Detail Letting Schedule for Bexar County (FY 2004)
| Detail Letting Schedule for Bexar County (FY 2004) | ||||
| Last Update: Tuesday, August 17, 2004 |
| Bexar County (FY 2004) |
CCSJ: 0016-07-118 | |||
| District: | San Antonio | Let Date: | JUN 2004 |
| Highway: | IH 35 | Let Status: | Actual |
| Project ID: | IM 35-2(304) | CSJ: | 0016-07-118 |
| Description: | 2" ACP OVERLAY & PAVEMENT MARKINGS ON MAINLANES | Handling Code: |
|
| Limits From: | 0.2 MI SOUTH OF WEIDNER ROAD | Fund Cat: | 1 |
| Limits To: | SH 218 | Estimate: | $2,183,131 |
| Length: | 3.3 Miles | Actual: | $2,335,690 |
|
Bid Tabulations Back... |
Totals for 0016-07-118 | ||
|---|---|---|---|
| Length: | 3.3 Miles | ||
| Estimate: | $2,183,131 | ||
| Actual: | $2,335,690 | ||
CCSJ: 0017-10-203 | |||
| District: | San Antonio | Let Date: | SEP 2003 |
| Highway: | IH 35 | Let Status: | Actual |
| Project ID: | IM 35-2(296) | CSJ: | 0017-10-203 |
| Description: | ADD AUXILARY LANES & RAMP TRANSITIONS | Handling Code: |
|
| Limits From: | 0.77 MI N OF BINZ-ENGLEMAN | Fund Cat: | 10 |
| Limits To: | WALZEM RD OVERPASS | Estimate: | $5,296,932 |
| Length: | 3.1 Miles | Actual: | $4,486,523 |
| District: | San Antonio | Let Date: | SEP 2003 |
| Highway: | IH 35 | Let Status: | Actual |
| Project ID: | IM 35-2(296) | CSJ: | 0017-10-212 |
| Description: | RESTORE EXISTING SOUTHBOUND FRONTAGE ROAD | Handling Code: |
|
| Limits From: | 2.64 MI S OF FM 1976 | Fund Cat: | 1 |
| Limits To: | 0.30 MI S OF FM 1976 | Estimate: | $1,145,959 |
| Length: | 2.3 Miles | Actual: | $886,824 |
| District: | San Antonio | Let Date: | SEP 2003 |
| Highway: | IH 35 | Let Status: | Actual |
| Project ID: | ER 2003(703) | CSJ: | 0017-10-214 |
| Description: | OCT 98 FLOOD - REPAIR RIPRAP AND CLEAN OUT WASH - OFF | Handling Code: |
NC |
| Limits From: | 2.64 MI SOUTH OF FM 1976 | Fund Cat: | 10 |
| Limits To: | 0.69 MI SOUTH OF FM 1976 | Estimate: | $805,735 |
| Length: | 2.0 Miles | Actual: | $527,693 |
|
Back... |
Totals for 0017-10-203 | ||
| Length: | 7.4 Miles | ||
| Estimate: | $7,248,626 | ||
| Actual: | $5,901,040 | ||
CCSJ: 0024-08-111 | |||
| District: | San Antonio | Let Date: | MAR 2004 |
| Highway: | US 90 | Let Status: | Actual |
| Project ID: | NH 2004(298) | CSJ: | 0024-08-111 |
| Description: | ACP OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | CUPPLES RD | Fund Cat: | 1 |
| Limits To: | S. FLORES | Estimate: | $1,390,906 |
| Length: | 2.1 Miles | Actual: | $1,286,295 |
| District: | San Antonio | Let Date: | MAR 2004 |
| Highway: | IH 10 | Let Status: | Actual |
| Project ID: | C 25-2-166 | CSJ: | 0025-02-166 |
| Description: | ACP OVERLAY & PAVEMENT MARKING | Handling Code: |
|
| Limits From: | LP 353 BRIDGE | Fund Cat: | 1 |
| Limits To: | S. FLORES BRIDGE | Estimate: | $772,412 |
| Length: | 0.6 Miles | Actual: | $705,158 |
|
Back... |
Totals for 0024-08-111 | ||
| Length: | 2.7 Miles | ||
| Estimate: | $2,163,318 | ||
| Actual: | $1,991,453 | ||
CCSJ: 0073-08-143 | |||
| District: | San Antonio | Let Date: | FEB 2004 |
| Highway: | IH 37 | Let Status: | Actual |
| Project ID: | IM 37-2(077) | CSJ: | 0073-08-143 |
| Description: | ACP OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | PECAN VALLEY OVERPASS | Fund Cat: | 1 |
