Detail Letting Schedule for Dallas County (FY 2004)
| Detail Letting Schedule for Dallas County (FY 2004) | ||||
| Last Update: Tuesday, August 17, 2004 |
| Dallas County (FY 2004) |
CCSJ: 0009-02-049 | |||
| District: | Dallas | Let Date: | JUL 2004 |
| Highway: | SH 78 | Let Status: | Actual |
| Project ID: | CM 97(89) | CSJ: | 0009-02-049 |
| Description: | INTERSECTION IMPROVEMENTS | Handling Code: |
NC |
| Limits From: | ON LAVON DR AT FIRST STREET IN THE | Fund Cat: | 5 |
| Limits To: | CITY OF GARLAND | Estimate: | $45,947 |
| Length: | 0.1 Miles | Actual: | $60,256 |
| District: | Dallas | Let Date: | JUL 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 97(89) | CSJ: | 0918-45-346 |
| Description: | 3 OFF SYSTEM INTERSECTION IMPROVEMENTS | Handling Code: |
NC |
| Limits From: | VARIOUS LOC AT FOREST LANE AND AT | Fund Cat: | 5 |
| Limits To: | CHURCHILL WAY | Estimate: | $678,307 |
| Length: | 0.5 Miles | Actual: | $831,626 |
|
Award Status Bid Tabulations Back... |
Totals for 0009-02-049 | ||
|---|---|---|---|
| Length: | 0.6 Miles | ||
| Estimate: | $724,254 | ||
| Actual: | $891,882 | ||
CCSJ: 0047-07-192 | |||
| District: | Dallas | Let Date: | AUG 2004 |
| Highway: | US 75 | Let Status: | Tentative |
| Project ID: | C 47-7-192 | CSJ: | 0047-07-192 |
| Description: | REHABILITATE VARIOUS PIECES OF VIDEO TRANSMISSION EQUIPT. | Handling Code: |
XX |
| Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $225,000 |
| Length: | 0.0 Miles | Actual: | |
|
Back... |
Totals for 0047-07-192 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $225,000 | ||
| Actual: | |||
CCSJ: 0047-07-199 | |||
| District: | Dallas | Let Date: | AUG 2004 |
| Highway: | US 75 | Let Status: | Tentative |
| Project ID: | C 47-7-199 | CSJ: | 0047-07-199 |
| Description: | REHABILITATE VIDEO EQUIPMENT | Handling Code: |
XX |
| Limits From: | TRANSPORTATION MANAGEMENT SATELITE | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $1,500,000 |
| Length: | 0.0 Miles | Actual: | |
|
Back... |
Totals for 0047-07-199 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $1,500,000 | ||
| Actual: | |||
CCSJ: 0091-06-053 | |||
| District: | Dallas | Let Date: | MAY 2004 |
| Highway: | SH 289 | Let Status: | Actual |
| Project ID: | C 91-5-51 | CSJ: | 0091-05-051 |
| Description: | CONCRETE PAVEMENT REPAIR | Handling Code: |
|
| Limits From: | DALLAS COUNTY LINE | Fund Cat: | 1 |
| Limits To: | SH 190 | Estimate: | $54,600 |
| Length: | 1.8 Miles | Actual: | $35,730 |
| District: | Dallas | Let Date: | MAY 2004 |
| Highway: | SH 289 | Let Status: | Actual |
| Project ID: | C 91-6-53 | CSJ: | 0091-06-053 |
| Description: | CONCRETE PAVEMENT REPAIR | Handling Code: |
|
| Limits From: | ELDERWOOD | Fund Cat: | 1 |
| Limits To: | DALLAS COUNTY LINE | Estimate: | $3,335,788 |
| Length: | 6.0 Miles | Actual: | $2,274,427 |
|
Back... |
Totals for 0091-06-053 | ||
| Length: | 7.8 Miles | ||
| Estimate: | $3,390,388 | ||
| Actual: | $2,310,157 | ||
CCSJ: 0094-07-036 | |||
| District: | Dallas | Let Date: | JUN 2004 |
| Highway: | SP 482 | Let Status: | Actual |
| Project ID: | C 94-3-97 | CSJ: | 0094-03-097 |
| Description: | PAVEMENT REPAIR | Handling Code: |
|
| Limits From: | SH 114 | Fund Cat: | 1 |
| Limits To: | TRINITY RIVER | Estimate: | $98,742 |
| Length: | 0.6 Miles | Actual: | $84,266 |
| District: | Dallas | Let Date: | JUN 2004 |
| Highway: | SH 183 | Let Status: | Actual |
| Project ID: | C 94-7-36 | CSJ: | 0094-07-036 |
| Description: | PAVEMENT REPAIR | Handling Code: |
|
| Limits From: | IH 35E | Fund Cat: | 1 |
| Limits To: | TRINITY RIVER | Estimate: | $1,415,851 |
| Length: | 1.5 Miles | Actual: | $877,929 |
|
Bid Tabulations Back... |
Totals for 0094-07-036 | ||
| Length: | 2.1 Miles | ||
| Estimate: | $1,514,593 | ||
| Actual: | $962,195 | ||
CCSJ: 0095-10-046 | |||
| District: | Dallas | Let Date: | MAY 2004 |
| Highway: | US 80 | Let Status: | Actual |
| Project ID: | CL 95-10-46 | CSJ: | 0095-10-046 |
| Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
XX |
| Limits From: | IH 30 | Fund Cat: | 10 |
| Limits To: | BIG TOWN BLVD | Estimate: | $4,687 |
| Length: | 0.4 Miles | Actual: | $5,000 |
|
Back... |
Totals for 0095-10-046 | ||
| Length: | 0.4 Miles | ||
| Estimate: | $4,687 | ||
| Actual: | $5,000 | ||
CCSJ: 0196-03-230 | |||
| District: | Dallas | Let Date: | MAR 2004 |
| Highway: | IH 35E | Let Status: | Actual |
| Project ID: | CPM 196-3-230 | CSJ: | 0196-03-230 |
| Description: | PAVEMENT REPAIR AND OVERLAY | Handling Code: |
|
| Limits From: | LOOP 12/IH 35E SPLIT | Fund Cat: | 1 |
| Limits To: | NORTH OF IH 635 | Estimate: | $5,155,756 |
| Length: | 3.3 Miles | Actual: | $4,803,223 |
|
Back... |
Totals for 0196-03-230 | ||
| Length: | 3.3 Miles | ||
| Estimate: | $5,155,756 | ||
| Actual: | $4,803,223 | ||
CCSJ: 0196-03-232 | |||
| District: | Dallas | Let Date: | JUL 2004 |
| Highway: | IH 35E | Let Status: | Actual |
| Project ID: | IM 35-6(385)E | CSJ: | 0196-03-232 |
| Description: | SIGN REFURBISHING | Handling Code: |
|
| Limits From: | IH 30 | Fund Cat: | 1 |
| Limits To: | 500' SOUTH OF VALLEY VIEW DRIVE | Estimate: | $1,059,994 |
| Length: | 13.4 Miles | Actual: | $864,354 |
|
Award Status Bid Tabulations Back... |
Totals for 0196-03-232 | ||
| Length: | 13.4 Miles | ||
| Estimate: | $1,059,994 | ||
| Actual: | $864,354 | ||
CCSJ: 0196-03-234 | |||
| District: | Dallas | Let Date: | MAY 2004 |
| Highway: | IH 35E | Let Status: | Actual |
| Project ID: | CPM 196-3-234 | CSJ: | 0196-03-234 |
| Description: | NOVACHIP SEAL OF MAINLANES AND SHOULDERS | Handling Code: |
|
| Limits From: | SH 183 | Fund Cat: | 1 |
| Limits To: | LOMBARDY LANE | Estimate: | $1,298,583 |
| Length: | 3.9 Miles | Actual: | $1,288,575 |
|
Back... |
Totals for 0196-03-234 | ||
| Length: | 3.9 Miles | ||
| Estimate: | $1,298,583 | ||
| Actual: | $1,288,575 | ||
CCSJ: 0196-03-236 | |||
| District: | Dallas | Let Date: | AUG 2004 |
| Highway: | IH 35E | Let Status: | Approved |
| Project ID: | C 196-3-236 | CSJ: | 0196-03-236 |
| Description: | PLANING AND OVERLAY | Handling Code: |
|
| Limits From: | NORTH ABUTMENT CONTINENTAL OVERPASS | Fund Cat: | 1 |
| Limits To: | SH 183/IH 35E SPLIT | Estimate: | $1,613,763 |
| Length: | 4.3 Miles | Actual: | |
|
List Showing Order Bidders List Bid Tabulations Proposal Req Form Back... |
Totals for 0196-03-236 | ||
| Length: | 4.3 Miles | ||
| Estimate: | $1,613,763 | ||
| Actual: | |||
CCSJ: 0196-06-027 | |||
| District: | Dallas | Let Date: | APR 2004 |
| Highway: | LP 354 | Let Status: | Actual |
| Project ID: | STP 2003(681) | CSJ: | 0196-06-027 |
| Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
| Limits From: | AT ROYAL LANE | Fund Cat: | 10 |
| Limits To: | . | Estimate: | $124,786 |
| Length: | 0.0 Miles | Actual: | $114,462 |
|
Back... |
Totals for 0196-06-027 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $124,786 | ||
| Actual: | $114,462 | ||
CCSJ: 0196-07-024 | |||
| District: | Dallas | Let Date: | OCT 2003 |
| Highway: | SP 366 | Let Status: | Actual |
| Project ID: | MG 2003(682) | CSJ: | 0196-07-024 |
| Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
| Limits From: | BOLL STREET | Fund Cat: | 10 |
| Limits To: | US 75 | Estimate: | $173,890 |
| Length: | 0.2 Miles | Actual: | $136,731 |
|
Back... |
Totals for 0196-07-024 | ||
| Length: | 0.2 Miles | ||
| Estimate: | $173,890 | ||
| Actual: | $136,731 | ||
CCSJ: 0197-02-095 | |||
| District: | Dallas | Let Date: | JAN 2004 |
| Highway: | US 175 | Let Status: | Actual |
| Project ID: | C 197-2-95 | CSJ: | 0197-02-095 |
| Description: | GRADING, BASE, SURFACE, STRIPING, SIGNS, SIGNALS | Handling Code: |
|
| Limits From: | AT MALLOY BRIDGE ROAD | Fund Cat: | 11 |
| Limits To: | . | Estimate: | $418,442 |
| Length: | 2.6 Miles | Actual: | $491,789 |
|
Back... |
Totals for 0197-02-095 | ||
| Length: | 2.6 Miles | ||
| Estimate: | $418,442 | ||
| Actual: | $491,789 | ||
CCSJ: 0261-03-050 | |||
| District: | Dallas | Let Date: | AUG 2004 |
| Highway: | US 67 | Let Status: | Approved |
| Project ID: | C 261-2-60 | CSJ: | 0261-02-060 |
| Description: | SURFACE TEXTURING | Handling Code: |
|
| Limits From: | WHEATLAND ROAD | Fund Cat: | 1 |
| Limits To: | COCKRELL HILL ROAD | Estimate: | $34,219 |
| Length: | 0.6 Miles | Actual: | |
| District: | Dallas | Let Date: | AUG 2004 |
| Highway: | US 67 | Let Status: | Approved |
| Project ID: | C 261-3-50 | CSJ: | 0261-03-050 |
| Description: | SURFACE TEXTURING | Handling Code: |
|
| Limits From: | IH 20 | Fund Cat: | 1 |
| Limits To: | WHEATLAND ROAD | Estimate: | $206,142 |
| Length: | 0.6 Miles | Actual: | |
| District: | Dallas | Let Date: | AUG 2004 |
| Highway: | IH 35E | Let Status: | Approved |
| Project ID: | C 442-2-137 | CSJ: | 0442-02-137 |
| Description: | SURFACE TEXTURING | Handling Code: |
|
| Limits From: | CLARENDON DRIVE | Fund Cat: | 1 |
| Limits To: | SOUTH END OF TRINITY RIVER BRIDGE | Estimate: | $141,472 |
| Length: | 2.1 Miles | Actual: | |
| District: | Dallas | Let Date: | AUG 2004 |
| Highway: | LP 12 | Let Status: | Approved |
| Project ID: | C 581-2-119 | CSJ: | 0581-02-119 |
| Description: | SURFACE TEXTURING | Handling Code: |
|
| Limits From: | IH 35E | Fund Cat: | 1 |
| Limits To: | NORTH END OF TRINITY RIVER BRIDGE | Estimate: | $837,851 |
| Length: | 11.4 Miles | Actual: | |
| District: | Dallas | Let Date: | AUG 2004 |
| Highway: | SP 408 | Let Status: | Approved |
| Project ID: | C 3000-1-16 | CSJ: | 3000-01-016 |
| Description: | SURFACE TEXTURING | Handling Code: |
|
| Limits From: | LOOP 12 | Fund Cat: | 1 |
| Limits To: | IH 20 | Estimate: | $274,959 |
| Length: | 4.3 Miles | Actual: | |
|
List Showing Order Bidders List Bid Tabulations Proposal Req Form Back... |
Totals for 0261-03-050 | ||
| Length: | 19.0 Miles | ||
