Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
County | TARRANT |
Highway | 0000000 |
From | 2501 SOUTHWEST LOOP 820, FORT WORTH, TX |
To | . |
CSJ | 4704-01-412 |
Proj ID | CBC - 470401412 |
Work Type | NEW FACILITIES |
|
| 0.001 | 4265000.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
IMPERIAL CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 4704-01-412 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 07154212 |
| Totals | 4265000.00 | 0.00 | 0.00 | 0.0 |
|
County | TARRANT |
Highway | FM0157 |
From | VARIOUS SECTION FROM GREEN OAKS TO |
To | DEBBIE LANE IN TARRANT COUNTY |
CSJ | 6230-93-001 |
Proj ID | RMC - 623093001 |
Work Type | PLANING & OVERLAY |
|
| 0.010 | 2803024.88 | | 2351963.82 | 84.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 06-04-12 |
Work Began | 06-06-12 |
Work Completed | |
Time Computed | 06-06-12 |
Contract Working Days | 40 |
Addl Days Granted | 10 |
Working Days Charged | 55 |
Percent Time Used | 110 |
Contractor(s) |
PEACHTREE CONSTRUCTION, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 6230-93-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03124003 |
| Totals | 2803024.88 | 0.00 | 2351963.82 | 84.0 |
|
County | TARRANT |
Highway | IH0035W |
From | VARIOUS LOCATIONS WITHIN |
To | SOUTH TARRANT COUNTY |
CSJ | 6314-67-001 |
Proj ID | RMC - 631467001 |
Work Type | FLEXIBLE PAVEMENT STRUCTURE REPAIR |
|
| 0.010 | 444444.44 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 50 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
VANN/ELLI, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6314-67-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 10174208 |
| Totals | 444444.44 | 0.00 | 0.00 | 0.0 |
|
County | TARRANT |
Highway | SH0114 |
From | VARIOUS ROADWAYS IN |
To | NORTH TARRANT COUNTY |
CSJ | 6324-76-001 |
Proj ID | RMC - 632476001 |
Work Type | ROUTINE SWEEPING AND DEBRIS REMOVAL |
|
| 0.010 | 623817.65 | | 705948.26 | 100.0 |
Work Order | 00-00-00 |
Work Began | 07-01-18 |
Work Completed | 01-02-20 |
Time Computed | 07-01-18 |
Contract Working Days | 365 |
Addl Days Granted | 184 |
Working Days Charged | 549 |
Percent Time Used | 100 |
Contractor(s) |
SWEEPING SERVICES OF TEXAS - OPERATING, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 6324-76-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12174219 |
| Totals | 623817.65 | 1312.80 | 705948.26 | 100.0 |
|
County | WISE |
Highway | US0081 |
From | WISE & JACK COUNTIES |
To | WISE & JACK COUNTIES |
CSJ | 6330-44-001 |
Proj ID | RMC - 633044001 |
Work Type | SWEEPING AND DEBRIS REMOVAL |
|
| 0.100 | 838347.20 | | 2247676.40 | 100.0 |
Work Order | 05-04-20 |
Work Began | 04-01-20 |
Work Completed | 11-17-22 |
Time Computed | 04-01-20 |
Contract Working Days | 365 |
Addl Days Granted | 605 |
Working Days Charged | 960 |
Percent Time Used | 98 |
Contractor(s) |
CEN-TEX IRRIGATION SYSTEMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6330-44-001 TEXAS TMA RENTAL (9.87)
|
Contract # | 11194009 |
| Totals | 838347.20 | 0.00 | 2247676.40 | 100.0 |
|
County | ERATH |
Highway | US0377 |
From | VARIOUS LOCATIONS IN |
To | ERATH, HOOD, SOMERVELL COUNTIES |
CSJ | 6343-05-001 |
Proj ID | RMC - 634305001 |
Work Type | TREE TRIMMING AND BRUSH AND TREE REMOVAL |
|
| 0.010 | 309400.00 | | 277850.00 | 100.0 |
Work Order | 12-16-19 |
Work Began | 12-16-19 |
Work Completed | 03-31-20 |
Time Computed | 12-18-19 |
Contract Working Days | 118 |
Addl Days Granted | 0 |
Working Days Charged | 79 |
Percent Time Used | 66 |
Contractor(s) |
CEN-TEX IRRIGATION SYSTEMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6343-05-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09194006 |
| Totals | 309400.00 | 0.00 | 277850.00 | 100.0 |
|
County | PALO PINTO |
Highway | SH0016 |
From | VARIOUS LOCATIONS IN |
To | FORT WORTH DISTRICT |
CSJ | 6343-20-001 |
Proj ID | RMC - 634320001 |
Work Type | FLEXIBLE PAVEMENT REPAIR |
|
| 0.010 | 977100.45 | | 994551.44 | 100.0 |
Work Order | 00-00-00 |
Work Began | 02-17-20 |
Work Completed | 04-12-20 |
Time Computed | 02-12-20 |
Contract Working Days | 40 |
Addl Days Granted | 0 |
Working Days Charged | 22 |
Percent Time Used | 55 |
