Letting Schedule for May, 2011 (FY 2011)
| Letting Schedule for May, 2011 (FY 2011) | ||||
| Last Update: Tuesday, September 6, 2011 |
| May, 2011 (FY 2011) | (see Links) |
| SEP 2010 | OCT 2010 | NOV 2010 | DEC 2010 | JAN 2011 | FEB 2011 | MAR 2011 | APR 2011 | MAY 2011 | JUN 2011 | JUL 2011 | AUG 2011 | ||||||
| CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
|---|---|---|---|---|---|---|
| 0911-00-072 | Angelina/ Lufkin |
VA | Actual | $615,501 | 1 | CONCRETE JOINT AND PAVEMENT REPAIRS |
| 0180-03-035 | Aransas/ Corpus Christi |
SH 35 | Actual | $98,162,590 | 6 | REHAB. ROADWAY |
| 0916-38-005 | Aransas/ Corpus Christi |
CS | Actual | $876,000 | 9 | CONSTRUCT VISITOR INFO. CENTER @ FULTON MANSION ON FULTON ST |
| 0914-18-055 | Bastrop/ Austin |
PW | Actual | $884,681 | 10 | REPAIR / RECONSTRUCT ROADS AND PARKING |
| 0915-12-478 | Bexar/ San Antonio |
VA | Actual | $2,030,157 | 10 | CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN SAN ANTONIO |
| 0915-12-482 | Bexar/ San Antonio |
VA | Actual | $1,000,000 | 7 | FURNISH & INSTALL DETECTION EQUIPMENT ALONG MAJOR CORRIDORS |
| 0252-03-045 | Blanco/ Austin |
US 281 | Actual | $742,748 | 1 | REPLACE BRIDGE AND APPROACHES |
| 0010-13-085 | Bowie/ Atlanta |
US 67 | Actual | $375,977 | 8 | INSTALL LEFT TURN LANE |
| 0085-04-039 | Bowie/ Atlanta |
US 259 | Actual | $2,109,795 | 8 | TEXTURIZE SHOULDERS & CENTERLINE TEXTURING |
| 0117-02-034 | Brazos/ Bryan |
SH 21 | Actual | $7,902,381 | 11 | WIDEN AN NON - FREEWAY FACILITY CONSISTING OF GRADING, |
| 0917-29-108 | Brazos/ Bryan |
VA | Actual | $257,444 | 9 | MISCELLANEOUS WORK CONSISTING OF CONSTRUCTING FACILITIES FOR |
| 0151-01-041 | Burnet/ Austin |
SH 29 | Actual | $2,224,094 | 1 | LEVEL UP AND SEAL COAT |
| 1012-02-025 | Collin/ Dallas |
FM 545 | Actual | $2,729,000 | 1 | REPLACE BRIDGE AND APPROACHES |
| 0231-19-002 | Coryell/ Waco |
US 190 | Actual | $43,074,719 | ROW | CONSTRUCT TWO - LANES OF ULTIMATE FOUR - LANE DIVIDED CONTROL |
| 1702-03-001 | Dallam/ Amarillo |
SS 17 | Actual | $1,621,574 | 11 | NEW LOCATION 2 LANE RDWY |
| 0009-11-222 | Dallas/ Dallas |
IH 30 | Actual | $5,269,891 | 1 | PLANING, ACP OVERLAY, SHOULDER REPAIR AND PAVEMENT MARKINGS |
| 0353-05-111 | Dallas/ Dallas |
SP 244 | Actual | $1,297,421 | 1 | FULL DEPTH CONCRETE PAVEMENT REPAIR, PATCHING, NOVACHIP, AND |
| 0918-00-179 | Dallas/ Dallas |
VA | Actual | $261,397 | 1 | REFURBISH ITS |
| 0918-45-807 | Dallas/ Dallas |
CS | Actual | $3,276,574 | ROW | RECONSTRUCT AND WIDEN FROM 4 TO 6 LANE DIVIDED |
| 0002-14-037 | El Paso/ El Paso |
FM 258 | Actual | $1,613,265 | 8 | CONTINUOUS LIGHTING |
| 0924-06-370 | El Paso/ El Paso |
VA | Actual | $500,000 | 5 | FORTY FOOT BUS PURCHASE 1 (DTC TO FIVE POINTS TO MISSION |
| 0924-06-371 | El Paso/ El Paso |
VA | Actual | $498,000 | 5 | 35" BUS PURCHASE |
| 0924-06-372 | El Paso/ El Paso |
VA | Actual | $833,333 | 5 | PURCHASE OF ARTICULATED BUS 2 (DTC TO FIVE POINTS TO MISSION |
| 0924-06-373 | El Paso/ El Paso |
VA | Actual | $833,333 | 5 | PURCHASE OF ARTICULATED BUS 3 (DTC TO FIVE POINTS TO MISSION |
| 1048-01-022 | Ellis/ Dallas |
FM 983 | Actual | $963,907 | 1 | REPLACE BRIDGE_AND APPROACHES |
| 0017-07-089 | Frio/ San Antonio |
IH 35 | Actual | $1,114,014 | 1 | RELOCATE EXISTING RAMP & CONSTRUCT NORTHBOUND FRONTAGE ROAD |
| 0912-73-146 | Galveston/ Houston |
VA | Actual | $97,083 | 1 | CRACK SEAL |
| 0047-18-067 | Grayson/ Paris |
US 75 | Actual | $966,675 | 8 | CONSTRUCT BRIDGE COLUMN PROTECTION USING CTB |
| 0111-01-090 | Harris/ Houston |
FM 521 | Actual | $113,022 | 1 | CRACK SEAL, BASE REPAIR |
| 0271-14-217 | Harris/ Houston |
IH 610 | Actual | 151,578,392 | 7 | RECONSTRUCT US 290 / IH 610 IC, CONSTRUCT INTERCHANGE WITH |
| 0500-03-462 | Harris/ Houston |
IH 45 | Actual | $77,483,150 | 2 | WIDEN AND RECONSTRUCT TO 10 MAIN LANES, TWO 3 - LANE_FRONTAGE |
| 0500-03-553 | Harris/ Houston |
IH 45 | Actual | $364,992 | 1 | ARMOR JOINT AND WIDE FLANGE BEAM REPAIRS |
| 0508-01-334 | Harris/ Houston |
IH 10 | Actual | $654,970 | 1 | REPAIR SLOPE FAILURE |
| 0912-72-067 | Harris/ Houston |
CS | Actual | $733,041 | 10 | CONSTRUCT PEDESTRIAN TRAIL |
| 0471-02-064 | Hays/ Austin |
SH 21 | Actual | $815,253 | 10 | INTERSECTION & SAFETY IMPROVEMENTS |
| 0683-05-010 | Hays/ Austin |
RM 12 | Actual | $337,960 | 8 | RESURFACE |
| 0255-07-130 | Hidalgo/ Pharr |
US 281 | Actual | $2,243,448 | 11 | OVERLAY (MAIN LANES) |
| 1429-02-031 | Hidalgo/ Pharr |
FM 1426 | Actual | $1,269,333 | 11 | REHABILITATE ROADWAY |
| 0014-07-081 | Hill/ Waco |
IH 35 | Actual | $15,116,416 | 9 | CONSTRUCTION OF A NEW SAFETY REST AREA |
| 1601-03-012 | Hood/ Fort Worth |
FM 2580 | Actual | $1,137,525 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0009-07-041 | Hunt/ Paris |
SP 302 | Actual | $1,055,691 | 1 | OVERLAY |
| 0901-22-099 | Hunt/ Paris |
PW | Actual | $130,227 | 10 | CONSTRUCT RV PARKING LANE AND PARKING LOT |
| 0932-02-045 | Jefferson/ Beaumont |
FM 365 | Actual | $588,276 | 8 | SAFETY TREAT FIXED OBJECTS |
| 0348-04-041 | Karnes/ Corpus Christi |
SH 80 | Actual | $1,264,897 | 1 | MILL & OVERLAY |
| 0473-02-033 | Lee/ Austin |
SH 21 | Actual | $4,326,346 | 11 | ADD SHOULDERS, REPAIR PAVEMENT AND SEAL COAT |
| 1148-02-015 | Leon/ Bryan |
FM 1146 | Actual | $712,450 | 8 | SAFETY WORK CONSISTING OF SUBGRADE WIDENING, FLEXIBLE BASE, |
| 0010-08-051 | Morris/ Atlanta |
US 67 | Actual | $2,886,203 | 8 | SAFETY TREAT FIXED OBJECTS |
