0200-01-070 | Angelina/ Lufkin |
US 69 | Actual | $1,345,778 | 11 | REHAB SHOULDERS AND ADD TWO WAY LEFT TURN LANE |
0911-38-053 | Angelina/ Lufkin |
CS | Actual | $782,722 | 11 | WIDEN STREET TO THREE LANES WITH CURB & GUTTER |
0408-05-021 | Austin/ Yoakum |
FM 529 | Actual | $2,385,258 | 1 | RESTORE ROADWAY |
0913-20-053 | Austin/ Yoakum |
CR | Actual | $540,659 | 6 | REPLACE BRIDGE AND APPROACHES |
0185-01-032 | Bell/ Waco |
US 190 | Actual | $3,735,860 | 1 | SEAL COAT AND ASPHALT CONCRETE PAVEMENT OVERLAY |
0231-10-013 | Bell/ Waco |
BU 190F | Actual | $1,176,438 | 1 | MICROSURFACING |
0909-36-110 | Bell/ Waco |
CS | Approved | $166,075 | 10 | GRADING, BASE, PAVEMENT, CURB AND GUTTER, PAVEMENT MARKINGS |
0849-01-039 | Bexar/ San Antonio |
FM 471 | Actual | $724,632 | 7 | CONSTRUCT SIDEWALKS ON NORTH SIDE OF ROADWAY |
0924-35-014 | Brewster/ El Paso |
VA | Actual | $1,384,118 | 11 | DEVELOP PEDESTRIAN FACILITY, REPAIR & RESURFACE OF EXISTING |
3510-10-002 | Chambers/ Beaumont |
SH 99 | Actual | $47,939,920 | 12 | CONSTRUCT 4 - LANE DIVIDED RURAL HIGHWAY WITH INTERCHANGES AT |
0054-05-010 | Coleman/ Brownwood |
SH 153 | Actual | $4,658,037 | 1 | CONSTRUCT URBAN CURB AND GUTTER SECTION |
0009-05-010 | Collin/ Dallas |
SH 66 | Actual | $868,207 | 1 | REPLACE BRIDGE AND APPROACHES |
0091-04-038 | Collin/ Dallas |
SH 289 | Actual | $1,033,336 | 11 | REPLACE BRIDGE AND APPROACHES |
0091-04-039 | Collin/ Dallas |
SH 289 | Actual | $1,562,683 | 6 | REPLACE BRIDGE AND APPROACHES |
0271-01-065 | Colorado/ Yoakum |
IH 10 | Actual | $608,505 | 1 | REHABILITATE BRIDGE |
0079-02-041 | Comanche/ Brownwood |
US 67 | Actual | $4,646,269 | 1 | GRADING, BASE, STORM SEWER, CURB AND GUTTER, SIDEWALK AND |
0724-01-039 | Coryell/ Waco |
FM 116 | Actual | $1,337,268 | 8 | SAFETY TREAT FIXED OBJECTS AND IMPROVE GUARDRAIL |
0600-03-019 | Crane/ Odessa |
SH 329 | Actual | $796,608 | 1 | ROADWAY REHABILITATION |
0233-03-012 | Culberson/ El Paso |
SH 54 | Actual | $4,783,807 | 11 | REHABILITATE AND DRAINAGE OF A RURAL FREEWAY FACILITY |
0009-11-195 | Dallas/ Dallas |
IH 30 | Actual | $626,646 | 1 | FULL DEPTH CONCRETE PAVEMENT REPAIR |
0918-45-311 | Dallas/ Dallas |
CS | Actual | $826,881 | 10 | RECONSTRUCT CITY STREET |
0918-45-597 | Dallas/ Dallas |
CS | Actual | $203,027 | 10 | PAVEMENT REPAIR |
0918-45-683 | Dallas/ Dallas |
VA | Actual | $2,193,474 | 1 | CONCRETE PAVEMENT REPAIR |
