Letting Schedule for Waco District (FY 2003)

 
 
Last Update: Thursday, August 28, 2003
Waco District (FY 2003)
Bell | Coryell | Falls | Hamilton | Hill | Limestone | McLennan

Bell County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0015-04-076 IH 35 Actual MAY 2003 $2,501,268 1 PLANING, SEAL COAT AND ASPHALT CONCRETE PAVEMENT OVERLAY
0185-01-032 US 190 Actual AUG 2003 $3,735,860 1 SEAL COAT AND ASPHALT CONCRETE PAVEMENT OVERLAY
0231-10-013 BU 190F Actual AUG 2003 $1,176,438 1 MICROSURFACING
0232-01-044 SH 53 Actual JUN 2003 $1,349,856 11 WIDEN ROADWAY TO 4 LANES WITH CENTER TURN LANE
0836-02-044 SH 195 Actual JAN 2003 $20,166,684 ROW WIDEN TO FOUR LANE DIVIDED HIGHWAY
0909-36-100 CR Actual FEB 2003 $275,090 6 REPLACE BRIDGE AND APPROACHES
0909-36-102 CS Actual OCT 2002 $174,980 6 REPLACE BRIDGE AND APPROACHES
0909-36-110 CS Approved AUG 2003 $166,075 10 GRADING, BASE, PAVEMENT, CURB AND GUTTER, PAVEMENT MARKINGS
1835-02-043 FM 1741 Actual JUN 2003 $568,158 8 IMPROVE TRAFFIC SIGNALS AND INTERCONNECT SIGNALS
1835-02-045 FM 93 Actual MAY 2003 $203,268 11 WIDEN ROADWAY AND ADD RIGHT AND LEFT TURN LANES

Coryell County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0184-01-053 SH 36 Actual NOV 2002 $5,757,366 1 SEAL COAT
0724-01-039 FM 116 Actual AUG 2003 $1,337,268 8 SAFETY TREAT FIXED OBJECTS AND IMPROVE GUARDRAIL
0724-01-040 FM 116 Actual JAN 2003 $1,657,054 1 MICROSURFACING
0909-39-025 CR Actual JUN 2003 $523,548 6 REPLACE BRIDGE AND APPROACHES

Falls County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0209-09-008 LP 265 Actual DEC 2002 $323,913 10 SCENIC ENHANCEMENT CONSISTING OF CURB REPAIR, HANDICAP RAMPS
0909-38-014 CR Actual FEB 2003 $646,552 6 REPLACE BRIDGE AND APPROACHES

Hamilton County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0120-01-016 SH 22 Actual OCT 2002 $258,317 11 INSTALL ARBOR UNITS, TRASH RECEPTACLES, SIDEWALK AND SOME
0909-29-030 CR Actual AUG 2003 $396,821 6 REPLACE BRIDGE AND APPROACHES

Hill County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0014-23-026 IH 35W Actual DEC 2002 $245,063 1 REFURBISH GUIDE SIGNS
0019-03-021 FM 2719 Actual AUG 2003 $292,121 11 REPLACE BRIDGE AND APPROACHES
0048-09-023 IH 35E Actual AUG 2003 $41,651,484 4 RECONSTRUCT INTERCHANGE
0909-37-032 CR Actual JUN 2003 $635,431 6 REPLACE BRIDGE AND APPROACHES
0909-37-037 CS Actual AUG 2003 $97,182 9 TRANSPORT, INSTALL AND REFURBISH COTTONWOOD CR PONY TRUSS
1190-02-010 FM 933 Actual AUG 2003 $4,014,920 1 REHABILITATE EXISTING ROADWAY

Limestone County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0056-03-052 US 84 Actual JUN 2003 $8,453 10 PURCHASE OF LANDSCAPE MATERIAL
0413-04-030 SH 164 Actual FEB 2003 $1,494,788 8 PROVIDE SAFETY END TREATMENTS TO PARALLEL DRAINAGE
0909-40-035 CS Approved AUG 2003 $430,015 9 REHABILITATE HISTORIC BURLINGTON - ROCK ISLAND RAILROAD DEPOT
0909-40-040 CS Actual JUN 2003 $10,625 9 RIGHT OF WAY ACQUISITION
1191-03-025 FM 1245 Actual JUL 2003 $5,181,142 1 ADD SHOULDERS, BASE OVERLAY, TWO COURSE SURFACE TREATMENT

McLennan County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0014-10-056 BU 77-L Actual AUG 2003 $162,503 1 MISCELLANEOUS BRIDGE WORK CONSISTING OF JOINT REPAIR, CURB
0015-01-190 IH 35 Actual MAY 2003 $3,616,703 4 RECONSTRUCT RAMPS AND FRONTAGE ROADS
0015-01-192 IH 35 Actual MAY 2003 $8,857,184 1 PLANING, SEAL, ACP OVERLAY & INSTALLING MEDIAN BARRIER
0015-01-196 IH 35 Actual JUN 2003 $4,500 10 PURCHASE OF LANDSCAPE MATERIAL
0049-01-067 SH 6 Actual MAY 2003 $1,989,451 6 REPLACE BRIDGE AND APPROACHES
0049-01-077 SH 6 Actual JUN 2003 $3,268,872 6 MODERNIZE BRIDGERAIL, IMPROVE GUARDRAIL & SAFETY TREAT FIXED
0055-08-097 US 84 Actual JUL 2003 $85,163 10 CONSTRUCTION OF SCENIC ENHANCEMENT CONSISTING OF CITY OF
0209-01-053 LP 2 Actual FEB 2003 $1,644,239 1 PLANING AND ASPHALT CONCRETE PAVEMENT OVERLAY
0258-09-092 SH 6 Actual AUG 2003 $25,354,987 3 WIDEN EXISTING TWO LANE HIGHWAY TO FOUR LANES DIVIDED AND
0258-09-118 SH 6 Actual JUL 2003 $3,517,240 6 REPLACE BRIDGE AND APPROACHES
0258-09-121 SH 6 Actual APR 2003 $458,015 1 MISC WORK CONSISTING OF CONSTRUCTING RAMPS
0413-01-027 SH 164 Actual AUG 2003 $4,227,432 ROW REHABILITATION OF EXISTING ROAD
0513-02-027 FM 107 Actual SEP 2002 $2,786,342 1 UPGRADE TO 2 LANE STANDARD
0909-00-039 VA Actual SEP 2002 $498,637 1 FY 2002 NON SITE SPECIFIC SIGNALS
0909-00-041 VA Actual JUL 2003 $963,634 11 CONSTRUCT / RECONSTRUCT ADA RAMPS
0909-22-107 CS Actual OCT 2002 $390,911 10 RECONSTRUCT EXISTING PAVEMENT
0909-22-110 CS Approved AUG 2003 $3,156,845 9 CONSTRUCT AN ALTERNATE TRANSPORTATION ROUTE LINKING THE
0909-22-117 VA Actual SEP 2002 $798,844 1 BRIDGE MAINTENANCE AT VARIOUS LOCATIONS IN MCLENNAN COUNTY
0909-22-122 VA Actual FEB 2003 $149,945 1 BRIDGE PAINTING AT VARIOUS LOCATIONS IN MCLENNAN COUNTY
2506-01-029 FM 1695 Actual JUN 2003 $824,701 1 MISCELLANEOUS WORK CONSISTING OF ADDING RIGHT AND LEFT TURN


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract