Letting Schedule for August, 2009 (FY 2009)

 
 
Last Update: Monday, November 9, 2009
August, 2009 (FY 2009) (see Links)
SEP 2008 | OCT 2008 | NOV 2008 | DEC 2008 | JAN 2009 | FEB 2009 | MAR 2009 | APR 2009 | MAY 2009 | JUN 2009 | JUL 2009 | AUG 2009
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0517-01-040 Atascosa/
San Antonio
SH 16 Actual $2,458,601 1 WIDEN EXISTING ROADWAY TO PROVIDE PASSING LANES
0114-17-009 Bastrop/
Austin
LP 109 Actual $400,000 8 RAILROAD SIGNAL
0231-03-123 Bell/
Waco
US 190 Actual $3,393,950 1 REVERSE RAMPS, ADD U - TURN AND INTERSECTION IMPROVEMENTS AT
0073-08-163 Bexar/
San Antonio
IH 37 Actual $584,778 1 REMOVE EXIST STRIPING AND RESTRIPE NBML FOR EMERGENCY LANE
0919-19-040 Bowie/
Atlanta
CR Actual $359,384 10 REHABILITATION OF EXISTING COUNTY ROAD
0598-02-044 Brazoria/
Houston
SH 288 Actual $8,328,816 7 CONSTRUCT GRADE SEPARATION AND RAMPS
0917-29-110 Brazos/
Bryan
VA Actual $588,000 10 IMPLEMENT THE BRAZOS VALLEY TRANSPORTATION MANAGEMENT CENTER
0914-24-013 Burnet/
Austin
CS Actual $430,953 6 REPLACE BRIDGE & APPROACHES
0220-05-064 Cameron/
Pharr
SH 48 Actual $4,092,635 10 REPLACE BRIDGE & RECONSTRUCT ROADWAY
0921-06-206 Cameron/
Pharr
VA Actual $3,342,181 10 CONSTRUCTION OF INTERNAL ROADS AT THE PORT OF BROWNSVILLE TO
0921-06-231 Cameron/
Pharr
CS Actual $200,000 8 UPGRADE RRX WARNING DEVICES
0508-03-075 Chambers/
Beaumont
IH 10 Actual $13,771,771 9 CONSTRUCT TOURIST AND VISITOR CENTER, PARKING LOT AND
0281-02-060 Collin/
Dallas
SH 78 Actual $12,800,993 10 WIDEN FROM 4 LANE TO 6 LANE DIVIDED
0470-01-024 Comal/
San Antonio
FM 1863 Actual $737,673 1 REHAB AND WIDEN NARROW ROADWAY TO ADD SHOULDERS
0909-39-117 Coryell/
Waco
CR Actual $444,688 1 REPLACE BRIDGE AND APPROACHES
0009-02-058 Dallas/
Dallas
SH 78 Actual $1,568,590 1 ACP OVERLAY, CONCRETE FULL DEPTH REPAIR AND PAVEMENT MARKINGS
2374-01-068 Dallas/
Dallas
IH 635 Actual 566,009,652 2 IMPROVE FREEWAY - PHASE 1; ADD SUBSURFACE HOV / MANAGED LANES
2374-07-061 Dallas/
Dallas
IH 635 Actual $79,980 10 LANDSCAPE DEVELOPMENT
2964-01-036 Dallas/
Dallas
SH 161 Actual $3,988,685 2 ELECTRONIC TOLL COLLECTION__ (TOLL)
0918-46-099 Denton/
Dallas
CR Actual $1,637,473 6 REPLACE BRIDGE AND APPROACHES
1567-02-027 Denton/
Dallas
FM 423 Actual $29,931,000 10 WIDEN 2 LANE RURAL TO 6 LANE DIVIDED URBAN HIGHWAY
0517-04-050 Duval/
Laredo
SH 16 Actual $1,617,793 6 FOR THE CONSTRUCTION OF THE REPLACEMENT OF THREE EXISTING
0001-04-085 El Paso/
El Paso
US 62 Actual $2,333,645 1 MILL AND INLAY
0924-06-357 El Paso/
El Paso
CS Actual $1,312,912 5 PURCHASE 16 PROPANE SCHOOL BUSES
2121-02-130 El Paso/
El Paso
IH 10 Actual $2,097,484 1 MILL & INLAY
1160-01-028 Ellis/
Dallas
FM 877 Actual $7,087,828 1 ADD 3 FOOT PAVE SHOULDERS
1597-02-014 Erath/
Fort Worth
FM 847 Actual $800,000 8 2009 FEDERAL RAILROAD SIGNAL PROGRAM
0334-08-032 Fayette/
Yoakum
FM 154 Actual $12,875,000 8 2009 FEDERAL RR SIGNAL PROGRAM
0202-01-011 Grayson/
Paris
FM 151 Actual $600,000 8 INSTALL RAILROAD LIGHTS AND GATES
0510-02-026 Grayson/
Paris
FM 902 Actual $200,000 8 INSTALL RAILROAD LIGHTS AND GATES
0728-01-045 Grayson/
Paris
FM 120 Actual $700,000 8 INSTALL RAILROAD LIGHTS AND GATES
0535-01-065 Guadalupe/
San Antonio
IH 10 Actual $1,784,603 1 RESTORE EXISTING ROADWAY WITH CRCP
0389-05-105 Harris/
Houston
SH 146 Actual $41,949,337 8 CONSTRUCT DIRECT CONNECTORS
0508-01-329 Harris/
Houston
IH 10 Actual $18,090,664 1 RECONSTRUCT ROADWAY
0598-01-089 Harris/
Houston
SH 288 Actual $635,655 5 FRONTAGE ROAD INTERSECTION IMPROVEMENTS (TSM)
0912-00-357 Harris/
Houston
VA Actual $3,074,000 5 CLEAN AIR ACTION PROGRAM FY 2009, FY 2010, FY 2011
0912-71-705 Harris/
Houston
CS Actual $1,127,531 9 LANDSCAPE AND SCENIC BEAUTIFICATION OF HISTORIC
0912-72-073 Harris/
Houston
CS Actual $11,790,329 7 WIDEN TO 4 LANES, C & G, STORM SEWER AND APPURTENANCES
0912-72-208 Harris/
Houston
VA Actual $2,568,233 1 TSM IMPROVEMENTS AT VARIOUS LOCATIONS
1006-01-058 Harris/
Houston
FM 529 Actual $8,936,872 1 RECONSTRUCT AND WIDEN TO 4 - LANE DIVIDED AND REPLACE DINNER
1685-01-091 Harris/
Houston
FM 1960 Actual $2,049,489 7 IMPLEMENT ACCESS MANAGEMENT TREATMENTS (INCLUDES ITS
3050-03-005 Harris/
Houston
FM 2978 Actual $18,490,602 6 WIDEN TO 5 LANE CURB AND GUTTER WITH IN - LINE DETENTION POND.
