Detail Letting Schedule for Fort Bend County (FY 2004)
| Detail Letting Schedule for Fort Bend County (FY 2004) | ||||
| Last Update: Tuesday, August 17, 2004 |
| Fort Bend County (FY 2004) |
CCSJ: 0027-06-050 | |||
| District: | Houston | Let Date: | DEC 2003 |
| Highway: | US 90A | Let Status: | Actual |
| Project ID: | STP 2004(81) | CSJ: | 0027-06-050 |
| Description: | MILLING, ADDING SHOULDERS AND ACP OVERLAY | Handling Code: |
|
| Limits From: | SP 10 | Fund Cat: | 1 |
| Limits To: | SP 529 | Estimate: | $2,747,926 |
| Length: | 3.9 Miles | Actual: | $1,818,598 |
|
Back... |
Totals for 0027-06-050 | ||
|---|---|---|---|
| Length: | 3.9 Miles | ||
| Estimate: | $2,747,926 | ||
| Actual: | $1,818,598 | ||
CCSJ: 0027-08-108 | |||
| District: | Houston | Let Date: | AUG 2004 |
| Highway: | US 90A | Let Status: | Approved |
| Project ID: | STP 2004(641)MM | CSJ: | 0027-08-108 |
| Description: | WIDEN TO 8 - LANE DIVIDED WITH IMPROVEMENTS AT DITCH "H" | Handling Code: |
|
| Limits From: | 0.3 MILES WEST OF SH 6 | Fund Cat: | 7 |
| Limits To: | SPUR 58 | Estimate: | $9,550,264 |
| Length: | 0.9 Miles | Actual: | |
| District: | Houston | Let Date: | AUG 2004 |
| Highway: | SH 6 | Let Status: | Approved |
| Project ID: | NH 2004(642) | CSJ: | 0192-01-050 |
| Description: | WIDEN FROM 4 LANES TO 6 - LANE DIVIDED CURB & GUTTER W / CTWLTL | Handling Code: |
|
| Limits From: | 0.33 MILES SE OF SPRR | Fund Cat: | 2 |
| Limits To: | SPUR 58 | Estimate: | $11,101,889 |
| Length: | 0.8 Miles | Actual: | |
| District: | Houston | Let Date: | AUG 2004 |
| Highway: | SH 6 | Let Status: | Approved |
| Project ID: | STP 2004(644)RGS | CSJ: | 1685-06-023 |
| Description: | CONSTRUCT RAILROAD - HIGHWAY GRADE SEPARATION | Handling Code: |
|
| Limits From: | 0.33 MI SE OF SPRR | Fund Cat: | 6 |
| Limits To: | 0.52 MI N OF US 90A | Estimate: | $15,437,105 |
| Length: | 0.9 Miles | Actual: | |
|
List Showing Order Bidders List Bid Tabulations Proposal Req Form Back... |
Totals for 0027-08-108 | ||
| Length: | 2.6 Miles | ||
| Estimate: | $36,089,258 | ||
| Actual: | |||
CCSJ: 0027-12-062 | |||
| District: | Houston | Let Date: | JUN 2004 |
| Highway: | US 59 | Let Status: | Actual |
| Project ID: | NH 2004(368) | CSJ: | 0027-12-062 |
| Description: | CONSTRUCT 8 MAINLANES W / 2 - WAY HOV LANES, 2 - 3 LANE FRONTAGE | Handling Code: |
|
| Limits From: | 0.354 MI S OF UNIVERSITY BLVD | Fund Cat: | 2 |
| Limits To: | 0.678 MI N OF SH 6 | Estimate: | $49,310,323 |
| Length: | 2.0 Miles | Actual: | $56,506,909 |
| District: | Houston | Let Date: | JUN 2004 |
| Highway: | US 59 | Let Status: | Actual |
| Project ID: | NH 2004(368) | CSJ: | 0027-12-110 |
| Description: | CONSTRUCT 8 MAINLANES W / 2 - WAY HOV LANES, BRIDGES & ITS | Handling Code: |
|
| Limits From: | 0.344 MI N OF FM 2759/SH 99 | Fund Cat: | 2 |
| Limits To: | 0.354 MI S OF UNIVERSITY BLVD | Estimate: | $78,870,923 |
| Length: | 2.2 Miles | Actual: | $95,748,556 |
| District: | Houston | Let Date: | JUN 2004 |
| Highway: | US 59 | Let Status: | Actual |
| Project ID: | NH 2004(368) | CSJ: | 0027-12-123 |
| Description: | ADJUSTMENT OF UTILITIES | Handling Code: |
|
