Letting Schedule for Houston District (FY 2004)
| Letting Schedule for Houston District (FY 2004) | ||||
| Last Update: Tuesday, August 17, 2004 |
| Houston District (FY 2004) |
| Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller | ||||||
Brazoria County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
|---|---|---|---|---|---|---|
| 0111-08-113 | SH 288 | Actual | JUN 2004 | $253,737 | 1 | REHABILITATE LIGHTING CONDUIT, CONDUCTORS AND ELECTRICAL |
| 0178-02-075 | SH 35 | Actual | JUL 2004 | $485,802 | 10 | LANDSCAPE DEVELOPMENT |
| 0179-01-028 | SH 35 | Actual | JAN 2004 | $11,899,116 | 2 | WIDEN TO 4 - LANE DIVIDED, WIDEN BRIDGES & INSTALL NEW BRIDGES |
| 0179-02-063 | SH 35 | Actual | DEC 2003 | $9,983,678 | 2 | WIDEN TO 4 - LANE DIVIDED RURAL |
| 0179-02-068 | SH 35 | Actual | FEB 2004 | $33,614,339 | 2 | WIDEN TO 4 - LANE DIVIDED, WIDEN BRIDGES, REPLACE BRIDGES AND |
| 0179-03-024 | SH 35 | Actual | MAR 2004 | $19,702,202 | 2 | WIDEN TO 4 - LANE DIVIDED RURAL |
| 0192-03-016 | SH 6 | Actual | NOV 2003 | $1,666,209 | 1 | CLTL AND SHOULDER AND OVERLAY |
| 0598-02-019 | SH 288 | Actual | JUN 2004 | $25,548,569 | 1 | BUILD FOUR OVERPASS STRUCTURES |
| 0598-02-039 | SH 288 | Actual | MAY 2004 | $172,770 | 1 | SEAL COAT FRONTAGE ROADS |
| 0847-02-014 | FM 521 | Actual | NOV 2003 | $748,165 | 1 | SPOT REPAIR, ACP OVERLAY AND PAVEMENT MARKINGS |
| 0912-31-134 | CR | Actual | OCT 2003 | $559,054 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0912-31-146 | VA | Actual | JUN 2004 | $236,950 | 1 | SPALL REPAIR (NON - SITE SPECIFIC) |
| 0912-31-148 | VA | Actual | JUN 2004 | $299,920 | 1 | CRACK SEAL (NON - SITE SPECIFIC) |
| 1003-01-084 | FM 523 | Actual | JUL 2004 | $125,580 | 1 | BRIDGE STRUCTURAL REPAIR AND REPLACE BEARING PADS |
| 1004-01-042 | FM 521 | Actual | SEP 2003 | $2,430,157 | 1 | THE WIDENING OF A BRIDGE FACILITY |
| 1684-01-018 | FM 1128 | Actual | DEC 2003 | $2,199,099 | 8 | ACP OVERLAY AND WIDEN SHOULDERS AND ADD TURN LANES AT CR 91 |
Fort Bend County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0027-06-050 | US 90A | Actual | DEC 2003 | $1,818,598 | 1 | MILLING, ADDING SHOULDERS AND ACP OVERLAY |
| 0027-08-108 | US 90A | Approved | AUG 2004 | $36,089,258 | 6 | WIDEN TO 8 - LANE DIVIDED WITH IMPROVEMENTS AT DITCH "H" |
| 0027-12-062 | US 59 | Actual | JUN 2004 | 152,570,260 | 12 | CONSTRUCT 8 MAINLANES W / 2 - WAY HOV LANES, 2 - 3 LANE FRONTAGE |
| 0027-12-120 | US 59 | Actual | NOV 2003 | $428,784 | 10 | LANDSCAPE DEVELOPMENT |
| 0188-02-037 | SH 36 | Actual | MAY 2004 | $2,849,452 | 1 | ACP OVERLAY |
| 0188-09-030 | FM 723 | Actual | JUL 2004 | $9,952,353 | 1 | REPLACE BRIDGE AND APPROACHES |
| 0192-01-080 | SH 6 | Actual | JUN 2004 | $1,143,218 | 5 | INSTALL ARTERIAL TRAFFIC MANAGEMENT SYSTEM |
| 0192-01-082 | SH 6 | Actual | NOV 2003 | $7,185,122 | 2 | CONSTRUCT GRADE SEPARATION |
| 0543-03-057 | FM 762 | Actual | JAN 2004 | $1,541,919 | 1 | BASE REPAIR, PLANING, ACP OVERLAY AND |
| 0838-02-017 | FM 442 | Actual | JUN 2004 | $1,313,167 | 1 | ADD SHOULDER AND OVERLAY |
| 0912-34-101 | CS | Actual | JUN 2004 | $285,166 | 5 | SYNCHRONIZATION AND INTERCONNECTION OF TRAFFIC SIGNALS |
| 0912-34-118 | VA | Actual | MAY 2004 | $3,271,573 | 1 | CONCRETE SPALL REPAIR |
| 1414-05-011 | FM 1462 | Actual | FEB 2004 | $1,022,573 | 1 | PAVEMENT REHABILITATION, ACP OVERLAY AND PAVEMENT MARKINGS |
| 1415-03-007 | FM 2759 | Actual | JUN 2004 | $2,258,928 | 1 | BASE REPAIR, WIDEN SUBGRADE, TRAFFIC SIGNALS, ACP OVERLAY |
| 1683-01-031 | FM 1640 | Actual | DEC 2003 | $2,624,633 | 1 | BASE REPAIR, PLANING, ACP OVERLAY AND PAVEMENT MARKINGS |
| 1685-06-027 | SH 6 | Actual | JAN 2004 | $4,624,328 | 1 | BASE REPAIR, PLANING, THIN BONDED FRICTION COURSE AND |
| 2093-01-018 | FM 2218 | Actual | SEP 2003 | $544,214 | 1 | BASE REPAIR, WIDEN, ACP, LEFT TURN LANE, PVMT MRKS |
| 2105-01-037 | FM 2234 | Actual | OCT 2003 | $1,478,836 | 7 | WIDEN INTERSECTION TO 7 LANES AND CONSTRUCT TRANSITION |
Galveston County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0051-03-094 | SH 3 | Actual | MAR 2004 | 8 | INSTALL TRAFFIC SIGNAL | |
| 0051-09-022 | FM 3005 | Actual | MAR 2004 | $43,339 | 10 | REMOVE AND DISPOSE OF DEBRIS ON ROADWAY AND SHOULDERS |
| 0367-02-070 | SH 124 | Actual | NOV 2003 | $914,359 | 1 | WIDEN SHOULDERS, BASE REPAIR, SEAL COAT AND EXTEND EXISTING |
| 0367-06-054 | SH 87 | Actual | JUN 2004 | $29,839,589 | 1 | CONSTRUCT THIRD FERRY LANDING |
| 0389-06-087 | SH 146 | Approved | AUG 2004 | $6,500,391 | 1 | GRADE SEPARATION |
| 0389-11-055 | LP 197 | Actual | DEC 2003 | $233,942 | 1 | FULL DEPTH REPAIR AND ACP OVERLAY |
| 0500-01-127 | IH 45 | Actual | NOV 2003 | $153,394 | 1 | REPLACE ILLUMINATION POLES |
| 0500-04-110 | IH 45 | Actual | SEP 2003 | $951,688 | 1 | FULL DEPTH CONCRETE REPAIR, CLEAN AND SEAL JOINTS AND FILL |
| 0628-01-020 | FM 519 | Actual | SEP 2003 | $534,221 | 1 | BASE REPAIR AND ACP OVERLAY |
| 0686-02-021 | FM 1765 | Actual | JAN 2004 | $1,099,331 | 1 | BASE REPAIR, MILLING, ACP SURFACE REHABILITATION AND |
| 0912-73-098 | CR | Actual | OCT 2003 | $427,572 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0912-73-103 | VA | Actual | JUL 2004 | $337,500 | 5 | NEW SERVICE ROUTES TO SUPPORT CRUISE SHIP ACTIVITY |
| 0912-73-110 | VA | Actual | MAR 2004 | $86,201 | 10 | REMOVE AND DISPOSE OF DEBRIS ON ROADWAY AND SHOULDERS |
| 0976-03-090 | FM 518 | Actual | SEP 2003 | $111,045 | 1 | LEFT TURN CHANNELIZATION AND TRAFFIC SIGNAL |
| 0978-02-052 | FM 517 | Actual | SEP 2003 | $438,127 | 1 | CURVE / SHOULDER RUMBLE STRIP, CRACK SEAL, WIDEN SHOULDER ON |
| 0978-02-057 | FM 517 | Actual | MAR 2004 | $6,072,564 | 1 | WIDEN FROM TWO LANES TO 4 - LANE DIVIDED, CURB & GUTTER |
| 0979-01-023 | FM 519 | Actual | FEB 2004 | $309,932 | 1 | INSTALL PIPE IN DITCHES (IN SECTIONS) |
| 1607-01-046 | FM 1764 | Actual | DEC 2003 | $141,496 | 8 | REHABILITATE SERVICES AND LUMINAIRES |
Harris County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0027-10-063 | US 90A | Actual | JUL 2004 | $3,770,586 | 1 | REHAB EXISTING ROAD AND DRAINAGE SYSTEM |
| 0027-13-184 | US 59 | Actual | JAN 2004 | $44,200 | 10 | LANDSCAPE DEVELOPMENT FOR MATERIAL PURCHASE ONLY |
| 0028-01-078 | US 90 | Actual | DEC 2003 | $1,814,148 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0028-01-084 | BU 90-U | Actual | OCT 2003 | $237,660 | 10 | CLEAN AND REPLACE EMBANKMENT W / CEMENT STABILIZED SAND AND |
| 0028-01-091 | BU 90-U | Actual | NOV 2003 | $2,334,060 | 1 | TREAT FLEX BASE SHOULDERS AND ACP OVERLAY |
| 0028-02-077 | US 90 | Actual | NOV 2003 | $108,597 | 1 | RAISE APPROACH SLABS |
| 0028-02-078 | US 90 | Actual | JUL 2004 | $362,152 | 1 | REHABILITATE LIGHTING CONDUIT, CONDUCTORS AND ELECTRICAL |
| 0051-02-083 | SH 3 | Actual | NOV 2003 | $2,492,520 | 1 | ACP OVERLAY, MILLING, AND STRIPING |
| 0110-05-104 | IH 45 | Actual | SEP 2003 | $309,296 | 1 | INSTALL EPOXY PAVEMENT MARKINGS AND RAISED REFLECTIVE |
| 0111-01-084 | FM 521 | Actual | NOV 2003 | $592,932 | 1 | MICROSURFACING |
| 0177-11-131 | US 59 | Actual | NOV 2003 | $1,397,921 | 5 | INSTALL COMPUTERIZED TRAFFIC MANAGEMENT SYSTEM |
| 0177-11-141 | US 59 | Actual | MAY 2004 | $1,638,641 | 1 | REHABILITATE PUMP STATION |
| 0178-01-032 | SH 35 | Actual | NOV 2003 | $420,427 | 1 | FULL DEPTH CONCRETE REPAIR AND JOINT / CRACK SEAL |
| 0271-07-248 | IH 10 | Actual | JUL 2004 | 250,411,715 | ROW | RECONSTRUCT & WIDEN ATO 8 MAINLANES, 4 MANAGED LANES & TWO |
| 0271-07-258 | IH 10 | Actual | MAY 2004 | $413,000 | 11 | REPLACE, UPGRADE AND MAINTAIN COMPUTERS AT TRANSTAR |
| 0271-15-074 | IH 610 | Actual | NOV 2003 | $21,367,859 | 1 | CONCRETE OVERLAY OF MAINLANES AND RECONSTRUCT |
| 0271-16-118 | IH 610 | Actual | DEC 2003 | $331,447 | 11 | CONSTRUCT SOUND WALL |
| 0389-03-034 | SH 146 | Actual | OCT 2003 | $2,538,148 | 1 | SPALL REPAIR AND THIN BOND OVERLAY |
| 0389-05-091 | SH 146 | Actual | OCT 2003 | $258,868 | 1 | REHABILITATE EXISTING 2 LANES |
| 0500-03-517 | IH 45 | Actual | DEC 2003 | $286,941 | 1 | DRAINAGE IMPROVEMENTS |
| 0500-03-519 | IH 45 | Actual | OCT 2003 | $533,001 | 1 | PAVEMENT TEXTURING |
| 0500-03-520 | IH 45 | Actual | NOV 2003 | $138,951 | 1 | CONSTRUCT CONCRETE RIPRAP EXTENSION AT CHANNEL, CLEAN |
| 0500-03-521 | IH 45 | Actual | SEP 2003 | $321,451 | 1 | INSTALL PREFABRICATED PAVEMENT MARKINGS WITH WARRANTY AND |
| 0500-03-523 | IH 45 | Actual | JUN 2004 | $373,840 | 1 | FULL DEPTH REPAIR, MILL AND ACP OVERLAY (NASA 1) |
| 0500-03-524 | IH 45 | Actual | APR 2004 | $2,559,744 | 1 | MILLING, ASPHALT OVERLAY, RECONSTRUCT EXIT RAMPS, |
| 0500-03-525 | IH 45 | Actual | JUN 2004 | $1,435,957 | 1 | MILL, RCRI, ASPHALT OVERLAY AND RESTRIPE |
| 0502-01-184 | IH 610 | Actual | JUN 2004 | $19,369,036 | 1 | BONDED CONCRETE OVERLAY OF MAINLANES AND RECONSTRUCT |
| 0502-01-193 | SH 225 | Actual | JUL 2004 | $312,982 | 1 | REPLACE PAVEMENT MARKINGS WITH REFLECTORIZED MULTIPOLYMER |
| 0508-01-308 | IH 10 | Actual | DEC 2003 | $4,073,314 | 1 | CLEAN AND SEAL JOINTS AND PAVEMENT REPAIR |
| 0598-01-073 | SH 288 | Actual | APR 2004 | $708,082 | 1 | ACP OVERLAY |
| 0720-03-116 | SH 249 | Actual | JUL 2004 | $372,299 | 1 | REPLACE PAVEMENT MARKINGS WITH REFLECTORIZED MULTIPOLYMER |
| 0912-00-251 | VA | Actual | JUL 2004 | $120,000 | 5 | FY 2003 TELECOMMUTING PROGRAM |
| 0912-00-253 | VA | Actual | JUL 2004 | $812,500 | 5 | FY 2003 CLEAN AIR ACTION PUBLIC OUTREACH PROGRAM |
| 0912-00-254 | VA | Actual | JUL 2004 | $1,900,000 | 5 | FY 2003 REGIONAL COMMUTE ALTERNATIVE PROGRAM - MARKETING |
| 0912-00-256 | VA | Actual | JUL 2004 | $120,000 | 5 | FY 2004 TELECOMMUTING PROGRAM |
| 0912-00-257 | VA | Actual | JUL 2004 | $2,200,000 | 5 | FY 2004 CONTINUATION OF ALTERNATIVE FUEL PROGRAM |
| 0912-00-258 | VA | Actual | JUL 2004 | $812,500 | 5 | FY 2004 CLEAN AIR ACTION PUBLIC OUTREACH PROGRAM |
| 0912-00-259 | VA | Actual | JUL 2004 | $1,900,000 | 5 | FY 2004 REGIONAL COMMUTE ALTERNATIVES PROGRAM - MARKETING |
| 0912-00-261 | VA | Actual | SEP 2003 | $499,798 | 1 | REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
| 0912-00-266 | VA | Actual | MAR 2004 | $1,264,057 | 1 | INSTALL TRAFFIC SIGNALS (NON - SITE SPECIFIC) |
| 0912-00-267 | VA | Actual | JUL 2004 | $657,770 | 1 | TRAFFIC SIGNAL UPGRADE |
| 0912-00-269 | VA | Actual | FEB 2004 | $539,680 | 1 | REPLACE RAISED PAVEMENT MARKERS |
| 0912-00-271 | VA | Actual | MAR 2004 | $800,918 | 1 | REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
| 0912-00-272 | VA | Actual | MAR 2004 | $1,074,622 | 1 | RETRACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
| 0912-00-273 | VA | Actual | JUN 2004 | $1,318,326 | 1 | INSTALL TRAFFIC SIGNALS (NON - SITE SPECIFIC) |
| 0912-00-274 | VA | Actual | JUN 2004 | $100,000 | 1 | MRDC (MOBILE RETROREFLECTIVITY DATA COLLECTION) FOR PAVEMENT |
| 0912-71-532 | CS | Actual | JUN 2004 | $8,515,040 | 7 | CONSTRUCT GRADE SEPARATION CONSISTING OF 4 LANES |
| 0912-71-581 | VA | Actual | MAY 2004 | $30,000 | 1 | UPGRADE SATELLITE BUILDING SECURITY WITH TIE - IN TO DISTRICT |
| 0912-71-590 | VA | Actual | MAY 2004 | $108,000 | 1 | TIME PHASING ADAPTION FOR COMPUTERIZED TRAFFIC MANAGEMENT |
| 0912-71-640 | CS | Actual | MAY 2004 | $6,347,037 | 7 | RECONSTRUCT AND REHABILITATE 3 - LANE ROADWAY |
| 0912-71-654 | CS | Approved | AUG 2004 | $823,281 | 8 | INSTALL SIDEWALKS |
| 0912-71-703 | CS | Actual | APR 2004 | $799,269 | 9 | CITY CENTER PEDESTRIAN LANDSCAPE ENHANCEMENT |
| 0912-71-747 | VA | Actual | FEB 2004 | $1,638,395 | 10 | ITS DEPLOYMENT - DMS IN HARRIS, MONTGOMERY, FORT BEND, WALLER, |
| 0912-71-764 | VA | Actual | NOV 2003 | $3,955,376 | 1 | SHOULDER EDGE REPAIR AND LONGITUDINAL JOINT REPAIR, JOINT |
| 0912-71-767 | VA | Actual | APR 2004 | $2,493,257 | 5 | DIRECT CONNECTOR IMPROVEMENTS |
| 0912-71-770 | CS | Actual | JUL 2004 | $2,400,579 | 7 | RECONSTRUCT 2 - LANE ROAD |
| 0912-71-795 | CS | Actual | JAN 2004 | $149,214 | 9 | DATE PALMS AND OLEANDERS IN LA PORTE |
| 0912-71-796 | CS | Approved | AUG 2004 | $505,701 | 9 | NASA PARKWAY SCENIC BEAUTIFICATION IN NASSAU BAY |
| 0912-71-806 | CR | Actual | JAN 2004 | $1,094,990 | 9 | HARDY TOLL RD AIRPORT CONNECTOR ENHANCEMENT - HCTRA, NORTH |
| 0912-71-812 | CS | Actual | SEP 2003 | $1,222,584 | 5 | CONSTRUCT ADDITIONAL TURN LANES IN EACH DIRECTION AT THE |
| 0912-71-820 | VA | Actual | OCT 2003 | $838,953 | 1 | ARMOR JOINT REPAIR, APPROACH SLAB REPAIR, CONCRETE |
| 0912-71-832 | VA | Actual | SEP 2003 | $988,492 | 1 | REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
| 0912-71-833 | VA | Actual | SEP 2003 | $637,568 | 1 | RETRACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE |
| 0912-71-853 | VA | Actual | MAY 2004 | $786,063 | 1 | LARGE SIGN REPLACEMENTS |
| 0912-71-855 | VA | Actual | APR 2004 | $844,401 | 1 | UPGRADE GUARD FENCE |
| 0912-71-857 | VA | Approved | AUG 2004 | $974,965 | 1 | REPLACE PAVEMENT MARKINGS AND RAISED REFLECTIVE PAVEMENT |
| 0912-71-860 | VA | Actual | JUN 2004 | $8,800,000 | 1 | ATM CONVERSION FOR TRANSTAR |
| 0912-71-863 | VA | Actual | JUL 2004 | $209,736 | 5 | CITY OF HOUSTON RCTSS / CMAQ PROGRAM PHASE 1 |
| 0912-71-865 | VA | Actual | JUL 2004 | $178,258 | 1 | INSTALL HIGH MAST LIGHT AND REFURBISH EXISTING HIGH MAST |
| 0912-71-878 | VA | Actual | JUN 2004 | $9,383,758 | 5 | FY 2004 NEW BUS SERVICE FOR METRO |
| 0976-01-031 | FM 865 | Actual | DEC 2003 | $316,762 | 1 | FULL DEPTH ACP REPAIR AND JOINT / CRACK SEAL |
| 0981-01-086 | NASA 1 | Actual | APR 2004 | $41,309,927 | 2 | CONSTRUCT 4 - LANE DIVIDED, ACCESS CONTROLLED FACILITY, WITH |
| 0981-01-094 | NASA 1 | Actual | MAY 2004 | $515,946 | 1 | ADD RIGHT - TURN LANE |
| 1006-01-052 | FM 529 | Actual | OCT 2003 | $6,553,815 | 5 | WIDEN TO 4 LANES WITH CTWLTL AND REPLACE BRIDGE |
| 1006-01-055 | FM 529 | Actual | JAN 2004 | $1,720,590 | 1 | BASE REPAIR, SUBGRADE WIDENING, PLANING, ONE COURSE SURFACE |
| 1062-02-020 | FM 2100 | Actual | SEP 2003 | $232,470 | 1 | LEFT TURN CHANNELIZATION AND TRAFFIC SIGNAL |
| 1258-04-053 | FM 1093 | Actual | MAR 2004 | $1,937,408 | 5 | WESTHEIMER CORRIDOR IMPROVEMENTS - PHASE 1 |
| 1685-03-083 | FM 1960 | Actual | MAY 2004 | $1,265,570 | 1 | BASE REPAIR, ULTRA THIN BONDED OVERLAY AND PAVEMENT MARKINGS |
| 1685-05-084 | SH 6 | Actual | NOV 2003 | $251,744 | 8 | IMPROVE TRAFFIC SIGNALS |
| 1743-01-008 | FM 1876 | Actual | JUL 2004 | $285,585 | 8 | ADD SAFETY LIGHTING |
| 3050-03-011 | FM 2978 | Actual | MAR 2004 | $337,546 | 1 | ADD TURN LANES |
| 3256-01-084 | BW 8 | Actual | OCT 2003 | $353,679 | 10 | RESHAPE AND STABILIZE EROSION |
| 3510-05-009 | SH 99 | Actual | APR 2004 | $17,284,961 | 7 | CONSTRUCT GRADE SEPARATION |
| 8170-12-005 | MH | Actual | OCT 2003 | $83,923 | 11 | CONSTRUCT TWO CONCRETE PEDESTRIAN SHELTER FOUNDATIONS WITH |
Montgomery County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0110-04-164 | IH 45 | Actual | JUN 2004 | $28,723,503 | 2 | WIDEN TO 8 MAIN LANES WITH FRONTAGE ROADS, TMS AND PROVISION |
| 0912-37-120 | CR | Actual | JUL 2004 | $3,269,833 | 11 | WIDEN TO 6 LANE DIVIDED |
| 0912-37-127 | VA | Actual | JAN 2004 | $904,781 | 1 | CROSS CULVERT REPLACEMENTS |
| 0912-37-145 | VA | Actual | SEP 2003 | $1,250,000 | 5 | PURCHASE 4 SMALL ALT FUELED VEHICLES |
| 0912-37-159 | VA | Actual | SEP 2003 | $550,000 | 5 | PREMIMINARY ENGINEERING FOR THE CORRIDOR EXTENSION FROM |
| 0912-37-160 | CS | Actual | SEP 2003 | $2,350,000 | 5 | PEDESTRIAN BRIDGES AT LAKE ROBBINS AND WOODSTEAD |
| 1062-01-025 | FM 1485 | Actual | SEP 2003 | $690,614 | 1 | BASE REPAIR, OCST AND ACP OVERLAY |
| 1259-02-014 | FM 1097 | Actual | MAY 2004 | $1,630,689 | 1 | REPLACE BRIDGE |
| 1416-03-012 | FM 1486 | Actual | JUN 2004 | $2,885,466 | 6 | BRIDGE REPLACEMENT |
| 1912-01-017 | FM 2090 | Actual | MAR 2004 | $483,122 | 1 | WIDEN FOR LEFT AND RIGHT TURN LANES AND HOT MIX OVERLAY |
| 1986-01-015 | FM 1314 | Approved | AUG 2004 | $8,943,668 | 1 | WIDEN FROM 2 LANES TO 4 - LANE DIVIDED |
| 2897-01-011 | FM 830 | Actual | DEC 2003 | $2,635,583 | 1 | WIDEN SUBGRADE, O.C.S.T.AND ACP OVERLAY |
Waller County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0050-05-064 | BU 290H | Actual | APR 2004 | $1,331,737 | 1 | PLANING, SEAL COAT, ACP OVERLAY, PAVEMENT MARKINGS, AND |
| 0271-09-017 | US 90 | Actual | DEC 2003 | $388,932 | 1 | PLANING, BASE REPAIR, ONE COURSE SURFACE TREATMENT, POROUS |
| 0523-01-024 | FM 1098 | Actual | DEC 2003 | $210,751 | 1 | BASE REPAIR AND ACP OVERLAY AND / OR CRACKSEAL |
| 1418-01-008 | FM 1489 | Actual | JAN 2004 | $771,957 | 1 | BASE REPAIR, PLANING, ACP REHABILITATION, OVERLAY AND |
| 2898-01-009 | FM 2855 | Actual | MAY 2004 | $698,222 | 1 | BASE REPAIR, PLANING, THIN BONDED PERMEABLE FRICTION COURSE |
|
| |