Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
County | HIDALGO |
Highway | IH 69C |
From | FM 1925 |
To | FM 2812 |
CSJ | 0255-07-149 |
Proj ID | F 2023(909) |
Work Type | OVERLAY |
|
| | 2641357.82 | | 2823334.42 | 99.9 |
County | HIDALGO |
Highway | SS 115 |
From | UVALDE RD. |
To | SARAH AVE. |
CSJ | 1804-01-082 |
Proj ID | F 2023(909) |
Work Type | OVERLAY |
|
| 5.510 | 1886920.30 | | 2002954.26 | 99.9 |
County | HIDALGO |
Highway | SS 115 |
From | SARAH AVE. |
To | UP 281 |
CSJ | 1804-01-083 |
Proj ID | F 2023(909) |
Work Type | OVERLAY |
|
| | 4041630.54 | | 4078553.58 | 99.9 |
Work Order | 07-19-23 |
Work Began | 10-16-23 |
Work Completed | |
Time Computed | 09-01-23 |
Contract Working Days | 140 |
Addl Days Granted | 0 |
Working Days Charged | 139 |
Percent Time Used | 99 |
Contractor(s) |
FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0255-07-149 D&G ENERGY CORPORATION (0.66) PAVEMENT MARKINGS INC. (4.37) SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. (0.23)
|
Contract # | 06233007 |
| Totals | 8569908.66 | 848.40 | 8904842.26 | 99.9 |
|
County | KENEDY |
Highway | US 77 |
From | 9.6 MILES NORTH OF NORIAS RD |
To | 6.33 MILES NORTH OF NORIAS RD |
CSJ | 0327-04-037 |
Proj ID | F 2B24(398) |
Work Type | FREEWAY OPERATIONAL IMPROVEMENTS |
|
| 3.190 | 33508385.70 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 09-18-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 453 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0327-04-037 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08243002 |
| Totals | 33508385.70 | 0.00 | 0.00 | 0.0 |
|
County | KENEDY |
Highway | US 77 |
From | 6.33 MILES NORTH OF NORIAS RD |
To | 1.46 MILES NORTH OF NORIAS RD |
CSJ | 0327-04-039 |
Proj ID | F 2B24(314) |
Work Type | FREEWAY OPERATIONAL IMPROVEMENTS |
|
| 4.870 | 93082026.74 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 09-18-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 685 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0327-04-039 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08243201 |
| Totals | 93082026.74 | 0.00 | 0.00 | 0.0 |
|
County | KENEDY |
Highway | US 77 |
From | NORIAS RD. |
To | 1.34 MILES NORTH OF WILLACY/KENEDY CO |
CSJ | 0327-05-041 |
Proj ID | F 2024(529) |
Work Type | FREEWAY OPERATIONAL IMPROVEMENTS |
|
| 11.643 | 190998296.03 | | 13122220.36 | 6.8 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 02-08-24 |
Work Began | 07-11-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 840 |
Addl Days Granted | 0 |
Working Days Charged | 91 |
Percent Time Used | 10 |
Contractor(s) |
POSILLICO CIVIL, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0327-05-041 HIGHWAY BARRICADES AND SERVICES, LLC (0.65) DEPENDABLE FENCE (0.74) D&G ENERGY CORPORATION (0.98) IZAGUIRRE CONSTRUCTION LLC (0.28) TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.55) CERTIFIED PLACERS LLC (0.06) FRONTIER DEVELOPMENT, INC. (0.08) PAVE/LOCK/PLUS II, LLC (0.10) SIBONEY CONTRACTING CO. (0.32) K. L. DURHAM CONSTRUCTION, L.L.C. (0.77)
|
Contract # | 12233028 |
| Totals | 190998296.03 | 9306966.43 | 13122220.36 | 6.8 |
|
County | CAMERON |
Highway | SH 100 |
From | S. MESQUITE ST. |
To | 567 FT. EAST OF EBANO ST. |
CSJ | 0331-01-052 |
Proj ID | NH 2021(193) |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| 0.900 | 4728315.84 | | 5147980.89 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 03-18-21 |
Work Began | 04-19-21 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 237 |
Addl Days Granted | 210 |
Working Days Charged | 466 |
Percent Time Used | 104 |
Contractor(s) |
EARTHWORKS ENTERPRISE |
SUBCONTRACTOR(S) FOR CCSJ: 0331-01-052 GO UNDERGROUND, LIMITED LIABILITY COMPANY (2.44) GP7 CONSTRUCTION INC. (0.77) SOIL TECH ADVANCE INC. (0.34) TEXAS HIGHWAY SYSTEMS, INC. (2.18) AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (2.33) PAVEMENT MARKINGS INC. (3.53)
|
Contract # | 11203202 |
| Totals | 4728315.84 | 0.00 | 5147980.89 | 99.9 |
|
County | CAMERON |
Highway | SH 100 |
From | SH 48 |
To | QUEEN ISABELLA CAUSEWAY |
CSJ | 0331-02-059 |
Proj ID | C 331-2-59 |
Work Type | OVERLAY |
|
| 1.480 | 1416470.40 | | 413552.04 | 29.1 |
County | CAMERON |
Highway | PR 100 |
From | ORCA CIRCLE |
To | QUEEN ISABELLA CAUSEWAY |
CSJ | 0331-04-073 |
Proj ID | C 331-4-73 |
Work Type | OVERLAY |
|
| 4.215 | 4482134.00 | | 0.00 | 0.0 |
County | CAMERON |
Highway | SL 499 |
From | BU 77X |
To | IH 69E |
CSJ | 1137-01-032 |
Proj ID | C 1137-1-32 |
Work Type | OVERLAY |
|
| 1.020 | 719232.10 | | 685001.06 | 95.2 |
County | CAMERON |
Highway | SL 499 |
From | FM 106 |
To | BU 77X |
CSJ | 1137-02-042 |
Proj ID | C 1137-2-42 |
Work Type | OVERLAY |
|
| 1.384 | 1147728.90 | | 1054272.20 | 91.8 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 04-11-24 |
Work Began | 08-08-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 135 |
Addl Days Granted | 0 |
Working Days Charged | 42 |
Percent Time Used | 31 |
Contractor(s) |
FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0331-02-059 AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (2.03) GP7 CONSTRUCTION INC. (1.01) HIGHWAY BARRICADES AND SERVICES, LLC (0.38) PAVEMENT MARKINGS INC. (5.90) SOIL TECH ADVANCE INC. (0.13)
|
Contract # | 01243014 |
| Totals | 7765565.40 | 579210.55 | 2152825.30 | 27.7 |
|
County | CAMERON |
Highway | PR 100 |
From | AT QUEEN ISABELLA CAUSEWAY |
To | STR #:_0331-04-005 |
CSJ | 0331-04-069 |
Proj ID | BR 2020(709) |
Work Type | BRIDGE MAINTENANCE |
|
| 2.639 | 9814198.00 | | 14221494.27 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 06-09-20 |
Work Began | 10-19-20 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 576 |
Addl Days Granted | 170 |
Working Days Charged | 701 |
Percent Time Used | 93 |
Contractor(s) |
SOUTHERN ROAD & BRIDGE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0331-04-069 MOBILE ENTERPRISES, INC. (3.60) PAVEMENT MARKINGS INC. (0.74)
|
Contract # | 04203206 |
| Totals | 9814198.00 | 0.00 | 14221494.27 | 99.9 |
|
County | HIDALGO |
Highway | SH 107 |
From | 59TH STREET |
To | SEAWALL BLVD |
CSJ | 0342-01-074 |
Proj ID | STP 2019(085) |
Work Type | CONST 6 LN DIV RURAL |
|
| 7.075 | 20492319.77 | | 23153191.92 | 99.9 |
County | HIDALGO |
Highway | SH 107 |
From | 0.7 MI W OF FM 2128 |
To | 0.4 MI W OF FM 2128 |
CSJ | 0342-01-088 |
Proj ID | STP 2019(084)HES |
Work Type | SAFETY LIGHTING |
|
| 1.101 | 321205.00 | | 0.00 | 0.0 |
County | HIDALGO |
Highway | SH 107 |
From | @ FM 1423 |
To | . |
CSJ | 0342-01-089 |
Proj ID | STP 2019(084)HES |
Work Type | IMPROVE TRAFFIC SIGNAL |
|
| 0.200 | 121038.60 | | 46428.75 | 38.3 |
County | HIDALGO |
Highway | SH 107 |
From | @ FM 907 |
To | . |
CSJ | 0342-01-090 |
Proj ID | STP 2019(084)HES |
Work Type | IMPROVE TRAFFIC SIGNAL |
|
| 0.200 | 169327.80 | | 107831.89 | 63.6 |
Work Order | 04-16-19 |
Work Began | 05-03-21 |
Work Completed | |
Time Computed | 05-25-20 |
Contract Working Days | 461 |
Addl Days Granted | 240 |
Working Days Charged | 633 |
Percent Time Used | 90 |
Contractor(s) |
FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0342-01-074 GP7 CONSTRUCTION INC. (13.50) HIGHWAY BARRICADES AND SERVICES, LLC (1.85) SOIL-TECH, INC. (0.54) TRAF-TEX, INC. (6.59) RIO GRANDE REBAR RODBUSTERS, LLC. (0.03) SOIL TECH ADVANCE INC. (0.54) G & E ESCOBEDO CONSTRUCTION, INC. (0.00)
|
Contract # | 03193203 |
| Totals | 21103891.17 | 652855.71 | 23307452.56 | 99.9 |
|
County | CAMERON |
Highway | SH 107 |
From | LOUISIANA ST. |
To | HOOKS E. HODGES RD. |
CSJ | 0342-03-037 |
Proj ID | C 342-3-37 |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| 1.000 | 5460340.75 | | 3742470.85 | 68.5 |
County | CAMERON |
Highway | SH 107 |
From | LOUISIANA ST. |
To | HOOKS E. HODGES RD. |
CSJ | 0342-03-041 |
Proj ID | ROW 342-3-41 |
Work Type | RIGHT OF WAY |
|
| 1.000 | 90736.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 11-01-23 |
Work Began | 12-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 225 |
Addl Days Granted | 0 |
Working Days Charged | 217 |
Percent Time Used | 96 |
Contractor(s) |
TEXAS CORDIA CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0342-03-037 PAVEMENT MARKINGS INC. (1.82) DUSTROL, INC. (5.41) EXTERIOR DESIGNS (1.36) AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (5.43)
|
Contract # | 08233005 |
| Totals | 5551076.75 | 214365.28 | 3742470.85 | 67.4 |
|
County | WILLACY |
Highway | SH 186 |
From | HIDALGO/ WILLACY C.L. |
To | KING ST |
CSJ | 0433-02-052 |
Proj ID | C 433-2-52 |
Work Type | REHABILITATE ROADWAY (SUPER 2) |
|
| 12.296 | 20899927.85 | | 23528194.01 | 99.9 |
Work Order | 09-18-18 |
Work Began | 01-07-19 |
Work Completed | |
Time Computed | 10-18-18 |
Contract Working Days | 560 |
Addl Days Granted | 551 |
Working Days Charged | 1,148 |
Percent Time Used | 103 |
Contractor(s) |
ASAGO, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0433-02-052 AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (0.52) HIGHWAY BARRICADES AND SERVICES, LLC (3.78) GULF COAST CONTRACTORS, INC. (0.73)
|
Contract # | 08183008 |
| Totals | 20899927.85 | 1555.00 | 23528194.01 | 99.9 |
|
County | JIM HOGG |
Highway | SH 285 |
From | FM 1017 |
To | JIM HOGG/BROOKS CL |
CSJ | 0482-01-036 |
Proj ID | F 2B24(072) |
Work Type | SUPER-2 HIGHWAY |
|
| 9.296 | 32400288.59 | | 4713270.08 | 14.5 |
County | BROOKS |
Highway | SH 285 |
From | JIM HOGG/BROOKS COUNTY LINE |
To | 0.66 MILES EAST OF JIM HOGG/BROOKS CL |
CSJ | 0482-02-035 |
Proj ID | F 2B24(072) |
Work Type | SUPER-2 HIGHWAY |
|
| | 2375564.38 | | 94540.00 | 3.9 |
Work Order | 06-12-24 |
Work Began | 07-12-24 |
Work Completed | |
Time Computed | 07-12-24 |
Contract Working Days | 1,179 |
Addl Days Granted | 0 |
Working Days Charged | 70 |
Percent Time Used | 5 |
Contractor(s) |
FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0482-01-036 TEXAS HIGHWAY SYSTEMS, INC. (0.41) SOIL TECH ADVANCE INC. (1.87) LAREDO STRIPING, INC. (0.97) ANDERSON COLUMBIA CO., INC. (45.41) AVILA AND SON"S L.L.C. (9.21) HIGHWAY BARRICADES AND SERVICES, LLC (1.67)
|
Contract # | 05243204 |
| Totals | 34775852.97 | 708198.83 | 4807810.08 | 13.8 |
|
County | JIM HOGG ETC |
Highway | SH 16 ETC |
From | 0.22 MI S OF SIESTA RD. |
To | JIM HOGG/ZAPATA COUNTY LINE |
CSJ | 0517-06-036 |
Proj ID | STP 2B20(155)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 148.414 | 4952063.28 | | 5018371.94 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 09-18-20 |
Work Began | 03-08-21 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 256 |
Addl Days Granted | 0 |
Working Days Charged | 517 |
Percent Time Used | 201 |
Contractor(s) |
ATLANTIC SPECIALTY INSURANCE COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0517-06-036 DEPENDABLE FENCE & WELDING CO. INC. (10.09) HIGHWAY BARRICADES AND SERVICES, LLC (0.18) TEXAS ICON CONSTRUCTION, LLC (30.18) TERRA CONSTRUCTION LLC (6.87) JMG CONCRETE INC (5.91) TREBOL TRAFFIC SAFETY GROUP LLC (3.63) HJC FARMS, INC. (74.52)
|
Contract # | 08203016 |
| Totals | 4952063.28 | 207344.42 | 5018371.94 | 99.9 |
|
County | HIDALGO |
Highway | FM 681 |
From | 0.1 MILES W. OF INSPIRATION RD. |
To | 0.1 MILES E. OF INSPIRATION RD. |
CSJ | 0669-01-066 |
Proj ID | STP 2B23(015)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 290587.40 | | 289466.60 | 99.6 |
County | STARR |
Highway | FM 755 |
From | 0.1 MILES NE OF FLORES ST. |
To | 0.1 MILES SW OF FLORES ST. |
CSJ | 1103-05-002 |
Proj ID | STP 2B23(015)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 254170.10 | | 239897.30 | 94.3 |
County | HIDALGO |
Highway | FM 2128 |
From | 0.1 MILES W. OF TERRY RD. |
To | 0.1 MILES E. OF TERRY RD. |
CSJ | 2450-01-026 |
Proj ID | STP 2B23(015)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 218831.60 | | 229341.43 | 99.9 |
Work Order | 07-12-23 |
Work Began | 02-12-24 |
Work Completed | |
Time Computed | 11-09-23 |
Contract Working Days | 100 |
Addl Days Granted | 19 |
Working Days Charged | 119 |
Percent Time Used | 100 |
Contractor(s) |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0669-01-066 RIO GRANDE CONSTRUCTORS AND CONSTRUCTION MANAGEMENT LLC (2.97) PAVEMENT MARKINGS INC. (8.72) G & E ESCOBEDO CONSTRUCTION, INC. (4.38) SOUTH TEXAS DRILLING, LLC (0.71)
|
Contract # | 06233057 |
| Totals | 763589.10 | 36118.90 | 758705.33 | 99.3 |
|
County | HIDALGO |
Highway | FM 2221 |
From | 0.1 MILES W. OF QUEEN PALM DR. |
To | 0.1 MILES E. OF QUEEN PALM DR. |
CSJ | 0669-03-029 |
Proj ID | STP 2B23(014)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 80576.40 | | 85422.37 | 99.9 |
County | HIDALGO |
Highway | FM 2221 |
From | 0.1 MILES W. OF ABRAM RD. |
To | 0.1 MILES E. OF ABRAM RD. |
CSJ | 0669-03-030 |
Proj ID | STP 2B23(014)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 245711.30 | | 233416.20 | 94.9 |
County | HIDALGO |
Highway | FM 492 |
From | 0.1 MILES N. OF MILE 6 RD. |
To | 0.1 MILES S. OF MILE 6 RD. |
CSJ | 0862-01-066 |
Proj ID | STP 2B23(014)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 221860.90 | | 210356.10 | 94.8 |
County | HIDALGO |
Highway | FM 1924 |
From | 0.1 MILES WEST OF SCHUERBACH RD. |
To | 0.1 MILES EAST OF SCHUERBACH RD. |
CSJ | 1802-01-046 |
Proj ID | STP 2B23(014)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 254565.35 | | 247003.00 | 97.0 |
Work Order | 07-12-23 |
Work Began | 03-08-24 |
Work Completed | |
Time Computed | 11-11-24 |
Contract Working Days | 120 |
Addl Days Granted | 0 |
Working Days Charged | 118 |
Percent Time Used | 98 |
Contractor(s) |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0669-03-029 PAVEMENT MARKINGS INC. (5.24) G & E ESCOBEDO CONSTRUCTION, INC. (5.00) RIO GRANDE CONSTRUCTORS AND CONSTRUCTION MANAGEMENT LLC (4.67) MUNOZ FOUNDATION DRILLING, INC. (2.27)
|
Contract # | 06233017 |
| Totals | 802713.95 | 65127.52 | 776197.67 | 96.6 |
|
County | BROOKS ETC |
Highway | FM 755 ETC |
From | US 281 |
To | 7.5 MILES WEST OF US 281 |
CSJ | 0818-01-020 |
Proj ID | F 2B24(500) |
Work Type | SEAL COAT |
|
| 1.280 | 5005655.51 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 100 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
CLARK CONSTRUCTION OF TEXAS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0818-01-020 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09243215 |
| Totals | 5005655.51 | 0.00 | 0.00 | 0.0 |
|
County | WILLACY |
Highway | FM 490 |
From | FM 88 |
To | FM 1015 |
CSJ | 0860-02-015 |
Proj ID | STP 2B24(196)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 5494396.77 | | 1132734.40 | 20.6 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 07-18-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 187 |
Addl Days Granted | 0 |
Working Days Charged | 21 |
Percent Time Used | 11 |
Contractor(s) |
FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0860-02-015 AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (0.87) HIGHWAY BARRICADES AND SERVICES, LLC (4.79) TEXAS HIGHWAY SYSTEMS, INC. (0.87) TEXAS ICON CONSTRUCTION, LLC (5.17)
|
Contract # | 06243015 |
| Totals | 5494396.77 | 1132734.40 | 1132734.40 | 20.6 |
|
County | HIDALGO |
Highway | FM 491 |
From | CR 1390 |
To | FM 1425 |
CSJ | 0861-01-068 |
Proj ID | STP 2022(723)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| | 3701235.71 | | 3637426.31 | 99.0 |
Work Order | 07-27-22 |
Work Began | 09-19-22 |
Work Completed | |
Time Computed | 09-29-22 |
Contract Working Days | 180 |
Addl Days Granted | 26 |
Working Days Charged | 236 |
Percent Time Used | 114 |
Contractor(s) |
ASAGO, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0861-01-068 HIGHWAY BARRICADES AND SERVICES, LLC (2.21) TEXAS ICON CONSTRUCTION, LLC (0.98)
|
Contract # | 06223415 |
| Totals | 3701235.71 | 437.43 | 3637426.31 | 99.0 |
|
County | HIDALGO ETC |
Highway | FM 1427 ETC |
From | US 83 |
To | BU 83S |
CSJ | 0862-02-020 |
Proj ID | C 862-2-20 |
Work Type | SEAL COAT |
|
| 28.916 | 8895309.40 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 120 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
CK NEWBERRY, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0862-02-020 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09243014 |
| Totals | 8895309.40 | 0.00 | 0.00 | 0.0 |
|
County | HIDALGO |
Highway | FM 494 |
From | SH 107 |
To | FM 676(MILE 5) |
CSJ | 0864-01-068 |
Proj ID | F 2B24(397) |
Work Type | WIDEN NON-FREEWAY |
|
| | 19548135.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 452 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
TEXAS CORDIA CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0864-01-068 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 10243213 |
| Totals | 19548135.00 | 0.00 | 0.00 | 0.0 |
|
County | CAMERON |
Highway | FM 506 |
From | BUS 83 |
To | FM 3067 |
CSJ | 0872-04-030 |
Proj ID | C 872-4-30 |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| 3.030 | 7719200.93 | | 4234222.44 | 54.8 |
County | CAMERON |
Highway | FM 800 |
From | FM 1479 |
To | FM 509 |
CSJ | 1136-02-053 |
Proj ID | C 1136-2-53 |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| 1.700 | 4776267.76 | | 4978259.86 | 99.9 |
County | CAMERON |
Highway | FM 1479 |
From | FM 800 |
To | FM 675 |
CSJ | 1425-04-023 |
Proj ID | C 1425-4-23 |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| 1.600 | 3290303.75 | | 3173512.98 | 96.4 |
Work Order | 10-11-22 |
Work Began | 01-10-23 |
Work Completed | |
Time Computed | 11-10-22 |
Contract Working Days | 554 |
Addl Days Granted | 0 |
Working Days Charged | 383 |
Percent Time Used | 69 |
Contractor(s) |
FOREMOST PAVING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0872-04-030 AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (0.08) HIGHWAY BARRICADES AND SERVICES, LLC (1.06) SOIL TECH ADVANCE INC. (0.95) SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. (1.67) RIO GRANDE REBAR RODBUSTERS, LLC. (0.04)
|
Contract # | 09223201 |
| Totals | 15785772.44 | 281450.25 | 12385995.28 | 78.4 |
|