| Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
| County | LUBBOCK |
| Highway | 0000000 |
| From | 135 E SLATON RD |
| To | LUBBOCK TX |
| CSJ | 4704-01-553 |
| Proj ID | CBC - 470401553 |
| Work Type | RENOVATION OR REPAIR |
| |
| 0.001 | 246439.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 90 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| FLYNN SOUTHWEST LP |
SUBCONTRACTOR(S) FOR CCSJ: 4704-01-553 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 08164218 |
| Totals | 246439.00 | 0.00 | 0.00 | 0.0 |
|
| County | LAMB |
| Highway | 0000000 |
| From | 1600 WEST DELANO |
| To | LITTLEFIELD TX 79339 |
| CSJ | 4704-01-774 |
| Proj ID | CBC - 470401774 |
| Work Type | RENOVATION OR REPAIR |
| |
| 0.001 | 273550.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 90 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| FLYNN SOUTHWEST LP |
SUBCONTRACTOR(S) FOR CCSJ: 4704-01-774 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 10164229 |
| Totals | 273550.00 | 0.00 | 0.00 | 0.0 |
|
| County | LUBBOCK |
| Highway | SL0289 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6267-07-001 |
| Proj ID | RMC - 626707001 |
| Work Type | HOT MIX MILL AND INLAY |
| |
| 0.500 | 1999567.71 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 67 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| ALLEN BUTLER CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6267-07-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 06144201 |
| Totals | 1999567.71 | 0.00 | 0.00 | 0.0 |
|
| County | FLOYD |
| Highway | US0062 |
| From | VARIOUS LOCATIONS IN |
| To | THE LUBBOCK DISTRICT |
| CSJ | 6271-00-001 |
| Proj ID | RMC - 627100001 |
| Work Type | PAVEMENT TEXTURING |
| |
| 0.001 | 102387.90 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 123 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| TOTAL HIGHWAY MAINTENANCE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6271-00-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 04140501 |
| Totals | 102387.90 | 0.00 | 0.00 | 0.0 |
|
| County | LUBBOCK |
| Highway | SL0289 |
| From | VARIOUS LOCATIONS |
| To | IN LUBBOCK COUNTY |
| CSJ | 6277-62-001 |
| Proj ID | RMC - 627762001 |
| Work Type | PM |
| |
| 0.500 | 1371551.12 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 51 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| ALLEN BUTLER CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6277-62-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 10144004 |
| Totals | 1371551.12 | 0.00 | 0.00 | 0.0 |
|
| County | LAMB |
| Highway | FM0037 |
| From | VARIOUS LOCATIONS |
| To | VARIOUS LOCATIONS |
| CSJ | 6380-18-001 |
| Proj ID | RMC - 638018001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 467330.80 | | 957734.24 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 07-26-21 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,050 |
| Percent Time Used | 71 |
| Contractor(s) |
| BERT WHITAKER |
SUBCONTRACTOR(S) FOR CCSJ: 6380-18-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 05214015 |
| Totals | 467330.80 | 0.00 | 957734.24 | 99.9 |
|
| County | BAILEY |
| Highway | FM0037 |
| From | VARIOUS LOCATIONS |
| To | VARIOUS LOCATIONS |
| CSJ | 6380-19-001 |
| Proj ID | RMC - 638019001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 490776.32 | | 779211.51 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 10-19-21 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,056 |
| Percent Time Used | 72 |
| Contractor(s) |
| CM COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6380-19-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 05214016 |
| Totals | 490776.32 | 0.00 | 779211.51 | 99.9 |
|
| County | LUBBOCK |
| Highway | IH0027 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6389-47-001 |
| Proj ID | RMC - 638947001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 409444.00 | | 504232.50 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 02-01-22 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,004 |
| Percent Time Used | 68 |
| Contractor(s) |
| GORMAN OUTDOOR, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6389-47-001 TEXAS BLACKTOPS LLC (0.00)
|
| Contract # | 11214021 |
| Totals | 409444.00 | 0.00 | 504232.50 | 99.9 |
|
| County | LUBBOCK |
| Highway | SL0289 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6389-48-001 |
| Proj ID | RMC - 638948001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 261944.00 | | 377916.00 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 02-01-22 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,004 |
| Percent Time Used | 68 |
| Contractor(s) |
| GORMAN OUTDOOR, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6389-48-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 11214022 |
| Totals | 261944.00 | 0.00 | 377916.00 | 99.9 |
|
| County | LUBBOCK |
| Highway | IH0027 |
| From | VARIOUS LOCATIONS |
| To | VARIOUS LOCATIONS |
| CSJ | 6390-58-001 |
| Proj ID | RMC - 639058001 |
| Work Type | PAVEMENT MARKINGS |
| |
| 0.010 | 1031724.00 | | 2039284.44 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 02-16-22 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 979 |
| Percent Time Used | 67 |
| Contractor(s) |
| TEXAS PANHANDLE CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6390-58-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 10214018 |
| Totals | 1031724.00 | 0.00 | 2039284.44 | 99.9 |
|
| County | GARZA |
| Highway | US0084 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6393-21-001 |
| Proj ID | RMC - 639321001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 807756.00 | | 1011542.00 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 05-19-22 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 897 |
| Percent Time Used | 61 |
| Contractor(s) |
| TEXAS BLACKTOPS LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6393-21-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02224013 |
| Totals | 807756.00 | 0.00 | 1011542.00 | 99.9 |
|
| County | PARMER |
| Highway | US0060 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6393-22-001 |
| Proj ID | RMC - 639322001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 774676.00 | | 935789.78 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 06-01-22 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 884 |
| Percent Time Used | 60 |
| Contractor(s) |
| CM COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6393-22-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02224014 |
| Totals | 774676.00 | 0.00 | 935789.78 | 99.9 |
|
| County | CROSBY |
| Highway | US0062 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6396-18-001 |
| Proj ID | RMC - 639618001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 816252.00 | | 784562.00 | 100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 09-01-22 |
| Work Completed | 08-30-24 |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 730 |
| Percent Time Used | 100 |
| Contractor(s) |
| CROSS PLUS CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6396-18-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 03224214 |
| Totals | 816252.00 | 0.00 | 784562.00 | 100.0 |
|
| County | SWISHER |
| Highway | IH0027 |
| From | VARIOUS |
| To | VARIOUS |
| CSJ | 6396-19-001 |
| Proj ID | RMC - 639619001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 566152.00 | | 565765.00 | 100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 09-01-22 |
| Work Completed | 08-30-24 |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 730 |
| Percent Time Used | 100 |
| Contractor(s) |
| CROSS PLUS CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6396-19-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 03224215 |
| Totals | 566152.00 | 0.00 | 565765.00 | 100.0 |
|
| County | LUBBOCK |
| Highway | IH0027 |
| From | VARIOUS LOCATIONS |
| To | VARIOUS LOCATIONS |
| CSJ | 6410-72-001 |
| Proj ID | BPM - 641072001 |
| Work Type | BRIDGE REPAIR |
| |
| 0.010 | 1197424.00 | | 1403155.90 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 02-15-24 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 279 |
| Addl Days Granted | 0 |
| Working Days Charged | 115 |
| Percent Time Used | 41 |
| Contractor(s) |
| TI-ZACK CONCRETE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6410-72-001 ONE WAY CONCRETE CONSTRUCTION, LLC (0.00) BARRICADES UNLIMITED (0.00) TRUMBLE CRANE & RIGGING (0.00)
|
| Contract # | 12234215 |
| Totals | 1197424.00 | 200896.94 | 1403155.90 | 99.9 |
|
| County | TERRY |
| Highway | US0062 |
| From | VARIOUS LOCATIONS |
| To | VARIOUS LOCATIONS |
| CSJ | 6432-26-001 |
| Proj ID | RMC - 643226001 |
| Work Type | TRAFFIC CONTROL SERVICES |
| |
| 0.010 | 1154459.00 | | 1897812.00 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 04-17-23 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 365 |
| Addl Days Granted | 365 |
| Working Days Charged | 564 |
| Percent Time Used | 77 |
| Contractor(s) |
| FC TRAFFIC CONTROL, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6432-26-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02234042 |
| Totals | 1154459.00 | 141990.00 | 1897812.00 | 99.9 |
|
| County | LAMB |
| Highway | US0084 |
| From | VARIOUS LOCATIONS |
| To | VARIOUS LOCATIONS |
| CSJ | 6432-28-001 |
| Proj ID | RMC - 643228001 |
| Work Type | TRAFFIC CONTROL SERVICES |
| |
| 0.010 | 450436.00 | | 624442.50 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 04-17-23 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 365 |
| Addl Days Granted | 365 |
| Working Days Charged | 564 |
| Percent Time Used | 77 |
| Contractor(s) |
| FC TRAFFIC CONTROL, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6432-28-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02234043 |
| Totals | 450436.00 | 88275.00 | 624442.50 | 99.9 |
|
| County | LUBBOCK |
| Highway | IH0027 |
| From | VARIOUS LOCATIONS |
| To | VARIOUS LOCATIONS |
| CSJ | 6432-30-001 |
| Proj ID | RMC - 643230001 |
| Work Type | TRAFFIC CONTROL SERVICES |
| |
| 0.010 | 1485576.00 | | 2683911.97 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 04-17-23 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 365 |
| Addl Days Granted | 365 |
| Working Days Charged | 564 |
| Percent Time Used | 77 |
| Contractor(s) |
| BARRICADES UNLIMITED |
SUBCONTRACTOR(S) FOR CCSJ: 6432-30-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02234227 |
| Totals | 1485576.00 | 176213.00 | 2683911.97 | 99.9 |
|
| County | HALE |
| Highway | IH0027 |
| From | VARIOUS LOCATIONS |
| To | VARIOUS LOCATIONS |
| CSJ | 6432-32-001 |
| Proj ID | RMC - 643232001 |
| Work Type | TRAFFIC CONTROL SERVICES |
| |
| 0.010 | 1040386.00 | | 1344057.53 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 04-17-23 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 365 |
| Addl Days Granted | 365 |
| Working Days Charged | 564 |
| Percent Time Used | 77 |
| Contractor(s) |
| FC TRAFFIC CONTROL, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6432-32-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02234228 |
| Totals | 1040386.00 | 119571.00 | 1344057.53 | 99.9 |
|
| County | HALE |
| Highway | IH0027 |
| From | VARIOUS LOCATIONS |
| To | VARIOUS LOCATIONS |
| CSJ | 6434-85-001 |
| Proj ID | RMC - 643485001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 588528.00 | | 421623.98 | 74.6 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 06-26-23 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 494 |
| Percent Time Used | 67 |
| Contractor(s) |
| TEXAS BLACKTOPS LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6434-85-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 04234012 |
| Totals | 588528.00 | 0.00 | 421623.98 | 74.6 |
|