2374-01-145 | Dallas/ Dallas |
IH 635 | Actual | $3,745,623 | 1 | TEXTURE EXISTING PAVEMENT SURFACE |
2374-03-054 | Dallas/ Dallas |
IH 20 | Actual | $2,356,603 | 7 | CONSTRUCT EB FRONTAGE ROAD |
2374-04-041 | Dallas/ Dallas |
IH 20 | Actual | $1,051,302 | 7 | CONSTRUCT FRONTAGE ROAD SEGMENTS |
0081-06-028 | Denton/ Dallas |
US 377 | Actual | $1,133,768 | 10 | ADDING CONTINUOUS TWO WAY LEFT TURN LANE |
0196-02-098 | Denton/ Dallas |
IH 35E | Actual | $656,056 | 1 | ADD RIGHT TURN LANE AND MODIFY TURNING RADIUS, MEDIAN |
0918-46-081 | Denton/ Dallas |
CS | Approved | $450,000 | 10 | RECONSTRUCT CITY STREET |
0918-46-122 | Denton/ Dallas |
VA | Actual | $2,945,878 | 1 | BASE REPAIR AND LEVEL - UP EXSITING ACP |
1567-01-024 | Denton/ Dallas |
FM 720 | Actual | $1,622,468 | 1 | BASE REPAIR, WIDEN OVERLAY AND PAVEMENT MARKINGS |
2054-01-011 | Denton/ Dallas |
FM 2164 | Actual | $3,557,787 | 6 | REPLACE BRIDGE AND APPROACHES |
0434-01-022 | Eastland/ Brownwood |
US 183 | Actual | $56,714 | 11 | SAFETY LIGHTING |
1239-01-024 | Eastland/ Brownwood |
FM 587 | Actual | $202,000 | 11 | REALIGN INTERSECTION |
0906-00-099 | Ector/ Odessa |
VA | Actual | $488,798 | 1 | PAVEMENT MARKINGS |
0167-01-083 | El Paso/ El Paso |
US 54 | Actual | $26,834,513 | 2 | CONSTRUCTION OF MAIN LANES AND INTERCHANGES |
0924-06-169 | El Paso/ El Paso |
CS | Actual | $886,033 | 10 | KEYSTONE HERITAGE PROJECT |
0048-08-037 | Ellis/ Dallas |
IH 35E | Actual | $62,597,022 | 1 | REHABILITATE FREEWAY MAINLANES |
0902-49-036 | Erath/ Fort Worth |
CR | Actual | $374,275 | 6 | REPLACE BRIDGE AND APPROACHES |
0902-49-039 | Erath/ Fort Worth |
CR | Actual | $740,420 | 6 | REPLACE BRIDGE AND APPROACHES |
2926-01-009 | Erath/ Fort Worth |
FM 988 | Actual | $95,189 | 1 | INSTALL TRAFFIC SIGNAL |
0114-08-033 | Fayette/ Yoakum |
US 290 | Actual | $2,968,221 | 1 | ACP OVERLAY |
0267-05-014 | Fayette/ Yoakum |
FM 609 | Actual | $4,592,454 | 1 | WIDEN AND REHABILITATE ROADWAY |
0045-03-032 | Grayson/ Paris |
SH 56 | Actual | $1,942,768 | 1 | MILL & ACP OVERLAY |
0909-29-030 | Hamilton/ Waco |
CR | Actual | $396,821 | 6 | REPLACE BRIDGE AND APPROACHES |
0114-12-005 | Harris/ Houston |
US 290 | Actual | $2,061,705 | 1 | PLANING, SEAL COAT, ACP OVERLAY AND PAVEMENT MARKINGS |
0500-03-522 | Harris/ Houston |
IH 45 | Actual | $924,456 | 10 | LANDSCAPE DEVELOPMENT |
0912-71-821 | Harris/ Houston |
VA | Actual | $978,909 | 10 | LANDSCAPE DEVELOPMENT (NON - SITE SPECIFIC) |
0912-71-835 | Harris/ Houston |
VA | Actual | $783,942 | 10 | LANDSCAPE DEVELOPMENT |
0683-03-023 | Hays/ Austin |
RM 12 | Actual | $213,474 | 11 | ADD LEFT TURN LANE |
1099-05-009 | Henderson/ Tyler |
FM 317 | Actual | $17,856,640 | 4 | CONSTRUCT 2 LANE RURAL HIGHWAY - NEW LOCATION (ATHENS LOOP) |
0621-01-091 | Hidalgo/ Pharr |
SH 336 | Actual | $125,269 | 10 | LANDSCAPE AND IRRIGATION IMPROVEMENTS |
0019-03-021 | Hill/ Waco |
FM 2719 | Actual | $292,121 | 11 | REPLACE BRIDGE AND APPROACHES |
0048-09-023 | Hill/ Waco |
IH 35E | Actual | $41,651,484 | 4 | RECONSTRUCT INTERCHANGE |
0909-37-037 | Hill/ Waco |
CS | Actual | $97,182 | 9 | TRANSPORT, INSTALL AND REFURBISH COTTONWOOD CR PONY TRUSS |
1190-02-010 | Hill/ Waco |
FM 933 | Actual | $4,014,920 | 1 | REHABILITATE EXISTING ROADWAY |
0136-12-022 | Hunt/ Paris |
BS 24-B | Actual | $1,947,749 | 11 | RECONSTRUCT EXISTING ROADWAY AND ADD CONTINUOUS TWO - WAY |
0902-40-014 | Jack/ Fort Worth |
CR | Actual | $284,402 | 6 | REPLACE BRIDGE AND APPROACHES |
0065-08-160 | Jefferson/ Beaumont |
SP 380 | Actual | $510,827 | 11 | LANDSCAPING |
0920-38-152 | Jefferson/ Beaumont |
VA | Actual | $525,483 | 9 | CONSTRUCT A HIKE AND BIKE FACILITY |
0422-03-065 | Johnson/ Fort Worth |
BU 67-M | Actual | $56,400 | 1 | INSTALL TRAFFIC SIGNAL |
0095-04-060 | Kaufman/ Dallas |
US 80 | Actual | $4,188,275 | 1 | RESURFACE EXISTING FACILITY AND TEXTURE SHOULDERS |
0688-02-044 | Lamar/ Paris |
FM 79 | Actual | $862,959 | 1 | REPL BR & APPR |
0445-02-043 | Lavaca/ Yoakum |
US 90A | Actual | $1,184,586 | 11 | WIDEN BRIDGE AND APPROACHES |
0909-40-035 | Limestone/ Waco |
CS | Approved | $430,015 | 9 | REHABILITATE HISTORIC BURLINGTON - ROCK ISLAND RAILROAD DEPOT |
0005-04-059 | Martin/ Odessa |
IH 20 | Actual | $2,366,498 | 1 | PAVEMENT OVERLAY |
0014-10-056 | McLennan/ Waco |
BU 77-L | Actual | $162,503 | 1 | MISCELLANEOUS BRIDGE WORK CONSISTING OF JOINT REPAIR, CURB |
0258-09-092 | McLennan/ Waco |
SH 6 | Actual | $25,354,987 | 3 | WIDEN EXISTING TWO LANE HIGHWAY TO FOUR LANES DIVIDED AND |
0413-01-027 | McLennan/ Waco |
SH 164 | Actual | $4,227,432 | ROW | REHABILITATION OF EXISTING ROAD |
0909-22-110 | McLennan/ Waco |
CS | Approved | $3,156,845 | 9 | CONSTRUCT AN ALTERNATE TRANSPORTATION ROUTE LINKING THE |
0005-14-060 | Midland/ Odessa |
