Letting Schedule for June, 2011 (FY 2011)
Letting Schedule for June, 2011 (FY 2011) | ||||
Last Update: Tuesday, September 6, 2011 |
June, 2011 (FY 2011) | (see Links) |
SEP 2010 | OCT 2010 | NOV 2010 | DEC 2010 | JAN 2011 | FEB 2011 | MAR 2011 | APR 2011 | MAY 2011 | JUN 2011 | JUL 2011 | AUG 2011 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0122-04-035 | Anderson/ Tyler |
US 287 | Actual | $3,229,268 | 1 | RESURFACE ROADWAY |
0576-02-061 | Angelina/ Lufkin |
FM 58 | Actual | $84,689 | 11 | INSTALL TRAFFIC SIGNAL |
0527-07-005 | Austin/ Yoakum |
PR 38 | Actual | $78,116 | 6 | REHABILITATE BRIDGE |
0913-20-075 | Austin/ Yoakum |
CR | Actual | $338,778 | 6 | REPLACE BRIDGE AND APPROACHES |
0913-20-077 | Austin/ Yoakum |
CR | Actual | $245,157 | 6 | REPLACE BRIDGE AND APPROACHES |
0913-20-081 | Austin/ Yoakum |
CR | Actual | $255,644 | 6 | REPLACE BRIDGE AND APPROACHES |
0115-04-046 | Bastrop/ Austin |
FM 20 | Actual | $1,247,831 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS |
0807-01-026 | Bastrop/ Austin |
FM 535 | Actual | $1,180,575 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS |
1533-01-019 | Bastrop/ Austin |
FM 1704 | Actual | $6,390,876 | 8 | GUARDRAIL & SAFETY TREAT FIXED OBJCTS |
0015-04-067 | Bell/ Waco |
IH 35 | Actual | 123,628,673 | 4 | RECONSTRUCT AND WIDEN FROM FOUR TO SIX LANES TO REDUCE |
0231-10-015 | Bell/ Waco |
BU 190F | Actual | $182,000 | 8 | INSTALL TRAFFIC SIGNAL |
0320-05-014 | Bell/ Waco |
LP 363 | Actual | $469,470 | 1 | RESURFACING |
0253-04-142 | Bexar/ San Antonio |
US 281 | Actual | $205,314 | 8 | INSTALL TRAFFIC SIGNALS |
0465-02-025 | Bexar/ San Antonio |
FM 1518 | Actual | $134,893 | 1 | CONSTRUCT LEFT TURN LANE |
0613-01-058 | Bexar/ San Antonio |
SH 16 | Actual | $379,533 | 1 | INSTALL TRAFFIC SIGNAL AND WIDEN TO CONSTRUCT LEFT TURN LANE |
0915-12-488 | Bexar/ San Antonio |
VA | Actual | $345,000 | 9 | "SAME ROAD, SAME RULES, SAME RIGHTS" PUBLIC SAFETY CAMPAIGN |
2104-02-029 | Bexar/ San Antonio |
FM 1957 | Actual | $903,456 | 8 | OVERLAY AND PAVEMENT MARKINGS |
0648-02-017 | Brazos/ Bryan |
FM 50 | Actual | $1,247,412 | 1 | RESTORE EXISTING ROAD CONSISTING OF GRADING, STRUCTURES |
1316-01-054 | Brazos/ Bryan |
FM 1179 | Actual | $2,006,292 | 11 | REHABILITATE EXISTING ROAD CONSISTING OF SCARIFYING EXISTING |
2399-01-059 | Brazos/ Bryan |
FM 2818 | Actual | $636,199 | 8 | MISCELLANEOUS WORK CONSISTING OF THE INSTALLATION OF A |
0833-11-030 | Burleson/ Bryan |
FM 1362 | Actual | $1,993,785 | 8 | SAFETY IMPROVEMENT WORK CONSISTING OF SUBGRADE WIDENING, |
0152-03-055 | Caldwell/ Austin |
US 183 | Actual | $3,291,233 | 1 | ADD SHOULDERS, PAVMENT REPAIR, & OVERLAY |
0389-02-039 | Chambers/ Beaumont |
SH 146 | Actual | $786,639 | 6 | REHABILITATE BRIDGE |
0224-01-057 | Clay/ Wichita Falls |
US 287 | Actual | $1,208,010 | 1 | MILLING AND HOT MIX OVERLAY |
0135-12-025 | Collin/ Dallas |
FM 3537 | Actual | $23,788,821 | 10 | WIDEN TWO LANE RURAL TO SIX LANE DIVIDED URBAN HIGHWAY |
2056-01-045 | Collin/ Dallas |
FM 2551 | Actual | $15,783,469 | 10 | RECONSTRUCT AND WIDEN 2 LANE RURAL TO 6 LANE URBAN DIVIDED |
0026-04-043 | Colorado/ Yoakum |
US 90 | Actual | $821,368 | 8 | SAFETY TREAT FIXED OBJECTS |
0923-17-034 | Comanche/ Brownwood |
CR | Actual | $743,520 | 6 | REPLACE BRIDGE AND APPROACHES |
0923-17-061 | Comanche/ Brownwood |
CR | Actual | $907,096 | 6 | REPLACE BRIDGE AND APPROACHES |
0009-11-218 | Dallas/ Dallas |
IH 30 | Actual | $899,417 | 1 | PLANING, ACP OVERLAY, PAVEMENT MARKINGS, AND SHOULDER REPAIR |
0095-02-108 | Dallas/ Dallas |
US 80 | Actual | $109,492 | 1 | REFURBISH GUIDE SIGNS |
0095-13-033 | Dallas/ Dallas |
IH 20 | Actual | $554,056 | 1 | REFURBISH GUIDE SIGNS |
0197-02-102 | Dallas/ Dallas |
US 175 | Actual | $174,136 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND |
0581-02-111 | Dallas/ Dallas |
LP 12 | Actual | $493,438 | 6 | REHABILITATE BRIDGE AND APPROACHES |
0918-00-177 | Dallas/ Dallas |
VA | Actual | $4,262,500 | 7 | REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN |
0918-00-178 | Dallas/ Dallas |
VA | Actual | $1,000,000 | 7 | REG AERIAL PHOTO DATA COLLECT / PLAN TO IMPROVE TRAVEL DEMAND |
0918-45-863 | Dallas/ Dallas |
VA | Actual | $408,721 | 1 | FULL AND PARTIAL DEPTH CONCRETE REPAIR |
0918-46-180 | Denton/ Dallas |
CR | Actual | $749,276 | 6 | REPLACE BRIDGE AND APPROACHES |
0925-10-034 | Donley/ Childress |
PW | Actual | $135,000 | 10 | BASE |
2224-01-075 | Ector/ Odessa |
LP 338 | Actual | $1,415,698 | 11 | PAVEMENT OVERLAY |
0167-02-048 | El Paso/ El Paso |
LP 478 | Actual | $558,667 | 8 | IMPROVE TRAFFIC SIGNAL |
2121-03-143 | El Paso/ El Paso |
IH 10 | Actual | $528,700 | 11 | PREVENTATIVE BRIDGE MAINTENANCE |
0048-03-083 | Ellis/ Dallas |
US 77 | Actual | $1,082,453 | 8 | CONSTRUCT INTERSECTION IMPROVEMENTS |
0209-03-046 | Falls/ Waco |
US 77 | Actual | $5,127,078 | 1 | REPAIR AND RESURFACE WITH ASPHALT PAVEMENT AND ADD PASSING |
0901-32-055 | Fannin/ Paris |
CR | Actual | $880,502 | 6 | REPLACE BRIDGE AND APPROACHES |
0543-03-069 | Fort Bend/ Houston |
FM 762 | Actual | $348,629 | 8 | CENTERLINE RUMBLE STRIPS |
0051-03-100 | Galveston/ Houston |
SH 3 | Actual | $462,224 | 1 | DRAINAGE IMPROVEMENTS IN GALVESTON CO DRAINAGE DISTRICT 2 |
0913-22-028 | Gonzales/ Yoakum |
CR | Actual | $163,536 | 6 | REPLACE BRIDGE AND APPROACHES |
0315-03-050 | Grimes/ Bryan |
SH 90 | Actual | $6,758,785 | 11 | REHABILITATE EXISTING ROAD CONSISTING OF GRADING, STRUCTURES |
0025-03-094 | Guadalupe/ San Antonio |
US 90A | Actual | $1,187,662 | 1 | SEAL COAT, SIGNS & PAVEMENT MARKINGS |
0703-02-053 | Hardin/ Beaumont |
FM 92 | Actual | $1,120,588 | 8 | SAFETY TREAT FIXED OBJECTS |
0389-03-036 | Harris/ Houston |
SH 146 | Actual | $1,963,262 | 1 | RICH BOTTOM LAYER REPAIR, SEAL COAT, 1" RICH BOTTOM LAYER |
0912-72-058 | Harris/ Houston |
CR | Actual | $291,970 | 6 | REPLACE BRIDGE (NBI# 12102AA0725001) |
1685-05-089 | Harris/ Houston |
SH 6 | Actual | $1,308,626 | 5 | INTERSECTION IMPROVEMENTS |
1844-01-026 | Harris/ Houston |
FM 1959 | Actual | $654,429 | 1 | OVERLAY, BASE REPAIR, AND SEAL COAT |
3058-01-007 | Harris/ Houston |
FM 2553 | Actual | $420,331 | 1 | ACP OVERLAY |
0096-08-050 | Harrison/ Atlanta |
US 80 | Actual | $1,540,210 | 8 | INSTALL LEFT TURN LANE |
0157-04-047 | Haskell/ Abilene |
US 277 | Actual | $517,536 | 8 | POUROUS FRICTION COURSE |
0888-01-015 | Hill/ Waco |
FM 934 | Actual | $551,562 | 6 | REPLACE BRIDGE AND APPROACHES |
2305-02-012 | Hill/ Waco |
FM 2114 | Actual | $5,787,719 | 1 | WIDEN PAVEMENT TO ADD SHOULDERS, PROVIDE SAFETY UPGRADES AND |
3524-01-003 | Hood/ Fort Worth |
SL 567 | Actual | $4,564,897 | 11 | CONSTRUCT TWO LANE RURAL ROAD ON NEW LOCATION |
0901-28-050 | Hopkins/ Paris |
CR | Actual | $385,175 | 6 | REPLACE BRIDGE AND APPROACHES |
0668-01-016 | Howard/ Abilene |
FM 700 | Actual | $83,893 | 8 | INSTALL TRAFFIC SIGNAL |
0200-11-096 | Jefferson/ Beaumont |
US 69 | Actual | $183,916 | 8 | INSTALLATION OF TRAFFIC SIGNALS |
0197-04-076 | Kaufman/ Dallas |
US 175 | Actual | $153,653 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND |
0697-04-016 | Kaufman/ Dallas |
FM 90 | Actual | $1,017,804 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0231-01-050 | Lampasas/ Brownwood |
US 190 | Actual | $114,900 | 8 | INSTALL TRAFFIC SIGNAL |
0380-01-080 | Lubbock/ Lubbock |
US 62 | Actual | $284,452 | 8 | TRAFFIC SIGNAL |
0177-14-031 | Montgomery/ Houston |
LP 494 | Actual | $749,767 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12170017714044) |
0523-09-019 | Montgomery/ Houston |
FM 1488 | Actual | $2,074,236 | 1 | BASE REPAIR, OCST & ACP OVERLAY |
0996-01-015 | Navarro/ Dallas |
FM 638 | Actual | $1,287,918 | 1 | REPLACE BRIDGE AND APPROACHES |
0030-03-025 | Ochiltree/ Amarillo |
US 83 | Actual | $11,848,783 | 1 | REHABILITATE EXISTING ROADWAY |
1388-02-021 | Panola/ Atlanta |
FM 1251 | Actual | $1,528,625 | 8 | SAFETY TREAT FIXED OBJECTS |
0176-06-012 | Polk/ Lufkin |
BU 59-J | Actual | $241,677 | 8 | INSTALL TRAFFIC SIGNAL |
0041-07-084 | Potter/ Amarillo |
US 87 | Actual | $791,190 | 6 | REPLACE BRIDGE & APPROACHES |
0045-12-066 | Red River/ Paris |
US 82 | Actual | $749,734 | 6 | REPL BR & APPR |
0138-05-052 | Rusk/ Tyler |
US 259 | Actual | $5,497,236 | 1 | CONSTRUCT GRADE SEPARATED UNDERPASS OF US 259 |
0911-30-027 | San Augustine/ Lufkin |
CR | Actual | $274,395 | 6 | REPLACE BRIDGE AND APPROACHES |
0101-04-111 | San Patricio/ Corpus Christi |
US 181 | Actual | $188,000 | 11 | SIGNAL INSTALLATION |
0916-28-030 | San Patricio/ Corpus Christi |
CS | Actual | $798,303 | 11 | REHABILITATION OF EXISTING ROADWAY |
1208-03-019 | San Patricio/ Corpus Christi |
FM 1944 | Actual | $1,704,686 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0203-08-014 | Smith/ Tyler |
FM 1253 | Actual | $1,376,356 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0424-07-009 | Smith/ Tyler |
FM 2767 | Actual | $3,944,946 | 1 | REPAIR, WIDEN & RESURFACE RDWY, CONCURRENT W / SAFETY WIDENING |
0679-01-010 | Smith/ Tyler |
FM 757 | Actual | $2,651,026 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0171-05-087 | Tarrant/ Fort Worth |
SH 199 | Actual | $112,000 | 8 | INSTALL TRAFFIC SIGNAL |
0902-48-505 | Tarrant/ Fort Worth |
CS | Actual | $24,150,158 | 6 | REPLACE BRIDGE AND APPROACHES |
1330-02-041 | Tarrant/ Fort Worth |
FM 1187 | Actual | $3,679,268 | 1 | WIDEN FROM 2 LANE TO 4 LANE FACILITY |
0125-03-041 | Throckmorton/ Wichita Falls |
US 183 | Actual | $1,099,044 | 1 | HOT MIX OVERLAY |
0069-07-102 | Tom Green/ San Angelo |
US 87 | Actual | $204,952 | 8 | REPLACE TRAFFIC SIGNAL |
0151-06-135 | Travis/ Austin |
US 183 | Actual | $1,912,438 | 1 | MILL, SEAL & OVERLAY FRONTAGE RDS |
1186-01-088 | Travis/ Austin |
FM 969 | Actual | $398,287 | 11 | ADD DUAL LEFT FROM HUNTERS BEND RD. |
0248-05-055 | Upshur/ Atlanta |
US 271 | Actual | $20,190,490 | 10 | CONSTRUCT GRADE SEPARATION |
0245-19-019 | Van Zandt/ Tyler |
SH 64 | Actual | $6,387,594 | 8 | WIDEN ROADWAY TO SUPER - TWO (3 LANE) CRITERIA |
0910-12-060 | Van Zandt/ Tyler |
PW | Actual | $971,990 | 10 | REPAIR, REPAVE, RESTRIPE CAMP ROADS, CAMPSITES, PARKING LOTS |
1687-01-016 | Waller/ Houston |
FM 1736 | Actual | $284,214 | 1 | SEAL COAT |
0114-10-093 | Washington/ Bryan |
BU 290F | Actual | $652,237 | 8 | SAFETY WORK CONSISTING OF MILLING, SMA AND PAVEMENT MARKINGS |
0337-01-034 | Williamson/ Austin |
SH 29 | Actual | $472,440 | 8 | INSTALL TRAFFIC SIGNAL |
0914-05-148 | Williamson/ Austin |
CS | Actual | $689,182 | 7 | THE CORRIDOR WILL BE STUDIED FOR THE EFFECTS OF WIDENING |
0134-07-068 | Wise/ Fort Worth |
US 380 | Actual | $122,535 | 8 | WORK CONSISTING OF INSTALLATION OF A FULL TRAFFIC - ACTUATED |
1751-01-017 | Wise/ Fort Worth |
FM 1655 | Actual | $3,479,076 | 1 | REPLACE 2 BRIDGES WITH ONE BRIDGE |
|
|