| Limits From: | 0.344 MI N OF FM 2759/SH 99 | Fund Cat: | 12 |
| Limits To: | 0.678 MI N OF SH 6 | Estimate: | $222,650 |
| Length: | 0.0 Miles | Actual: | $314,795 |
|
Bid Tabulations Back... |
Totals for 0027-12-062 | ||
| Length: | 4.2 Miles | ||
| Estimate: | 128,403,896 | ||
| Actual: | 152,570,260 | ||
CCSJ: 0027-12-120 | |||
| District: | Houston | Let Date: | NOV 2003 |
| Highway: | US 59 | Let Status: | Actual |
| Project ID: | MG 2004(9) | CSJ: | 0027-12-120 |
| Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
| Limits From: | LAKESIDE PLAZA DR | Fund Cat: | 10 |
| Limits To: | COMMERCE GREEN BLVD | Estimate: | $627,562 |
| Length: | 1.6 Miles | Actual: | $428,784 |
|
Back... |
Totals for 0027-12-120 | ||
| Length: | 1.6 Miles | ||
| Estimate: | $627,562 | ||
| Actual: | $428,784 | ||
CCSJ: 0188-02-037 | |||
| District: | Houston | Let Date: | MAY 2004 |
| Highway: | US 90A | Let Status: | Actual |
| Project ID: | STP 2004(494) | CSJ: | 0027-08-162 |
| Description: | MODIFY MEDIAN OPENINGS AND TURN LANES | Handling Code: |
|
| Limits From: | SH 99 | Fund Cat: | 1 |
| Limits To: | GATEWAY | Estimate: | $81,855 |
| Length: | 0.4 Miles | Actual: | $69,998 |
| District: | Houston | Let Date: | MAY 2004 |
| Highway: | US 59 | Let Status: | Actual |
| Project ID: | NH 2004(399) | CSJ: | 0089-09-069 |
| Description: | BASE REPAIR AND OVERLAY (ASPHALT SECTIONS ONLY) | Handling Code: |
|
| Limits From: | SPUR 529 | Fund Cat: | 1 |
| Limits To: | COUNTY LINE | Estimate: | $1,312,712 |
| Length: | 10.0 Miles | Actual: | $1,011,992 |
| District: | Houston | Let Date: | MAY 2004 |
| Highway: | SH 36 | Let Status: | Actual |
| Project ID: | NH 2004(399) | CSJ: | 0188-02-037 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | FM 1236 | Fund Cat: | 1 |
| Limits To: | FM 442 | Estimate: | $678,877 |
| Length: | 2.2 Miles | Actual: | $548,637 |
| District: | Houston | Let Date: | MAY 2004 |
| Highway: | FM 359 | Let Status: | Actual |
| Project ID: | STP 2004(494) | CSJ: | 0543-02-054 |
| Description: | BASE REPAIR, OVERLAY AND STRIPE FOR TWCLTL | Handling Code: |
|
| Limits From: | FM 723 | Fund Cat: | 1 |
| Limits To: | US 90A | Estimate: | $924,687 |
| Length: | 6.1 Miles | Actual: | $742,234 |
| District: | Houston | Let Date: | MAY 2004 |
| Highway: | FM 2759 | Let Status: | Actual |
| Project ID: | STP 2004(494) | CSJ: | 2817-01-007 |
| Description: | ULTRA - THIN BONDED WEARING COURSE | Handling Code: |
|
| Limits From: | FM 762 | Fund Cat: | 1 |
| Limits To: | THOMPSONS | Estimate: | $438,377 |
| Length: | 7.1 Miles | Actual: | $476,591 |
|
Back... |
Totals for 0188-02-037 | ||
| Length: | 25.8 Miles | ||
| Estimate: | $3,436,508 | ||
| Actual: | $2,849,452 | ||
CCSJ: 0188-09-030 | |||
| District: | Houston | Let Date: | JUL 2004 |
| Highway: | FM 723 | Let Status: | Actual |
| Project ID: | BR 2002(4) | CSJ: | 0188-09-030 |
| Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
| Limits From: | AT BRAZOS RIVER | Fund Cat: | 6 |
| Limits To: | . | Estimate: | $6,546,239 |
| Length: | 0.4 Miles | Actual: | $8,804,507 |
| District: | Houston | Let Date: | JUL 2004 |
| Highway: | FM 723 | Let Status: | Actual |
| Project ID: | STP 2004(530) | CSJ: | 0188-09-037 |
| Description: | WIDEN SUBGRADE, CONCRETE PAVEMENT WITH CURBS AND GUTTERS, | Handling Code: |
|
| Limits From: | BRAZOS RIVER BRIDGE | Fund Cat: | 1 |
| Limits To: | 0.1 MI N OF AVENUE D | Estimate: | $708,695 |
| Length: | 0.2 Miles | Actual: | $934,206 |
| District: | Houston | Let Date: | JUL 2004 |
| Highway: | FM 723 | Let Status: | Actual |
| Project ID: | STP 2004(530) | CSJ: | 0188-09-039 |
| Description: | INTERSECTION RECONSTRUCTION | Handling Code: |
|
| Limits From: | 0.1 MILE NORTH OF AVENUE D | Fund Cat: | 1 |
| Limits To: | 0.1 MILE SOUTH OF AVENUE D | Estimate: | $190,934 |
| Length: | 0.0 Miles | Actual: | $213,640 |
|
Award Status Bid Tabulations Back... |
Totals for 0188-09-030 | ||
| Length: | 0.6 Miles | ||
| Estimate: | $7,445,868 | ||
| Actual: | $9,952,353 | ||
CCSJ: 0192-01-080 | |||
| District: | Houston | Let Date: | JUN 2004 |
| Highway: | SH 6 | Let Status: | Actual |
| Project ID: | CM 2004(466) | CSJ: | 0192-01-080 |
| Description: | INSTALL ARTERIAL TRAFFIC MANAGEMENT SYSTEM | Handling Code: |
|
| Limits From: | SETTLERS WAY | Fund Cat: | 5 |
| Limits To: | FM 521 | Estimate: | $1,441,245 |
| Length: | 10.1 Miles | Actual: | $1,143,218 |
|
Bid Tabulations Back... |
Totals for 0192-01-080 | ||
| Length: | 10.1 Miles | ||
| Estimate: | $1,441,245 | ||
| Actual: | $1,143,218 | ||
CCSJ: 0192-01-082 | |||
| District: | Houston | Let Date: | NOV 2003 |
| Highway: | SH 6 | Let Status: | Actual |
| Project ID: | NH 2004(20) | CSJ: | 0192-01-082 |
| Description: | CONSTRUCT GRADE SEPARATION | Handling Code: |
|
| Limits From: | AT FORT BEND PARKWAY (FORMERLY SH 1 | Fund Cat: | 2 |
| Limits To: | . | Estimate: | $8,397,286 |
| Length: | 0.5 Miles | Actual: | $7,185,122 |
|
Back... |
Totals for 0192-01-082 | ||
| Length: | 0.5 Miles | ||
| Estimate: | $8,397,286 | ||
| Actual: | $7,185,122 | ||
CCSJ: 0543-03-057 | |||
| District: | Houston | Let Date: | JAN 2004 |
| Highway: | FM 762 | Let Status: | Actual |
| Project ID: | CPM 543-3-57 | CSJ: | 0543-03-057 |
| Description: | BASE REPAIR, PLANING, ACP OVERLAY AND | Handling Code: |
|
| Limits From: | 3.0 MI S. OF FM 2759 | Fund Cat: | 1 |
| Limits To: | FM 1462 | Estimate: | $2,825,569 |
| Length: | 13.0 Miles | Actual: | $1,541,919 |
|
Back... |
Totals for 0543-03-057 | ||
| Length: | 13.0 Miles | ||
| Estimate: | $2,825,569 | ||
| Actual: | $1,541,919 | ||
CCSJ: 0838-02-017 | |||
| District: | Houston | Let Date: | JUN 2004 |
| Highway: | FM 442 | Let Status: | Actual |
| Project ID: | STP 2004(470) | CSJ: | 0838-02-017 |
| Description: | ADD SHOULDER AND OVERLAY | Handling Code: |
|
| Limits From: | WHARTON C/L | Fund Cat: | 1 |
| Limits To: | FM 1236 | Estimate: | $1,373,016 |
| Length: | 3.1 Miles | Actual: | $1,313,167 |
|
Bid Tabulations Back... |
Totals for 0838-02-017 | ||
| Length: | 3.1 Miles | ||
| Estimate: | $1,373,016 | ||
| Actual: | $1,313,167 | ||
CCSJ: 0912-34-101 | |||
| District: | Houston | Let Date: | JUN 2004 |
| Highway: | CS | Let Status: | Actual |
| Project ID: | CM 2001(353) | CSJ: | 0912-34-101 |
| Description: | SYNCHRONIZATION AND INTERCONNECTION OF TRAFFIC SIGNALS | Handling Code: |
NC |
| Limits From: | ALONG LEXINGTON BLVD, AUSTIN PKWY A | Fund Cat: | 5 |
| Limits To: | SWEETWATER BLVD | Estimate: | $506,849 |
| Length: | 0.0 Miles | Actual: | $285,166 |
|
Bid Tabulations Back... |
Totals for 0912-34-101 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $506,849 | ||
| Actual: | $285,166 | ||
CCSJ: 0912-34-118 | |||
| District: | Houston | Let Date: | MAY 2004 |
| Highway: | IH 10 | Let Status: | Actual |
| Project ID: | NH 2004(404) | CSJ: | 0271-05-031 |
| Description: | THIN DECK OVERLAY 2 MAIN LANES ON BRIDGE AND STRIPING | Handling Code: |
|
| Limits From: | SNAKE CREEK | Fund Cat: | 1 |
| Limits To: | AT CANE ISLAND BRANCH | Estimate: | $56,301 |
| Length: | 0.0 Miles | Actual: | $114,681 |
| District: | Houston | Let Date: | MAY 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | NH 2004(403) | CSJ: | 0912-34-118 |
| Description: | CONCRETE SPALL REPAIR | Handling Code: |
|
| Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $4,023,573 |
| Length: | 0.0 Miles | Actual: | $3,156,892 |
|
Back... |
Totals for 0912-34-118 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $4,079,874 | ||
| Actual: | $3,271,573 | ||
CCSJ: 1414-05-011 | |||
| District: | Houston | Let Date: | FEB 2004 |
| Highway: | FM 1462 | Let Status: | Actual |
| Project ID: | C 1414-5-11 | CSJ: | 1414-05-011 |
| Description: | PAVEMENT REHABILITATION, ACP OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 762 | Fund Cat: | 1 |
| Limits To: | BRAZOS RIVER | Estimate: | $1,422,249 |
| Length: | 3.6 Miles | Actual: | $1,022,573 |
|
Back... |
Totals for 1414-05-011 | ||
| Length: | 3.6 Miles | ||
| Estimate: | $1,422,249 | ||
| Actual: | $1,022,573 | ||
CCSJ: 1415-03-007 | |||
| District: | Houston | Let Date: | JUN 2004 |
| Highway: | FM 762 | Let Status: | Actual |
| Project ID: | STP 2004(474) | CSJ: | 0543-03-055 |
| Description: | BASE REPAIR, WIDEN SUBGRADE, RAILROAD UPGRADE, TRAFFIC | Handling Code: |
|
| Limits From: | 0.237 MI WEST OF FM 2759 | Fund Cat: | 11 |
| Limits To: | 0.255 MI SOUTH OF FM 2759 | Estimate: | $819,631 |
| Length: | 0.5 Miles | Actual: | $487,106 |
| District: | Houston | Let Date: | JUN 2004 |
| Highway: | FM 2759 | Let Status: | Actual |
| Project ID: | STP 2004(474) | CSJ: | 1415-03-006 |
| Description: | BASE REPAIR, WIDEN SUBGRADE, TRAFFIC SIGNALS, ACP OVERLAY | Handling Code: |
|
| Limits From: | AT TARA DRIVE | Fund Cat: | 11 |
| Limits To: | . | Estimate: | $324,144 |
| Length: | 0.3 Miles | Actual: | $312,770 |
| District: | Houston | Let Date: | JUN 2004 |
| Highway: | FM 2759 | Let Status: | Actual |
| Project ID: | STP 2004(474) | CSJ: | 1415-03-007 |
| Description: | BASE REPAIR, WIDEN SUBGRADE, TRAFFIC SIGNALS, ACP OVERLAY | Handling Code: |
|
| Limits From: | US 59 | Fund Cat: | 1 |
| Limits To: | FM 762 | Estimate: | $1,217,452 |
| Length: | 1.4 Miles | Actual: | $1,176,801 |
| District: | Houston | Let Date: | JUN 2004 |
| Highway: | FM 2759 | Let Status: | Actual |
| Project ID: | STP 2004(474) | CSJ: | 2817-01-006 |
| Description: | WIDEN SUBGRADE, ACP OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 762 | Fund Cat: | 1 |
| Limits To: | 0.247 MI EAST | Estimate: | $220,028 |
| Length: | 0.2 Miles | Actual: | $282,251 |
|
Bid Tabulations Back... |
Totals for 1415-03-007 | ||
| Length: | 2.4 Miles | ||
| Estimate: | $2,581,255 | ||
| Actual: | $2,258,928 | ||
CCSJ: 1683-01-031 | |||
| District: | Houston | Let Date: | DEC 2003 |
| Highway: | FM 359 | Let Status: | Actual |
| Project ID: | STP 2004(89) | CSJ: | 0543-02-052 |
| Description: | BASE REPAIR, PLANING, ACP OVERLAY, FABRIC UNDERSEAL AND | Handling Code: |
|
| Limits From: | FULSHEAR | Fund Cat: | 1 |
| Limits To: | FM 1463 | Estimate: | $812,506 |
| Length: | 3.2 Miles | Actual: | $629,583 |
| District: | Houston | Let Date: | DEC 2003 |
| Highway: | FM 1093 | Let Status: | Actual |
| Project ID: | STP 2004(89) | CSJ: | 1258-02-028 |
| Description: | BASE REPAIR, PLANING, ACP OVERLAY, FABRIC UNDERSEAL AND | Handling Code: |
|
| Limits From: | BRAZOS RIVER | Fund Cat: | 1 |
| Limits To: | SIMONTON | Estimate: | $760,007 |
| Length: | 2.7 Miles | Actual: | $575,214 |
| District: | Houston | Let Date: | DEC 2003 |
| Highway: | FM 1093 | Let Status: | Actual |
| Project ID: | STP 2004(89) | CSJ: | 1258-03-036 |
| Description: | BASE REPAIR, PLANING, ACP OVERLAY, FABRIC UNDERSEAL AND | Handling Code: |
|
| Limits From: | FM 1463 | Fund Cat: | 1 |
| Limits To: | 0.227 MI E. OF KATY GASTON | Estimate: | $592,883 |
| Length: | 3.2 Miles | Actual: | $469,358 |
| District: | Houston | Let Date: | DEC 2003 |
| Highway: | FM 1640 | Let Status: | Actual |
| Project ID: | STP 2004(89) | CSJ: | 1683-01-031 |
| Description: | BASE REPAIR, PLANING, ACP OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | SP 529 | Fund Cat: | 1 |
| Limits To: | FM 2218 | Estimate: | $1,256,442 |
| Length: | 3.4 Miles | Actual: | $950,478 |
|
Back... |
Totals for 1683-01-031 | ||
| Length: | 12.5 Miles | ||
| Estimate: | $3,421,838 | ||
| Actual: | $2,624,633 | ||
CCSJ: 1685-06-027 | |||
| District: | Houston | Let Date: | JAN 2004 |
| Highway: | FM 1875 | Let Status: | Actual |
| Project ID: | STP 2004(186) | CSJ: | 0527-05-010 |
| Description: | BASE REPAIR, MACROSURFACE AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | US 90A | Fund Cat: | 1 |
| Limits To: | LP 540 | Estimate: | $284,728 |
| Length: | 4.6 Miles | Actual: | $176,359 |
| District: | Houston | Let Date: | JAN 2004 |
| Highway: | FM 1952 | Let Status: | Actual |
| Project ID: | C 527-8-8 | CSJ: | 0527-08-008 |
| Description: | BASE REPAIR, MACROSURFACE AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | AUSTIN COUNTY LINE | Fund Cat: | 1 |
| Limits To: | FM 1489 | Estimate: | $439,512 |
| Length: | 5.7 Miles | Actual: | $275,984 |
| District: | Houston | Let Date: | JAN 2004 |
| Highway: | FM 762L | Let Status: | Actual |
| Project ID: | STP 2004(186) | CSJ: | 0543-06-005 |
| Description: | BASE REPAIR, PLANING, ACP OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 762 | Fund Cat: | 1 |
| Limits To: | US 90A | Estimate: | $241,651 |
| Length: | 0.7 Miles | Actual: | $142,591 |
| District: | Houston | Let Date: | JAN 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | C 912-34-114 | CSJ: | 0912-34-114 |
| Description: | BASE REPAIR, PLANING, SUBGRADE WIDENING, OVERLAY PARKING | Handling Code: |
|
| Limits From: | AT RICHMOND STATE SCHOOL | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $208,575 |
| Length: | 0.0 Miles | Actual: | $169,829 |
| District: | Houston | Let Date: | JAN 2004 |
| Highway: | FM 1092 | Let Status: | Actual |
| Project ID: | STP 2004(186) | CSJ: | 1257-01-043 |
| Description: | BASE REPAIR, PLANING, ACP OVERLAY, FABRIC UNDERSEAL AND | Handling Code: |
|
| Limits From: | US 90A | Fund Cat: | 1 |
| Limits To: | SH 6 | Estimate: | $1,567,710 |
| Length: | 2.8 Miles | Actual: | $1,017,254 |
| District: | Houston | Let Date: | JAN 2004 |
| Highway: | SH 6 | Let Status: | Actual |
| Project ID: | STP 2004(186) | CSJ: | 1685-06-027 |
| Description: | BASE REPAIR, PLANING, THIN BONDED FRICTION COURSE AND | Handling Code: |
|
| Limits From: | HARRIS COUNTY LINE | Fund Cat: | 1 |
| Limits To: | US 90A | Estimate: | $2,290,030 |
| Length: | 5.1 Miles | Actual: | $2,496,618 |
| District: | Houston | Let Date: | JAN 2004 |
| Highway: | FM 2977 | Let Status: | Actual |
| Project ID: | STP 2004(186) | CSJ: | 3048-01-011 |
| Description: | BASE REPAIR, MACRO - SURFACING AND PAVEMENT MARKINGS | Handling Code: |
|
| Limits From: | FM 762 | Fund Cat: | 1 |
| Limits To: | FM 361 | Estimate: | $578,809 |
| Length: | 7.8 Miles | Actual: | $345,693 |
|
Back... |
Totals for 1685-06-027 | ||
| Length: | 26.7 Miles | ||
| Estimate: | $5,611,015 | ||
| Actual: | $4,624,328 | ||
CCSJ: 2093-01-018 | |||
| District: | Houston | Let Date: | SEP 2003 |
| Highway: | SP 58 | Let Status: | Actual |
| Project ID: | STP 2003(505)MM | CSJ: | 0192-05-006 |
| Description: | BASE REPAIR, MILLING AND ASPHALT OVERLAY | Handling Code: |
|
| Limits From: | SH 6 | Fund Cat: | 1 |
| Limits To: | US 90A | Estimate: | $322,896 |
| Length: | 1.0 Miles | Actual: | $231,609 |
| District: | Houston | Let Date: | SEP 2003 |
| Highway: | FM 2218 | Let Status: | Actual |
| Project ID: | STP 2003(670) | CSJ: | 2093-01-018 |
| Description: | BASE REPAIR, WIDEN, ACP, LEFT TURN LANE, PVMT MRKS | Handling Code: |
|
| Limits From: | AT READING RD | Fund Cat: | 1 |
| Limits To: | . | Estimate: | $203,215 |
| Length: | 0.2 Miles | Actual: | $185,395 |
| District: | Houston | Let Date: | SEP 2003 |
| Highway: | SP 41 | Let Status: | Actual |
| Project ID: | STP 2003(505)MM | CSJ: | 2996-01-001 |
| Description: | BASE REPAIR, MILLING AND ASPHALT OVERLAY | Handling Code: |
|
| Limits From: | PARK LANE | Fund Cat: | 1 |
| Limits To: | US 90A | Estimate: | $133,492 |
| Length: | 0.2 Miles | Actual: | $127,210 |
|
Back... |
Totals for 2093-01-018 | ||
| Length: | 1.4 Miles | ||
| Estimate: | $659,603 | ||
| Actual: | $544,214 | ||
CCSJ: 2105-01-037 | |||
| District: | Houston | Let Date: | OCT 2003 |
| Highway: | FM 2234 | Let Status: | Actual |
| Project ID: | STP 2003(677)MM | CSJ: | 2105-01-037 |
| Description: | WIDEN INTERSECTION TO 7 LANES AND CONSTRUCT TRANSITION | Handling Code: |
|
| Limits From: | 0.290 MI W | Fund Cat: | 7 |
| Limits To: | 0.246 MI E OF PROPOSED FORT BEND PARKWAY | Estimate: | $1,641,678 |
| Length: | 0.5 Miles | Actual: | $1,478,836 |
|
Back... |
Totals for 2105-01-037 | ||
| Length: | 0.5 Miles | ||
| Estimate: | $1,641,678 | ||
| Actual: | $1,478,836 | ||
|
| |