| Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
| County | TOM GREEN |
| Highway | US0087 |
| From | VARIOUS LOCATIONS IN TOM GREEN COUNTY |
| To | VARIOUS LOCATIONS IN TOM GREEN COUNTY |
| CSJ | 6187-12-001 |
| Proj ID | RMC - 618712001 |
| Work Type | MOWING THE RIGHT OF WAY |
| |
| 0.001 | 37895.20 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 16 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| WEST TEXAS CIVIL CONTRACTORS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6187-12-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 11080708 |
| Totals | 37895.20 | 0.00 | 0.00 | 0.0 |
|
| County | TOM GREEN |
| Highway | US0087 |
| From | VARIOUS LOCATIONS IN TOM GREEN COUNTY |
| To | VARIOUS LOCATIONS IN TOM GREEN COUNTY |
| CSJ | 6192-30-001 |
| Proj ID | RMC - 619230001 |
| Work Type | MOWING THE RIGHT OF WAY |
| |
| 0.001 | 60490.92 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 16 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| DAVIS COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 6192-30-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 03090701 |
| Totals | 60490.92 | 0.00 | 0.00 | 0.0 |
|
| County | CROCKETT |
| Highway | SH0163 |
| From | VARIOUS LOCATIONS IN CROCKETT, ETC. |
| To | VARIOUS LOCATIONS IN CROCKETT, ETC. |
| CSJ | 6197-27-001 |
| Proj ID | RMC - 619727001 |
| Work Type | STRIP MOWING AND ROADSIDE MOWING |
| |
| 0.001 | 57765.80 | | 30378.20 | 52.5 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 08-04-10 |
| Work Began | 08-09-10 |
| Work Completed | |
| Time Computed | 08-09-10 |
| Contract Working Days | 44 |
| Addl Days Granted | 0 |
| Working Days Charged | 17 |
| Percent Time Used | 38 |
| Contractor(s) |
| GALINDO'S LANDSCAPING |
SUBCONTRACTOR(S) FOR CCSJ: 6197-27-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 01100701 |
| Totals | 57765.80 | 0.00 | 30378.20 | 52.5 |
|
| County | SUTTON |
| Highway | US0277 |
| From | VARIOUS LOCATIONS IN SUTTON, ETC. |
| To | VARIOUS LOCATIONS IN SCHLEICHER, ETC. |
| CSJ | 6197-29-001 |
| Proj ID | RMC - 619729001 |
| Work Type | STRIP MOWING AND ROADSIDE MOWING |
| |
| 0.001 | 61335.40 | | 80846.05 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 07-12-10 |
| Work Began | 07-19-10 |
| Work Completed | |
| Time Computed | 07-19-10 |
| Contract Working Days | 46 |
| Addl Days Granted | 0 |
| Working Days Charged | 17 |
| Percent Time Used | 36 |
| Contractor(s) |
| SQUARE G, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6197-29-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 01100703 |
| Totals | 61335.40 | 0.00 | 80846.05 | 99.9 |
|
| County | TOM GREEN |
| Highway | LP0306 |
| From | VARIOUS LOCATIONS |
| To | DISTRICT WIDE |
| CSJ | 6197-79-001 |
| Proj ID | SUP - 619779001 |
| Work Type | LANDSCAPE MAINTENANCE |
| |
| 0.001 | 297899.92 | | 71696.19 | 24.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 09-01-09 |
| Work Began | 09-01-09 |
| Work Completed | |
| Time Computed | 09-01-09 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 303 |
| Percent Time Used | 41 |
| Contractor(s) |
TIBH INDUSTRIES, INC. CONCHO RESOURCE CENTER |
SUBCONTRACTOR(S) FOR CCSJ: 6197-79-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 08090750 |
| Totals | 297899.92 | 0.00 | 71696.19 | 24.0 |
|
| County | TOM GREEN |
| Highway | US0067 |
| From | TOM GREEN COUNTY |
| To | TOM GREEN COUNTY |
| CSJ | 6204-72-001 |
| Proj ID | RMC - 620472001 |
| Work Type | SWEEPING AND CLEANING OF HIGHWAYS-URBAN |
| |
| 0.001 | 34865.58 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 243 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| CHARLIE'S CERTIFIED TRANSMISSIONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6204-72-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 12090701 |
| Totals | 34865.58 | 0.00 | 0.00 | 0.0 |
|
| County | KIMBLE |
| Highway | US0377 |
| From | CONCHO MENARD KIMBLE REAL EDWARDS CO. |
| To | CONCHO MENARD KIMBLE REAL EDWARDS CO. |
| CSJ | 6206-40-001 |
| Proj ID | RMC - 620640001 |
| Work Type | CLEANING AND SEALING JOINTS AND CRACKSCL |
| |
| 89.300 | 41399.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 04-09-10 |
| Work Began | 04-19-10 |
| Work Completed | |
| Time Computed | 04-19-10 |
| Contract Working Days | 40 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| MENENDEZ-DONNELL & ASSOCIATES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6206-40-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 03100702 |
| Totals | 41399.00 | 0.00 | 0.00 | 0.0 |
|
| County | TOM GREEN |
| Highway | RM0584 |
| From | 4502 KNICKERBOCKER ROAD |
| To | 4502 KNICKERBOCKER ROAD |
| CSJ | 6207-26-001 |
| Proj ID | SUP - 620726001 |
| Work Type | JANITORIAL SERVICES |
| |
| 0.010 | 41603.30 | | 39350.30 | 100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 01-17-10 |
| Work Began | 02-01-10 |
| Work Completed | 01-31-11 |
| Time Computed | 02-01-10 |
| Contract Working Days | 365 |
| Addl Days Granted | 0 |
| Working Days Charged | 365 |
| Percent Time Used | 100 |
| Contractor(s) |
TIBH INDUSTRIES, INC. WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6207-26-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 01100750 |
| Totals | 41603.30 | 0.00 | 39350.30 | 100.0 |
|
| County | REAGAN |
| Highway | US0067 |
| From | VARIOUS LOCATIONS IN REAGAN COUNTY |
| To | LOCATIONS IN IRION, GLASSCOCK & CROCKETT |
| CSJ | 6211-99-001 |
| Proj ID | RMC - 621199001 |
| Work Type | MOWING IN THE RIGHT OF WAY |
| |
| 0.001 | 33337.38 | | 67990.10 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 11-09-10 |
| Work Began | 11-22-10 |
| Work Completed | |
| Time Computed | 11-22-10 |
| Contract Working Days | 25 |
| Addl Days Granted | 25 |
| Working Days Charged | 35 |
| Percent Time Used | 70 |
| Contractor(s) |
| BRANDON DIERINGER |
SUBCONTRACTOR(S) FOR CCSJ: 6211-99-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 07100708 |
| Totals | 33337.38 | 0.00 | 67990.10 | 99.9 |
|
| County | TOM GREEN |
| Highway | US0087 |
| From | VARIOUS LOCATIONS IN SAN ANGELO DISTRICT |
| To | VARIOUS LOCATIONS IN SAN ANGELO DISTRICT |
| CSJ | 6212-03-001 |
| Proj ID | SUP - 621203001 |
| Work Type | PICNIC AREA MAINTENANCE |
| |
| 0.001 | 240850.00 | | 226735.00 | 94.1 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 09-01-10 |
| Work Began | 09-01-10 |
| Work Completed | |
| Time Computed | 09-01-10 |
| Contract Working Days | 130 |
| Addl Days Granted | 25 |
| Working Days Charged | 142 |
| Percent Time Used | 91 |
| Contractor(s) |
TIBH INDUSTRIES, INC. CONCHO RESOURCE CENTER |
SUBCONTRACTOR(S) FOR CCSJ: 6212-03-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 08100704 |
| Totals | 240850.00 | 0.00 | 226735.00 | 94.1 |
|
| County | TOM GREEN |
| Highway | RM0584 |
| From | 4502 KNICKERBOCKER RD |
| To | 4502 KNICKERBOCKER RD |
| CSJ | 6221-78-001 |
| Proj ID | SUP - 622178001 |
| Work Type | REGIONAL AND DISTRICT JANITORIAL |
| |
| 0.010 | 69228.60 | | 67001.18 | 100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 02-01-11 |
| Work Began | 02-01-11 |
| Work Completed | 08-31-12 |
| Time Computed | 02-01-11 |
| Contract Working Days | 576 |
| Addl Days Granted | 2 |
| Working Days Charged | 578 |
| Percent Time Used | 100 |
| Contractor(s) |
TIBH INDUSTRIES, INC. WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6221-78-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02110703 |
| Totals | 69228.60 | 0.00 | 67001.18 | 100.0 |
|
| County | TOM GREEN |
| Highway | US0087 |
| From | VARIOUS LOCATIONS IN SAN ANGELO DISTRICT |
| To | VARIOUS LOCATIONS IN SNA ANGELO DISTRICT |
| CSJ | 6224-32-001 |
| Proj ID | SUP - 622432001 |
| Work Type | PICNIC AREA MAINTENANCE |
| |
| 0.001 | 240600.00 | | 228188.50 | 94.8 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 08-31-11 |
| Work Began | 09-01-11 |
| Work Completed | |
| Time Computed | 09-01-11 |
| Contract Working Days | 160 |
| Addl Days Granted | 0 |
| Working Days Charged | 143 |
| Percent Time Used | 89 |
| Contractor(s) |
TIBH INDUSTRIES, INC. CONCHO RESOURCE CENTER |
SUBCONTRACTOR(S) FOR CCSJ: 6224-32-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 08110701 |
| Totals | 240600.00 | 0.00 | 228188.50 | 94.8 |
|
| County | SUTTON |
| Highway | US0277 |
| From | JUNCTION AREA OFFICE |
| To | SONORA AREA OFFICE |
| CSJ | 6231-17-001 |
| Proj ID | SUP - 623117001 |
| Work Type | STATE USE JANITORIAL |
| |
| 0.010 | 16940.00 | | 13675.00 | 100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 08-25-11 |
| Work Began | 09-01-11 |
| Work Completed | 08-31-12 |
| Time Computed | 09-01-11 |
| Contract Working Days | 365 |
| Addl Days Granted | 1 |
| Working Days Charged | 366 |
| Percent Time Used | 100 |
| Contractor(s) |
TIBH INDUSTRIES, INC. WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6231-17-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 08110709 |
| Totals | 16940.00 | 0.00 | 13675.00 | 100.0 |
|
| County | TOM GREEN |
| Highway | SH0208 |
| From | ROBERT LEE |
| To | ROCKSPRINGS |
| CSJ | 6231-27-001 |
| Proj ID | SUP - 623127001 |
| Work Type | JANITORIAL COKE STERLING RUNNELS EDWARDS |
| |
| 0.010 | 34740.98 | | 29013.65 | 100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 08-01-11 |
| Work Began | 08-01-11 |
| Work Completed | 08-31-12 |
| Time Computed | 08-01-11 |
| Contract Working Days | 396 |
| Addl Days Granted | 63 |
| Working Days Charged | 459 |
| Percent Time Used | 100 |
| Contractor(s) |
TIBH INDUSTRIES, INC. WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6231-27-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 07110703 |
| Totals | 34740.98 | 0.00 | 29013.65 | 100.0 |
|
| County | KIMBLE |
| Highway | US0083 |
| From | VARIOUS LOCATIONS IN JUNCTION AREA OFF |
| To | VARIOUS LOCATIONS IN JUNCTION AREA OFF |
| CSJ | 6243-19-001 |
| Proj ID | SUP - 624319001 |
| Work Type | PICNIC AREA MAINTENANCE & LANDSCAPE MOW |
| |
| 0.001 | 99520.93 | | 96400.25 | 96.8 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 09-01-12 |
| Work Began | 09-01-12 |
| Work Completed | |
| Time Computed | 09-01-12 |
| Contract Working Days | 365 |
| Addl Days Granted | 61 |
| Working Days Charged | 395 |
| Percent Time Used | 92 |
| Contractor(s) |
TIBH INDUSTRIES, INC. CONCHO RESOURCE CENTER |
SUBCONTRACTOR(S) FOR CCSJ: 6243-19-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 09120704 |
| Totals | 99520.93 | 0.00 | 96400.25 | 96.8 |
|
| County | CROCKETT |
| Highway | SH0163 |
| From | OZONA MAINT OFFICE |
| To | OZONA MAINT OFFICE |
| CSJ | 6243-54-001 |
| Proj ID | SUP - 624354001 |
| Work Type | JANITORIAL |
| |
| 0.010 | 9401.00 | | 6101.00 | 100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 08-26-12 |
| Work Began | 10-01-12 |
| Work Completed | 05-31-13 |
| Time Computed | 10-01-12 |
| Contract Working Days | 365 |
| Addl Days Granted | 0 |
| Working Days Charged | 243 |
| Percent Time Used | 66 |
| Contractor(s) |
TIBH INDUSTRIES, INC. WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6243-54-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 08120713 |
| Totals | 9401.00 | 0.00 | 6101.00 | 100.0 |
|
| County | TOM GREEN |
| Highway | RM0584 |
| From | DISTRICT GROUNDS LANDSCAPE |
| To | DISTRICT GROUNDS LANDSCAPE |
| CSJ | 6246-35-001 |
| Proj ID | SUP - 624635001 |
| Work Type | DISTRICT GROUNDS LANDSCAPE |
| |
| 0.001 | 34852.00 | | 27609.68 | 79.2 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 08-31-12 |
| Work Began | 09-01-12 |
| Work Completed | |
| Time Computed | 09-01-12 |
| Contract Working Days | 365 |
| Addl Days Granted | 30 |
| Working Days Charged | 395 |
| Percent Time Used | 100 |
| Contractor(s) |
TIBH INDUSTRIES, INC. ENTERPRISE PROFESSIONAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6246-35-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 08120706 |
| Totals | 34852.00 | 0.00 | 27609.68 | 79.2 |
|
| County | COKE |
| Highway | SH0208 |
| From | ROBERT LEE |
| To | ROBERT LEE |
| CSJ | 6247-88-001 |
| Proj ID | SUP - 624788001 |
| Work Type | JANITORIAL |
| |
| 0.010 | 7294.00 | | 3880.00 | 100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 08-26-12 |
| Work Began | 09-01-12 |
| Work Completed | 05-31-13 |
| Time Computed | 09-01-12 |
| Contract Working Days | 365 |
| Addl Days Granted | 0 |
| Working Days Charged | 273 |
| Percent Time Used | 74 |
| Contractor(s) |
TIBH INDUSTRIES, INC. WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6247-88-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 08120712 |
| Totals | 7294.00 | 0.00 | 3880.00 | 100.0 |
|
| County | RUNNELS |
| Highway | US0067 |
| From | BALLINGER |
| To | BALLINGER |
| CSJ | 6247-89-001 |
| Proj ID | SUP - 624789001 |
| Work Type | JANITORIAL |
| |
| 0.010 | 7880.00 | | 5559.80 | 100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 08-26-12 |
| Work Began | 09-01-12 |
| Work Completed | 05-31-13 |
| Time Computed | 09-01-12 |
| Contract Working Days | 365 |
| Addl Days Granted | 0 |
| Working Days Charged | 273 |
| Percent Time Used | 74 |
| Contractor(s) |
TIBH INDUSTRIES, INC. WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6247-89-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 08120710 |
| Totals | 7880.00 | 0.00 | 5559.80 | 100.0 |
|
| County | STERLING |
| Highway | US0087 |
| From | STERLING CITY |
| To | STERLING CITY |
| CSJ | 6247-91-001 |
| Proj ID | SUP - 624791001 |
| Work Type | JANITORIAL |
| |
| 0.010 | 7716.00 | | 4980.00 | 100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 08-26-12 |
| Work Began | 09-01-12 |
| Work Completed | 05-31-13 |
| Time Computed | 09-01-12 |
| Contract Working Days | 365 |
| Addl Days Granted | 0 |
| Working Days Charged | 273 |
| Percent Time Used | 74 |
| Contractor(s) |
TIBH INDUSTRIES, INC. WORLD TECHNICAL SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6247-91-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 08120711 |
| Totals | 7716.00 | 0.00 | 4980.00 | 100.0 |
|