IH 20 | Actual | $784,076 | 11 | HIGH MAST ILLUMINATION |
0610-04-030 | Morris/ Atlanta |
IH 30 | Actual | $398,373 | 1 | RESURFACE INTERSTATE MAINLANES |
0911-08-025 | Nacogdoches/ Lufkin |
CR | Actual | $823,000 | 6 | REPLACE BRIDGE & APPROACHES |
1810-02-011 | Nacogdoches/ Lufkin |
FM 225 | Actual | $2,087,001 | 1 | REPLACE BRIDGE & APPROACHES |
2560-01-061 | Nacogdoches/ Lufkin |
LP 224 | Actual | $1,903,058 | 11 | WIDEN AND ADD LEFT TURN LANE |
0074-06-203 | Nueces/ Corpus Christi |
US 181 | Actual | $357,416 | 11 | LANDSCAPE |
0102-01-081 | Nueces/ Corpus Christi |
SH 44 | Actual | $17,237,456 | 2 | CONSTRUCT 4 LANE FREEWAY ON NEW LOCATION |
0916-35-090 | Nueces/ Corpus Christi |
CR | Actual | $727,317 | 6 | REPLACE BRIDGE AND APPROACHES |
0314-02-047 | Palo Pinto/ Fort Worth |
IH 20 | Actual | $18,688,849 | 1 | REHABILITATE EXISTING ROADWAY WITH OVERLAYS |
0362-02-020 | Palo Pinto/ Fort Worth |
SH 16 | Actual | $4,739,710 | 1 | WIDEN EXISTING ROADWAY; ADD SHOULDERS |
0902-38-036 | Parker/ Fort Worth |
CR | Actual | $240,109 | 6 | REPLACE BRIDGE |
1179-03-007 | Parker/ Fort Worth |
FM 2552 | Actual | $2,186,187 | 11 | WIDEN TWO LANE ROADWAY TO FOUR LANES WITH CONTINUOUS TURN |
0021-06-025 | Pecos/ Odessa |
US 90 | Actual | $1,981,669 | 1 | PAVEMENT STRUCTURE RESTORATION |
0341-03-033 | Polk/ Lufkin |
US 287 | Actual | $2,511,464 | 1 | REHABILITATION OF EXISTING ROADWAY |
0077-01-023 | Reagan/ San Angelo |
US 67 | Actual | $3,687,925 | 1 | REHABILITATE EXISTING ROADWAY |
0078-01-033 | Runnels/ San Angelo |
US 67 | Actual | $4,630,682 | 1 | REHABILITATE EXISTING ROADWAY |
0207-03-018 | Rusk/ Tyler |
SH 43 | Actual | $1,960,000 | 11 | REPLACE RAILROAD UNDERPASS |
0896-01-004 | Sabine/ Lufkin |
FM 330 | Actual | $339,000 | 6 | REPLACE BRIDGE AND APPROACHES |
3436-01-004 | Sabine/ Lufkin |
FM 3449 | Actual | $578,246 | 6 | REPLACE BRIDGE AND APPROACHES |
2594-02-009 | San Jacinto/ Lufkin |
FM 3081 | Actual | $568,001 | 11 | SAFETY TREAT FIXED OBJECTS |
0507-03-037 | San Patricio/ Corpus Christi |
SH 188 | Actual | $7,359,129 | 4 | REHAB |
0743-02-019 | Shelby/ Lufkin |
FM 138 | Actual | $1,112,296 | 11 | SAFETY TREAT FIXED OBJECTS |
1879-01-012 | Shelby/ Lufkin |
FM 2026 | Actual | $459,958 | 11 | REPLACE BRIDGE & APPROACHES |
0008-12-074 | Tarrant/ Fort Worth |
SH 183 | Actual | $3,844,065 | 6 | REHAB BRIDGE |
0008-14-102 | Tarrant/ Fort Worth |