3256-02-074 Harris/
Houston
BW 8 Actual $29,595,090 1 CONSTRUCT 4 DIRECT CONNECTORS
0843-07-012 Harrison/
Atlanta
FM 2625 Actual $932,083 6 REHABILITATE BRIDGES AND APPROACHES
0016-02-104 Hays/
Austin
IH 35 Actual $9,393,526 12 REPLACE BRIDGE AND APPROACHES & WIDEN FRONTAGE ROADS
0016-02-107 Hays/
Austin
IH 35 Actual $13,147,196 10 REPLACE BRIDGE AND APPROACHES
0471-02-056 Hays/
Austin
SH 21 Actual $1,031,679 6 REPLACE BRIDGE & APPROACHES
0914-33-041 Hays/
Austin
CR Actual $278,178 8 IMPROVE GUARDRAIL, SAFETY TREAT FIXED
0528-01-097 Hidalgo/
Pharr
SH 107 Actual $1,000,000 8 UPGRADE RRX WARNING DEVICES
0861-05-021 Hidalgo/
Pharr
FM 491 Actual $1,625,037 1 REHAB EXISTING ROADWAY
0921-02-191 Hidalgo/
Pharr
CR Actual $678,444 10 IMPROVEMENTS AT PROGRESSO INT'L BRIDGE
0904-07-008 Hutchinson/
Amarillo
CR Actual $289,229 6 REPLACE BRIDGE & APPROACHES
1623-02-016 Hutchinson/
Amarillo
FM 1551 Actual $200,000 8 2009 FEDERAL RR SIGNAL PROGRAM
0921-24-007 Jim Hogg/
Pharr
CS Actual $6,120,000 8 UPGRADE RRX WARNING DEVICES
0691-01-029 Karnes/
Corpus Christi
FM 81 Actual $2,170,824 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0915-11-020 Kendall/
San Antonio
PW Actual $100,000 10 RECONSTRUCT PARKING
0915-11-027 Kendall/
San Antonio
CS Actual $474,512 8 CONSTRUCT SIDEWALKS
0829-04-021 Kerr/
San Antonio
FM 1340 Actual $735,980 6 REPLACE BRIDGE AND APPROACHES
0909-40-052 Limestone/
Waco
CR Actual $608,820 6 REPLACE BRIDGE AND APPROACHES
0909-22-136 McLennan/
Waco
CS Actual $3,961,348 10 CONSTRUCT AN ALTERNATE TRANSPORTATION ROUTE CONSISTING OF
0262-07-020 Milam/
Bryan
FM 1915 Actual $1,410,004 1 REPLACEMENT OF EXISTING BRG FACILITY CONSISTING OF GRADING
0523-10-016 Montgomery/
Houston
FM 1488 Actual $23,642,375 10 WIDEN 2 LANES TO 4 - LANE DIVIDED (PTF)
0425-02-029 Moore/
Amarillo
US 87 Actual $9,581,339 6 RR GRADE SEPARATION
0175-07-054 Nacogdoches/
Lufkin
US 59 Actual $633,068 1 RESURFACE WITH MICROSURFACE
0918-18-112 Navarro/
Dallas
CS Actual $438,307 8 CONSTRUCT SIDEWALKS, CROSSWALKS, AND SIGNS AT RICE JR HIGH
0920-06-028 Newton/
Beaumont
CR Actual $271,656 6 REPLACE BRIDGE AND APPROACHES
0617-02-058 Nueces/
Corpus Christi
PR 22 Actual $5,297,448 6 PIER PROTECTION
2263-02-074 Nueces/
Corpus Christi
SH 361 Actual $13,012,000 10 CONSTRUCT NEW 28 CAR FERRY BOAT PLANS BY NAVAL ARCHITECT
0710-02-059 Orange/
Beaumont
FM 105 Actual $304,485 5 OVERLAY EXISTING ROADWAY
0008-03-077 Parker/
Fort Worth
US 180 Actual $8,635,958 6 REPLACE 2 BRIDGES AND APPROACHES
0314-07-039 Parker/
Fort Worth
IH 20 Actual $518,999 10 CONSTRUCT WESTBOUND EXIT RAMP WEST OF LAKESHORE DRIVE TO
1014-03-039 Rockwall/
Dallas
FM 740 Actual $12,283,664 10 WIDEN 2 LN RURAL TO 4 LN DIV URBAN
0336-07-061 San Augustine/
Lufkin
SH 103 Actual $800,000 8 SIGNAL UPGRADE
0910-16-105 Smith/
Tyler
CS Actual $145,209 8 2007 SRTS INFRASTRUCTURE PROJECT AT DOUGLAS ELEM. IN TYLER
0008-14-058 Tarrant/
Fort Worth
IH 820 Actual 594,192,593 1 RECONSTRUCT 4 TO 10 W / HOV / MANAGED LANE
0747-04-059 Tarrant/
Fort Worth
FM 157 Actual $2,833,448 1 WIDEN BRIDGE ACROSS IH20 TO 6 THRU LANES WITH AUXILIARY LANE
0902-00-110 Tarrant/
Fort Worth
VA Actual $924,322 1 INSTALLATION OF PERMANENT PAVEMENT MARKINGS FOR FY08
0902-48-454 Tarrant/
Fort Worth
VA Actual $1,733,389 5 CONSTRUCT TRAIL TO CONNECT LINKS BETWEEN ENTITIES
0902-48-587 Tarrant/
Fort Worth
VA Actual $1,769,040 7 SIGNAL TIMING / ITS TO MANAGE CONGESTION WITH CONNECTIONS TO
1978-01-048 Tarrant/
Fort Worth
FM 1938 Actual $15,244,574 7 CONSTRUCT 6 LANE NEW LOCATION ROADWAY FROM SH 114 TO DOVE RD
2374-05-070 Tarrant/
Fort Worth
IH 20 Actual $146,900 1 ABATEMENT OF ASBESTOS FROM BRIDGE STRUCTURE AND ELEMENTS
0011-01-031 Taylor/
Abilene
SH 351 Actual $200,000 8 INSTALL / UPGRADE RR XING PROTECTION
0908-00-074 Taylor/
Abilene
VA Actual $755,280 10 CONSTRUCT CURB RAMPS IN CALLAHAN, JONES, NOLAN AND TAYLOR
1176-02-018 Titus/
Atlanta
FM 899 Actual $200,000 8 INSTALL AUTOMATIC RR WARNING DEVICES
0015-13-317 Travis/
Austin
IH 35 Actual $996,365 1 INTERSTATE CORRIDOR TRAFFIC MANAGEMENT ROUTINE MAINTENANCE
0700-03-099 Travis/
Austin
SH 71 Actual $826,076 10 INSTALL LTL & CONSTRUCT PAVED SHOULDERS
0914-00-249 Travis/
Austin
VA Actual $100,100 7 MODELING BEST PRACTICES
0914-00-257 Travis/
Austin
VA Actual $200,100 7 TRAVEL SURVEY
0914-00-280 Travis/
Austin
VA Actual $1,362,761 1 SITE SPECIFIC SIGNALS
0914-00-285 Travis/
Austin
VA Actual $269,491 1 SIGNING
0914-00-288 Travis/
Austin
VA Actual $160,100 7 AIR QUALITY EMISSIONS ANALYSIS
0914-00-312 Travis/
Austin
VA Actual $800,000 11 MISCELLANEOUS WORK CONSISTING OF FURNISHING DYNAMIC MESSAGE
0914-04-256 Travis/
Austin
VA Actual $120,100 10 INSTALL INTELLIGENT TRANSPORTATION SYSTEM
2100-01-042 Travis/
Austin
RM 2222 Actual $5,765,520 11 REPLACE BRIDGE AND APPROACHES
3136-01-150 Travis/
Austin
LP 1 Actual $442,116 8 INSTALL MEDIAN BARRIER
0922-11-027 Val Verde/
Laredo
VA Actual $80,698 9 FOR THE CONSTRUCTION OF A HIKE & BIKE TRAIL FACILITY
0018-03-041 Webb/
Laredo
IH 35 Actual $1,429,393 1 INSTALL MEDIAN BARRIER
0086-16-001 Webb/
Laredo
SL 20 Actual $33,839,631 3 FOR THE CONSTRUCTION OF A NEW LOCATION 2 LANE ROADWAY
0903-30-042 Wilbarger/
Wichita Falls
CS Actual $6,400,000 8 2009 FEDERAL SIGNAL PROGRAM
2211-02-021 Williamson/
Austin
FM 1460 Actual $9,229,357 2 RECONST TO 4 - LANE DIVIDED RDWY


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract