0111-08-113 SH 288 Actual JUN 2004 $253,737 1 REHABILITATE LIGHTING CONDUIT, CONDUCTORS AND ELECTRICAL
0178-02-075 SH 35 Actual JUL 2004 $485,802 10 LANDSCAPE DEVELOPMENT
0179-01-028 SH 35 Actual JAN 2004 $11,899,116 2 WIDEN TO 4 - LANE DIVIDED, WIDEN BRIDGES & INSTALL NEW BRIDGES
0179-02-063 SH 35 Actual DEC 2003 $9,983,678 2 WIDEN TO 4 - LANE DIVIDED RURAL
0179-02-068 SH 35 Actual FEB 2004 $33,614,339 2 WIDEN TO 4 - LANE DIVIDED, WIDEN BRIDGES, REPLACE BRIDGES AND
0179-03-024 SH 35 Actual MAR 2004 $19,702,202 2 WIDEN TO 4 - LANE DIVIDED RURAL
0192-03-016 SH 6 Actual NOV 2003 $1,666,209 1 CLTL AND SHOULDER AND OVERLAY
0598-02-019 SH 288 Actual JUN 2004 $25,548,569 1 BUILD FOUR OVERPASS STRUCTURES
0598-02-039 SH 288 Actual MAY 2004 $172,770 1 SEAL COAT FRONTAGE ROADS
0847-02-014 FM 521 Actual NOV 2003 $748,165 1 SPOT REPAIR, ACP OVERLAY AND PAVEMENT MARKINGS
0912-31-134 CR Actual OCT 2003 $559,054 6 REPLACE BRIDGE AND APPROACHES
0912-31-146 VA Actual JUN 2004 $236,950 1 SPALL REPAIR (NON - SITE SPECIFIC)
0912-31-148 VA Actual JUN 2004 $299,920 1 CRACK SEAL (NON - SITE SPECIFIC)
1003-01-084 FM 523 Actual JUL 2004 $125,580 1 BRIDGE STRUCTURAL REPAIR AND REPLACE BEARING PADS
1004-01-042 FM 521 Actual SEP 2003 $2,430,157 1 THE WIDENING OF A BRIDGE FACILITY
1684-01-018 FM 1128 Actual DEC 2003 $2,199,099 8 ACP OVERLAY AND WIDEN SHOULDERS AND ADD TURN LANES AT CR 91

Fort Bend County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0027-06-050 US 90A Actual DEC 2003 $1,818,598 1 MILLING, ADDING SHOULDERS AND ACP OVERLAY
0027-08-108 US 90A Approved AUG 2004 $36,089,258 6 WIDEN TO 8 - LANE DIVIDED WITH IMPROVEMENTS AT DITCH "H"
0027-12-062 US 59 Actual JUN 2004 152,570,260 12 CONSTRUCT 8 MAINLANES W / 2 - WAY HOV LANES, 2 - 3 LANE FRONTAGE
0027-12-120 US 59 Actual NOV 2003 $428,784 10 LANDSCAPE DEVELOPMENT
0188-02-037 SH 36 Actual MAY 2004 $2,849,452 1 ACP OVERLAY
0188-09-030 FM 723 Actual JUL 2004 $9,952,353 1 REPLACE BRIDGE AND APPROACHES
0192-01-080 SH 6 Actual JUN 2004 $1,143,218 5 INSTALL ARTERIAL TRAFFIC MANAGEMENT SYSTEM
0192-01-082 SH 6 Actual NOV 2003 $7,185,122 2 CONSTRUCT GRADE SEPARATION
0543-03-057 FM 762 Actual JAN 2004 $1,541,919 1 BASE REPAIR, PLANING, ACP OVERLAY AND
0838-02-017 FM 442 Actual JUN 2004 $1,313,167 1 ADD SHOULDER AND OVERLAY
0912-34-101 CS Actual JUN 2004 $285,166 5 SYNCHRONIZATION AND INTERCONNECTION OF TRAFFIC SIGNALS
0912-34-118 VA Actual MAY 2004 $3,271,573 1 CONCRETE SPALL REPAIR
1414-05-011 FM 1462 Actual FEB 2004 $1,022,573 1 PAVEMENT REHABILITATION, ACP OVERLAY AND PAVEMENT MARKINGS
1415-03-007 FM 2759 Actual JUN 2004 $2,258,928 1 BASE REPAIR, WIDEN SUBGRADE, TRAFFIC SIGNALS, ACP OVERLAY
1683-01-031 FM 1640 Actual DEC 2003 $2,624,633 1 BASE REPAIR, PLANING, ACP OVERLAY AND PAVEMENT MARKINGS