IH 820 | Actual | $117,400 | 1 | INSTALL TRAFFIC SIGNAL |
0080-07-079 | Tarrant/ Fort Worth |
US 377 | Actual | $95,497 | 5 | SIGNAL COORDINATION TIMING STUDIES AND RADIO COMMUNICATIONS |
0080-07-080 | Tarrant/ Fort Worth |
US 377 | Actual | $14,281 | 8 | TEXTURIZE SHOULDERS - MILLED |
0094-02-088 | Tarrant/ Fort Worth |
SH 10 | Actual | $6,505,813 | 7 | WIDEN FROM 4 LANE TO 6 LANE DIVIDED |
0363-01-124 | Tarrant/ Fort Worth |
SH 26 | Actual | $290,265 | 5 | SIGNAL TIMING IMPROVEMENTS ON SH 26 AT VARIOUS LOCATIONS |
0902-00-094 | Tarrant/ Fort Worth |
VA | Actual | $5,309,510 | 1 | INTERSTATE MAINTENANCE PAVEMENT REPAIRS INCLUDING CRACK SEAL |
0902-48-405 | Tarrant/ Fort Worth |
VA | Approved | $2,091,530 | 9 | CONSTRUCT CONCRETE TRAIL AND BRIDGES TO CONNECT EXISTING |
1068-01-190 | Tarrant/ Fort Worth |
IH 30 | Actual | $146,926 | 6 | REHABILITATE BRIDGE - CLASS CULVERT |
2266-02-096 | Tarrant/ Fort Worth |
SH 360 | Actual | $17,884,485 | 2 | ON NEW LOCATION, CONSTRUCT 4 MAIN LANES |
2266-02-097 | Tarrant/ Fort Worth |
SH 360 | Actual | $2,249,552 | 2 | INTERSECTION IMPROVEMENTS |
2141-02-010 | Tom Green/ San Angelo |
FM 2288 | Actual | $8,299,540 | 1 | WIDEN EXISTING ROADWAY TO FOUR LANE UNDIVIDED FACILITY |
0015-10-040 | Travis/ Austin |
IH 35 | Actual | $2,380,781 | 2 | INSTALL CONDUIT & DETECTION AND |
0152-01-060 | Travis/ Austin |
US 183 | Actual | $325,835 | 11 | ADD LEFT TURN LANE |
0914-04-132 | Travis/ Austin |
VA | Approved | $132,000 | 7 | CONST SIDEWALK TO CITY STANDARDS |
0914-04-173 | Travis/ Austin |
VA | Approved | $123,303 | 7 | DESIGN & CONST 10' WIDE SIDEWALK |
1200-02-018 | Travis/ Austin |
FM 973 | Actual | $6,288,563 | 11 | REHABILITATION OF EXISTING ROADWAY |
3136-01-065 | Travis/ Austin |
LP 1 | Actual | $8,290,805 | 2 | STAGE 2 - CONSTRUCT MAIN LANES FOR 6 LANE FREEWAY & TMS |
0004-02-052 | Ward/ Odessa |
IH 20 | Actual | $6,160,114 | 1 | PAVEMENT OVERLAY |
0018-05-062 | Webb/ Laredo |
IH 35 | Actual | $43,060,987 | 3 | UPGRADE TO A 3 LANE RURAL SECTION EACH DIRECTION |
0015-08-111 | Williamson/ Austin |
IH 35 | Actual | $1,058,583 | 1 | ADD TURNAROUND STRUCTURE FROM NORTHBOUND FRONTAGE ROAD TO |
0683-01-070 | Williamson/ Austin |
SH 45 | Actual | $63,228,139 | 2 | CONSTRUCT TURNPIKE FACILITY WITH INTERMITTENT FRONTAGE |
0902-20-075 | Wise/ Fort Worth |
CR | Actual | $362,909 | 6 | REPLACE BRIDGE AND APPROACHES |
|
|