162 in Jefferson County. Provides notification of utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-620 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0102-16-001 in Nueces County. Provides notification of utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-619 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1656-03-012 in Falls County. Provides notification of utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-618 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0909-38-071 in Falls County. Provides notification of right of way within the project limits has not been cleared.
One-Time Use.
|
SP000-617 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0909-39-127 in Coryell County. Provides notification of unclear utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-616 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0215-06-039 in Kendall County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-615 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0117-01-052 in Brazos County. Provides notification of utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-614 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0212-03-062 in Brazos County. Provides notification that a railroad agreement has not been executed with the appropriate railroad.
One-Time Use.
|
SP000-613 |
PDF |
RTF |
Important Notice to Contractors - For project 0540-05-048 in Brazos County. Provides notification that a Railroad (RR) agreement has not been executed and a Utility within the project limits has not been cleared.
One-Time Use.
|
SP000-612 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0902-20-111 in Wise County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-611 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0921-02-305 in Hidalgo County. Provides notification of unclear utilities and right of way within the project limits.
One-Time Use.
|
SP000-610 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0906-32-054 in Midland County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-609 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0751-02-025 in Kaufman County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-607 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0200-11-095 in Jefferson County. Notice of unclear utilities within the project limits.
One-Time Use.
|
SP000-606 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0912-72-075 in Harris County. Notice of unclear utilities within the project limits.
One-Time Use.
|
SP000-605 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0034-01-126 in Taylor County. Notice of unclear utilities and encroachment within the project limits.
One-Time Use.
|
SP000-604 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2374-02-147 in Dallas County. Notice of unclear utilities within the project limits.
One-Time Use.
|
SP000-603 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0543-02-065 in Fort Bend County. Provides notification of unclear utilities, right of way, and relocations within the project limits.
One-Time Use.
|
SP000-602 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0909-39-127 in Coryell County. Provides notification of unclear utilities within the project limits
One-Time Use.
|
SP000-601 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0184-01-063 in Coryell County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-600 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2452-03-112 in Bexar County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-599 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0500-04-106 in Galveston County. Provides notification of unclear right of way within the project limits.
One-Time Use.
|
SP000-598 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0189-01-011 in Red River County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-597 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1656-03-012 in Falls County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-596 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0389-05-116 in Harris County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-595 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1091-03-012 in Rockwall County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-594 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1068-04-119 in Dallas County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-593 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0394-03-040 in Panola County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-592 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2679-02-008 in Collin County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-591 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0495-04-065 in Smith County. Provides notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-590 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1005-02-001 in Harris County. Notifies the contractor of unclear utilities and encroachments within the project limits.
One-Time Use.
|
SP000-589 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1259-01-042 in Montgomery County. Notifies the contractor of unclear utilities, right of way and relocations within the project limits.
One-Time Use.
|
SP000-588 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0475-03-064 in Madison County. Notifies the contractor of unexecuted rail road agreement.
One-Time Use.
|
SP000-587 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0917-19-050 in Washington County. Notifies the contractor of unclear right of way and utilities within the project limits.
One-Time Use.
|
SP000-586 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0200-02-039 in Angelina County. Informs the contractor of unclear utilities located within the project limits.
One-Time Use.
|
SP000-585 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0902-48-744 in Tarrant County. Notifies the contractor of unclear utilities located within the project limits.
One-Time Use.
|
SP000-584 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0192-01-093 in Fort Bend County. Notifies the contractor of unclear utilities located within the project limits.
One-Time Use.
|
SP000-583 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0229-03-035 in Crane County. Notifies the contractor of unclear utilities located within the project limits.
One-Time Use.
|
SP000-582 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1257-01-049 in Fort Bend County. Notifies the contractor of unclear utilities located within the project limits.
One-Time Use.
|
SP000-581 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0912-72-333 in Harris County. Notifies the contractor of unclear utilities located within the project limits.
One-Time Use.
|
SP000-580 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0816-04-050 in Collin County. Notifies the contractor of unclear utilities located within the project limits.
One-Time Use.
|
SP000-579 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-09-073 in Wharton County. Notifies the contractor of unclear utilities located within the project limits.
One-Time Use.
|
SP000-578 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0909-40-074 in Limestone County. Notifies the contractor of unclear utilities located within the project limits.
One-Time Use.
|