1685-06-027 SH 6 Actual JAN 2004 $4,624,328 1 BASE REPAIR, PLANING, THIN BONDED FRICTION COURSE AND
2093-01-018 FM 2218 Actual SEP 2003 $544,214 1 BASE REPAIR, WIDEN, ACP, LEFT TURN LANE, PVMT MRKS
2105-01-037 FM 2234 Actual OCT 2003 $1,478,836 7 WIDEN INTERSECTION TO 7 LANES AND CONSTRUCT TRANSITION

Galveston County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0051-03-094 SH 3 Actual MAR 2004   8 INSTALL TRAFFIC SIGNAL
0051-09-022 FM 3005 Actual MAR 2004 $43,339 10 REMOVE AND DISPOSE OF DEBRIS ON ROADWAY AND SHOULDERS
0367-02-070 SH 124 Actual NOV 2003 $914,359 1 WIDEN SHOULDERS, BASE REPAIR, SEAL COAT AND EXTEND EXISTING
0367-06-054 SH 87 Actual JUN 2004 $29,839,589 1 CONSTRUCT THIRD FERRY LANDING
0389-06-087 SH 146 Approved AUG 2004 $6,500,391 1 GRADE SEPARATION
0389-11-055 LP 197 Actual DEC 2003 $233,942 1 FULL DEPTH REPAIR AND ACP OVERLAY
0500-01-127 IH 45 Actual NOV 2003 $153,394 1 REPLACE ILLUMINATION POLES
0500-04-110 IH 45 Actual SEP 2003 $951,688 1 FULL DEPTH CONCRETE REPAIR, CLEAN AND SEAL JOINTS AND FILL
0628-01-020 FM 519 Actual SEP 2003 $534,221 1 BASE REPAIR AND ACP OVERLAY
0686-02-021 FM 1765 Actual JAN 2004 $1,099,331 1 BASE REPAIR, MILLING, ACP SURFACE REHABILITATION AND
0912-73-098 CR Actual OCT 2003 $427,572 6 REPLACE BRIDGE AND APPROACHES
0912-73-103 VA Actual JUL 2004 $337,500 5 NEW SERVICE ROUTES TO SUPPORT CRUISE SHIP ACTIVITY
0912-73-110 VA Actual MAR 2004 $86,201 10 REMOVE AND DISPOSE OF DEBRIS ON ROADWAY AND SHOULDERS
0976-03-090 FM 518 Actual SEP 2003 $111,045 1 LEFT TURN CHANNELIZATION AND TRAFFIC SIGNAL
0978-02-052 FM 517 Actual SEP 2003 $438,127 1 CURVE / SHOULDER RUMBLE STRIP, CRACK SEAL, WIDEN SHOULDER ON
0978-02-057 FM 517 Actual MAR 2004 $6,072,564 1 WIDEN FROM TWO LANES TO 4 - LANE DIVIDED, CURB & GUTTER
0979-01-023 FM 519 Actual FEB 2004 $309,932 1 INSTALL PIPE IN DITCHES (IN SECTIONS)
1607-01-046 FM 1764 Actual DEC 2003 $141,496 8 REHABILITATE SERVICES AND LUMINAIRES

Harris County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0027-10-063 US 90A Actual JUL 2004 $3,770,586 1 REHAB EXISTING ROAD AND DRAINAGE SYSTEM
0027-13-184 US 59 Actual JAN 2004 $44,200 10 LANDSCAPE DEVELOPMENT FOR MATERIAL PURCHASE ONLY
0028-01-078 US 90 Actual DEC 2003 $1,814,148 6 REPLACE BRIDGE AND APPROACHES
0028-01-084 BU 90-U Actual OCT 2003 $237,660 10 CLEAN AND REPLACE EMBANKMENT W / CEMENT STABILIZED SAND AND
0028-01-091 BU 90-U Actual NOV 2003 $2,334,060 1 TREAT FLEX BASE SHOULDERS AND ACP OVERLAY
0028-02-077 US 90 Actual NOV 2003 $108,597 1 RAISE APPROACH SLABS
0028-02-078 US 90 Actual JUL 2004 $362,152 1 REHABILITATE LIGHTING CONDUIT, CONDUCTORS AND ELECTRICAL
0051-02-083 SH 3 Actual NOV 2003 $2,492,520 1 ACP OVERLAY, MILLING, AND STRIPING
0110-05-104 IH 45 Actual SEP 2003 $309,296 1 INSTALL EPOXY PAVEMENT MARKINGS AND RAISED REFLECTIVE