| Limits To: | SALADO CREEK BRIDGE | Estimate: | $3,338,486 |
| Length: | 3.7 Miles | Actual: | $2,925,262 |
|
Back... |
Totals for 0073-08-143 | ||
| Length: | 3.7 Miles | ||
| Estimate: | $3,338,486 | ||
| Actual: | $2,925,262 | ||
CCSJ: 0143-01-052 | |||
| District: | San Antonio | Let Date: | OCT 2003 |
| Highway: | US 87 | Let Status: | Actual |
| Project ID: | STP 2003(694)MM | CSJ: | 0143-01-052 |
| Description: | RESTORE EXISTING PAVEMENT (CURB, SIDEWALKS & DRAINAGE) | Handling Code: |
|
| Limits From: | IH 10 | Fund Cat: | 7 |
| Limits To: | RIGSBY AVE | Estimate: | $2,023,721 |
| Length: | 0.5 Miles | Actual: | $2,155,693 |
|
Back... |
Totals for 0143-01-052 | ||
| Length: | 0.5 Miles | ||
| Estimate: | $2,023,721 | ||
| Actual: | $2,155,693 | ||
CCSJ: 0253-04-122 | |||
| District: | San Antonio | Let Date: | JAN 2004 |
| Highway: | SP 537 | Let Status: | Actual |
| Project ID: | STP 2004(191) | CSJ: | 0253-04-122 |
| Description: | LANDSCAPE | Handling Code: |
|
| Limits From: | ON SAN PEDRO @ RAMSEY | Fund Cat: | 10 |
| Limits To: | TANGO DRIVE | Estimate: | $150,370 |
| Length: | 0.5 Miles | Actual: | $190,868 |
|
Back... |
Totals for 0253-04-122 | ||
| Length: | 0.5 Miles | ||
| Estimate: | $150,370 | ||
| Actual: | $190,868 | ||
CCSJ: 0291-10-089 | |||
| District: | San Antonio | Let Date: | OCT 2003 |
| Highway: | SH 16 | Let Status: | Actual |
| Project ID: | NH 2003(102) | CSJ: | 0291-10-089 |
| Description: | UPGRADING TRAFFIC SIGNALS | Handling Code: |
|
| Limits From: | IN LEON VALLEY AND IN HELOTES | Fund Cat: | 11 |
| Limits To: | . | Estimate: | $738,770 |
| Length: | 0.0 Miles | Actual: | $573,707 |
|
Back... |
Totals for 0291-10-089 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $738,770 | ||
| Actual: | $573,707 | ||
CCSJ: 0291-12-001 | |||
| District: | San Antonio | Let Date: | OCT 2003 |
| Highway: | SP 66 | Let Status: | Actual |
| Project ID: | C 291-12-1 | CSJ: | 0291-12-001 |
| Description: | CONSTRUCT SPUR TO REPLACE WATSON ROAD | Handling Code: |
NC |
| Limits From: | 0.27 MI WEST OF SH 16 | Fund Cat: | 12 |
| Limits To: | APPLEWHITE ROAD | Estimate: | $9,523,243 |
| Length: | 1.8 Miles | Actual: | $7,518,523 |
|
Back... |
Totals for 0291-12-001 | ||
| Length: | 1.8 Miles | ||
| Estimate: | $9,523,243 | ||
| Actual: | $7,518,523 | ||
CCSJ: 0465-01-051 | |||
| District: | San Antonio | Let Date: | OCT 2003 |
| Highway: | SH 218 | Let Status: | Actual |
| Project ID: | STP 2002(735)MM | CSJ: | 0465-01-051 |
| Description: | CONSTRUCTING SIDEWALKS, DRIVEWAYS, AND STORM DRAINAGE | Handling Code: |
|
| Limits From: | ON PAT BOOKER RD FROM LP 1604 | Fund Cat: | 7 |
| Limits To: | TO FM 78 | Estimate: | $2,593,529 |
| Length: | 2.7 Miles | Actual: | $2,381,671 |
| District: | San Antonio | Let Date: | OCT 2003 |
| Highway: | SH 218 | Let Status: | Actual |
| Project ID: | STP 2000(625)TE | CSJ: | 0465-01-052 |
| Description: | CONSTRUCTING BIKE / PEDSTRIAN FACILITIES AND LANDSCAPING | Handling Code: |
NC |
| Limits From: | LOOP 1604 | Fund Cat: | 9 |
| Limits To: | FM 78 | Estimate: | $2,927,228 |
| Length: | 0.0 Miles | Actual: | $2,674,541 |
|
Back... |
Totals for 0465-01-051 | ||
| Length: | 2.7 Miles | ||
| Estimate: | $5,520,757 | ||
| Actual: | $5,056,212 | ||
CCSJ: 0521-01-042 | |||
| District: | San Antonio | Let Date: | SEP 2003 |
| Highway: | LP 13 | Let Status: | Actual |
| Project ID: | CPM 521-1-42 | CSJ: | 0521-01-042 |
| Description: | MILLING, OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SOUTH PRESA STREET (US 181) | Fund Cat: | 1 |
| Limits To: | 0.31 MI WEST OF GOLIAD | Estimate: | $651,078 |
| Length: | 1.5 Miles | Actual: | $554,182 |
| District: | San Antonio | Let Date: | SEP 2003 |
| Highway: | LP 13 | Let Status: | Actual |
| Project ID: | CPM 521-2-34 | CSJ: | 0521-02-034 |
| Description: | MILLING, OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | IH 35 | Fund Cat: | 1 |
| Limits To: | SOUTH PRESA STREET (US 181) | Estimate: | $1,443,638 |
| Length: | 3.9 Miles | Actual: | $1,205,310 |
|
Back... |
Totals for 0521-01-042 | ||
| Length: | 5.4 Miles | ||
| Estimate: | $2,094,716 | ||
| Actual: | $1,759,492 | ||
CCSJ: 0521-04-189 | |||
| District: | San Antonio | Let Date: | JAN 2004 |
| Highway: | IH 410 | Let Status: | Actual |
| Project ID: | NH 2004(190) | CSJ: | 0521-04-189 |
| Description: | UPGRADE TO 10 LANE FREEWAY & TRAFFIC MANAGEMENT SYSTEM | Handling Code: |
|
| Limits From: | BLANCO RD | Fund Cat: | 2 |
| Limits To: | MC CULLOUGH AVE | Estimate: | $35,490,024 |
| Length: | 0.8 Miles | Actual: | $35,176,360 |
| District: | San Antonio | Let Date: | JAN 2004 |
| Highway: | IH 410 | Let Status: | Actual |
| Project ID: | NH 2004(190) | CSJ: | 0521-04-259 |
| Description: | RIGHT OF WAY UTILITY ADJUSTMENT | Handling Code: |
|
| Limits From: | BLANCO ROAD | Fund Cat: | ROW |
| Limits To: | MCCULLOGH AVE | Estimate: | $1,309,039 |
| Length: | 1.0 Miles | Actual: | $1,415,061 |
|
Back... |
Totals for 0521-04-189 | ||
| Length: | 1.8 Miles | ||
| Estimate: | $36,799,063 | ||
| Actual: | $36,591,421 | ||
CCSJ: 0521-04-209 | |||
| District: | San Antonio | Let Date: | SEP 2003 |
| Highway: | IH 410 | Let Status: | Actual |
| Project ID: | NH 2001(783) | CSJ: | 0521-04-209 |
| Description: | UPGRADE TO 10 LANE FREEWAY & TRAFFIC MANAGEMENT SYSTEM | Handling Code: |
|
| Limits From: | CULEBRA RD | Fund Cat: | 2 |
| Limits To: | E OF INGRAM RD | Estimate: | $28,098,091 |
| Length: | 2.6 Miles | Actual: | $29,691,860 |
|
Back... |
Totals for 0521-04-209 | ||
| Length: | 2.6 Miles | ||
| Estimate: | $28,098,091 | ||
| Actual: | $29,691,860 | ||
CCSJ: 0521-05-123 | |||
| District: | San Antonio | Let Date: | MAY 2004 |
| Highway: | IH 410 | Let Status: | Actual |
| Project ID: | IM 410-4(338) | CSJ: | 0521-05-123 |
| Description: | RECONSTRUCT INTERSECTION | Handling Code: |
NC |
| Limits From: | U.P.R.R. | Fund Cat: | 12 |
| Limits To: | SH 16 | Estimate: | $12,054,372 |
| Length: | 2.3 Miles | Actual: | $11,940,239 |
| District: | San Antonio | Let Date: | MAY 2004 |
| Highway: | IH 410 | Let Status: | Actual |
| Project ID: | IM 410-4(338) | CSJ: | 0521-05-125 |
| Description: | UTILITIES | Handling Code: |
|
| Limits From: | U.P.R.R. | Fund Cat: | 12 |
| Limits To: | SH 16 | Estimate: | $539,309 |
| Length: | 2.3 Miles | Actual: | $559,319 |
|
Back... |
Totals for 0521-05-123 | ||
| Length: | 4.6 Miles | ||
| Estimate: | $12,593,681 | ||
| Actual: | $12,499,558 | ||
CCSJ: 0521-05-127 | |||
| District: | San Antonio | Let Date: | APR 2004 |
| Highway: | IH 410 | Let Status: | Actual |
| Project ID: | CPM 521-5-127 | CSJ: | 0521-05-127 |
| Description: | PAVEMENT REPAIR, SEAL COAT, ACP OVERLAY AND | Handling Code: |
|
| Limits From: | SH 16 SOUTH | Fund Cat: | 1 |
| Limits To: | IH 35 SOUTH | Estimate: | $1,423,278 |
| Length: | 3.5 Miles | Actual: | $1,091,430 |
| District: | San Antonio | Let Date: | APR 2004 |
| Highway: | SH 16 | Let Status: | Actual |
| Project ID: | CPM 613-1-52 | CSJ: | 0613-01-052 |
| Description: | PAVEMENT REPAIR, OVERLAY & SEAL COAT, AND PAVEMENT MARKING | Handling Code: |
|
| Limits From: | LOOP 1604 | Fund Cat: | 1 |
| Limits To: | 1.0 MI NORTH OF APPLEWHITE ROAD | Estimate: | $2,272,485 |
| Length: | 5.4 Miles | Actual: | $1,736,005 |
|
Back... |
Totals for 0521-05-127 | ||
| Length: | 8.9 Miles | ||
| Estimate: | $3,695,763 | ||
| Actual: | $2,827,435 | ||
CCSJ: 0521-06-122 | |||
| District: | San Antonio | Let Date: | APR 2004 |
| Highway: | IH 410 | Let Status: | Actual |
| Project ID: | IM 410-4(337) | CSJ: | 0521-06-122 |
| Description: | OVERLAY, MBGF & INTERSECTION IMPROVEMENT | Handling Code: |
|
| Limits From: | SALADO CREEK (FRONTAGE ROAD) | Fund Cat: | 1 |
| Limits To: | FM 1346 | Estimate: | $1,009,988 |
| Length: | 6.7 Miles | Actual: | $889,151 |
|
Back... |
Totals for 0521-06-122 | ||
| Length: | 6.7 Miles | ||
| Estimate: | $1,009,988 | ||
| Actual: | $889,151 | ||
CCSJ: 0915-00-083 | |||
| District: | San Antonio | Let Date: | OCT 2003 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | MG 2003(696) | CSJ: | 0915-00-083 |
| Description: | THERMOPLASTIC RE - STRIPING (FY 2003) - CAT 10A | Handling Code: |
|
| Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $199,217 |
| Length: | 0.0 Miles | Actual: | $178,432 |
|
Back... |
Totals for 0915-00-083 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $199,217 | ||
| Actual: | $178,432 | ||
CCSJ: 0915-00-084 | |||
| District: | San Antonio | Let Date: | OCT 2003 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | MG 2003(700) | CSJ: | 0915-00-084 |
| Description: | THERMOPLASTIC RE - STRIPING (FY 2003) - CAT 2 | Handling Code: |
|
| Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $235,700 |
| Length: | 0.0 Miles | Actual: | $209,435 |
|
Back... |
Totals for 0915-00-084 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $235,700 | ||
| Actual: | $209,435 | ||
CCSJ: 0915-00-085 | |||
| District: | San Antonio | Let Date: | APR 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | C 915-00-85 | CSJ: | 0915-00-085 |
| Description: | THERMOPLASTIC RE - STRIPING (FY 2004) - CAT 10A | Handling Code: |
|
| Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $195,887 |
| Length: | 0.0 Miles | Actual: | $199,932 |
|
Back... |
Totals for 0915-00-085 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $195,887 | ||
| Actual: | $199,932 | ||
CCSJ: 0915-00-086 | |||
| District: | San Antonio | Let Date: | APR 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | C 915-00-86 | CSJ: | 0915-00-086 |
| Description: | THERMOPLASTIC RE - STRIPING (FY 2004) | Handling Code: |
|
| Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $210,453 |
| Length: | 0.0 Miles | Actual: | $236,056 |
|
Back... |
Totals for 0915-00-086 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $210,453 | ||
| Actual: | $236,056 | ||
CCSJ: 0915-00-088 | |||
| District: | San Antonio | Let Date: | OCT 2003 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | MG 2003(701) | CSJ: | 0915-00-088 |
| Description: | RAISED REFL PAVEMENT MARKERS REPLACEMENT (FY 2003) - CAT 2 | Handling Code: |
|
| Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $486,945 |
| Length: | 0.0 Miles | Actual: | $378,670 |
|
Back... |
Totals for 0915-00-088 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $486,945 | ||
| Actual: | $378,670 | ||
CCSJ: 0915-00-091 | |||
| District: | San Antonio | Let Date: | MAY 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | C 915-00-91 | CSJ: | 0915-00-091 |
| Description: | DISTRICTWIDE THERMOPLASTIC RE - STRIPING (FY2005) (CAT 10A) | Handling Code: |
|
| Limits From: | DISTRICTWIDE THERMOPLASTIC RE-STRIP | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $632,635 |
| Length: | 0.0 Miles | Actual: | $708,739 |
|
Back... |
Totals for 0915-00-091 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $632,635 | ||
| Actual: | $708,739 | ||
CCSJ: 0915-00-092 | |||
| District: | San Antonio | Let Date: | MAY 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | C 915-00-92 | CSJ: | 0915-00-092 |
| Description: | DISTRICTWIDE THERMOPLASTIC RE - STRIPING_ (FY 2005) (CAT 2) | Handling Code: |
|
| Limits From: | DISTRICTWIDE THERMOPLASTIC RE-STRIP | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $235,174 |
| Length: | 0.0 Miles | Actual: | $251,139 |
|
Back... |
Totals for 0915-00-092 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $235,174 | ||
| Actual: | $251,139 | ||
CCSJ: 0915-00-093 | |||
| District: | San Antonio | Let Date: | MAY 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | C 915-00-93 | CSJ: | 0915-00-093 |
| Description: | DISTRICTWIDE RAISED REFLECTIVE PAV MARK (FY 2005) | Handling Code: |
|
| Limits From: | DISTRICTWIDE RAISED REFLECTIVE PAV | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $249,638 |
| Length: | 0.0 Miles | Actual: | $178,753 |
|
Back... |
Totals for 0915-00-093 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $249,638 | ||
| Actual: | $178,753 | ||
CCSJ: 0915-00-096 | |||
| District: | San Antonio | Let Date: | JUN 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | C 915-00-96 | CSJ: | 0915-00-096 |
| Description: | DISTRICTWIDE TRAFFIC MANAGEMENT (FY2004) (CAT 10B) | Handling Code: |
XX |
| Limits From: | DISTRICTWIDE_TRAFFIC MANAGEMENT (FY | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $1,900,000 |
| Length: | 0.0 Miles | Actual: | $1,900,000 |
|
Back... |
Totals for 0915-00-096 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $1,900,000 | ||
| Actual: | $1,900,000 | ||
CCSJ: 0915-00-107 | |||
| District: | San Antonio | Let Date: | MAY 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | C 915-00-107 | CSJ: | 0915-00-107 |
| Description: | DISTRICTWIDE TRAFFIC SIGNALS | Handling Code: |
|
| Limits From: | DISTRICTWIDE TRAFFIC CONTROL (FY 20 | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $1,224,175 |
| Length: | 0.0 Miles | Actual: | $1,073,188 |
|
Back... |
Totals for 0915-00-107 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $1,224,175 | ||
| Actual: | $1,073,188 | ||
CCSJ: 0915-12-162 | |||
| District: | San Antonio | Let Date: | MAR 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2000(166)MM | CSJ: | 0915-12-162 |
| Description: | WIDEN EXIST STREET TO LENGTHEN LEFT TURN LANES | Handling Code: |
|
| Limits From: | ON WURBACH RD FROM IH 10 | Fund Cat: | 7 |
| Limits To: | IRONSIDE RD | Estimate: | $1,374,953 |
| Length: | 0.2 Miles | Actual: | $1,704,299 |
| District: | San Antonio | Let Date: | MAR 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2000(166)MM | CSJ: | 0915-12-196 |
| Description: | WIDEN NB APPROACH FOR RIGHT TURN LANE | Handling Code: |
|
| Limits From: | IN SAN ANTONIO ON IRONSIDE | Fund Cat: | 7 |
| Limits To: | AT WURZBACH | Estimate: | $102,048 |
| Length: | 0.1 Miles | Actual: | $109,591 |
|
Back... |
Totals for 0915-12-162 | ||
| Length: | 0.3 Miles | ||
| Estimate: | $1,477,001 | ||
| Actual: | $1,813,890 | ||
CCSJ: 0915-12-180 | |||
| District: | San Antonio | Let Date: | FEB 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2004(94)MM | CSJ: | 0915-12-180 |
| Description: | REHABILITATE AND IMPROVE SHOULDER | Handling Code: |
|
| Limits From: | IN SCHERTZ ON LOWER SEGUIN RD | Fund Cat: | 7 |
| Limits To: | FROM LP 1604 TO FM 1518 | Estimate: | $3,157,996 |
| Length: | 2.9 Miles | Actual: | $2,408,264 |
|
Back... |
Totals for 0915-12-180 | ||
| Length: | 2.9 Miles | ||
| Estimate: | $3,157,996 | ||
| Actual: | $2,408,264 | ||
CCSJ: 0915-12-227 | |||
| District: | San Antonio | Let Date: | OCT 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 96(401)MM | CSJ: | 0915-12-227 |
| Description: | REHABILITATE AND WIDEN NARROW PAVEMENT (SIDEWALKS) | Handling Code: |
|
| Limits From: | IN SAN ANTONIO ON SUNSET RD | Fund Cat: | 7 |
| Limits To: | FROM JONES MALTSBERGER TO TEAK | Estimate: | $2,937,263 |
| Length: | 0.5 Miles | Actual: | $2,485,708 |
|
Back... |
Totals for 0915-12-227 | ||
| Length: | 0.5 Miles | ||
| Estimate: | $2,937,263 | ||
| Actual: | $2,485,708 | ||
CCSJ: 0915-12-268 | |||
| District: | San Antonio | Let Date: | FEB 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2000(130)MM | CSJ: | 0915-12-268 |
| Description: | RECONSTRUCT & EXPAND 2 TO 4 LANE W / CLTL (CURBS, SIDEWALK) | Handling Code: |
|
| Limits From: | ON KITTY HAWK DR FROM MILLER RD | Fund Cat: | 7 |
| Limits To: | CONVERSE CITY LIMITS | Estimate: | $1,701,508 |
| Length: | 0.7 Miles | Actual: | $1,491,458 |
|
Back... |
Totals for 0915-12-268 | ||
| Length: | 0.7 Miles | ||
| Estimate: | $1,701,508 | ||
| Actual: | $1,491,458 | ||
CCSJ: 0915-12-295 | |||
| District: | San Antonio | Let Date: | FEB 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2001(519)MM | CSJ: | 0915-12-295 |
| Description: | RECONSTRUCT & EXPAND 2 TO 4 LANE W / CLTL (CURBS, SIDEWALKS) | Handling Code: |
|
| Limits From: | ON CRESTWAY FROM MILLER RD | Fund Cat: | 7 |
| Limits To: | NEW WORLD | Estimate: | $2,842,860 |
| Length: | 0.8 Miles | Actual: | $2,624,114 |
|
Back... |
Totals for 0915-12-295 | ||
| Length: | 0.8 Miles | ||
| Estimate: | $2,842,860 | ||
| Actual: | $2,624,114 | ||
CCSJ: 0915-12-333 | |||
| District: | San Antonio | Let Date: | SEP 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2001(145)MM | CSJ: | 0915-12-333 |
| Description: | RESTORING EXISTING PAVEMENT (CURB, SDWK, DRAINAGE) | Handling Code: |
|
| Limits From: | ON NEW WORLD FROM MILLER ROAD | Fund Cat: | 7 |
| Limits To: | CRESTWAY | Estimate: | $1,242,981 |
| Length: | 0.6 Miles | Actual: | $1,060,275 |
|
Back... |
Totals for 0915-12-333 | ||
| Length: | 0.6 Miles | ||
| Estimate: | $1,242,981 | ||
| Actual: | $1,060,275 | ||
CCSJ: 0915-12-351 | |||
| District: | San Antonio | Let Date: | DEC 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 99(788)MM | CSJ: | 0915-12-351 |
| Description: | INSTALL BIKE RACKS AT APPROXIMATELY 50 VARIOUS LOCATIONS | Handling Code: |
XX |
| Limits From: | IN SAN ANTONIO AT VARIOUS LOCATIONS | Fund Cat: | 7 |
| Limits To: | . | Estimate: | $72,000 |
| Length: | 0.0 Miles | Actual: | |
|
Back... |
Totals for 0915-12-351 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $72,000 | ||
| Actual: | |||
CCSJ: 0915-12-355 | |||
| District: | San Antonio | Let Date: | SEP 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2003(413)MM | CSJ: | 0915-12-355 |
| Description: | RECONSTRUCT & EXPAND 2 TO 4 LANE (CURB, SDWKS, DRAINAGE) | Handling Code: |
|
| Limits From: | ON CRESTWAY FROM WINDCREST CITY LIMITS | Fund Cat: | 7 |
| Limits To: | TO NEW WORLD | Estimate: | $1,449,583 |
| Length: | 0.5 Miles | Actual: | $1,084,165 |
|
Back... |
Totals for 0915-12-355 | ||
| Length: | 0.5 Miles | ||
| Estimate: | $1,449,583 | ||
| Actual: | $1,084,165 | ||
CCSJ: 0915-12-360 | |||
| District: | San Antonio | Let Date: | NOV 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 99(794)MM | CSJ: | 0915-12-360 |
| Description: | REHAB & WIDEN NARROW PAVEMENT (CURB, SDWK, DRAINAGE) | Handling Code: |
|
| Limits From: | ON HOUSTON FROM PINE | Fund Cat: | 7 |
| Limits To: | TO WALTERS STREET | Estimate: | $5,181,184 |
| Length: | 1.1 Miles | Actual: | $4,790,545 |
|
Back... |
Totals for 0915-12-360 | ||
| Length: | 1.1 Miles | ||
| Estimate: | $5,181,184 | ||
| Actual: | $4,790,545 | ||
CCSJ: 0915-12-366 | |||
| District: | San Antonio | Let Date: | FEB 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2003(414)MM | CSJ: | 0915-12-366 |
| Description: | REHAB & WIDEN NARROW PAVEMENT W / CLTL (CURB, DRAINAGE) | Handling Code: |
|
| Limits From: | ON MILLER RD/CRESTWAY FROM NEW WORL | Fund Cat: | 7 |
| Limits To: | TO 0.4 MI S OF KITTY HAWK | Estimate: | $2,755,497 |
| Length: | 1.3 Miles | Actual: | $2,634,833 |
|
Back... |
Totals for 0915-12-366 | ||
| Length: | 1.3 Miles | ||
| Estimate: | $2,755,497 | ||
| Actual: | $2,634,833 | ||
CCSJ: 0915-12-404 | |||
| District: | San Antonio | Let Date: | FEB 2004 |
| Highway: | IH 410 | Let Status: | Actual |
| Project ID: | IM 410(336) | CSJ: | 0521-05-126 |
| Description: | UTILITIES | Handling Code: |
NC |
| Limits From: | U.P.R.R. | Fund Cat: | ROW |
| Limits To: | SH 16 | Estimate: | $12,591 |
| Length: | 2.3 Miles | Actual: | $4,803 |
