Letting Schedule for October, 2007 (FY 2008)
| Letting Schedule for October, 2007 (FY 2008) | ||||
| Last Update: Monday, February 2, 2009 |
| October, 2007 (FY 2008) | (see Links) |
| SEP 2007 | OCT 2007 | NOV 2007 | DEC 2007 | JAN 2008 | FEB 2008 | MAR 2008 | APR 2008 | MAY 2008 | JUN 2008 | JUL 2008 | AUG 2008 | ||||||
| CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
|---|---|---|---|---|---|---|
| 0176-03-129 | Angelina/ Lufkin |
BU 59-G | Actual | $664,494 | 10 | CONCRETE PAVEMENT / JOINT REPAIRS AND OVERLAY |
| 0320-01-059 | Bell/ Waco |
US 190 | Actual | $7,679,629 | 6 | REPLACE RAILROAD UNDERPASS |
| 2304-03-010 | Bell/ Waco |
FM 2484 | Actual | $325,840 | 1 | ADD LEFT TURN LANES |
| 0024-08-122 | Bexar/ San Antonio |
US 90 | Actual | $4,147,324 | 1 | REPLACE NARROW BRIDGE & APPROACHES |
| 2104-02-028 | Bexar/ San Antonio |
FM 1957 | Actual | $2,193,717 | 1 | ULTRATHIN BONDED WEARING COURSE & PAVEMENT MARKINGS (TO |
| 0049-12-069 | Brazos/ Bryan |
SH 6 | Actual | $8,150,790 | 3 | PHASE 2 CONSTRUCTION TO ADD AND RELOCATE ENTRANCE AND EXIT |
| 0049-12-073 | Brazos/ Bryan |
SH 6 | Actual | $7,446,378 | 1 | SEAL COAT CONSISTING OF A ONE COURSE SURFACE TREATMENT AND |
| 0923-00-052 | Brown/ Brownwood |
VA | Actual | $433,910 | 1 | THERMOPLASTIC STRIPING |
| 0116-03-057 | Burleson/ Bryan |
SH 21 | Actual | $976,131 | 1 | REHABILITATE EXISTING BRIDGE FACILITY CONSISTING OF GRADING, |
| 1140-02-032 | Cameron/ Pharr |
FM 802 | Actual | $6,676,151 | 10 | WIDEN TO 6 LANE DIVIDED |
| 0218-03-080 | Cass/ Atlanta |
US 59 | Actual | $6,212,836 | 1 | SEAL COAT |
| 0920-39-020 | Chambers/ Beaumont |
VA | Actual | $177,520 | 11 | COUNTY ROAD SIGN REPLACEMENT |
| 0027-02-030 | Colorado/ Yoakum |
FM 102 | Actual | $5,198,990 | 1 | SEAL COAT |
| 0032-04-029 | Cottle/ Childress |
US 83 | Actual | $1,121,504 | 6 | REPLACE EXIST BRIDGE FACILITY |
| 0925-15-004 | Dickens/ Childress |
CR | Actual | $774,123 | 6 | REPLACE EXIST BRIDGE FACILITY |
| 1773-01-009 | Dickens/ Childress |
FM 1868 | Actual | $1,476,916 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0923-09-049 | Eastland/ Brownwood |
CR | Actual | $1,075,373 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0906-06-047 | Ector/ Odessa |
CS | Actual | $49,650 | 8 | ELIMINATION OF ROADWAY HAZARDS |
| 0026-03-041 | Fayette/ Yoakum |
US 90 | Actual | $5,755,136 | 1 | SEAL COAT |
| 0098-03-033 | Foard/ Childress |
SH 6 | Actual | $6,186,104 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0675-01-056 | Freestone/ Bryan |
IH 45 | Actual | $2,743,078 | 8 | SAFETY WORK CONSISTING OF THE INSTALLATION OF A MEDIAN |
| 0017-07-088 | Frio/ San Antonio |
IH 35 | Actual | $676,442 | 6 | WIDEN NARROW BRIDGE & APPROACHES |
| 0912-73-082 | Galveston/ Houston |
CS | Actual | $223,779 | 9 | PEDESTRIAN BARRIER FENCING, LANDSCAPE, AND IRRIGATION |
| 0912-73-127 | Galveston/ Houston |
VA | Actual | $593,050 | 1 | COUNTY WIDE FULL DEPTH CONCRETE REPAIR AND SPALL REPAIR |
| 0976-05-023 | Galveston/ Houston |
FM 1266 | Actual | $475,693 | 1 | PLACE CONCRETE RIPRAP ON STEEP NON - MAINTAINABLE DITCH SLOPES |