Contractor(s) |
NORTHEASTERN PAVERS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6343-20-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08194011 |
| Totals | 977100.45 | 327678.39 | 994551.44 | 100.0 |
|
County | PARKER |
Highway | FM0051 |
From | VARIOUS LOCATIONS IN |
To | PARKER AND PALO PINTO COUNTIES |
CSJ | 6344-18-001 |
Proj ID | RMC - 634418001 |
Work Type | TREE TRIMNG,BRUSH REMOVL AND TREE REMOVL |
|
| 0.010 | 359143.55 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
C.E.S. CONTRACTOR |
SUBCONTRACTOR(S) FOR CCSJ: 6344-18-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08194012 |
| Totals | 359143.55 | 0.00 | 0.00 | 0.0 |
|
County | PARKER |
Highway | IH0020 |
From | VARIOUS LOCATIONS IN |
To | PARKER AND PALO PINTO COUNTIES |
CSJ | 6352-35-001 |
Proj ID | RMC - 635235001 |
Work Type | REFLECTORIZED PAVEMENT MARKINGS & MRKS |
|
| 0.010 | 573158.97 | | 553922.49 | 96.6 |
Work Order | 00-00-00 |
Work Began | 07-26-21 |
Work Completed | |
Time Computed | 07-26-21 |
Contract Working Days | 100 |
Addl Days Granted | 0 |
Working Days Charged | 87 |
Percent Time Used | 87 |
Contractor(s) |
BATTERSON, LLP |
SUBCONTRACTOR(S) FOR CCSJ: 6352-35-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 02214013 |
| Totals | 573158.97 | 0.00 | 553922.49 | 96.6 |
|
County | JOHNSON |
Highway | IH0035W |
From | ALL STATE MAINTAINED ROADS |
To | IN JOHNSON COUNTY |
CSJ | 6359-12-001 |
Proj ID | RMC - 635912001 |
Work Type | GUARDRAIL AND CABLE BARRIER REPAIR |
|
| 0.020 | 609442.00 | | 2110730.25 | 100.0 |
Work Order | 00-00-00 |
Work Began | 12-22-20 |
Work Completed | 10-04-22 |
Time Computed | 12-22-20 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 650 |
Percent Time Used | 89 |
Contractor(s) |
JCW CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6359-12-001 JUNIOR CONSTRUCTION COMPANY, INC. (0.00)
|
Contract # | 07204007 |
| Totals | 609442.00 | 0.00 | 2110730.25 | 100.0 |
|
County | ERATH |
Highway | US0377 |
From | VARIOUS LOCATIONS IN |
To | ERATH, HOOD AND SOMERVELL COUNTIES |
CSJ | 6359-91-001 |
Proj ID | RMC - 635991001 |
Work Type | ROUTINE MAINTENANCE PROJECT - SEALED |
|
| | 409886.00 | | 384874.63 | 93.8 |
Work Order | 00-00-00 |
Work Began | 03-29-21 |
Work Completed | |
Time Computed | 03-29-21 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 639 |
Percent Time Used | 87 |
Contractor(s) |
TRP CONSTRUCTION GROUP, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6359-91-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 01214207 |
| Totals | 409886.00 | 0.00 | 384874.63 | 93.8 |
|
County | ERATH |
Highway | US0377 |
From | VARIOUS LOCATIONS IN |
To | ERATH, HOOD AND SOMERVELL COUNTIES |
CSJ | 6359-93-001 |
Proj ID | RMC - 635993001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 979828.00 | | 543371.00 | 55.4 |
Work Order | 00-00-00 |
Work Began | 10-19-21 |
Work Completed | |
Time Computed | 10-18-21 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 434 |
Percent Time Used | 59 |
Contractor(s) |
CROSS PLUS CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6359-93-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06214016 |
| Totals | 979828.00 | 137720.00 | 543371.00 | 55.4 |
|
County | TARRANT |
Highway | IH0035W |
From | VARIOUS LOCATIONS |
To | WITHIN SOUTH TARRANT COUNTY |
CSJ | 6368-33-001 |
Proj ID | RMC - 636833001 |
Work Type | CALLOUT REFLECTORIZED PAVEMENT MARKINGS |
|
| 0.010 | 296274.50 | | 785069.61 | 99.9 |
Work Order | 00-00-00 |
Work Began | 04-19-21 |
Work Completed | |
Time Computed | 04-12-21 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 620 |
Percent Time Used | 84 |
Contractor(s) |
STRIPE-A-ZONE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6368-33-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 01214210 |
| Totals | 296274.50 | 49792.56 | 785069.61 | 99.9 |
|
County | TARRANT |
Highway | IH0820 |
From | VARIOUS ROADWAYS IN |
To | NORTH TARRANT COUNTY |
CSJ | 6368-41-001 |
Proj ID | RMC - 636841001 |
Work Type | CALLOUT REFLECTORIZED PAV MRKS AND MRKRS |
|
| 0.010 | 282469.50 | | 803268.40 | 99.9 |
Work Order | 00-00-00 |
Work Began | 10-05-21 |
Work Completed | |