| 0918-18-102 | Navarro/ Dallas |
VA | Actual | $2,030,183 | 10 | UPGRADE SELECT INTERSECTIONS TO CURRENT ADA STANDARDS |
| 0617-01-175 | Nueces/ Corpus Christi |
SH 358 | Actual | $771,210 | 1 | MILL AND INLAY |
| 0008-01-045 | Palo Pinto/ Fort Worth |
US 180 | Actual | $555,000 | 1 | MILL AND OVERLAY |
| 0539-04-034 | Palo Pinto/ Fort Worth |
SH 254 | Actual | $2,015,925 | 1 | CEMENT TREAT EXISTING BASE AND HMAC OVERLAY |
| 0924-07-011 | Presidio/ El Paso |
CS | Actual | $326,034 | 10 | REPAVE AND RESTRIPE EXISTING AIRSTRIP / AIRPLANE TIE DOWN AREA |
| 0372-01-094 | San Patricio/ Corpus Christi |
US 77 | Actual | $365,316 | 8 | INSTALL SAFETY LIGHTING |
| 0742-01-045 | Shelby/ Lufkin |
FM 139 | Actual | $1,630,133 | 1 | REPLACE BRIDGES AND APPROACHES |
| 0810-01-017 | Shelby/ Lufkin |
FM 417 | Actual | $1,006,868 | 6 | REPLACE BRIDGE AND APPROACHES |
| 1879-01-019 | Shelby/ Lufkin |
FM 2026 | Actual | $892,526 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0191-01-079 | Smith/ Tyler |
US 69 | Actual | $239,806 | 8 | UPGRADE TRAFFIC SIGNALS |
| 0008-13-222 | Tarrant/ Fort Worth |
IH 820 | Actual | $369,480 | 1 | SCOUR AND EROSION PROTECTION AND DEBRIS REMOVAL |
| 0363-01-135 | Tarrant/ Fort Worth |
SH 26 | Actual | $1,085,355 | 1 | MILL, BASE REPAIR, 2" HMAC OVERLAY, PAVEMENT MARKINGS |
| 0902-00-122 | Tarrant/ Fort Worth |
VA | Actual | $1,291,394 | 1 | FULL DEPTH CONCRETE PAVEMENT REPAIR ON VARIOUS ROADWAYS |
| 0902-48-647 | Tarrant/ Fort Worth |
CS | Actual | $42,216 | 7 | INSTALL WAYSIDE HORN AND CONSTANT WARNING TIME DEVICE |
| 1330-01-058 | Tarrant/ Fort Worth |
BF1187C | Actual | $766,145 | 6 | REPLACE BRIDGE |
| 2266-02-137 | Tarrant/ Fort Worth |
SH 360 | Actual | $131,124 | 8 | IMPROVE TRAFFIC SIGNAL AND LENGTHEN LEFT TURN LANE |
| 0015-10-059 | Travis/ Austin |
IH 35 | Actual | $550,419 | 1 | MILL, SEAL & THIN OVERLAY |
| 0113-08-068 | Travis/ Austin |
US 290 | Actual | $1,496,501 | 8 | INSTALL CENTER TURN LANE AND PAVE SHOULDERS |
| 0683-02-053 | Travis/ Austin |
RM 620 | Actual | $1,391,104 | 1 | INSTALL ADV WARNING & SAFETY LIGHTING |
| 0700-03-114 | Travis/ Austin |
SH 71 | Actual | $5,357,702 | ROW | INSTALL CENTER TURN LANE, ACCELERATION LANE & SHOULDERS |
| 1386-01-020 | Upshur/ Atlanta |
FM 1404 | Actual | $136,997 | 1 | IMPROVE INTERSECTION |
| 0022-10-058 | Val Verde/ Laredo |
US 90 | Actual | $140,514 | 8 | INSTALL TRAFFIC SIGNAL |
| 0913-27-037 | Victoria/ Yoakum |
CR | Actual | $1,209,307 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0523-02-032 | Waller/ Houston |
FM 362 | Actual | $4,277,602 | 1 | ACP OVERLAY, BASE REPAIR AND WIDEN SHOULDERS |
| 0320-04-024 | Williamson/ Austin |
US 79 | Actual | $388,270 | 1 | EXTEND LTL AND INSTALL SIGNAL |
|
| |