Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
County | PARKER |
Highway | VA |
From | VARIOUS INTERSECTIONS IN PARKER COUNTY |
To | . |
CSJ | 0902-38-146 |
Proj ID | STP 2025(019)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 169473.93 | | 0.00 | 0.0 |
County | PALO PINTO |
Highway | VA |
From | VARIOUS INTERSECTIONS IN |
To | PALO PINTO COUNTY |
CSJ | 0902-39-044 |
Proj ID | STP 2025(019)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 288229.27 | | 0.00 | 0.0 |
County | JOHNSON |
Highway | VA |
From | VARIOUS INTERSECTIONS IN JOHNSON COUNTY |
To | . |
CSJ | 0902-50-144 |
Proj ID | STP 2025(019)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 466175.26 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 10-16-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 11-16-24 |
Contract Working Days | 80 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
SCOTT TUCKER CONSTRUCTION COMPANY, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-38-146 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09243024 |
| Totals | 923878.46 | 0.00 | 0.00 | 0.0 |
|
County | PALO PINTO |
Highway | VA |
From | VARIOUS LOCATIONS @ PALO PINTO_MTNS |
To | STATE PARK OFF OF FM 2372 |
CSJ | 0902-39-040 |
Proj ID | C 902-39-40 |
Work Type | NEW LOCATION NON-FREEWAY |
|
| 0.100 | 11699665.16 | | 13855053.11 | 99.9 |
Work Order | 09-16-21 |
Work Began | 05-17-22 |
Work Completed | |
Time Computed | 10-17-21 |
Contract Working Days | 254 |
Addl Days Granted | 268 |
Working Days Charged | 522 |
Percent Time Used | 100 |
Contractor(s) |
A. L. HELMCAMP, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0902-39-040 BARRICADES UNLIMITED (0.41) FARR FOUNDATION, INC. (1.41) MARCOM"S MOWING SERVICE, LLC (0.46) WOLFE CONSTRUCTION GROUP, INCORPORATED (0.51) SLATON BROS, INC. (1.76) AR ROJAS CONSTRUCTION, INC (0.21) BAYER CONSTRUCTION ELECTRICAL CONTRACTORS, INC. (13.61) HARDROCK UTILITY CONTRACTORS, L.L.C. (4.64) BARRILLEAUX EXPRESS, LLC (0.69) A.L. CONSTRUCTION LLC (0.86) TORO BRAVO CONSTRUCTION, LLC (0.33)
|
Contract # | 08213019 |
| Totals | 11699665.16 | 8617.20 | 13855053.11 | 99.9 |
|
County | JACK |
Highway | CR |
From | OVER TRIB OF CROOKED CREEK |
To | . |
CSJ | 0902-40-032 |
Proj ID | BR 2024(090) |
Work Type | BRIDGE REPLACEMENT |
|
| | 788118.36 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 85 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
YOKO EXCAVATING, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-40-032 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 11243029 |
| Totals | 788118.36 | 0.00 | 0.00 | 0.0 |
|
County | SOMERVELL |
Highway | VA |
From | VARIOUS LOCATIONS IN CITY OF GLEN ROSE |
To | . |
CSJ | 0902-41-002 |
Proj ID | STP 2022(832)TAPS |
Work Type | PEDESTRIAN, SIDEWALKS & CURB RAMPS |
|
| | 1348858.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 09-18-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 10-19-24 |
Contract Working Days | 215 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
GARRET SHIELDS INFRASTRUCTURE |
SUBCONTRACTOR(S) FOR CCSJ: 0902-41-002 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08243245 |
| Totals | 1348858.00 | 0.00 | 0.00 | 0.0 |
|
County | TARRANT |
Highway | CS |
From | FOREST HILL DR. AT TRIB. OF VILLAGE |
To | CREEK IN FOREST HILL. |
CSJ | 0902-48-659 |
Proj ID | BR 2006(543) |
Work Type | REPLACE BRIDGES AND APPROACHES |
|
| 0.100 | 2252080.58 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 192 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
CD BUILDERS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0902-48-659 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08153244 |
| Totals | 2252080.58 | 0.00 | 0.00 | 0.0 |
|
County | TARRANT |
Highway | CS |
From | E. LONG AVENUE OVER LITTLE FOSSIL C |
To | IN FORT WORTH |
CSJ | 0902-48-894 |
Proj ID | BR 1502(322) |
Work Type | BRIDGE REPLACEMENT |
|
| | 4807165.35 | | 1260797.80 | 26.2 |
Work Order | 09-07-23 |
Work Began | 04-12-24 |
Work Completed | |
Time Computed | 10-08-23 |
Contract Working Days | 320 |
Addl Days Granted | 0 |
Working Days Charged | 162 |
Percent Time Used | 50 |
Contractor(s) |
HARPER BROTHERS CONSTRUCTION LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-48-894 BARRICADES UNLIMITED (0.70) ACT SAW CUTTING & REMOVAL (0.15) TEX OP CONSTRUCTION, LP (0.37) BEAN ELECTRICAL, INC. (0.66) REYNOLDS ASPHALT & CONSTRUCTION COMPANY (0.97) WYLIE DRILLING & DRAINAGE, INC. (3.60) PRIMATE CONSTRUCTION, LP (0.18) USA SWPPP INSPECTIONS, INC.DBA USA EROSION (0.19) FORTSON CONTRACTING, INC. (2.26) BREDA COMPANY, INC. (0.97) DFW REBAR, INC. (0.17) TRAFFIC HIGHWAY MAINTENANCE, LLC (0.16)
|
Contract # | 08233220 |
| Totals | 4807165.35 | 109441.17 | 1260797.80 | 26.2 |
|
County | JOHNSON |
Highway | VA |
From | VARIOUS LOCATIONS IN JOHNSON CO |
To | . |
CSJ | 0902-50-122 |
Proj ID | C 902-50-122 |
Work Type | INTERSECTION & OPERATIONAL IMPRV |
|
| 0.100 | 2237555.89 | | 2333731.62 | 99.9 |
Work Order | 04-19-23 |
Work Began | 07-10-23 |
Work Completed | |
Time Computed | 05-20-23 |
Contract Working Days | 171 |
Addl Days Granted | 66 |
Working Days Charged | 323 |
Percent Time Used | 136 |
Contractor(s) |
JAY MILLS CONTRACTING, INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 0902-50-122 NORTHEASTERN PAVERS, LLC (34.61) SYNERGY SIGNS & SERVICES LLC (1.37) J. H. ODEN CONTRACTING COMPANY (1.33) RAMBO CONTRACTING, INC. (3.64) TRP CONSTRUCTION GROUP, LLC (3.01)
|
Contract # | 03233021 |
| Totals | 2237555.89 | 67073.62 | 2333731.62 | 99.9 |
|
County | JOHNSON |
Highway | VA |
From | ALSBURY BLVD; FROM FM 731 |
To | IH 35W NB FRONTAGE RD |
CSJ | 0902-50-143 |
Proj ID | STP 2024(633)VRU |
Work Type | INTERSECTION & OPERATIONAL IMPRV |
|
| | 730197.55 | | 0.00 | 0.0 |
Work Order | 02-02-24 |
Work Began | 11-06-24 |
Work Completed | |
Time Computed | 05-03-24 |
Contract Working Days | 108 |
Addl Days Granted | 42 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
FLORIDA TRAFFIC CONTROL DEVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0902-50-143 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 01243240 |
| Totals | 730197.55 | 0.00 | 0.00 | 0.0 |
|
County | TARRANT |
Highway | CS |
From | RIVERSIDE DR (SB) AT W FORK OF TRIN |
To | IN FT WORTH |
CSJ | 0902-90-019 |
Proj ID | BR 2018(804) |
Work Type | BRIDGE WIDENING OR REHABILITATION |
|
| 0.172 | 3019165.33 | | 0.00 | 0.0 |
County | TARRANT |
Highway | CS |
From | RIVERSIDE DRIVE AT W FORK OF TRINITY |
To | IN FORT WORTH |
CSJ | 0902-90-298 |
Proj ID | C 902-90-298 |
Work Type | BRIDGE WIDENING OR REHABILITATION |
|
| 0.172 | 20460.00 | | 0.00 | 0.0 |
County | TARRANT |
Highway | CS |
From | RIVERSIDE DRIVE AT W FORK OF TRINITY |
To | IN FORT WORTH |
CSJ | 0902-90-306 |
Proj ID | ROW 902-90-306 |
Work Type | UTILITY ADJUSTMENTS |
|
| 0.172 | 148375.00 | | 0.00 | 0.0 |
Work Order | 08-01-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 09-02-24 |
Contract Working Days | 150 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
RAGLE CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0902-90-019 USA SWPPP INSPECTIONS, INC.DBA USA EROSION (0.94) DIIBS SPECIALISTS, LLC (0.81) REYNOLDS ASPHALT & CONSTRUCTION COMPANY (2.48) DUSTROL, INC. (0.76) ELITE STRIPING, LLC (1.09) HERMANOS STEEL, LLC (2.72) PENHALL COMPANY (0.14) SUPERIOR TRAFFIC CONTROL, LLC (0.60)
|
Contract # | 06243228 |
| Totals | 3188000.33 | 0.00 | 0.00 | 0.0 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS IN TARRANT CO |
To | . |
CSJ | 0902-90-104 |
Proj ID | C 902-90-104 |
Work Type | TRAFFIC CONTROL DEVICES |
|
| 0.100 | 1850378.36 | | 1401794.30 | 76.4 |
Work Order | 09-08-20 |
Work Began | 07-12-21 |
Work Completed | |
Time Computed | 10-09-20 |
Contract Working Days | 250 |
Addl Days Granted | 51 |
Working Days Charged | 318 |
Percent Time Used | 105 |
Contractor(s) |
AMERICAN LIGHTING AND SIGNALIZATION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-90-104 MEDELLIN HDD LLC (0.45) FC TRAFFIC CONTROL, INC. (0.18) RAYRAY UNDERGROUND LLC (4.17)
|
Contract # | 08203034 |
| Totals | 1850378.36 | 195583.31 | 1401794.30 | 76.4 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS IN TARRANT CO |
To | . |
CSJ | 0902-90-105 |
Proj ID | C 902-90-105 |
Work Type | TRAFFIC CONTROL DEVICES |
|
| 0.100 | 2216191.75 | | 1686436.08 | 76.0 |
Work Order | 09-29-21 |
Work Began | 05-09-23 |
Work Completed | |
Time Computed | 12-29-21 |
Contract Working Days | 300 |
Addl Days Granted | 0 |
Working Days Charged | 164 |
Percent Time Used | 54 |
Contractor(s) |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0902-90-105 KHONSU ENTERPRISE LLC (6.13) SUPERIOR TRAFFIC CONTROL, LLC (0.27)
|
Contract # | 08213251 |
| Totals | 2216191.75 | 0.00 | 1686436.08 | 76.0 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS IN TARRANT CO |
To | . |
CSJ | 0902-90-106 |
Proj ID | NH 1902(230) |
Work Type | TCD |
|
| 0.100 | 4346466.81 | | 2616082.72 | 60.1 |
Work Order | 10-25-19 |
Work Began | 05-04-21 |
Work Completed | |
Time Computed | 01-23-20 |
Contract Working Days | 512 |
Addl Days Granted | 360 |
Working Days Charged | 519 |
Percent Time Used | 59 |
Contractor(s) |
AMERICAN LIGHTING AND SIGNALIZATION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-90-106 COLLIER SERVICES LLC (6.97) FC TRAFFIC CONTROL, INC. (0.25) J & S DIRECTIONAL BORING INC. (1.47) RAYRAY UNDERGROUND LLC (0.88)
|
Contract # | 07193228 |
| Totals | 4346466.81 | 112828.90 | 2616082.72 | 60.1 |
|
County | TARRANT |
Highway | VA |
From | VARIOUS LOCATIONS |
To | WITHIN FORT WORTH DISTRICT |
CSJ | 0902-90-108 |
Proj ID | C 902-90-108 |
Work Type | TRAFFIC CONTROL DEVICES |
|
| 0.100 | 4310784.57 | | 603479.74 | 13.9 |
Work Order | 08-12-21 |
Work Began | 05-14-24 |
Work Completed | |
Time Computed | 11-11-21 |
Contract Working Days | 768 |
Addl Days Granted | 0 |
Working Days Charged | 62 |
Percent Time Used | 8 |
Contractor(s) |
AMERICAN LIGHTING AND SIGNALIZATION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-90-108 FC TRAFFIC CONTROL, INC. (0.22) J & S DIRECTIONAL BORING INC. (0.43) RAYRAY UNDERGROUND LLC (2.57) GUARDRAIL SAFETY SERVICES, LLC (0.14)
|
Contract # | 07213216 |
| Totals | 4310784.57 | 91282.81 | 603479.74 | 13.9 |
|
County | TARRANT |
Highway | CS |
From | MCCART AT ALTA MESA |
To | . |
CSJ | 0902-90-119 |
Proj ID | STP 2022(870)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 0.200 | 1562142.00 | | 1151995.21 | 73.8 |
County | TARRANT |
Highway | CS |
From | INTERSECTION OF MCCART AVE. |
To | AT ALTAMESA |
CSJ | 0902-90-192 |
Proj ID | CC 902-90-192 |
Work Type | INTERSECTION & OPERATIONAL IMPRV |
|
| | 131284.00 | | 0.00 | 0.0 |
Work Order | 09-21-22 |
Work Began | 12-18-23 |
Work Completed | |
Time Computed | 10-22-22 |
Contract Working Days | 172 |
Addl Days Granted | 0 |
Working Days Charged | 175 |
Percent Time Used | 101 |
Contractor(s) |
FNH CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-90-119 AWP SAFETY (0.76) D&G ENERGY CORPORATION (7.89) FIBERTEL, LLC (2.06) AAA DRILLING FOUNDATION COMPANY, INC. (0.38) M. JONES CONSTRUCTION (0.44)
|
Contract # | 08223241 |
| Totals | 1693426.00 | 8500.00 | 1151995.21 | 68.1 |
|
County | TARRANT |
Highway | CS |
From | WALNUT CREEK DRIVE @ WALNUT CREEK |
To | . |
CSJ | 0902-90-125 |
Proj ID | BR 2022(252) |
Work Type | BRIDGE REPLACEMENT |
|
| | 3181088.97 | | 3036027.10 | 95.4 |
County | TARRANT |
Highway | CR |
From | STEPHENSON LEVY RD |
To | @ TRIB. TO VILLAGE CREEK |
CSJ | 0902-90-135 |
Proj ID | BR 2021(123) |
Work Type | BRIDGE REPLACEMENT |
|
| | 680157.82 | | 654405.81 | 96.2 |
Work Order | 03-06-23 |
Work Began | 05-08-23 |
Work Completed | |
Time Computed | 04-06-23 |
Contract Working Days | 217 |
Addl Days Granted | 0 |
Working Days Charged | 216 |
Percent Time Used | 99 |
Contractor(s) |
INDUS ROAD & BRIDGE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0902-90-125 A BROTHERS MILLING, LLC (0.43) FORTSON CONTRACTING, INC. (0.75) HERMANOS STEEL, LLC (3.85) KING & GEORGE, LLC (0.00) REYNOLDS ASPHALT & CONSTRUCTION COMPANY (6.55) SOUTHEAST GRINDING AND GROOVING LLC (0.21) TEXAS SHAFTS, INC. (6.40) TRAFFIC HIGHWAY MAINTENANCE, LLC (0.51) A-CORE CONCRETE CUTTING OF TEXAS, INC. (0.01) USA SWPPP INSPECTIONS, INC.DBA USA EROSION (0.62) TNT CRANE & RIGGING, INC. (0.31) FC TRAFFIC CONTROL, INC. (0.25) C. GREEN SCAPING, L.P. (0.21) PROFESSIONAL SERVICE INDUSTRIES, INC. (0.00) HILBASH INVESTMENT LLC (0.00) DAVIS MOTOR CRANE SERVICE, INC. (0.00) VISTA RIDGE CONCRETE PUMPING, INC. (0.00) KING GEORGE TRAFFIC SOLUTIONS LLC (0.54)
|
Contract # | 01233212 |
| Totals | 3861246.79 | 0.00 | 3690432.91 | 95.5 |
|
County | TARRANT |
Highway | SS 580 |
From | ALTA MERE DR. |
To | LACKLAND ROAD |
CSJ | 0902-90-126 |
Proj ID | F 2023(254) |
Work Type | PEDESTRIAN, SIDEWALKS & CURB RAMPS |
|
| | 438635.00 | | 425893.41 | 97.3 |
Work Order | 01-04-23 |
Work Began | 08-22-23 |
Work Completed | |
Time Computed | 02-04-23 |
Contract Working Days | 64 |
Addl Days Granted | 0 |
Working Days Charged | 66 |
Percent Time Used | 103 |
Contractor(s) |
GARRET SHIELDS INFRASTRUCTURE |
SUBCONTRACTOR(S) FOR CCSJ: 0902-90-126 LINEAR TRAFFIC MARKINGS LLC (0.00) WG ENGINEERING & CONSTRUCTION, LLC (0.00) GOMEZ PROPERTY SOLUTIONS LLC (100.00)
|
Contract # | 12223225 |
| Totals | 438635.00 | 593.88 | 425893.41 | 97.3 |
|
County | TARRANT |
Highway | CS |
From | BEDFORD-EULESS RD |
To | @ LOREAN-MESQUITE BRANCH |
CSJ | 0902-90-130 |
Proj ID | BR 2021(304) |
Work Type | BRIDGE REPLACEMENT |
|
| 0.034 | 1513118.10 | | 115664.18 | 7.6 |
Work Order | 08-03-23 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 11-02-23 |
Contract Working Days | 192 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
MCMAHON CONTRACTING AND CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-90-130 TRP CONSTRUCTION GROUP, LLC (2.17) DUSTROL, INC. (0.55) PENHALL COMPANY (0.46) WYLIE DRILLING & DRAINAGE, INC. (7.70) REYNOLDS ASPHALT & CONSTRUCTION COMPANY (2.97) USA SWPPP INSPECTIONS, INC.DBA USA EROSION (2.08) TORO BRAVO CONSTRUCTION, LLC (0.98) UNDERGROUND SUPPORT SERVICES, LLC (3.46)
|
Contract # | 06233631 |
| Totals | 1513118.10 | 0.00 | 115664.18 | 7.6 |
|
County | TARRANT |
Highway | CS |
From | JACKSON DRIVE |
To | AT LITTLE BEAR CREEK |
CSJ | 0902-90-132 |
Proj ID | BR 2021(146) |
Work Type | BRIDGE REPLACEMENT |
|
| | 1754000.00 | | 757005.13 | 43.1 |
Work Order | 07-26-23 |
Work Began | 01-31-24 |
Work Completed | |
Time Computed | 10-25-23 |
Contract Working Days | 128 |
Addl Days Granted | 0 |
Working Days Charged | 120 |
Percent Time Used | 93 |
Contractor(s) |
HARPER BROTHERS CONSTRUCTION LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-90-132 BARRICADES UNLIMITED (2.26) REYNOLDS ASPHALT & CONSTRUCTION COMPANY (3.26) SOUTHERN CROSS CONTRACTORS, LLC (1.21) WYLIE DRILLING & DRAINAGE, INC. (6.56) TEXOP CONSTRUCTION (0.35) G J SEEDING, LLC (3.67) PRIMATE CONSTRUCTION, LP (0.34) DFW REBAR, INC. (0.17) TEXAS SHAFTS, INC. (6.56) TORO BRAVO CONSTRUCTION, LLC (0.55)
|
Contract # | 06233438 |
| Totals | 1754000.00 | 4260.00 | 757005.13 | 43.1 |
|
County | TARRANT |
Highway | CS |
From | AT LIVE OAK CREEK |
To | ON WHITE SETTLEMENT ROAD |
CSJ | 0902-90-134 |
Proj ID | BR 2021(124) |
Work Type | BRIDGE REPLACEMENT |
|
| 0.098 | 1644915.14 | | 1550213.56 | 94.9 |
Work Order | 07-19-23 |
Work Began | 10-23-23 |
Work Completed | |
Time Computed | 08-19-23 |
Contract Working Days | 192 |
Addl Days Granted | 0 |
Working Days Charged | 205 |
Percent Time Used | 106 |
Contractor(s) |
SEMA CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0902-90-134 WYLIE DRILLING & DRAINAGE, INC. (3.06) MASSEY CONTRACTORS, LLC (0.34) BREDA COMPANY, INC. (0.37) FC TRAFFIC CONTROL, INC. (2.18) LAUGHLEY BRIDGE & CONSTRUCTION, INC. (12.58) FORTSON CONTRACTING, INC. (0.80) TRP CONSTRUCTION GROUP, LLC (0.75) SYNERGY SIGNS & SERVICES LLC (0.18) DFW REBAR, INC. (0.13) DUSTROL, INC. (0.77) C. GREEN SCAPING, L.P. (0.41) REYNOLDS ASPHALT & CONSTRUCTION COMPANY (4.79) GEOTEX ENGINEERING LLC (0.31)
|
Contract # | 06233027 |
| Totals | 1644915.14 | 292.50 | 1550213.56 | 94.9 |
|
County | TARRANT |
Highway | VA |
From | IH 820 FROM US 377 |
To | OLD DECATUR ROAD |
CSJ | 0902-90-184 |
Proj ID | F 2021(733) |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 13.760 | 1484096.25 | | 1374453.41 | 99.0 |
Work Order | 08-12-21 |
Work Began | 02-22-23 |
Work Completed | |
Time Computed | 11-11-21 |
Contract Working Days | 128 |
Addl Days Granted | 0 |
Working Days Charged | 268 |
Percent Time Used | 209 |
Contractor(s) |
AMERICAN LIGHTING AND SIGNALIZATION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0902-90-184 COLLIER SERVICES LLC (13.87) DALLAS LITE AND BARRICADE, INC. (1.22) SNOWHILL CONTRACTING LLC (27.62) J & S DIRECTIONAL BORING INC. (0.53) LINEAR TRAFFIC MARKINGS LLC (0.37) FC TRAFFIC CONTROL, INC. (0.25) A & E UTILITIES SERVICES LLC (2.10)
|
Contract # | 07213030 |
| Totals | 1484096.25 | 0.00 | 1374453.41 | 99.0 |
|