Time Computed | 09-01-21 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 474 |
Percent Time Used | 64 |
Contractor(s) |
TRP CONSTRUCTION GROUP, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6368-41-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 01214209 |
| Totals | 282469.50 | 0.00 | 803268.40 | 99.9 |
|
County | WISE |
Highway | US0380 |
From | VARIOUS LOCATIONS IN WISE & JACK COUNTY |
To | VARIOUS LOCATIONS IN WISE & JACK COUNTY |
CSJ | 6370-36-001 |
Proj ID | RMC - 637036001 |
Work Type | GUARDRAIL REPAIR & INSTALLATION |
|
| 0.100 | 848007.00 | | 1551365.79 | 99.9 |
Work Order | 06-28-21 |
Work Began | 06-01-21 |
Work Completed | |
Time Computed | 06-01-21 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 573 |
Percent Time Used | 78 |
Contractor(s) |
MARCOM'S MOWING SERVICE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6370-36-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 01214015 |
| Totals | 848007.00 | 118442.74 | 1551365.79 | 99.9 |
|
County | TARRANT |
Highway | IH0820 |
From | VARIOUS LOCATIONS IN |
To | IN NORTH TARRANT COUNTY |
CSJ | 6375-47-001 |
Proj ID | RMC - 637547001 |
Work Type | METAL BEAM GUARD FENCE REPAIR |
|
| 0.010 | 1387648.00 | | 2161545.35 | 99.9 |
Work Order | 00-00-00 |
Work Began | 09-09-21 |
Work Completed | |
Time Computed | 09-07-21 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 475 |
Percent Time Used | 65 |
Contractor(s) |
SHORT-LINE CORPORATION |
SUBCONTRACTOR(S) FOR CCSJ: 6375-47-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 05214011 |
| Totals | 1387648.00 | 130054.00 | 2161545.35 | 99.9 |
|
County | TARRANT |
Highway | IH0820 |
From | VARIOUS LOCATIONS IN |
To | IN NORTH TARRANT COUNTY |
CSJ | 6375-48-001 |
Proj ID | RMC - 637548001 |
Work Type | SWEEPING AND DEBRIS REMOVAL |
|
| 0.010 | 671937.65 | | 545520.73 | 81.1 |
Work Order | 00-00-00 |
Work Began | 09-01-21 |
Work Completed | |
Time Computed | 08-31-21 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 481 |
Percent Time Used | 65 |
Contractor(s) |
SWEEPING SERVICES OF TEXAS - OPERATING, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 6375-48-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 05214211 |
| Totals | 671937.65 | 9806.70 | 545520.73 | 81.1 |
|
County | WISE |
Highway | US0081 |
From | VARIOUS LOCATIONS |
To | IN WISE AND JACK COUNTIES |
CSJ | 6375-69-001 |
Proj ID | RMC - 637569001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 455625.78 | | 700637.49 | 100.0 |
Work Order | 00-00-00 |
Work Began | 10-26-21 |
Work Completed | 12-22-22 |
Time Computed | 10-26-21 |
Contract Working Days | 365 |
Addl Days Granted | 82 |
Working Days Charged | 422 |
Percent Time Used | 94 |
Contractor(s) |
CROSS PLUS CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6375-69-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 07214205 |
| Totals | 455625.78 | 139764.62 | 700637.49 | 100.0 |
|
County | PARKER |
Highway | IH0020 |
From | VARIOUS LOCATIONS IN |
To | PARKER AND PALO PINTO COUNTIES |
CSJ | 6375-82-001 |
Proj ID | RMC - 637582001 |
Work Type | REFLECTORIZED PAVEMENT MARKINGS & MARKE |
|
| 0.010 | 509560.94 | | 447224.11 | 87.7 |
Work Order | 00-00-00 |
Work Began | 07-11-21 |
Work Completed | |
Time Computed | 07-11-21 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 533 |
Percent Time Used | 73 |
Contractor(s) |
TRP CONSTRUCTION GROUP, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6375-82-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03214010 |
| Totals | 509560.94 | 0.00 | 447224.11 | 87.7 |
|
County | PARKER |
Highway | IH0020 |
From | VARIOUS LOCATIONS IN |
To | PARKER AND PALO PINTO COUNTIES |
CSJ | 6376-36-001 |
Proj ID | RMC - 637636001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 1631019.25 | | 1071767.25 | 65.7 |
Work Order | 00-00-00 |
Work Began | 09-21-21 |
Work Completed | |
Time Computed | 09-21-21 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 461 |
Percent Time Used | 63 |
Contractor(s) |
CROSS PLUS CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6376-36-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06214211 |
| Totals | 1631019.25 | 0.00 | 1071767.25 | 65.7 |
|