Detail Letting Schedule for Smith County (FY 2011)

 
 
Last Update: Tuesday, September 6, 2011
Smith County (FY 2011)

CCSJ: 0191-01-079

District: Tyler Let Date: MAY 2011
Highway: US 69 Let Status: Actual
Project ID: STP 2011(979)HES CSJ: 0191-01-079
Description: UPGRADE TRAFFIC SIGNALS Handling
Code:
 
Limits From: AT SH 64(4TH & 5TH ST ONE-WAY PAIR) Fund Cat: 8
Limits To: IN TYLER Estimate: $194,528
Length: 0.1 Miles Actual: $198,319
 
District: Tyler Let Date: MAY 2011
Highway: FM 756 Let Status: Actual
Project ID: STP 2011(979)HES CSJ: 0492-04-031
Description: INTERCONNECT TRAFFIC SIGNAL WITH REST OF SYSTEM Handling
Code:
 
Limits From: W OF FM 756 (PALUXY) ON SL 323, E Fund Cat: 8
Limits To: E OF SH 110 ON SL 323 IN TYLER Estimate: $51,829
Length: 0.4 Miles Actual: $41,487
 
Back...

Totals for 0191-01-079
Length: 0.5 Miles
Estimate: $246,357
Actual: $239,806

CCSJ: 0203-08-014

District: Tyler Let Date: JUN 2011
Highway: FM 1253 Let Status: Actual
Project ID: STP 1102(050)HES CSJ: 0203-08-014
Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH Handling
Code:
 
Limits From: 1.1 MI S OF US 80 (CR 457), S Fund Cat: 8
Limits To: 1.3 MI N OF FM 857 (CR 462) Estimate: $306,505
Length: 1.1 Miles Actual: $353,814
 
District: Tyler Let Date: JUN 2011
Highway: SH 110 Let Status: Actual
Project ID: STP 1102(050)HES CSJ: 0505-02-040
Description: INSTALL RAISED CENTERLINE RUMBLE STRIPS Handling
Code:
 
Limits From: VAN ZANDT C/L, SE Fund Cat: 8
Limits To: .9 MI NW OF SL323(NR CR46) IN TYLER Estimate: $143,491
Length: 19.2 Miles Actual: $211,501
 
District: Tyler Let Date: JUN 2011
Highway: SH 110 Let Status: Actual
Project ID: STP 1102(050)HES CSJ: 0505-02-041
Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH Handling
Code:
 
Limits From: 0.1 MI S OF FM 1253, SE Fund Cat: 8
Limits To: IH 20 Estimate: $723,841
Length: 2.6 Miles Actual: $811,041
 
Bid Tabulations
Back...

Totals for 0203-08-014
Length: 22.9 Miles
Estimate: $1,173,837
Actual: $1,376,356

CCSJ: 0424-07-009

District: Tyler Let Date: JUN 2011
Highway: FM 2767 Let Status: Actual
Project ID: STP 1102(051) CSJ: 0424-07-009
Description: REPAIR, WIDEN & RESURFACE RDWY, CONCURRENT W / SAFETY WIDENING Handling
Code:
 
Limits From: FM 757, E Fund Cat: 1
Limits To: 1 MI NW OF SH 31 (GREGG C/L) Estimate: $1,177,570
Length: 7.6 Miles Actual: $1,214,721
 
District: Tyler Let Date: JUN 2011
Highway: FM 2767 Let Status: Actual
Project ID: STP 1102(052)HES CSJ: 0424-07-010
Description: INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS Handling
Code:
 
Limits From: 0.15 MI E OF FM 850, E Fund Cat: 8
Limits To: GREGG C/L Estimate: $112,229
Length: 16.7 Miles Actual: $154,324
 
District: Tyler Let Date: JUN 2011
Highway: FM 2767 Let Status: Actual
Project ID: STP 1102(052)HES CSJ: 0424-07-011
Description: WIDEN ROADWAY TO 28' FOR SAFETY & SEAL COAT Handling
Code:
 
Limits From: FM 757, E Fund Cat: 8
Limits To: 1 MI NW OF SH 31 (GREGG C/L) Estimate: $1,936,063
Length: 7.6 Miles Actual: $2,005,773
 
District: Tyler Let Date: JUN 2011
Highway: FM 2767 Let Status: Actual
Project ID: STP 1102(051) CSJ: 0424-08-003
Description: REPAIR, RESURF & WIDEN ROADWAY TO 28' TO PRESERVE PVMT EDGES Handling
Code:
 
Limits From: 1 MI NW OF SH 31 (SMITH C/L), SE Fund Cat: 1
Limits To: SH 31 Estimate: $547,270
Length: 0.9 Miles Actual: $570,128
 
Bid Tabulations
Back...

Totals for 0424-07-009
Length: 32.8 Miles
Estimate: $3,773,132
Actual: $3,944,946

CCSJ: 0679-01-010

District: Tyler Let Date: JUN 2011
Highway: FM 757 Let Status: Actual
Project ID: STP 1102(053)HES CSJ: 0679-01-010
Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH Handling
Code:
 
Limits From: IH 20, S Fund Cat: 8
Limits To: 1.85 MI N OF FM 2767 Estimate: $508,405
Length: 2.2 Miles Actual: $533,277
 
District: Tyler Let Date: JUN 2011
Highway: FM 1252 Let Status: Actual
Project ID: STP 1102(053)HES CSJ: 1389-01-009
Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH Handling
Code:
 
Limits From: 5.6 MI E OF FM 757 (NR CR 3104), E Fund Cat: 8
Limits To: 3.6 MI W OF SH 135 (GREGG C/L) Estimate: $556,415
Length: 2.6 Miles Actual: $604,376
 
District: Tyler Let Date: JUN 2011
Highway: FM 2015 Let Status: Actual
Project ID: STP 1102(053)HES CSJ: 1934-02-003
Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH Handling
Code:
 
Limits From: 1.4 MI N OF IH20(SAND FLAT/CR313),S Fund Cat: 8
Limits To: 0.5 MI N OF US 271 (CR 328) Estimate: $1,440,698
Length: 4.8 Miles Actual: $1,513,373
 
Bid Tabulations
Back...

Totals for 0679-01-010
Length: 9.6 Miles
Estimate: $2,505,518
Actual: $2,651,026

CCSJ: 0910-00-090

District: Tyler Let Date: SEP 2010
Highway: VA Let Status: Actual
Project ID: STP 2011(426) CSJ: 0910-00-090
Description: DISTRICT - WIDE THERMO PLASTIC PAVEMENT MARKINGS PROGRAM Handling
Code:
 
Limits From: VARIOUS LOCATIONS IN Fund Cat: 1
Limits To: THE TYLER DISTRICT Estimate: $350,500
Length: 0.1 Miles Actual: $344,250
 
Back...

Totals for 0910-00-090
Length: 0.1 Miles
Estimate: $350,500
Actual: $344,250

CCSJ: 2075-02-059

District: Tyler Let Date: OCT 2010
Highway: LP 323 Let Status: Actual
Project ID: STP 2011(630)ES CSJ: 2075-02-059
Description: RESURFACE ROADWAY USING NOVA CHIP METHOD Handling
Code:
 
Limits From: 0.1 MI W OF 155(S) IN TYLER,E Fund Cat: 1
Limits To: 0.1 MI E OF US 69(S) Estimate: $1,220,867
Length: 2.4 Miles Actual: $1,287,655
 
Back...

Totals for 2075-02-059
Length: 2.4 Miles
Estimate: $1,220,867
Actual: $1,287,655


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract