|
Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
County | TRAVIS |
Highway | LP0001 |
From | TRAVIS AND WILLIAMSON COUNTIES |
To | . |
CSJ | 6182-61-001 |
Proj ID | SUP - 618261001 |
Work Type | JANITORIAL SERVICES FOR TOLL ROADS |
|
| 0.001 | 280300.44 | | 887401.38 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 06-25-08 |
Work Began | 07-01-08 |
Work Completed | |
Time Computed | 07-01-08 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 1,157 |
Percent Time Used | 316 |
Contractor(s) |
TIBH INDUSTRIES, INC. GOODWILL INDUSTRIES OF CENTRAL TEXAS |
SUBCONTRACTOR(S) FOR CCSJ: 6182-61-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06081431 |
| Totals | 280300.44 | 0.00 | 887401.38 | 99.9 |
|
County | MASON |
Highway | SH0029 |
From | MASON COUNTY MAINTENANCE OFFICE |
To | . |
CSJ | 6231-23-001 |
Proj ID | SUP - 623123001 |
Work Type | JANITORIAL MAINTENANCE IN MASON COUNTY |
|
| 0.001 | 13355.32 | | 12900.53 | 21.6 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 08-16-11 |
Work Began | 08-16-11 |
Work Completed | |
Time Computed | 08-16-11 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 747 |
Percent Time Used | 102 |
Contractor(s) |
TIBH INDUSTRIES, INC. WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6231-23-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08111430 |
| Totals | 13355.32 | 0.00 | 12900.53 | 21.6 |
|
County | TRAVIS |
Highway | LP0001 |
From | TRAVIS AND WILLIAMSON COUNTIES |
To | . |
CSJ | 6235-86-001 |
Proj ID | SUP - 623586001 |
Work Type | JANITORIAL SERVICES FOR TOLL ROADS |
|
| 0.001 | 719997.41 | | 625964.01 | 87.8 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 08-12-11 |
Work Began | 08-15-11 |
Work Completed | |
Time Computed | 08-15-11 |
Contract Working Days | 1,048 |
Addl Days Granted | 0 |
Working Days Charged | 1,051 |
Percent Time Used | 100 |
Contractor(s) |
TIBH INDUSTRIES, INC. GOODWILL TEMPORARY SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6235-86-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08111432 |
| Totals | 719997.41 | 0.00 | 625964.01 | 87.8 |
|
County | TRAVIS |
Highway | US0183 |
From | VARIOUS LOCATIONS IN |
To | TRAVIS AND HAYS COUNTY |
CSJ | 6264-02-001 |
Proj ID | RMC - 626402001 |
Work Type | REMOVAL AND DISPOSAL OF TREES & BRUSH |
|
| 0.010 | 184732.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 50 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
FST CONSTRUCTION |
SUBCONTRACTOR(S) FOR CCSJ: 6264-02-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 10131403 |
| Totals | 184732.00 | 0.00 | 0.00 | 0.0 |
|
County | TRAVIS |
Highway | RM2322 |
From | SH 71 |
To | END STATE MAINTENANCE |
CSJ | 6268-21-001 |
Proj ID | RMC - 626821001 |
Work Type | TIER 1 SEAL |
|
| 4.564 | 298395.12 | | 329641.98 | 100.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 04-23-14 |
Work Began | 05-05-14 |
Work Completed | 08-08-14 |
Time Computed | 05-05-14 |
Contract Working Days | 18 |
Addl Days Granted | 0 |
Working Days Charged | 19 |
Percent Time Used | 105 |
Contractor(s) |
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. |
SUBCONTRACTOR(S) FOR CCSJ: 6268-21-001 FLASHER EQUIPMENT COMPANY (23.70) N-LINE TRAFFIC MAINTENANCE, L.P. (0.93)
|
Contract # | 03141402 |
| Totals | 298395.12 | 0.00 | 329641.98 | 100.0 |
|
County | GILLESPIE |
Highway | US0290 |
From | VARIOUS LOCATIONS IN GILLESPIE |
To | . |
CSJ | 6269-64-001 |
Proj ID | SUP - 626964001 |
Work Type | LITTER REMOVAL |
|
| 0.001 | 84585.82 | | 60167.55 | 100.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 04-01-14 |
Work Began | 04-01-14 |
Work Completed | 01-28-16 |
Time Computed | 04-07-14 |
Contract Working Days | 60 |
Addl Days Granted | 0 |
Working Days Charged | 32 |
Percent Time Used | 53 |
Contractor(s) |
TIBH INDUSTRIES, INC. BOOTSTRAPS OCCUPATIONAL SERVICES INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6269-64-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 02141430 |
| Totals | 84585.82 | 0.00 | 60167.55 | 100.0 |
|
County | MASON |
Highway | US0087 |
From | VARIOUS LOCATIONS IN MASON, LLANO AND |
To | GILLESPIE COUNTIES |
CSJ | 6271-62-001 |
Proj ID | RMC - 627162001 |
Work Type | LITTER REMOVAL |
|
| 0.001 | 92146.20 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 76 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
FLAGSHIP SWEEPING SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6271-62-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 04141404 |
| Totals | 92146.20 | 0.00 | 0.00 | 0.0 |
|
County | CALDWELL |
Highway | SH0080 |
From | SH 80 AT CALLAHAN CREEK |
To | STR ID 14-028-0286-03-009 |
CSJ | 6327-11-001 |
Proj ID | BPM - 632711001 |
Work Type | REPAIR BACKWALL |
|
| 0.001 | 160040.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 32 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
JMT CONSTRUCTION |
SUBCONTRACTOR(S) FOR CCSJ: 6327-11-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 11181403 |
| Totals | 160040.00 | 0.00 | 0.00 | 0.0 |
|
County | BURNET |
Highway | US0281 |
From | VARIOUS |
To | VARIOUS |
CSJ | 6327-20-001 |
Proj ID | RMC - 632720001 |
Work Type | LITTER REMOVAL |
|
| 0.001 | 0.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
BOEN LANDSCAPING & IRRIGATION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6327-20-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08181401 |
| Totals | 0.00 | 0.00 | 0.00 | 0.0 |
|
County | TRAVIS |
Highway | IH0035 |
From | VARIOUS LOCATIONS IN THE AUSTIN DISTRICT |
To | . |
CSJ | 6359-46-001 |
Proj ID | SUP - 635946001 |
Work Type | GROUNDS MAINTENANCE. |
|
| 0.001 | 45000.00 | | 26150.36 | 100.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | 07-31-20 |
Time Computed | 00-00-00 |
Contract Working Days | 32 |
Addl Days Granted | 0 |
Working Days Charged | 30 |
Percent Time Used | 93 |
Contractor(s) |
WORKQUEST ENTERPRISE PROFESSIONAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6359-46-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 02201430 |
| Totals | 45000.00 | 14016.37 | 26150.36 | 100.0 |
|
County | WILLIAMSON |
Highway | IH0035 |
From | VARIOUS LOCATIONS IN WILLIAMSON |
To | AND TRAVIS COUNTY |
CSJ | 6399-11-001 |
Proj ID | SUP - 639911001 |
Work Type | STATE USE CONTRACT |
|
| 0.010 | 118451.68 | | 107346.83 | 90.6 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 04-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 580 |
Percent Time Used | 79 |
Contractor(s) |
WORKQUEST RELIEF ENTERPRISES |
SUBCONTRACTOR(S) FOR CCSJ: 6399-11-001 RELIEF ENTERPRISES (0.00)
|
Contract # | 03231433 |
| Totals | 118451.68 | 5552.42 | 107346.83 | 90.6 |
|
County | TRAVIS |
Highway | US0183 |
From | VARIOUS LOCATIONS IN |
To | THE AUSTIN DISTRICT |
CSJ | 6405-58-001 |
Proj ID | RMC - 640558001 |
Work Type | SMALL SIGN MAINTENANCE |
|
| 0.010 | 139475.00 | | 73270.00 | 52.5 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 366 |
Percent Time Used | 50 |
Contractor(s) |
DIGG COMMERCIAL, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6405-58-001 BUYERS BARRICADES AUSTIN, LLC (0.00)
|
Contract # | 06231401 |
| Totals | 139475.00 | 0.00 | 73270.00 | 52.5 |
|
County | TRAVIS |
Highway | US0290 |
From | VARIOUS LOCATIONS IN |
To | THE AUSTIN DISTRICT |
CSJ | 6405-60-001 |
Proj ID | RMC - 640560001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 363318.00 | | 276748.00 | 76.1 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 06-20-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 106 |
Addl Days Granted | 0 |
Working Days Charged | 56 |
Percent Time Used | 52 |
Contractor(s) |
YELLOWSTONE LANDSCAPE - CENTRAL, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6405-60-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 02231403 |
| Totals | 363318.00 | 0.00 | 276748.00 | 76.1 |
|
County | HAYS |
Highway | FM2001 |
From | VARIOUS LOCATIONS IN HAYS, TRAVIS, |
To | AND CALDWELL COUNTIES |
CSJ | 6405-62-001 |
Proj ID | RMC - 640562001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 314305.00 | | 189077.00 | 60.1 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 12-11-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 98 |
Addl Days Granted | 12 |
Working Days Charged | 31 |
Percent Time Used | 28 |
Contractor(s) |
CROSS PLUS CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6405-62-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 02231404 |
| Totals | 314305.00 | 0.00 | 189077.00 | 60.1 |
|
County | TRAVIS |
Highway | US0183 |
From | VARIOUS LOCATIONS IN |
To | TRAVIS COUNTY |
CSJ | 6405-64-001 |
Proj ID | RMC - 640564001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 310166.00 | | 226490.10 | 73.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 05-31-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 96 |
Addl Days Granted | 0 |
Working Days Charged | 14 |
Percent Time Used | 14 |
Contractor(s) |
CEN-TEX IRRIGATION SYSTEMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6405-64-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 04231401 |
| Totals | 310166.00 | 0.00 | 226490.10 | 73.0 |
|
County | TRAVIS |
Highway | US0183 |
From | VARIOUS LOCATIONS IN TRAVIS |
To | WILLIAMSON AND HAYS COUNTIES |
CSJ | 6405-90-001 |
Proj ID | RMC - 640590001 |
Work Type | SWEEPING AND DEBRIS REMOVAL |
|
| 0.010 | 534570.00 | | 23684.00 | 4.4 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 10-23-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 9 |
Percent Time Used | 1 |
Contractor(s) |
CEN-TEX IRRIGATION SYSTEMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6405-90-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08241402 |
| Totals | 534570.00 | 23684.00 | 23684.00 | 4.4 |
|
County | BASTROP |
Highway | SH0021 |
From | VARIOUS LOCATIONS IN BASTROP |
To | CALDWELL, AND LEE COUNTIES |
CSJ | 6406-02-001 |
Proj ID | RMC - 640602001 |
Work Type | TREE TRIMMING AND BRUSH REMOVAL |
|
| 0.010 | 150372.00 | | 34425.00 | 22.8 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 48 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
JCW CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6406-02-001 BEAVER BOYS INDUSTRIES LLC (0.00)
|
Contract # | 06241403 |
| Totals | 150372.00 | 0.00 | 34425.00 | 22.8 |
|
County | HAYS |
Highway | RM0012 |
From | VARIOUS LOCATIONS IN |
To | HAYS AND TRAVIS COUNTIES |
CSJ | 6406-08-001 |
Proj ID | RMC - 640608001 |
Work Type | TREE TRIMMING AND BRUSH REMOVAL |
|
| 0.010 | 245020.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 90 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
JCW CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6406-08-001 BEAVER BOYS SERVICES LLC (90.00)
|
Contract # | 06241402 |
| Totals | 245020.00 | 0.00 | 0.00 | 0.0 |
|
County | WILLIAMSON |
Highway | US0079 |
From | VARIOUS LOCATIONS IN |
To | WILLIAMSON AND TRAVIS COUNTIES |
CSJ | 6406-12-001 |
Proj ID | RMC - 640612001 |
Work Type | CRACK SEAL |
|
| 0.010 | 218444.60 | | 202494.50 | 100.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 10-20-24 |
Work Completed | 11-07-24 |
Time Computed | 00-00-00 |
Contract Working Days | 40 |
Addl Days Granted | 0 |
Working Days Charged | 9 |
Percent Time Used | 22 |
Contractor(s) |
FYL ENTERPRISES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6406-12-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 07241403 |
| Totals | 218444.60 | 202494.50 | 202494.50 | 100.0 |
|
County | BASTROP |
Highway | US0290 |
From | VARIOUS LOCATIONS IN BASTROP |
To | CALDWELL AND LEE COUNTIES |
CSJ | 6406-14-001 |
Proj ID | RMC - 640614001 |
Work Type | CRACK SEAL |
|
| 0.010 | 158756.89 | | 162436.77 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 09-30-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 16 |
Addl Days Granted | 0 |
Working Days Charged | 8 |
Percent Time Used | 50 |
Contractor(s) |
FYL ENTERPRISES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6406-14-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 07241402 |
| Totals | 158756.89 | 135329.31 | 162436.77 | 99.9 |
|