0111-01-084 FM 521 Actual NOV 2003 $592,932 1 MICROSURFACING
0177-11-131 US 59 Actual NOV 2003 $1,397,921 5 INSTALL COMPUTERIZED TRAFFIC MANAGEMENT SYSTEM
0177-11-141 US 59 Actual MAY 2004 $1,638,641 1 REHABILITATE PUMP STATION
0178-01-032 SH 35 Actual NOV 2003 $420,427 1 FULL DEPTH CONCRETE REPAIR AND JOINT / CRACK SEAL
0271-07-248 IH 10 Actual JUL 2004 250,411,715 ROW RECONSTRUCT & WIDEN ATO 8 MAINLANES, 4 MANAGED LANES & TWO
0271-07-258 IH 10 Actual MAY 2004 $413,000 11 REPLACE, UPGRADE AND MAINTAIN COMPUTERS AT TRANSTAR
0271-15-074 IH 610 Actual NOV 2003 $21,367,859 1 CONCRETE OVERLAY OF MAINLANES AND RECONSTRUCT
0271-16-118 IH 610 Actual DEC 2003 $331,447 11 CONSTRUCT SOUND WALL
0389-03-034 SH 146 Actual OCT 2003 $2,538,148 1 SPALL REPAIR AND THIN BOND OVERLAY
0389-05-091 SH 146 Actual OCT 2003 $258,868 1 REHABILITATE EXISTING 2 LANES
0500-03-517 IH 45 Actual DEC 2003 $286,941 1 DRAINAGE IMPROVEMENTS
0500-03-519 IH 45 Actual OCT 2003 $533,001 1 PAVEMENT TEXTURING
0500-03-520 IH 45 Actual NOV 2003 $138,951 1 CONSTRUCT CONCRETE RIPRAP EXTENSION AT CHANNEL, CLEAN
0500-03-521 IH 45 Actual SEP 2003 $321,451 1 INSTALL PREFABRICATED PAVEMENT MARKINGS WITH WARRANTY AND
0500-03-523 IH 45 Actual JUN 2004 $373,840 1 FULL DEPTH REPAIR, MILL AND ACP OVERLAY (NASA 1)
0500-03-524 IH 45 Actual APR 2004 $2,559,744 1 MILLING, ASPHALT OVERLAY, RECONSTRUCT EXIT RAMPS,
0500-03-525 IH 45 Actual JUN 2004 $1,435,957 1 MILL, RCRI, ASPHALT OVERLAY AND RESTRIPE
0502-01-184 IH 610 Actual JUN 2004 $19,369,036 1 BONDED CONCRETE OVERLAY OF MAINLANES AND RECONSTRUCT
0502-01-193 SH 225 Actual JUL 2004 $312,982 1 REPLACE PAVEMENT MARKINGS WITH REFLECTORIZED MULTIPOLYMER
0508-01-308 IH 10 Actual DEC 2003 $4,073,314 1 CLEAN AND SEAL JOINTS AND PAVEMENT REPAIR
0598-01-073 SH 288 Actual APR 2004 $708,082 1 ACP OVERLAY
0720-03-116 SH 249 Actual JUL 2004 $372,299 1 REPLACE PAVEMENT MARKINGS WITH REFLECTORIZED MULTIPOLYMER
0912-00-251 VA Actual JUL 2004 $120,000 5 FY 2003 TELECOMMUTING PROGRAM
0912-00-253 VA Actual JUL 2004 $812,500 5 FY 2003 CLEAN AIR ACTION PUBLIC OUTREACH PROGRAM
0912-00-254 VA Actual JUL 2004 $1,900,000 5 FY 2003 REGIONAL COMMUTE ALTERNATIVE PROGRAM - MARKETING
0912-00-256 VA Actual JUL 2004 $120,000 5 FY 2004 TELECOMMUTING PROGRAM
0912-00-257 VA Actual JUL 2004 $2,200,000 5 FY 2004 CONTINUATION OF ALTERNATIVE FUEL PROGRAM
0912-00-258 VA Actual JUL 2004 $812,500 5 FY 2004 CLEAN AIR ACTION PUBLIC OUTREACH PROGRAM
0912-00-259 VA Actual JUL 2004 $1,900,000 5 FY 2004 REGIONAL COMMUTE ALTERNATIVES PROGRAM - MARKETING
0912-00-261 VA Actual SEP 2003 $499,798 1 REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE
0912-00-266 VA Actual MAR 2004 $1,264,057 1 INSTALL TRAFFIC SIGNALS (NON - SITE SPECIFIC)