| 0508-01-309 | Harris/ Houston |
IH 10 | Actual | $3,468,680 | 6 | FENDER SYSTEM AND SUPPORT COLUMN PROTECTION SYSTEM |
| 0919-03-031 | Harrison/ Atlanta |
VA | Actual | $1,955,676 | 10 | RECONSTRUCT PARKING & PROVIDE ADA ACCESS AT CADDO LAKE STATE |
| 0039-17-157 | Hidalgo/ Pharr |
US 83 | Actual | $1,112,897 | 10 | LANDSCAPE AND IRRIGATION IMPROVEMENTS |
| 0083-04-027 | Hopkins/ Paris |
SH 11 | Actual | $3,793,226 | 1 | REHABILITATE AND WIDEN |
| 0086-11-039 | Jim Wells/ Corpus Christi |
SH 44 | Actual | $5,416,982 | 1 | SEAL COAT ROADWAY EB & WB MAINLANES (2008 LOW CONTROL PROJECT) |
| 0260-01-050 | Johnson/ Wichita Falls |
US 67 | Actual | $8,973,985 | 1 | SEAL TRAVEL LANES AND SHOULDERS |
| 0996-02-013 | Limestone/ Waco |
FM 638 | Actual | $1,610,108 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0380-15-016 | Lubbock/ Lubbock |
SP 327 | Actual | $23,504,611 | 1 | CONVERT NON - FREEWAY TO FREEWAY |
| 0905-00-040 | Lubbock/ Lubbock |
VA | Actual | $6,153,094 | 1 | PUMP STATION SAFETY UPGRADE |
| 0905-00-042 | Lubbock/ Lubbock |
VA | Actual | $822,245 | 10 | MISCELLANEOUS CONSTRUCTION |
| 0013-02-019 | Montague/ Wichita Falls |
US 81 | Actual | $7,451,433 | 1 | SEAL COAT |
| 1062-03-042 | Montgomery/ Houston |
FM 1485 | Actual | $7,331,921 | 10 | WIDEN TO 4 LANE DIVIDED (PTF) |
| 0904-00-125 | Potter/ Amarillo |
VA | Actual | $257,386 | 1 | CRACK POURING |
| 0904-00-126 | Potter/ Amarillo |
VA | Actual | $322,087 | 1 | CRACK POURING |
| 2494-01-010 | Potter/ Amarillo |
RM 2381 | Actual | $5,622,816 | 1 | REHAB AND WIDEN EXISTING ROADWAY |
| 0101-08-002 | San Patricio/ Corpus Christi |
SH 89 | Actual | $5,258,317 | 1 | OVERLAY ROADWAY |
| 0191-01-064 | Smith/ Tyler |
US 69 | Actual | $11,338,450 | 1 | CONSTRUCT GRADE - SEPARATED INTERCHANGE |
| 0907-00-070 | Tom Green/ San Angelo |
VA | Actual | $1,648,187 | 1 | INSTALL ILLUMINATION ASSEMBLIES |
| 0914-04-175 | Travis/ Austin |
VA | Actual | $454,158 | 10 | CONSTRUCT ROADWAY IMPROVMENTS, PARKING & DRAINAGE |
| 0914-04-233 | Travis/ Austin |
CR | Actual | $297,931 | 8 | INSTALL TRAFFIC SIGNAL |
| 0160-06-022 | Val Verde/ Laredo |
US 277 | Actual | $2,272,431 | 1 | REHABILITATION OF AN EXISTING ROADWAY |
| 0095-06-062 | Van Zandt/ Tyler |
US 80 | Actual | $2,835,002 | 8 | IMPROVE AND INTERCONNECT TRAFFIC SIGNALS |
| 0523-02-035 | Waller/ Houston |
FM 362 | Actual | $884,320 | 1 | RESHAPING AND STABILIZE EROSION AT MILLER DRAINAGE EASEMENT |
| 0922-33-077 | Webb/ Laredo |
CR | Actual | $738,793 | 6 | FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING |
| 0804-04-022 | Wichita/ Wichita Falls |
FM 368 | Actual | $671,172 | 1 | REPLACE BRIDGE AND APPROACHES |
| 0043-05-102 | Wilbarger/ Wichita Falls |
US 287 | Actual | $1,177,482 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0284-01-045 | Young/ Wichita Falls |
SH 79 | Actual | $122,398 | 1 | NEW TRAFFIC SIGNAL |
| 0276-04-022 | Zavala/ Laredo |
US 57 | Actual | $7,190,083 | 1 | WIDEN RDWY TO PROVIDE PASSING LANES (SUPER 2) |
|
| |