Detail Letting Schedule for Val Verde County (FY 2009)

 
 
Last Update: Monday, November 9, 2009
Val Verde County (FY 2009)

CCSJ: 0022-08-022

District: Laredo Let Date: APR 2009
Highway: US 90 Let Status: Actual
Project ID: STP 2009(498)ES CSJ: 0022-08-022
Description: REHABILITATION OF AN EXISTING ROADWAY Handling
Code:
 
Limits From: 4.44 MI SOUTH OF SH 163 Fund Cat: 11
Limits To: 8.46 MI SOUTH OF SH 163 Estimate: $3,161,464
Length: 4.0 Miles Actual: $1,863,201
 
Back...

Totals for 0022-08-022
Length: 4.0 Miles
Estimate: $3,161,464
Actual: $1,863,201

CCSJ: 0922-11-027

District: Laredo Let Date: AUG 2009
Highway: VA Let Status: Actual
Project ID: STP 2007(565)ESTE CSJ: 0922-11-027
Description: FOR THE CONSTRUCTION OF A HIKE & BIKE TRAIL FACILITY Handling
Code:
 
Limits From: BRIDGE ST Fund Cat: 9
Limits To: 0.225 MI SOUTH OF BRIDGE ST Estimate: $102,150
Length: 0.2 Miles Actual: $80,698
 
Back...

Totals for 0922-11-027
Length: 0.2 Miles
Estimate: $102,150
Actual: $80,698

CCSJ: 0922-11-034

District: Laredo Let Date: JUN 2009
Highway: CR Let Status: Actual
Project ID: DMO 2009(736) CSJ: 0922-11-034
Description: FOR THE CONSTRUCTION OF A RAILROAD GRADE SEPARATION Handling
Code:
 
Limits From: ON BOX CANYON ROAD 0.73 MILE Fund Cat: 10
Limits To: WEST OF U.S. 90 Estimate: $825,215
Length: 0.3 Miles Actual: $569,632
 
Back...

Totals for 0922-11-034
Length: 0.3 Miles
Estimate: $825,215
Actual: $569,632


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract