Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
County | UPSHUR |
Highway | US 271 |
From | 0.06 MI N OF FM 726 |
To | GREGG C/L |
CSJ | 0248-05-065 |
Proj ID | C 248-5-65 |
Work Type | OVERLAY |
|
| 4.169 | 4881470.75 | | 5142422.62 | 99.9 |
Work Order | 05-16-24 |
Work Began | 06-20-24 |
Work Completed | |
Time Computed | 06-17-24 |
Contract Working Days | 65 |
Addl Days Granted | 4 |
Working Days Charged | 77 |
Percent Time Used | 111 |
Contractor(s) |
MADDEN CONTRACTING COMPANY, LLC. |
SUBCONTRACTOR(S) FOR CCSJ: 0248-05-065 COLD CREEK CONSTRUCTION, LTD (4.08) PANOLA SIGN & BARRICADE, INC. (0.24) MORRIS COUNTY CONTRACTORS, L.L.C. (0.30) R & G CONSTRUCTION, LLC (3.28) STRIPING TECHNOLOGY, L.P. (3.00) SOUTHWEST ENVIRONMENT SERVICES LLC (0.81) WEST TEXAS ROCK RESOURCES, LLC (0.13)
|
Contract # | 04243206 |
| Totals | 4881470.75 | 125009.91 | 5142422.62 | 99.9 |
|
County | PANOLA |
Highway | SH 315 |
From | 0.5 MI W OF FM 348 |
To | RUSK C/L |
CSJ | 0462-03-048 |
Proj ID | F 2B23(017) |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 2.493 | 2393806.97 | | 2841135.56 | 99.9 |
County | PANOLA |
Highway | SH 315 |
From | FM 1970 |
To | 0.5 MI W OF FM 348 |
CSJ | 0462-03-050 |
Proj ID | STP 2B23(019)HES |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 6.185 | 3576329.35 | | 4116028.60 | 99.9 |
Work Order | 09-13-23 |
Work Began | 12-04-23 |
Work Completed | |
Time Computed | 10-13-23 |
Contract Working Days | 199 |
Addl Days Granted | 0 |
Working Days Charged | 206 |
Percent Time Used | 103 |
Contractor(s) |
MADDEN CONTRACTING COMPANY, LLC. |
SUBCONTRACTOR(S) FOR CCSJ: 0462-03-048 CAP RIVER LLC (0.28) ISAACS CONSTRUCTION SERVICES LLC (0.22) MORRIS COUNTY CONTRACTORS, L.L.C. (0.94) PRIMATE CONSTRUCTION, LP (0.59) PANOLA SIGN & BARRICADE, INC. (0.69) R & G CONSTRUCTION, LLC (7.84) SOUTHWEST ENVIRONMENT SERVICES LLC (0.40) STRIPING TECHNOLOGY, L.P. (9.08)
|
Contract # | 08233012 |
| Totals | 5970136.32 | 1505782.54 | 6957164.16 | 99.9 |
|
County | HARRISON |
Highway | IH 20 |
From | GREGG C/L |
To | 0.5 MI W OF SH 43 |
CSJ | 0495-08-138 |
Proj ID | F 2023(843) |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| 16.891 | 4714765.00 | | 5168161.36 | 99.9 |
Work Order | 07-20-23 |
Work Began | 09-07-23 |
Work Completed | |
Time Computed | 09-07-23 |
Contract Working Days | 148 |
Addl Days Granted | 0 |
Working Days Charged | 177 |
Percent Time Used | 119 |
Contractor(s) |
GHB EQUIPMENT COMPANY, L.L.C. |
SUBCONTRACTOR(S) FOR CCSJ: 0495-08-138 WINDING ROAD CONSTRUCTION, INC. (41.18) J. H. ODEN CONTRACTING COMPANY (1.60) STRIPING TECHNOLOGY, L.P. (0.56) WEST TEXAS ROCK RESOURCES, LLC (0.14)
|
Contract # | 06233225 |
| Totals | 4714765.00 | 52073.55 | 5168161.36 | 99.9 |
|
County | HARRISON |
Highway | IH 20 |
From | AT US 59 |
To | . |
CSJ | 0495-09-056 |
Proj ID | C 495-9-56 |
Work Type | BRIDGE REPLACEMENT |
|
| 0.010 | 11887790.53 | | 11485304.85 | 97.8 |
Work Order | 09-21-21 |
Work Began | 10-21-21 |
Work Completed | |
Time Computed | 10-21-21 |
Contract Working Days | 440 |
Addl Days Granted | 0 |
Working Days Charged | 558 |
Percent Time Used | 126 |
Contractor(s) |
EAST TEXAS BRIDGE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0495-09-056 HODGES AND SON CONSTRUCTION COMPANY, INC. (1.55) J. H. ODEN CONTRACTING COMPANY (1.38) PANOLA SIGN & BARRICADE, INC. (0.31) SOUTHWEST ENVIRONMENT SERVICES LLC (0.16) STRIPING TECHNOLOGY, L.P. (8.98) MORRIS COUNTY CONTRACTORS, L.L.C. (1.32) TORO BRAVO CONSTRUCTION, LLC (0.38) SOUTHEAST GRINDING AND GROOVING LLC (0.06) TEX OP CONSTRUCTION, LP (0.07)
|
Contract # | 08213017 |
| Totals | 11887790.53 | 84722.40 | 11485304.85 | 97.8 |
|
County | UPSHUR |
Highway | SH 155 |
From | 0.4 MI N OF FM 2911 |
To | 0.1 MI S OF FM 1404 |
CSJ | 0520-02-068 |
Proj ID | C 520-2-68 |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| 7.960 | 14945724.64 | | 2804070.57 | 18.7 |
Work Order | 09-06-24 |
Work Began | 09-23-24 |
Work Completed | |
Time Computed | 10-06-24 |
Contract Working Days | 230 |
Addl Days Granted | 0 |
Working Days Charged | 28 |
Percent Time Used | 12 |
Contractor(s) |
LONGVIEW BRIDGE AND ROAD, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0520-02-068 FLEX SUPPLY, LLC (0.13) CHEROKEE SERVICES (0.19) COLD CREEK CONSTRUCTION, LTD (1.97) TEXCO SERVICES, LLC (0.38) SOUTHWEST ENVIRONMENT SERVICES LLC (0.33) STRIPING TECHNOLOGY, L.P. (3.50) PROFESSIONAL TRAFFIC CONTROL LLC (0.06) KITECO PROPERTY SOLUTIONS INC. (0.15) J. H. ODEN CONTRACTING COMPANY (0.09)
|
Contract # | 05243012 |
| Totals | 14945724.64 | 1833015.57 | 2804070.57 | 18.7 |
|
County | CASS |
Highway | SH 155 |
From | MARION C/L |
To | 0.1 MI W. OF SH 49 |
CSJ | 0520-03-039 |
Proj ID | C 520-3-39 |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| 3.757 | 8058457.57 | | 0.00 | 0.0 |
County | MARION |
Highway | SH 155 |
From | 1.4 MI W. OF FM 729 |
To | CASS C/L |
CSJ | 0520-04-037 |
Proj ID | C 520-4-37 |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| 5.735 | 9367430.49 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 178 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
EAST TEXAS BRIDGE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0520-03-039 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 10243204 |
| Totals | 17425888.06 | 0.00 | 0.00 | 0.0 |
|
County | MARION |
Highway | SH 155 |
From | SOUTH END OF BIG CYPRESS CREEK BRIDGE |
To | 1.5 MI W OF FM 729 |
CSJ | 0520-04-026 |
Proj ID | BR 2023(154) |
Work Type | BRIDGE REPLACEMENT |
|
| 1.065 | 44688042.63 | | 16993787.78 | 38.0 |
County | UPSHUR |
Highway | SH 155 |
From | GLENDIA DRIVE |
To | SOUTH END OF BIG CYPRESS CREEK BRIDGE |
