Detail Letting Schedule for Tom Green County (FY 2003)
Detail Letting Schedule for Tom Green County (FY 2003) | ||||
Last Update: Thursday, August 28, 2003 |
Tom Green County (FY 2003) |
CCSJ: 0907-00-056 | |||
District: | San Angelo | Let Date: | DEC 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | CPM 907-0-56 | CSJ: | 0907-00-056 |
Description: | REPAIR BRIDGE JOINTS | Handling Code: |
|
Limits From: | VARIOUS BRIDGE LOCATIONS IN THE SJT DIST | Fund Cat: | 1 |
Limits To: | . | Estimate: | $464,175 |
Length: | 0.0 Miles | Actual: | $308,000 |
Back... |
Totals for 0907-00-056 | ||
---|---|---|---|
Length: | 0.0 Miles | ||
Estimate: | $464,175 | ||
Actual: | $308,000 | ||
CCSJ: 0907-00-057 | |||
District: | San Angelo | Let Date: | JAN 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 907-0-57 | CSJ: | 0907-00-057 |
Description: | UPGRADE ILLUMINATION ASSEMBLIES | Handling Code: |
|
Limits From: | AT VARIOUS LOCATIONS IN THE SJT DITRICT | Fund Cat: | 1 |
Limits To: | . | Estimate: | $775,749 |
Length: | 0.0 Miles | Actual: | $593,612 |
Back... |
Totals for 0907-00-057 | ||
Length: | 0.0 Miles | ||
Estimate: | $775,749 | ||
Actual: | $593,612 | ||
CCSJ: 2141-02-010 | |||
District: | San Angelo | Let Date: | AUG 2003 |
Highway: | FM 2288 | Let Status: | Actual |
Project ID: | C 2141-2-10 | CSJ: | 2141-02-010 |
Description: | WIDEN EXISTING ROADWAY TO FOUR LANE UNDIVIDED FACILITY | Handling Code: |
|
Limits From: | 3.5 MI N. OF US 67 (LOCH LOMOND DR.) | Fund Cat: | 1 |
Limits To: | US 67 | Estimate: | $8,778,255 |
Length: | 3.5 Miles | Actual: | $8,299,540 |
Bid Tabulations Award Status Back... |
Totals for 2141-02-010 | ||
Length: | 3.5 Miles | ||
Estimate: | $8,778,255 | ||
Actual: | $8,299,540 |
|
|