| District: | San Antonio | Let Date: | FEB 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2004(56) | CSJ: | 0915-12-404 |
| Description: | RECONSTRUCT & EXPAND 2 TO 4 LANES W / CLTL | Handling Code: |
NC |
| Limits From: | ON ZARZAMORA FROM W OF APPLEWHITE | Fund Cat: | 12 |
| Limits To: | IH 410 | Estimate: | $9,402,558 |
| Length: | 2.1 Miles | Actual: | $9,061,632 |
| District: | San Antonio | Let Date: | FEB 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2004(57) | CSJ: | 0915-12-410 |
| Description: | RECONSTRUCT & EXPAND 2 TO 4 LANES W / CLTL | Handling Code: |
NC |
| Limits From: | ON APPLEWHITE RD FROM WATSON RD | Fund Cat: | 12 |
| Limits To: | ZARZAMORA RD | Estimate: | $7,217,829 |
| Length: | 2.0 Miles | Actual: | $6,711,005 |
|
Back... |
Totals for 0915-12-404 | ||
| Length: | 6.4 Miles | ||
| Estimate: | $16,632,978 | ||
| Actual: | $15,777,440 | ||
CCSJ: 0915-12-412 | |||
| District: | San Antonio | Let Date: | APR 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | STP 2004(447) | CSJ: | 0915-12-412 |
| Description: | ALAMO AREA COMMUTE SOLUTION PGM - FY 2004 | Handling Code: |
XX |
| Limits From: | IN SAN ANTONIO/BEXAR CO AREA | Fund Cat: | 7 |
| Limits To: | . | Estimate: | $220,000 |
| Length: | 0.0 Miles | Actual: | |
|
Back... |
Totals for 0915-12-412 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $220,000 | ||
| Actual: | |||
CCSJ: 2020-02-025 | |||
| District: | San Antonio | Let Date: | MAY 2004 |
| Highway: | LP 1604 | Let Status: | Actual |
| Project ID: | STP 2004(414) | CSJ: | 1479-01-019 |
| Description: | OPERATIONAL IMPROVEMENTS. PASSING LANES, RECONSTRUCT | Handling Code: |
NC |
| Limits From: | SH 16 | Fund Cat: | 12 |
| Limits To: | FM 1937 | Estimate: | $4,666,321 |
| Length: | 8.8 Miles | Actual: | $4,419,125 |
| District: | San Antonio | Let Date: | MAY 2004 |
| Highway: | LP 1604 | Let Status: | Actual |
| Project ID: | STP 2004(414) | CSJ: | 2020-02-025 |
| Description: | OPERATIONAL IMPROVEMEMNTS. PASSING LANES, MODIFY SH 16 | Handling Code: |
NC |
| Limits From: | IH 35 | Fund Cat: | 12 |
| Limits To: | SH 16 | Estimate: | $2,871,185 |
| Length: | 3.2 Miles | Actual: | $2,656,485 |
| District: | San Antonio | Let Date: | MAY 2004 |
| Highway: | LP 1604 | Let Status: | Actual |
| Project ID: | STP 2004(414) | CSJ: | 2255-01-029 |
| Description: | OPRATIONAL IMPROVEMENTS. PASSING LANES. | Handling Code: |
NC |
| Limits From: | FM 1937 | Fund Cat: | 12 |
| Limits To: | IH 37 | Estimate: | $953,272 |
| Length: | 2.3 Miles | Actual: | $899,040 |
|
Back... |
Totals for 2020-02-025 | ||
| Length: | 14.3 Miles | ||
| Estimate: | $8,490,778 | ||
| Actual: | $7,974,650 | ||
CCSJ: 2452-03-093 | |||
| District: | San Antonio | Let Date: | JUL 2004 |
| Highway: | LP 1604 | Let Status: | Actual |
| Project ID: | C 2452-3-93 | CSJ: | 2452-03-093 |
| Description: | CONSTRUCTING DECELERATION LANE FROM EXISTING EXIT RAMP | Handling Code: |
|
| Limits From: | ON EBFR RD FROM 2000'W BULVERDE RD | Fund Cat: | 11 |
| Limits To: | BULVERDE RD | Estimate: | $292,275 |
| Length: | 0.4 Miles | Actual: | $293,937 |
|
Award Status Bid Tabulations Back... |
Totals for 2452-03-093 | ||
| Length: | 0.4 Miles | ||
| Estimate: | $292,275 | ||
| Actual: | $293,937 | ||
|
| |