CSJ | 0520-05-043 |
Proj ID | BR 2023(155) |
Work Type | BRIDGE REPLACEMENT |
|
| 0.394 | 9111876.79 | | 1110375.53 | 12.1 |
Work Order | 06-14-23 |
Work Began | 06-28-23 |
Work Completed | |
Time Computed | 06-26-23 |
Contract Working Days | 880 |
Addl Days Granted | 0 |
Working Days Charged | 274 |
Percent Time Used | 31 |
Contractor(s) |
LONGVIEW BRIDGE AND ROAD, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0520-04-026 CAP RIVER LLC (0.15) HODGES AND SON CONSTRUCTION COMPANY, INC. (3.90) ISAACS CONSTRUCTION SERVICES LLC (0.55) MORRIS COUNTY CONTRACTORS, L.L.C. (0.40) PANOLA SIGN & BARRICADE, INC. (0.09) WITHERS CONSTRUCTION, LLC (0.12) WEST TEXAS ROCK RESOURCES, LLC (0.00) SNOWHILL CONTRACTING LLC (1.63) STRIPING TECHNOLOGY, L.P. (0.33) TORO BRAVO CONSTRUCTION, LLC (4.05) J. H. ODEN CONTRACTING COMPANY (0.51)
|
Contract # | 05233005 |
| Totals | 53799919.42 | 967331.20 | 18104163.31 | 33.6 |
|
County | TITUS ETC |
Highway | IH 30 ETC |
From | FRANKLIN COUNTY LINE |
To | MORRIS COUNTY LINE |
CSJ | 0610-03-100 |
Proj ID | F 2021(740) |
Work Type | SAFETY IMPROVEMENT PROJECTS |
|
| 63.308 | 6534113.55 | | 5914531.76 | 92.4 |
Work Order | 08-02-21 |
Work Began | 10-11-21 |
Work Completed | |
Time Computed | 09-01-21 |
Contract Working Days | 528 |
Addl Days Granted | 0 |
Working Days Charged | 642 |
Percent Time Used | 121 |
Contractor(s) |
HIGHWAY 19 CONSTRUCTION LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0610-03-100 DUSTIN ALLEN, INC. (41.10) FLEX SUPPLY, LLC (0.91) CF SOUTHWEST ENVIRONMENT SERVICES LLC (0.00) STRIPING TECHNOLOGY, L.P. (1.44) AREA WIDE PROTECTIVE, INC. (0.86) SOUTHWEST ENVIRONMENT SERVICES LLC (0.77)
|
Contract # | 06213038 |
| Totals | 6534113.55 | 88458.18 | 5914531.76 | 92.4 |
|
County | TITUS ETC |
Highway | IH 30 ETC |
From | AT TANKERSLEY CREEK (WB) |
To | . |
CSJ | 0610-03-104 |
Proj ID | BR 2025(036) |
Work Type | BRIDGE MAINTENANCE |
|
| 2.445 | 3819729.19 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 10-23-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 424 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
THK CONSTRUCTION LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0610-03-104 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09243212 |
| Totals | 3819729.19 | 0.00 | 0.00 | 0.0 |
|
County | MORRIS ETC |
Highway | IH 30 |
From | AT US 259 |
To | . |
CSJ | 0610-04-033 |
Proj ID | NH 2022(220) |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| 39.692 | 33388167.53 | | 22116337.49 | 66.2 |
Work Order | 12-16-21 |
Work Began | 02-18-22 |
Work Completed | |
Time Computed | 01-15-22 |
Contract Working Days | 397 |
Addl Days Granted | 17 |
Working Days Charged | 352 |
Percent Time Used | 85 |
Contractor(s) |
LONGVIEW BRIDGE AND ROAD, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0610-04-033 ISAACS CONSTRUCTION SERVICES LLC (0.56) MORRIS COUNTY CONTRACTORS, L.L.C. (0.53) PANOLA SIGN & BARRICADE, INC. (0.36) SURFACE PREPARATION TECHNOLOGIES, LLC (0.04) STRIPING TECHNOLOGY, L.P. (1.93) KITECO PROPERTY SOLUTIONS INC. (0.04)
|
Contract # | 11213019 |
| Totals | 33388167.53 | 128468.00 | 22116337.49 | 66.2 |
|
County | BOWIE |
Highway | IH 30 |
From | FM 3419 |
To | FM 989 |
CSJ | 0610-07-097 |
Proj ID | IM 0303(125) |
Work Type | FREEWAY OPERATIONAL IMPROVEMENTS |
|
| 0.519 | 58800539.83 | | 20607979.32 | 35.0 |
Work Order | 07-18-22 |
Work Began | 08-15-22 |
Work Completed | |
Time Computed | 08-15-22 |
Contract Working Days | 441 |
Addl Days Granted | 75 |
Working Days Charged | 330 |
Percent Time Used | 63 |
Contractor(s) |
LONGVIEW BRIDGE AND ROAD, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0610-07-097 HODGES AND SON CONSTRUCTION COMPANY, INC. (1.31) MORRIS COUNTY CONTRACTORS, L.L.C. (1.14) S & S BRIDGE PAINTING, INC. (0.02) STATEWIDE SAFETY SYSTEMS (0.40) STRIPING TECHNOLOGY, L.P. (5.88) TORO BRAVO CONSTRUCTION, LLC (1.88) WEST TEXAS ROCK RESOURCES, LLC (0.00) SOUTHWEST ENVIRONMENT SERVICES LLC (0.23) ISAACS CONSTRUCTION SERVICES LLC (0.60) CAP RIVER LLC (0.67) CARTHAGE DRILLING, INC. (0.30) C&J CONTRACTORS LLC (0.07)
|
Contract # | 06223202 |
| Totals | 58800539.83 | 286478.49 | 20607979.32 | 35.0 |
|
County | BOWIE |
Highway | IH 30 |
From | 0.6 MI W OF FM 989 |
To | ARKANSAS STATE LINE |
CSJ | 0610-07-113 |
Proj ID | NH 2020(455) |
Work Type | WIDEN FREEWAY |
|
| 5.854 | 88870748.58 | | 54341034.08 | 61.1 |
Work Order | 07-20-20 |
Work Began | 08-16-20 |
Work Completed | |
Time Computed | 08-17-20 |
Contract Working Days | 724 |
Addl Days Granted | 298 |
Working Days Charged | 787 |
Percent Time Used | 77 |
Contractor(s) |
LONGVIEW BRIDGE AND ROAD, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0610-07-113 TIME STRIPING, INC. (0.98) DUSTIN ALLEN, INC. (0.72) EXPRESS EMPLOYMENT PROFESSIONALS (0.00) HODGES AND SON CONSTRUCTION COMPANY, INC. (0.00) COLLIER-MANPOWER, INC. (0.00) J. H. ODEN CONTRACTING COMPANY (0.18) SOUTHWEST ENVIRONMENT SERIVES, LLC (0.40) STRIPING TECHNOLOGY, L.P. (2.87) TORO BRAVO CONSTRUCTION, LLC (6.14) A R DANIEL CONSTRUCTION SERVICES, INCORPORATED (0.09) ANTIGO CONSTRUCTION, INC. (0.09) CARTHAGE DRILLING, INC. (0.01) ACT SAW CUTTING & REMOVAL (0.01) TORO BRAVO CONSTRUCTION, LLC (0.01) HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. (0.01) SOUTHEAST GRINDING AND GROOVING LLC (0.00) MORRIS COUNTY CONTRACTORS, L.L.C. (0.19) (INACTIVE)BLASTERS, INC. (0.01) CREATIVE DESIGN CONCEPTS, INC. (0.04) KITECO PROPERTY SOLUTIONS INC. (0.02)
|
Contract # | 05203201 |
| Totals | 88870748.58 | 331734.48 | 54341034.08 | 61.1 |
|
County | CASS |
Highway | VA |
From | VARIOUS LOCATIONS |
To | VARIOUS LOCATIONS |
CSJ | 0919-00-093 |
Proj ID | F 2B24(110) |
Work Type | LANDSCAPE & SCENIC ENHANCEMENT |
|
| | 134759.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 08-01-24 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 10-01-24 |
Contract Working Days | 20 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
TEXAS ROAD CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0919-00-093 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06243257 |
| Totals | 134759.00 | 0.00 | 0.00 | 0.0 |
|
County | BOWIE |
Highway | VA |
From | NORTH AND SOUTH ELM STREET |
To | FRONT STREET, W LION DR AND ELLIS STREET |
CSJ | 0919-19-083 |
Proj ID | STP 2021(276)TAPS |
Work Type | PEDESTRIAN, SIDEWALKS & CURB RAMPS |
|
| | 760142.25 | | 607880.12 | 84.4 |
Work Order | 12-14-22 |
Work Began | 04-11-23 |
Work Completed | |
Time Computed | 01-13-23 |
Contract Working Days | 64 |
Addl Days Granted | 0 |
Working Days Charged | 119 |
Percent Time Used | 185 |
Contractor(s) |
BLACKSTONE CONCRETE VENTURES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0919-19-083 TRAFFIC HIGHWAY MAINTENANCE, LLC (1.71) HODGES AND SON CONSTRUCTION COMPANY, INC. (5.04) KITECO PROPERTY SOLUTIONS INC. (1.94)
|
Contract # | 10223211 |
| Totals | 760142.25 | 1250.00 | 607880.12 | 84.4 |
|
County | BOWIE |
Highway | 0000000 |
From | ALONG US 82 FROM CR 4105 |
To | SH 98 |
CSJ | 0919-19-087 |
Proj ID | STP 2022(679)TAPS |
Work Type | PEDESTRIAN, SIDEWALKS & CURB RAMPS |
|
| 3.133 | 1656386.60 | | 1124533.80 | 67.8 |
County | BOWIE |
Highway | 0000000 |
From | ALONG US 82 FROM CR 4105 |
To | SH 98 |
CSJ | 0919-19-094 |
Proj ID | ROW 919-19-94 |
Work Type | UTILITY ADJUSTMENTS |
|
| 3.133 | 302122.50 | | 303144.34 | 99.9 |
Work Order | 10-23-23 |
Work Began | 01-30-24 |
Work Completed | |
Time Computed | 11-23-23 |
Contract Working Days | 185 |
Addl Days Granted | 0 |
Working Days Charged | 147 |
Percent Time Used | 79 |
Contractor(s) |
GARRET SHIELDS INFRASTRUCTURE |
SUBCONTRACTOR(S) FOR CCSJ: 0919-19-087 MOORE CONSTRUCTION SERVICES, LLC (12.15) SKC EARTHWORKS LIMITED LIABILITY COMPANY (45.08) DIAMOND ELITE BARRICADES, LLC (0.41) TERRY BLACK CONSTRUCTION COMPANY (1.77) J. H. ODEN CONTRACTING COMPANY (4.01)
|
Contract # | 09233023 |
| Totals | 1958509.10 | 254483.20 | 1427678.14 | 72.8 |
|
County | BOWIE |
Highway | VA |
From | ON KENNEDY LANE FROM SH 93 |
To | ROBISON ROAD |
CSJ | 0919-19-088 |
Proj ID | STP 2022(680)TAPS |
Work Type | PEDESTRIAN, SIDEWALKS & CURB RAMPS |
|
| | 1777958.06 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 137 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
THK CONSTRUCTION LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0919-19-088 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 11243219 |
| Totals | 1777958.06 | 0.00 | 0.00 | 0.0 |
|
County | TITUS |
Highway | CR |
From | ON CR 4754 AT WILLIAMSON CREEK |
To | . |
CSJ | 0919-30-061 |
Proj ID | BR 2019(353) |
Work Type | BRIDGE REPLACEMENT |
|
| 0.066 | 723296.87 | | 542115.82 | 74.9 |
Work Order | 08-01-24 |
Work Began | 08-19-24 |
Work Completed | |
Time Computed | 09-02-24 |
Contract Working Days | 79 |
Addl Days Granted | 0 |
Working Days Charged | 50 |
Percent Time Used | 63 |
Contractor(s) |
THK CONSTRUCTION LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0919-30-061 MORRIS COUNTY CONTRACTORS, L.L.C. (3.03) SOUTHWEST ENVIRONMENT SERVICES LLC (0.82) PANOLA SIGN & BARRICADE, INC. (0.82)
|
Contract # | 06243048 |
| Totals | 723296.87 | 115365.30 | 542115.82 | 74.9 |
|
County | UPSHUR |
Highway | FM 2796 |
From | SH 155 |
To | FM 593 |
CSJ | 0946-03-027 |
Proj ID | F 2B24(111) |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| 4.363 | 5101063.37 | | 577361.80 | 11.3 |
Work Order | 07-17-24 |
Work Began | 09-04-24 |
Work Completed | |
Time Computed | 08-16-24 |
Contract Working Days | 333 |
Addl Days Granted | 0 |
Working Days Charged | 41 |
Percent Time Used | 12 |
Contractor(s) |
TRUE ROADS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0946-03-027 TEXCO SERVICES, LLC (6.33) STRIPING TECHNOLOGY, L.P. (2.43) FLEX SUPPLY, LLC (0.63) COLD CREEK CONSTRUCTION, LTD (10.47) J. H. ODEN CONTRACTING COMPANY (2.52)
|
Contract # | 06243021 |
| Totals | 5101063.37 | 153698.40 | 577361.80 | 11.3 |
|
County | TITUS |
Highway | FM 1735 |
From | SH 49 |
To | 2.1 MI S OF SH 49 |
CSJ | 1226-02-016 |
Proj ID | C 1226-2-16 |
Work Type | REHABILITATION OF EXISTING ROAD |
|
| 2.102 | 11920527.81 | | 8527857.92 | 71.5 |
Work Order | 02-14-23 |
Work Began | 05-03-23 |
Work Completed | |
Time Computed | 05-04-23 |
Contract Working Days | 276 |
Addl Days Granted | 28 |
Working Days Charged | 209 |
Percent Time Used | 68 |
Contractor(s) |
H. H. HOWARD & SONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1226-02-016 J. H. ODEN CONTRACTING COMPANY (3.18) PANOLA SIGN & BARRICADE, INC. (0.25) PROFESSIONAL TRAFFIC CONTROL LLC (0.02) RICHARD DRAKE CONSTRUCTION COMPANY, L.P. (16.13) WITHERS CONSTRUCTION, LLC (0.71) STRIPING TECHNOLOGY, L.P. (4.55) TEXOP CONSTRUCTION (0.84) TRAFFIC HIGHWAY MAINTENANCE, LLC (0.43)
|
Contract # | 01233005 |
| Totals | 11920527.81 | 731755.84 | 8527857.92 | 71.5 |
|
County | BOWIE |
Highway | FM 989 |
From | 0.1 MI. S. OF US 67 |
To | 0.1 MI. N. OF US 59 |
CSJ | 1231-01-073 |
Proj ID | C 1231-1-73 |
Work Type | OVERLAY |
|
| 2.005 | 2429230.48 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 69 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
RK HALL, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1231-01-073 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 10243211 |
| Totals | 2429230.48 | 0.00 | 0.00 | 0.0 |
|