0912-00-267 VA Actual JUL 2004 $657,770 1 TRAFFIC SIGNAL UPGRADE
0912-00-269 VA Actual FEB 2004 $539,680 1 REPLACE RAISED PAVEMENT MARKERS
0912-00-271 VA Actual MAR 2004 $800,918 1 REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE
0912-00-272 VA Actual MAR 2004 $1,074,622 1 RETRACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE
0912-00-273 VA Actual JUN 2004 $1,318,326 1 INSTALL TRAFFIC SIGNALS (NON - SITE SPECIFIC)
0912-00-274 VA Actual JUN 2004 $100,000 1 MRDC (MOBILE RETROREFLECTIVITY DATA COLLECTION) FOR PAVEMENT
0912-71-532 CS Actual JUN 2004 $8,515,040 7 CONSTRUCT GRADE SEPARATION CONSISTING OF 4 LANES
0912-71-581 VA Actual MAY 2004 $30,000 1 UPGRADE SATELLITE BUILDING SECURITY WITH TIE - IN TO DISTRICT
0912-71-590 VA Actual MAY 2004 $108,000 1 TIME PHASING ADAPTION FOR COMPUTERIZED TRAFFIC MANAGEMENT
0912-71-640 CS Actual MAY 2004 $6,347,037 7 RECONSTRUCT AND REHABILITATE 3 - LANE ROADWAY
0912-71-654 CS Approved AUG 2004 $823,281 8 INSTALL SIDEWALKS
0912-71-703 CS Actual APR 2004 $799,269 9 CITY CENTER PEDESTRIAN LANDSCAPE ENHANCEMENT
0912-71-747 VA Actual FEB 2004 $1,638,395 10 ITS DEPLOYMENT - DMS IN HARRIS, MONTGOMERY, FORT BEND, WALLER,
0912-71-764 VA Actual NOV 2003 $3,955,376 1 SHOULDER EDGE REPAIR AND LONGITUDINAL JOINT REPAIR, JOINT
0912-71-767 VA Actual APR 2004 $2,493,257 5 DIRECT CONNECTOR IMPROVEMENTS
0912-71-770 CS Actual JUL 2004 $2,400,579 7 RECONSTRUCT 2 - LANE ROAD
0912-71-795 CS Actual JAN 2004 $149,214 9 DATE PALMS AND OLEANDERS IN LA PORTE
0912-71-796 CS Approved AUG 2004 $505,701 9 NASA PARKWAY SCENIC BEAUTIFICATION IN NASSAU BAY
0912-71-806 CR Actual JAN 2004 $1,094,990 9 HARDY TOLL RD AIRPORT CONNECTOR ENHANCEMENT - HCTRA, NORTH
0912-71-812 CS Actual SEP 2003 $1,222,584 5 CONSTRUCT ADDITIONAL TURN LANES IN EACH DIRECTION AT THE
0912-71-820 VA Actual OCT 2003 $838,953 1 ARMOR JOINT REPAIR, APPROACH SLAB REPAIR, CONCRETE
0912-71-832 VA Actual SEP 2003 $988,492 1 REPLACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE
0912-71-833 VA Actual SEP 2003 $637,568 1 RETRACE PAVEMENT MARKINGS AND INSTALL RAISED REFLECTIVE
0912-71-853 VA Actual MAY 2004 $786,063 1 LARGE SIGN REPLACEMENTS
0912-71-855 VA Actual APR 2004 $844,401 1 UPGRADE GUARD FENCE
0912-71-857 VA Approved AUG 2004 $974,965 1 REPLACE PAVEMENT MARKINGS AND RAISED REFLECTIVE PAVEMENT
0912-71-860 VA Actual JUN 2004 $8,800,000 1 ATM CONVERSION FOR TRANSTAR
0912-71-863 VA Actual JUL 2004 $209,736 5 CITY OF HOUSTON RCTSS / CMAQ PROGRAM PHASE 1
0912-71-865 VA Actual JUL 2004 $178,258 1 INSTALL HIGH MAST LIGHT AND REFURBISH EXISTING HIGH MAST
0912-71-878 VA Actual JUN 2004 $9,383,758 5 FY 2004 NEW BUS SERVICE FOR METRO
0976-01-031 FM 865 Actual DEC 2003 $316,762 1 FULL DEPTH ACP REPAIR AND JOINT / CRACK SEAL
0981-01-086 NASA 1 Actual APR 2004 $41,309,927 2 CONSTRUCT 4 - LANE DIVIDED, ACCESS CONTROLLED FACILITY, WITH
0981-01-094 NASA 1 Actual MAY 2004 $515,946 1 ADD RIGHT - TURN LANE
1006-01-052 FM 529 Actual OCT 2003 $6,553,815 5 WIDEN TO 4 LANES WITH CTWLTL AND REPLACE BRIDGE
1006-01-055 FM 529 Actual JAN 2004 $1,720,590 1 BASE REPAIR, SUBGRADE WIDENING, PLANING, ONE COURSE SURFACE
1062-02-020 FM 2100 Actual SEP 2003 $232,470 1 LEFT TURN CHANNELIZATION AND TRAFFIC SIGNAL
1258-04-053 FM 1093 Actual MAR 2004 $1,937,408 5 WESTHEIMER CORRIDOR IMPROVEMENTS - PHASE 1
1685-03-083 FM 1960 Actual MAY 2004 $1,265,570 1 BASE REPAIR, ULTRA THIN BONDED OVERLAY AND PAVEMENT MARKINGS
1685-05-084 SH 6 Actual NOV 2003 $251,744 8 IMPROVE TRAFFIC SIGNALS
1743-01-008 FM 1876 Actual JUL 2004 $285,585 8 ADD SAFETY LIGHTING
3050-03-011 FM 2978 Actual MAR 2004 $337,546 1 ADD TURN LANES
3256-01-084 BW 8 Actual OCT 2003 $353,679 10 RESHAPE AND STABILIZE EROSION
3510-05-009 SH 99 Actual APR 2004 $17,284,961 7 CONSTRUCT GRADE SEPARATION
8170-12-005 MH Actual OCT 2003 $83,923 11 CONSTRUCT TWO CONCRETE PEDESTRIAN SHELTER FOUNDATIONS WITH

Montgomery County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0110-04-164 IH 45 Actual JUN 2004 $28,723,503 2 WIDEN TO 8 MAIN LANES WITH FRONTAGE ROADS, TMS AND PROVISION
0912-37-120 CR Actual JUL 2004 $3,269,833 11 WIDEN TO 6 LANE DIVIDED
0912-37-127 VA Actual JAN 2004 $904,781 1 CROSS CULVERT REPLACEMENTS
0912-37-145 VA Actual SEP 2003 $1,250,000 5 PURCHASE 4 SMALL ALT FUELED VEHICLES
0912-37-159 VA Actual SEP 2003 $550,000 5 PREMIMINARY ENGINEERING FOR THE CORRIDOR EXTENSION FROM
0912-37-160 CS Actual SEP 2003 $2,350,000 5 PEDESTRIAN BRIDGES AT LAKE ROBBINS AND WOODSTEAD
1062-01-025 FM 1485 Actual SEP 2003 $690,614 1 BASE REPAIR, OCST AND ACP OVERLAY
1259-02-014 FM 1097 Actual MAY 2004 $1,630,689 1 REPLACE BRIDGE
1416-03-012 FM 1486 Actual JUN 2004 $2,885,466 6 BRIDGE REPLACEMENT
1912-01-017 FM 2090 Actual MAR 2004 $483,122 1 WIDEN FOR LEFT AND RIGHT TURN LANES AND HOT MIX OVERLAY
1986-01-015 FM 1314 Approved AUG 2004 $8,943,668 1 WIDEN FROM 2 LANES TO 4 - LANE DIVIDED
2897-01-011 FM 830 Actual DEC 2003 $2,635,583 1 WIDEN SUBGRADE, O.C.S.T.AND ACP OVERLAY

Waller County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0050-05-064 BU 290H Actual APR 2004 $1,331,737 1 PLANING, SEAL COAT, ACP OVERLAY, PAVEMENT MARKINGS, AND
0271-09-017 US 90 Actual DEC 2003 $388,932 1 PLANING, BASE REPAIR, ONE COURSE SURFACE TREATMENT, POROUS
0523-01-024 FM 1098 Actual DEC 2003 $210,751 1 BASE REPAIR AND ACP OVERLAY AND / OR CRACKSEAL
1418-01-008 FM 1489 Actual JAN 2004 $771,957 1 BASE REPAIR, PLANING, ACP REHABILITATION, OVERLAY AND
2898-01-009 FM 2855 Actual MAY 2004 $698,222 1 BASE REPAIR, PLANING, THIN BONDED PERMEABLE FRICTION COURSE


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract