Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
County | RED RIVER |
Highway | US0082 |
From | VARIOUS LOCATIONS IN |
To | RED RIVER COUNTY |
CSJ | 6423-60-001 |
Proj ID | RMC - 642360001 |
Work Type | TREE REMOVAL |
|
| 0.010 | 239302.00 | | 304637.00 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 03-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 611 |
Percent Time Used | 83 |
Contractor(s) |
EASTGATE SERVICES |
SUBCONTRACTOR(S) FOR CCSJ: 6423-60-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 01230103 |
| Totals | 239302.00 | 21830.00 | 304637.00 | 99.9 |
|
County | LAMAR |
Highway | US0082 |
From | VARIOUS LOCATIONS IN |
To | LAMAR, DELTA, AND RED RIVER COUNTIES |
CSJ | 6429-04-001 |
Proj ID | RMC - 642904001 |
Work Type | DRAINAGE IMPROVEMENT AND/OR REPAIRS |
|
| 0.010 | 166450.00 | | 313320.75 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 04-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 580 |
Percent Time Used | 79 |
Contractor(s) |
TEXAS DRAINAGE INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6429-04-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 01230104 |
| Totals | 166450.00 | 0.00 | 313320.75 | 99.9 |
|
County | DELTA |
Highway | FM0064 |
From | VARIOUS LOCATIONS IN |
To | DELTA COUNTY |
CSJ | 6430-40-001 |
Proj ID | BPM - 643040001 |
Work Type | BRIDGE PREVENTATIVE MAINTENANCE |
|
| 0.010 | 275835.00 | | 274435.00 | 99.4 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 06-06-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 32 |
Addl Days Granted | 0 |
Working Days Charged | 32 |
Percent Time Used | 100 |
Contractor(s) |
MB WESTERN INDUSTRIAL CONTRACTING COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6430-40-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03230104 |
| Totals | 275835.00 | 0.00 | 274435.00 | 99.4 |
|
County | LAMAR |
Highway | US0082 |
From | VARIOUS LOCATIONS IN |
To | LAMAR, DELTA, AND RED RIVER COUNTIES |
CSJ | 6443-14-001 |
Proj ID | RMC - 644314001 |
Work Type | METAL BEAM GUARD FENCE REPAIR |
|
| 0.010 | 218478.00 | | 242986.75 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 10-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 397 |
Percent Time Used | 54 |
Contractor(s) |
CATOCON, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6443-14-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08230102 |
| Totals | 218478.00 | 8511.00 | 242986.75 | 99.9 |
|
County | RAINS |
Highway | US0069 |
From | JANITORIAL MAINTENANCE |
To | AT RAINS CO. MAINT. OFFICE |
CSJ | 6449-65-001 |
Proj ID | RMC - 644965001 |
Work Type | JANITORIAL MAINTENANCE |
|
| 0.010 | 13171.20 | | 12120.80 | 92.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 11-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 366 |
Percent Time Used | 50 |
Contractor(s) |
KLEEN SWEEP SERVICES |
SUBCONTRACTOR(S) FOR CCSJ: 6449-65-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09230106 |
| Totals | 13171.20 | 810.00 | 12120.80 | 92.0 |
|
County | HUNT |
Highway | IH0030 |
From | JANITORIAL MAINTENANCE |
To | AT THE GREENVILLE AREA OFFICE/HUNT MAINT |
CSJ | 6449-69-001 |
Proj ID | RMC - 644969001 |
Work Type | JANITORIAL MAINTENANCE |
|
| 0.010 | 18140.00 | | 16185.00 | 89.2 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 12-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 336 |
Percent Time Used | 46 |
Contractor(s) |
KLEEN SWEEP SERVICES |
SUBCONTRACTOR(S) FOR CCSJ: 6449-69-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 10230101 |
| Totals | 18140.00 | 1475.00 | 16185.00 | 89.2 |
|
County | HOPKINS |
Highway | SH0019 |
From | VARIOUS LOCATIONS IN |
To | HOPKINS AND FRANKLIN COUNTIES |
CSJ | 6452-37-001 |
Proj ID | RMC - 645237001 |
Work Type | DITCH CLEANING AND RESHAPING |
|
| 0.010 | 216050.00 | | 285698.30 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 11-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 366 |
Percent Time Used | 50 |
Contractor(s) |
TEXAS DRAINAGE INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6452-37-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09230107 |
| Totals | 216050.00 | 0.00 | 285698.30 | 99.9 |
|
County | HOPKINS |
Highway | IH0030 |
From | VARIOUS LOCATIONS IN |
To | HOPKINS AND FRANKLIN COUNTIES |
CSJ | 6452-39-001 |
Proj ID | RMC - 645239001 |
Work Type | CLEANING AND SWEEPING HIGHWAYS |
|
| 0.010 | 71539.00 | | 60854.00 | 85.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 11-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 366 |
Percent Time Used | 50 |
Contractor(s) |
SWEEPING CORPORATION OF AMERICA, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6452-39-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09230108 |
| Totals | 71539.00 | 4768.50 | 60854.00 | 85.0 |
|
County | LAMAR |
Highway | BU0271B |
From | JANITORIAL MAINTENANCE |
To | AT PARIS DISTRICT HEADQUARTERS |
CSJ | 6454-93-001 |
Proj ID | RMC - 645493001 |
Work Type | JANITORIAL MAINTENANCE |
|
| 0.010 | 44200.00 | | 43300.00 | 97.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 11-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 366 |
Percent Time Used | 50 |
Contractor(s) |
RWCS JANITORIAL LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6454-93-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09230109 |
| Totals | 44200.00 | 3600.00 | 43300.00 | 97.9 |
|
County | GRAYSON |
Highway | US0082 |
From | VARIOUS LOCATIONS IN |
To | GRAYSON AND FANNIN COUNTY |
CSJ | 6455-37-001 |
Proj ID | RMC - 645537001 |
Work Type | TREE REMOVAL |
|
| 0.010 | 146746.00 | | 117564.00 | 80.1 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 12-18-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 319 |
Percent Time Used | 87 |
Contractor(s) |
ALLIES LAND CLEARING |
SUBCONTRACTOR(S) FOR CCSJ: 6455-37-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 10230102 |
| Totals | 146746.00 | 34597.00 | 117564.00 | 80.1 |
|
County | GRAYSON |
Highway | US0075 |
From | VARIOUS LOCATIONS IN |
To | GRAYSON COUNTY |
CSJ | 6457-48-001 |
Proj ID | BPM - 645748001 |
Work Type | BRIDGE PREVENTATIVE MAINTENANCE |
|
| 0.010 | 117765.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 30 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
GARRET SHIELDS INFRASTRUCTURE |
SUBCONTRACTOR(S) FOR CCSJ: 6457-48-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06240101 |
| Totals | 117765.00 | 0.00 | 0.00 | 0.0 |
|
County | RED RIVER |
Highway | BU0082J |
From | VARIOUS LOCATIONS IN |
To | RED RIVER, LAMAR AND DELTA CO. |
CSJ | 6457-51-001 |
Proj ID | BPM - 645751001 |
Work Type | BRIDGE PREVENTATIVE MAINTENANCE |
|
| 0.010 | 158160.00 | | 167410.00 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 07-22-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 48 |
Addl Days Granted | 0 |
Working Days Charged | 28 |
Percent Time Used | 58 |
Contractor(s) |
CATOCON, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6457-51-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 05240102 |
| Totals | 158160.00 | 45800.00 | 167410.00 | 99.9 |
|
County | GRAYSON |
Highway | US0075 |
From | VARIOUS LOCATIONS IN |
To | GRAYSON COUNTY |
CSJ | 6457-55-001 |
Proj ID | BPM - 645755001 |
Work Type | BRIDGE PREVENTATIVE MAINTENANCE |
|
| 0.010 | 173186.00 | | 48403.29 | 27.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 43 |
Addl Days Granted | 0 |
Working Days Charged | 16 |
Percent Time Used | 37 |
Contractor(s) |
ALBECO CONTRACTORS LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6457-55-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06240102 |
| Totals | 173186.00 | 48403.29 | 48403.29 | 27.9 |
|
County | RED RIVER |
Highway | US0082 |
From | VARIOUS ROADWAYS IN |
To | RED RIVER COUNTY |
CSJ | 6458-15-001 |
Proj ID | RMC - 645815001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 257253.00 | | 236860.00 | 92.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 06-01-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 63 |
Addl Days Granted | 0 |
Working Days Charged | 62 |
Percent Time Used | 98 |
Contractor(s) |
RICKEY BAIRD |
SUBCONTRACTOR(S) FOR CCSJ: 6458-15-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12230101 |
| Totals | 257253.00 | 65347.00 | 236860.00 | 92.0 |
|
County | DELTA |
Highway | SH0024 |
From | VARIOUS ROADWAYS IN |
To | DELTA COUNTY |
CSJ | 6458-17-001 |
Proj ID | RMC - 645817001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 171185.00 | | 160009.00 | 95.2 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 06-01-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 46 |
Addl Days Granted | 0 |
Working Days Charged | 51 |
Percent Time Used | 110 |
Contractor(s) |
RICKEY BAIRD |
SUBCONTRACTOR(S) FOR CCSJ: 6458-17-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12230102 |
| Totals | 171185.00 | 1638.00 | 160009.00 | 95.2 |
|
County | RAINS |
Highway | US0069 |
From | VARIOUS ROADWAYS IN |
To | RAINS COUNTY |
CSJ | 6458-19-001 |
Proj ID | RMC - 645819001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 185593.64 | | 185517.90 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 05-20-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 50 |
Addl Days Granted | 0 |
Working Days Charged | 29 |
Percent Time Used | 58 |
Contractor(s) |
DOUBLE S TRACTOR SERVICES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6458-19-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12230103 |
| Totals | 185593.64 | 71196.96 | 185517.90 | 99.9 |
|
County | HUNT |
Highway | SH0011 |
From | VARIOUS ROADWAYS IN |
To | HUNT COUNTY |
CSJ | 6458-21-001 |
Proj ID | RMC - 645821001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 270054.06 | | 117572.53 | 43.5 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 06-01-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 66 |
Addl Days Granted | 0 |
Working Days Charged | 65 |
Percent Time Used | 98 |
Contractor(s) |
DOUBLE S TRACTOR SERVICES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6458-21-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12230104 |
| Totals | 270054.06 | 0.00 | 117572.53 | 43.5 |
|
County | FRANKLIN |
Highway | SH0037 |
From | VARIOUS ROADWAYS IN |
To | FRANKLIN COUNTY |
CSJ | 6458-23-001 |
Proj ID | RMC - 645823001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 126968.00 | | 126816.00 | 99.8 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 06-01-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 42 |
Addl Days Granted | 0 |
Working Days Charged | 15 |
Percent Time Used | 35 |
Contractor(s) |
EASTGATE SERVICES |
SUBCONTRACTOR(S) FOR CCSJ: 6458-23-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12230105 |
| Totals | 126968.00 | 63408.50 | 126816.00 | 99.8 |
|
County | LAMAR |
Highway | US0082 |
From | VARIOUS ROADWAYS IN |
To | LAMAR COUNTY |
CSJ | 6458-25-001 |
Proj ID | RMC - 645825001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 250691.00 | | 158087.00 | 63.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 06-01-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 66 |
Addl Days Granted | 0 |
Working Days Charged | 62 |
Percent Time Used | 93 |
Contractor(s) |
RICKEY BAIRD |
SUBCONTRACTOR(S) FOR CCSJ: 6458-25-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12230106 |
| Totals | 250691.00 | 40183.00 | 158087.00 | 63.0 |
|
County | HOPKINS |
Highway | SH0019 |
From | VARIOUS ROADWAYS IN |
To | HOPKINS COUNTY |
CSJ | 6458-31-001 |
Proj ID | RMC - 645831001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 164603.00 | | 134192.00 | 81.5 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 06-01-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 52 |
Addl Days Granted | 0 |
Working Days Charged | 32 |
Percent Time Used | 61 |
Contractor(s) |
EASTGATE SERVICES |
SUBCONTRACTOR(S) FOR CCSJ: 6458-31-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12230107 |
| Totals | 164603.00 | 53821.00 | 134192.00 | 81.5 |
|