| Estimate: | $1,494,643 | ||
| Actual: | |||
CCSJ: 0261-03-051 | |||
| District: | Dallas | Let Date: | AUG 2004 |
| Highway: | US 67 | Let Status: | Approved |
| Project ID: | CPM 261-3-51 | CSJ: | 0261-03-051 |
| Description: | FULL DEPTH PVMT REPAIR | Handling Code: |
|
| Limits From: | ON FRTG RDS FROM SOUTH OF LP 12 | Fund Cat: | 1 |
| Limits To: | IH 20 | Estimate: | $276,701 |
| Length: | 3.2 Miles | Actual: | |
|
List Showing Order Bidders List Bid Tabulations Proposal Req Form Back... |
Totals for 0261-03-051 | ||
| Length: | 3.2 Miles | ||
| Estimate: | $276,701 | ||
| Actual: | |||
CCSJ: 0281-03-042 | |||
| District: | Dallas | Let Date: | OCT 2003 |
| Highway: | SH 5 | Let Status: | Actual |
| Project ID: | STP 2003(687) | CSJ: | 0047-09-028 |
| Description: | TRAFFIC SIGNAL EQUIPMENT UPGRADE | Handling Code: |
|
| Limits From: | INTERSECTION OF FM 2786 | Fund Cat: | 1 |
| Limits To: | ' | Estimate: | $14,331 |
| Length: | 1.1 Miles | Actual: | $19,178 |
| District: | Dallas | Let Date: | OCT 2003 |
| Highway: | SH 78 | Let Status: | Actual |
| Project ID: | STP 2003(687) | CSJ: | 0281-02-055 |
| Description: | TRAFFIC SIGNAL EQUIPMENT UPGRADE | Handling Code: |
|
| Limits From: | INTERSECTION OF SH 205 | Fund Cat: | 1 |
| Limits To: | ' | Estimate: | $12,951 |
| Length: | 0.0 Miles | Actual: | $19,600 |
| District: | Dallas | Let Date: | OCT 2003 |
| Highway: | SH 78 | Let Status: | Actual |
| Project ID: | STP 2003(687) | CSJ: | 0281-03-042 |
| Description: | TRAFFIC SIGNAL EQUIPMENT | Handling Code: |
|
| Limits From: | INTERSECTIONS OF 5TH STREET | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $33,241 |
| Length: | 0.0 Miles | Actual: | $31,988 |
| District: | Dallas | Let Date: | OCT 2003 |
| Highway: | FM 544 | Let Status: | Actual |
| Project ID: | STP 2003(687) | CSJ: | 0619-03-049 |
| Description: | TRAFFIC SIGNAL EQUIPMENT UPGRADE | Handling Code: |
|
| Limits From: | INTERSECTION OF FM 1378 | Fund Cat: | 1 |
| Limits To: | ' | Estimate: | $12,479 |
| Length: | 0.0 Miles | Actual: | $18,946 |
| District: | Dallas | Let Date: | OCT 2003 |
| Highway: | FM 544 | Let Status: | Actual |
| Project ID: | STP 2003(687) | CSJ: | 0619-03-052 |
| Description: | TRAFFIC SIGNAL | Handling Code: |
|
| Limits From: | INTERSECTION OF FM 544 | Fund Cat: | 1 |
| Limits To: | AT WESTGATE WAY IN WYLIE | Estimate: | $108,893 |
| Length: | 0.0 Miles | Actual: | $103,443 |
| District: | Dallas | Let Date: | OCT 2003 |
| Highway: | FM 2551 | Let Status: | Actual |
| Project ID: | STP 2003(687) | CSJ: | 2056-01-039 |
| Description: | TRAFFIC SIGNAL EQUIPMENT UGRADE | Handling Code: |
|
| Limits From: | INTERSECTION OF FM 544 | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $20,944 |
| Length: | 0.0 Miles | Actual: | $25,271 |
|
Back... |
Totals for 0281-03-042 | ||
| Length: | 1.1 Miles | ||
| Estimate: | $202,839 | ||
| Actual: | $218,426 | ||
CCSJ: 0353-04-077 | |||
| District: | Dallas | Let Date: | MAR 2004 |
| Highway: | SP 348 | Let Status: | Actual |
| Project ID: | CM 99(37) | CSJ: | 0353-04-077 |
| Description: | INTERSECTION IMPROVEMENTS | Handling Code: |
|
| Limits From: | LUNA ROAD | Fund Cat: | 5 |
| Limits To: | 0.2 MI WEST OF HARRY HINES | Estimate: | $5,253,945 |
| Length: | 2.3 Miles | Actual: | $5,021,901 |
|
Back... |
Totals for 0353-04-077 | ||
| Length: | 2.3 Miles | ||
| Estimate: | $5,253,945 | ||
| Actual: | $5,021,901 | ||
CCSJ: 0353-04-081 | |||
| District: | Dallas | Let Date: | SEP 2003 |
| Highway: | SH 114 | Let Status: | Actual |
| Project ID: | NH 2003(641) | CSJ: | 0353-04-081 |
| Description: | GUIDE SIGN REFURBISHING | Handling Code: |
|
| Limits From: | TARRANT/DALLAS COUNTY LINE | Fund Cat: | 1 |
| Limits To: | SPUR 348 | Estimate: | $209,702 |
| Length: | 5.6 Miles | Actual: | $178,894 |
| District: | Dallas | Let Date: | SEP 2003 |
| Highway: | SH 114 | Let Status: | Actual |
| Project ID: | NH 2003(641) | CSJ: | 0353-06-047 |
| Description: | GUIDE SIGN REFURBISHING | Handling Code: |
|
| Limits From: | SPUR 348 | Fund Cat: | 1 |
| Limits To: | SH 183 | Estimate: | $187,886 |
| Length: | 4.7 Miles | Actual: | $153,190 |
|
Back... |
Totals for 0353-04-081 | ||
| Length: | 10.3 Miles | ||
| Estimate: | $397,588 | ||
| Actual: | $332,084 | ||
CCSJ: 0353-05-109 | |||
| District: | Dallas | Let Date: | JUN 2004 |
| Highway: | LP 12 | Let Status: | Actual |
| Project ID: | C 353-5-109 | CSJ: | 0353-05-109 |
| Description: | CONCRETE PAVEMENT REPAIR AND OVERLAY | Handling Code: |
|
| Limits From: | 0.1 MI W OF MIDWAY ROAD | Fund Cat: | 1 |
| Limits To: | BOEDECKER | Estimate: | $2,080,908 |
| Length: | 3.8 Miles | Actual: | $2,050,644 |
|
Bid Tabulations Back... |
Totals for 0353-05-109 | ||
| Length: | 3.8 Miles | ||
| Estimate: | $2,080,908 | ||
| Actual: | $2,050,644 | ||
CCSJ: 0353-06-044 | |||
| District: | Dallas | Let Date: | JUN 2004 |
| Highway: | SH 114 | Let Status: | Actual |
| Project ID: | C 353-6-44 | CSJ: | 0353-06-044 |
| Description: | INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES | Handling Code: |
XX |
| Limits From: | IN IRVING ON SH 114 N. FRONTAGE ROA | Fund Cat: | 11 |
| Limits To: | BNSF RAILROAD; DOT NO. 673418L | Estimate: | $160,000 |
| Length: | 0.0 Miles | Actual: | $160,000 |
|
Back... |
Totals for 0353-06-044 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $160,000 | ||
| Actual: | $160,000 | ||
CCSJ: 0353-06-045 | |||
| District: | Dallas | Let Date: | JUN 2004 |
| Highway: | SH 114 | Let Status: | Actual |
| Project ID: | C 353-6-45 | CSJ: | 0353-06-045 |
| Description: | INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES | Handling Code: |
XX |
| Limits From: | IN FARMERS BRANCH ON SH 114 S. FRON | Fund Cat: | 11 |
| Limits To: | ROAD AT BNSF RAILROAD; DOT NO. 6734 | Estimate: | $170,000 |
| Length: | 0.0 Miles | Actual: | $170,000 |
|
Back... |
Totals for 0353-06-045 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $170,000 | ||
| Actual: | $170,000 | ||
CCSJ: 0581-01-115 | |||
| District: | Dallas | Let Date: | NOV 2003 |
| Highway: | LP 12 | Let Status: | Actual |
| Project ID: | STP 2003(573)HES | CSJ: | 0581-01-115 |
| Description: | INCREASE TURNING RADIUS | Handling Code: |
|
| Limits From: | ON LOOP 12 AT CHENAULT | Fund Cat: | 8 |
| Limits To: | ' | Estimate: | $12,840 |
| Length: | 0.0 Miles | Actual: | $7,567 |
| District: | Dallas | Let Date: | NOV 2003 |
| Highway: | LP 12 | Let Status: | Actual |
| Project ID: | STP 2004(107) | CSJ: | 0581-01-124 |
| Description: | TRAFFIC SIGNAL UPGRADE | Handling Code: |
|
| Limits From: | ON LOOP 12 AT CHENAULT | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $81,429 |
| Length: | 0.0 Miles | Actual: | $67,267 |
| District: | Dallas | Let Date: | NOV 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2003(573)HES | CSJ: | 0918-45-437 |
| Description: | TRAFFIC SIGNAL UPGRADE | Handling Code: |
|
| Limits From: | INTERSECTION OF COCKRELL HILL RD. | Fund Cat: | 8 |
| Limits To: | WITH ILLINOIS AVE. | Estimate: | $57,573 |
| Length: | 0.0 Miles | Actual: | $45,961 |
| District: | Dallas | Let Date: | NOV 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2003(573)HES | CSJ: | 0918-45-439 |
| Description: | TRAFFIC SIGNAL UPGRADE | Handling Code: |
|
| Limits From: | INTERSECTION OF ROYAL LN. WITH | Fund Cat: | 8 |
| Limits To: | WEBB CHAPEL ROAD | Estimate: | $56,325 |
| Length: | 0.0 Miles | Actual: | $41,660 |
| District: | Dallas | Let Date: | NOV 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2003(573)HES | CSJ: | 0918-45-443 |
| Description: | TRAFFIC SIGNAL UPGRADE | Handling Code: |
|
| Limits From: | INTERSECTION WITH WESTMORLAND ROAD | Fund Cat: | 8 |
| Limits To: | AND CAMP WISDOM ROAD | Estimate: | $58,659 |
| Length: | 0.0 Miles | Actual: | $46,116 |
| District: | Dallas | Let Date: | NOV 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2003(573)HES | CSJ: | 0918-45-444 |
| Description: | TRAFFIC SIGNAL UPGRADE | Handling Code: |
|
| Limits From: | INTERSECTION OF FORT WORTH AVE. | Fund Cat: | 8 |
| Limits To: | WITH N WESTMORLAND ROAD | Estimate: | $61,377 |
| Length: | 0.0 Miles | Actual: | $49,397 |
| District: | Dallas | Let Date: | NOV 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2003(573)HES | CSJ: | 0918-45-491 |
| Description: | TRAFFIC SIGNAL INSTALLATION | Handling Code: |
|
| Limits From: | ON PEAVY ROAD AT FERGUSON ROAD | Fund Cat: | 8 |
| Limits To: | ' | Estimate: | $48,417 |
| Length: | 0.0 Miles | Actual: | $38,851 |
| District: | Dallas | Let Date: | NOV 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2003(573)HES | CSJ: | 0918-45-493 |
| Description: | ADD LEFT TURN SIGNAL PHASE | Handling Code: |
|
| Limits From: | ON MCCREE AT JUPITER RD. | Fund Cat: | 8 |
| Limits To: | ' | Estimate: | $24,920 |
| Length: | 0.0 Miles | Actual: | $17,841 |
|
Back... |
Totals for 0581-01-115 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $401,540 | ||
| Actual: | $314,660 | ||
CCSJ: 0918-00-067 | |||
| District: | Dallas | Let Date: | NOV 2003 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | STP 2004(29) | CSJ: | 0918-00-067 |
| Description: | UPGRADE GUARDRAIL END TREATMENTS | Handling Code: |
|
| Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $1,591,264 |
| Length: | 0.0 Miles | Actual: | $1,334,391 |
|
Back... |
Totals for 0918-00-067 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $1,591,264 | ||
| Actual: | $1,334,391 | ||
CCSJ: 0918-00-070 | |||
| District: | Dallas | Let Date: | DEC 2003 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | CPM 918-0-70 | CSJ: | 0918-00-070 |
| Description: | SEALCOAT | Handling Code: |
|
| Limits From: | DALLAS DISTRICTWIDE | Fund Cat: | 1 |
| Limits To: | NORTHERN SECTIONS | Estimate: | $1,587,685 |
| Length: | 89.3 Miles | Actual: | $1,552,609 |
|
Back... |
Totals for 0918-00-070 | ||
| Length: | 89.3 Miles | ||
| Estimate: | $1,587,685 | ||
| Actual: | $1,552,609 | ||
CCSJ: 0918-00-072 | |||
| District: | Dallas | Let Date: | JAN 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | CPM 918-0-72 | CSJ: | 0918-00-072 |
| Description: | SEALCOAT | Handling Code: |
|
| Limits From: | DALLAS DISTRICTWIDE | Fund Cat: | 1 |
| Limits To: | SOUTHERN SECTIONS | Estimate: | $3,958,498 |
| Length: | 174.1 Miles | Actual: | $3,899,957 |
|
Back... |
Totals for 0918-00-072 | ||
| Length: | 174.1 Miles | ||
| Estimate: | $3,958,498 | ||
| Actual: | $3,899,957 | ||
CCSJ: 0918-00-074 | |||
| District: | Dallas | Let Date: | NOV 2003 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | MG 2003(709) | CSJ: | 0918-00-074 |
| Description: | NON - SITE SPECIFIC TRAFFIC SIGNAL CONTRACT | Handling Code: |
|
| Limits From: | VARIOUS LOCATIONS IN THE DALLAS DIS | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $1,031,207 |
| Length: | 0.0 Miles | Actual: | $705,600 |
|
Back... |
Totals for 0918-00-074 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $1,031,207 | ||
| Actual: | $705,600 | ||
CCSJ: 0918-00-078 | |||
| District: | Dallas | Let Date: | AUG 2004 |
| Highway: | VA | Let Status: | Approved |
| Project ID: | C 918-00-78 | CSJ: | 0918-00-078 |
| Description: | NON - SITE SPECIFIC TRAFFIC SIGNAL CONTRACT | Handling Code: |
|
| Limits From: | VAR LOCATIONS IN DALLAS DISTRICT | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $1,030,538 |
| Length: | 0.0 Miles | Actual: | |
|
List Showing Order Bidders List Bid Tabulations Proposal Req Form Back... |
Totals for 0918-00-078 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $1,030,538 | ||
| Actual: | |||
CCSJ: 0918-00-085 | |||
| District: | Dallas | Let Date: | OCT 2003 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | C 918-0-85 | CSJ: | 0918-00-085 |
| Description: | RAILROAD CROSSING PAVEMENT MARKINGS AND SIGNING | Handling Code: |
|
| Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $102,182 |
| Length: | 0.0 Miles | Actual: | $114,870 |
|
Back... |
Totals for 0918-00-085 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $102,182 | ||
| Actual: | $114,870 | ||
CCSJ: 0918-45-292 | |||
| District: | Dallas | Let Date: | DEC 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 96(65) | CSJ: | 0918-45-292 |
| Description: | 2 INTERSECTION IMPROVEMENTS | Handling Code: |
LC |
| Limits From: | VARIOUS LOCATIONS ON N GARLAND AVE | Fund Cat: | 5 |
| Limits To: | IN GARLAND | Estimate: | $191,367 |
| Length: | 0.2 Miles | Actual: | $178,693 |
|
Back... |
Totals for 0918-45-292 | ||
| Length: | 0.2 Miles | ||
| Estimate: | $191,367 | ||
| Actual: | $178,693 | ||
CCSJ: 0918-45-321 | |||
| District: | Dallas | Let Date: | DEC 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 96(907) | CSJ: | 0918-45-321 |
| Description: | INTERSECTION IMPROVEMENTS | Handling Code: |
|
| Limits From: | MACARTHUR AT BELT LINE RD | Fund Cat: | 5 |
| Limits To: | IN CITY OF COPPELL | Estimate: | $424,782 |
| Length: | 0.1 Miles | Actual: | $115,829 |
|
Back... |
Totals for 0918-45-321 | ||
| Length: | 0.1 Miles | ||
| Estimate: | $424,782 | ||
| Actual: | $115,829 | ||
CCSJ: 0918-45-441 | |||
| District: | Dallas | Let Date: | AUG 2004 |
| Highway: | CS | Let Status: | Approved |
| Project ID: | STP 2004(615)HES | CSJ: | 0918-45-441 |
| Description: | TRAFFIC SIGNAL INSTALLATION | Handling Code: |
|
| Limits From: | INTERSECTION WITH LAKE JUNE ROAD | Fund Cat: | 8 |
| Limits To: | WITH WAL-MART ENTRANCE | Estimate: | $95,892 |
| Length: | 0.0 Miles | Actual: | |
|
List Showing Order Bidders List Bid Tabulations Proposal Req Form Back... |
Totals for 0918-45-441 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $95,892 | ||
| Actual: | |||
CCSJ: 0918-45-460 | |||
| District: | Dallas | Let Date: | OCT 2003 |
| Highway: | CR | Let Status: | Actual |
| Project ID: | BR 2000(453) | CSJ: | 0918-45-460 |
| Description: | REPLACE BR & APPRS | Handling Code: |
|
| Limits From: | SACHSE RD AT LONG BRANCH | Fund Cat: | 6 |
| Limits To: | . | Estimate: | $279,429 |
| Length: | 0.1 Miles | Actual: | $286,746 |
|
Back... |
Totals for 0918-45-460 | ||
| Length: | 0.1 Miles | ||
| Estimate: | $279,429 | ||
| Actual: | $286,746 | ||
CCSJ: 0918-45-472 | |||
| District: | Dallas | Let Date: | DEC 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2004(101)MM | CSJ: | 0918-45-472 |
| Description: | WIDEN 2 LANE FACILITY TO 4 LANE FACILITY | Handling Code: |
|
| Limits From: | VALLEY VIEW LANE | Fund Cat: | 7 |
| Limits To: | SH 183 | Estimate: | $4,348,914 |
| Length: | 0.5 Miles | Actual: | $3,328,442 |
|
Back... |
Totals for 0918-45-472 | ||
| Length: | 0.5 Miles | ||
| Estimate: | $4,348,914 | ||
| Actual: | $3,328,442 | ||
CCSJ: 0918-45-495 | |||
| District: | Dallas | Let Date: | NOV 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2004(30) | CSJ: | 0918-45-495 |
| Description: | REHABILITATE CITY STREET | Handling Code: |
|
| Limits From: | ON WESTMORELAND (N) FROM REMOND | Fund Cat: | 10 |
| Limits To: | SINGLETON BLVD. | Estimate: | $7,135,795 |
| Length: | 1.0 Miles | Actual: | $5,933,000 |
|
Back... |
Totals for 0918-45-495 | ||
| Length: | 1.0 Miles | ||
| Estimate: | $7,135,795 | ||
| Actual: | $5,933,000 | ||
CCSJ: 0918-45-497 | |||
| District: | Dallas | Let Date: | OCT 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CUS 918-45-497 | CSJ: | 0918-45-497 |
| Description: | RESTORE CITY STREET | Handling Code: |
XX |
| Limits From: | ON COCKRELL HILL RD. FROM JEFFERSON | Fund Cat: | 10 |
| Limits To: | SOUTH CITY LIMITS OF COCKRELL HILL | Estimate: | $100,732 |
| Length: | 0.4 Miles | Actual: | $100,731 |
|
Back... |
Totals for 0918-45-497 | ||
| Length: | 0.4 Miles | ||
| Estimate: | $100,732 | ||
| Actual: | $100,731 | ||
CCSJ: 0918-45-526 | |||
| District: | Dallas | Let Date: | JAN 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | STP 2000(550)TE | CSJ: | 0918-45-526 |
| Description: | CONSTRUCT 12' WIDE NORTHERN & 16' WIDE SOUTHERN EXTENSIONS | Handling Code: |
LN |
| Limits From: | LYTE ST | Fund Cat: | 9 |
| Limits To: | AIRLINE ROAD | Estimate: | $2,977,778 |
| Length: | 2.8 Miles | Actual: | $1,672,613 |
|
Back... |
Totals for 0918-45-526 | ||
| Length: | 2.8 Miles | ||
| Estimate: | $2,977,778 | ||
| Actual: | $1,672,613 | ||
CCSJ: 0918-45-577 | |||
| District: | Dallas | Let Date: | DEC 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | STP 2001(674)MM | CSJ: | 0918-45-577 |
| Description: | RIGHT OF WAY ACQUISITION, RELOCATION ASSISTANCE AND UTILITY | Handling Code: |
XX |
| Limits From: | ON MONTFORT DRIVE, PETERSON LANE | Fund Cat: | 7 |
| Limits To: | ALPHA ROAD | Estimate: | |
| Length: | 0.0 Miles | Actual: | $900,000 |
|
Back... |
Totals for 0918-45-577 | ||
| Length: | 0.0 Miles | ||
| Estimate: | |||
| Actual: | $900,000 | ||
CCSJ: 0918-45-619 | |||
| District: | Dallas | Let Date: | AUG 2004 |
| Highway: | CS | Let Status: | Approved |
| Project ID: | CM 2004(616) | CSJ: | 0918-45-619 |
| Description: | 1 OFF SYSTEM INTERSECTION IMPROVEMENT | Handling Code: |
NC |
| Limits From: | SW 3RD STREET AT FREETOWN ROAD | Fund Cat: | 5 |
| Limits To: | . | Estimate: | $515,988 |
| Length: | 0.1 Miles | Actual: | |
|
List Showing Order Bidders List Bid Tabulations Proposal Req Form Back... |
Totals for 0918-45-619 | ||
| Length: | 0.1 Miles | ||
| Estimate: | $515,988 | ||
| Actual: | |||
CCSJ: 0918-45-623 | |||
| District: | Dallas | Let Date: | MAR 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 2002(456) | CSJ: | 0918-45-623 |
| Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
| Limits From: | JUPITER ROAD AT BUCKINGHAM RD | Fund Cat: | 5 |
| Limits To: | . | Estimate: | |
| Length: | 0.0 Miles | Actual: | $546,478 |
|
Back... |
Totals for 0918-45-623 | ||
| Length: | 0.0 Miles | ||
| Estimate: | |||
| Actual: | $546,478 | ||
CCSJ: 0918-45-625 | |||
| District: | Dallas | Let Date: | MAR 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 2002(493) | CSJ: | 0918-45-625 |
| Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
| Limits From: | JUPITER ROAD AT ARAPAHO ROAD | Fund Cat: | 5 |
| Limits To: | . | Estimate: | |
| Length: | 0.0 Miles | Actual: | $301,453 |
|
Back... |
Totals for 0918-45-625 | ||
| Length: | 0.0 Miles | ||
| Estimate: | |||
| Actual: | $301,453 | ||
CCSJ: 0918-45-626 | |||
| District: | Dallas | Let Date: | MAR 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 2002(494) | CSJ: | 0918-45-626 |
| Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
| Limits From: | JUPITER ROAD AT BELT LINE ROAD | Fund Cat: | 5 |
| Limits To: | . | Estimate: | |
| Length: | 0.0 Miles | Actual: | $143,128 |
|
Back... |
Totals for 0918-45-626 | ||
| Length: | 0.0 Miles | ||
| Estimate: | |||
| Actual: | $143,128 | ||
CCSJ: 0918-45-629 | |||
| District: | Dallas | Let Date: | DEC 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 2002(541) | CSJ: | 0918-45-629 |
| Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
| Limits From: | MONTFORD | Fund Cat: | 5 |
| Limits To: | AT SPRING VALLEY | Estimate: | |
| Length: | 0.0 Miles | Actual: | $344,908 |
|
Back... |
Totals for 0918-45-629 | ||
| Length: | 0.0 Miles | ||
| Estimate: | |||
| Actual: | $344,908 | ||
CCSJ: 0918-45-630 | |||
| District: | Dallas | Let Date: | DEC 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 2002(542) | CSJ: | 0918-45-630 |
| Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
| Limits From: | NOEL ROAD | Fund Cat: | 5 |
| Limits To: | AT SPRING VALLEY | Estimate: | |
| Length: | 0.0 Miles | Actual: | $256,849 |
|
Back... |
Totals for 0918-45-630 | ||
| Length: | 0.0 Miles | ||
| Estimate: | |||
| Actual: | $256,849 | ||
CCSJ: 0918-45-633 | |||
| District: | Dallas | Let Date: | MAY 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 2002(676) | CSJ: | 0918-45-633 |
| Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
| Limits From: | SPRING VALLEY ROAD AT HILL CREST RO | Fund Cat: | 5 |
| Limits To: | . | Estimate: | |
| Length: | 0.0 Miles | Actual: | $19,887 |
|
Back... |
Totals for 0918-45-633 | ||
| Length: | 0.0 Miles | ||
| Estimate: | |||
| Actual: | $19,887 | ||
CCSJ: 0918-45-672 | |||
| District: | Dallas | Let Date: | FEB 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | HP 1022(1) | CSJ: | 0918-45-672 |
| Description: | REPAIR AND REHABILITATION OF THE BRIDGE SECTION BETWEEN | Handling Code: |
NC |
| Limits From: | HOUSTON ST VIADUCT FROM HOTEL ST | Fund Cat: | 2 |
| Limits To: | MARSALIS AVE | Estimate: | $8,201,208 |
| Length: | 0.8 Miles | Actual: | $6,419,279 |
|
Back... |
Totals for 0918-45-672 | ||
| Length: | 0.8 Miles | ||
| Estimate: | $8,201,208 | ||
| Actual: | $6,419,279 | ||
CCSJ: 0918-45-676 | |||
| District: | Dallas | Let Date: | AUG 2004 |
| Highway: | CS | Let Status: | Tentative |
| Project ID: | CM 2004(428) | CSJ: | 0918-45-676 |
| Description: | ACQUISITION AND UTILITIES | Handling Code: |
XX |
| Limits From: | GREENVILLE AVE. AT LOVERS LANE | Fund Cat: | 5 |
| Limits To: | . | Estimate: | |
| Length: | 0.0 Miles | Actual: | |
|
Back... |
Totals for 0918-45-676 | ||
| Length: | 0.0 Miles | ||
| Estimate: | |||
| Actual: | |||
CCSJ: 0918-45-679 | |||
| District: | Dallas | Let Date: | DEC 2003 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 2004(36) | CSJ: | 0918-45-679 |
| Description: | ACQUISITION, UTILITIES AND RELOCATION FOR 5 INTERSECTION | Handling Code: |
XX |
| Limits From: | DALLAS NORTH TOLLWAY AT FRANKFORD D | Fund Cat: | 5 |
| Limits To: | . | Estimate: | $1 |
| Length: | 0.0 Miles | Actual: | $142,643 |
|
Back... |
Totals for 0918-45-679 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $1 | ||
| Actual: | $142,643 | ||
CCSJ: 0918-45-684 | |||
| District: | Dallas | Let Date: | DEC 2003 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | STP 2004(63) | CSJ: | 0918-45-684 |
| Description: | REPLACING OLD SIGNS, DELINEATORS AND OBJECT MARKERS | Handling Code: |
|
| Limits From: | COUNTY WIDE | Fund Cat: | 1 |
| Limits To: | COUNTY WIDE | Estimate: | $708,460 |
| Length: | 0.0 Miles | Actual: | $344,030 |
|
Back... |
Totals for 0918-45-684 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $708,460 | ||
| Actual: | $344,030 | ||
CCSJ: 0918-45-685 | |||
| District: | Dallas | Let Date: | MAR 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 2004(262) | CSJ: | 0918-45-685 |
| Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
| Limits From: | ALPHA ROAD @ HILLCREST ROAD | Fund Cat: | 5 |
| Limits To: | . | Estimate: | |
| Length: | 0.0 Miles | Actual: | $17,735 |
|
Back... |
Totals for 0918-45-685 | ||
| Length: | 0.0 Miles | ||
| Estimate: | |||
| Actual: | $17,735 | ||
CCSJ: 0918-45-686 | |||
| District: | Dallas | Let Date: | MAR 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 2004(263) | CSJ: | 0918-45-686 |
| Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
| Limits From: | BELT LINE ROAD @ HILLCREST ROAD | Fund Cat: | 5 |
| Limits To: | . | Estimate: | |
| Length: | 0.0 Miles | Actual: | $35,616 |
|
Back... |
Totals for 0918-45-686 | ||
| Length: | 0.0 Miles | ||
| Estimate: | |||
| Actual: | $35,616 | ||
CCSJ: 0918-45-687 | |||
| District: | Dallas | Let Date: | MAR 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 2004(264) | CSJ: | 0918-45-687 |
| Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
| Limits From: | CAMPBELL ROAD @ MEANDERING ROAD | Fund Cat: | 5 |
| Limits To: | . | Estimate: | |
| Length: | 0.0 Miles | Actual: | $23,646 |
|
Back... |
Totals for 0918-45-687 | ||
| Length: | 0.0 Miles | ||
| Estimate: | |||
| Actual: | $23,646 | ||
CCSJ: 0918-45-688 | |||
| District: | Dallas | Let Date: | MAR 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 2004(265) | CSJ: | 0918-45-688 |
| Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
| Limits From: | CAMPBELL ROAD AT HILLCREST ROAD | Fund Cat: | 5 |
| Limits To: | . | Estimate: | |
| Length: | 0.0 Miles | Actual: | $32,949 |
|
Back... |
Totals for 0918-45-688 | ||
| Length: | 0.0 Miles | ||
| Estimate: | |||
| Actual: | $32,949 | ||
CCSJ: 0918-45-696 | |||
| District: | Dallas | Let Date: | SEP 2003 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | CM 2003(708) | CSJ: | 0918-45-696 |
| Description: | PURCHASE OF 1 - TRAIN SET FOR RDC FLEET (2 - REFURBISHED | Handling Code: |
TR |
| Limits From: | DART/FWTA | Fund Cat: | 5 |
| Limits To: | . | Estimate: | $12,450,000 |
| Length: | 0.0 Miles | Actual: | $12,450,000 |
|
Back... |
Totals for 0918-45-696 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $12,450,000 | ||
| Actual: | $12,450,000 | ||
CCSJ: 0918-45-697 | |||
| District: | Dallas | Let Date: | JUN 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | STP 2004(278)MM | CSJ: | 0918-45-697 |
| Description: | CBD SIGNAGE AND WAYFINDING | Handling Code: |
LC |
| Limits From: | DALLAS - VARIOUS LOCATIONS | Fund Cat: | 7 |
| Limits To: | . | Estimate: | $972,740 |
| Length: | 0.0 Miles | Actual: | $526,851 |
| District: | Dallas | Let Date: | JUN 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | STP 2004(319)MM | CSJ: | 0918-45-712 |
| Description: | CBD SIGNAGE & WAYFINDING | Handling Code: |
LC |
| Limits From: | DALLAS - VARIOUS LOCATIONS | Fund Cat: | 7 |
| Limits To: | . | Estimate: | $27,035 |
| Length: | 0.0 Miles | Actual: | $27,035 |
|
Back... |
Totals for 0918-45-697 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $999,775 | ||
| Actual: | $553,886 | ||
CCSJ: 1047-03-058 | |||
| District: | Dallas | Let Date: | OCT 2003 |
| Highway: | FM 1382 | Let Status: | Actual |
| Project ID: | BR 2003(668) | CSJ: | 1047-03-058 |
| Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
| Limits From: | AT DRAW | Fund Cat: | 6 |
| Limits To: | . | Estimate: | $2,748,741 |
| Length: | 0.2 Miles | Actual: | $2,829,374 |
|
Back... |
Totals for 1047-03-058 | ||
| Length: | 0.2 Miles | ||
| Estimate: | $2,748,741 | ||
| Actual: | $2,829,374 | ||
CCSJ: 1047-03-059 | |||
| District: | Dallas | Let Date: | JUN 2004 |
| Highway: | FM 1382 | Let Status: | Actual |
| Project ID: | CPM 1047-3-59 | CSJ: | 1047-03-059 |
| Description: | REHABILITATION OF EXISTING ROADWAY | Handling Code: |
|
| Limits From: | SOUTH OF JEFFERSON | Fund Cat: | 1 |
| Limits To: | SP 303 | Estimate: | $601,486 |
| Length: | 2.5 Miles | Actual: | $715,498 |
|
Bid Tabulations Back... |
Totals for 1047-03-059 | ||
| Length: | 2.5 Miles | ||
| Estimate: | $601,486 | ||
| Actual: | $715,498 | ||
CCSJ: 1068-04-134 | |||
| District: | Dallas | Let Date: | MAR 2004 |
| Highway: | IH 30 | Let Status: | Actual |
| Project ID: | C 1068-4-134 | CSJ: | 1068-04-134 |
| Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
| Limits From: | 0.1 MI WEST OF BELTLINE RD | Fund Cat: | 10 |
| Limits To: | MOUNTAIN CREEK | Estimate: | $353,818 |
| Length: | 4.0 Miles | Actual: | $339,736 |
|
Back... |
Totals for 1068-04-134 | ||
| Length: | 4.0 Miles | ||
| Estimate: | $353,818 | ||
| Actual: | $339,736 | ||
CCSJ: 2374-04-055 | |||
| District: | Dallas | Let Date: | SEP 2003 |
| Highway: | IH 20 | Let Status: | Actual |
| Project ID: | IM 35E-6(382) | CSJ: | 2374-03-058 |
| Description: | REPLACE MEDIAN WITH CTB, MILL AND REPLACE SHOULDER | Handling Code: |
|
| Limits From: | 0.5 MILES WEST OF IH 35E | Fund Cat: | 1 |
| Limits To: | IH 35E | Estimate: | $249,726 |
| Length: | 0.4 Miles | Actual: | $184,507 |
| District: | Dallas | Let Date: | SEP 2003 |
| Highway: | IH 20 | Let Status: | Actual |
| Project ID: | IM 35E-6(382) | CSJ: | 2374-04-055 |
| Description: | REPLACE MEDIAN WITH CTB, SIGNING AND ILLUMINATION, | Handling Code: |
|
| Limits From: | MOUNTAIN CREEK PARKWAY | Fund Cat: | 1 |
| Limits To: | 0.5 MILES WEST OF IH 35E | Estimate: | $4,873,275 |
| Length: | 8.5 Miles | Actual: | $4,055,320 |
|
Back... |
Totals for 2374-04-055 | ||
| Length: | 8.9 Miles | ||
| Estimate: | $5,123,001 | ||
| Actual: | $4,239,827 | ||
CCSJ: 2374-07-043 | |||
| District: | Dallas | Let Date: | SEP 2003 |
| Highway: | IH 635 | Let Status: | Actual |
| Project ID: | IM 635-6(383) | CSJ: | 2374-07-043 |
| Description: | ADD SEQUENTIAL SIGNING | Handling Code: |
|
| Limits From: | TARRANT CO LINE | Fund Cat: | 1 |
| Limits To: | 0.500 MILES WEST OF MACARTHUR BLVD. | Estimate: | $277,734 |
| Length: | 4.5 Miles | Actual: | $234,463 |
|
Back... |
Totals for 2374-07-043 | ||
| Length: | 4.5 Miles | ||
| Estimate: | $277,734 | ||
| Actual: | $234,463 | ||
CCSJ: 2374-07-049 | |||
| District: | Dallas | Let Date: | FEB 2004 |
| Highway: | IH 635 | Let Status: | Actual |
| Project ID: | CC 2374-7-49 | CSJ: | 2374-07-049 |
| Description: | CONSTRUCT CONNECTOR | Handling Code: |
|
| Limits From: | VALLEY RANCH CONNECTOR | Fund Cat: | 10 |
| Limits To: | AT IH 635/VALLEY VIEW | Estimate: | $2,430,245 |
| Length: | 0.0 Miles | Actual: | $2,421,120 |
|
Back... |
Totals for 2374-07-049 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $2,430,245 | ||
| Actual: | $2,421,120 | ||
CCSJ: 2964-01-024 | |||
| District: | Dallas | Let Date: | JUL 2004 |
| Highway: | SH 161 | Let Status: | Actual |
| Project ID: | NH 2004(524) | CSJ: | 2964-01-024 |
| Description: | INTERCHANGE EXTENDS SOUTH TO CONFLANS RD. | Handling Code: |
|
| Limits From: | S OF SH 183 | Fund Cat: | 7 |
| Limits To: | N OF SH 183 | Estimate: | $53,883,615 |
| Length: | 1.6 Miles | Actual: | $44,921,148 |
|
Award Status Bid Tabulations Back... |
Totals for 2964-01-024 | ||
| Length: | 1.6 Miles | ||
| Estimate: | $53,883,615 | ||
| Actual: | $44,921,148 | ||
|
| |