0122-04-035 Anderson/
Tyler
US 287 Actual $3,229,268 1 RESURFACE ROADWAY
0576-02-061 Angelina/
Lufkin
FM 58 Actual $84,689 11 INSTALL TRAFFIC SIGNAL
0527-07-005 Austin/
Yoakum
PR 38 Actual $78,116 6 REHABILITATE BRIDGE
0913-20-075 Austin/
Yoakum
CR Actual $338,778 6 REPLACE BRIDGE AND APPROACHES
0913-20-077 Austin/
Yoakum
CR Actual $245,157 6 REPLACE BRIDGE AND APPROACHES
0913-20-081 Austin/
Yoakum
CR Actual $255,644 6 REPLACE BRIDGE AND APPROACHES
0115-04-046 Bastrop/
Austin
FM 20 Actual $1,247,831 8 GUARDRAIL & SAFETY TREAT FIXED OBJCTS
0807-01-026 Bastrop/
Austin
FM 535 Actual $1,180,575 8 GUARDRAIL & SAFETY TREAT FIXED OBJCTS
1533-01-019 Bastrop/
Austin
FM 1704 Actual $6,390,876 8 GUARDRAIL & SAFETY TREAT FIXED OBJCTS
0015-04-067 Bell/
Waco
IH 35 Actual 123,628,673 4 RECONSTRUCT AND WIDEN FROM FOUR TO SIX LANES TO REDUCE
0231-10-015 Bell/
Waco
BU 190F Actual $182,000 8 INSTALL TRAFFIC SIGNAL
0320-05-014 Bell/
Waco
LP 363 Actual $469,470 1 RESURFACING
0253-04-142 Bexar/
San Antonio
US 281 Actual $205,314 8 INSTALL TRAFFIC SIGNALS
0465-02-025 Bexar/
San Antonio
FM 1518 Actual $134,893 1 CONSTRUCT LEFT TURN LANE
0613-01-058 Bexar/
San Antonio
SH 16 Actual $379,533 1 INSTALL TRAFFIC SIGNAL AND WIDEN TO CONSTRUCT LEFT TURN LANE
0915-12-488 Bexar/
San Antonio
VA Actual $345,000 9 "SAME ROAD, SAME RULES, SAME RIGHTS" PUBLIC SAFETY CAMPAIGN
2104-02-029 Bexar/
San Antonio
FM 1957 Actual $903,456 8 OVERLAY AND PAVEMENT MARKINGS
0648-02-017 Brazos/
Bryan
FM 50 Actual $1,247,412 1 RESTORE EXISTING ROAD CONSISTING OF GRADING, STRUCTURES
1316-01-054 Brazos/
Bryan
FM 1179 Actual $2,006,292 11 REHABILITATE EXISTING ROAD CONSISTING OF SCARIFYING EXISTING
2399-01-059 Brazos/
Bryan
FM 2818 Actual $636,199 8 MISCELLANEOUS WORK CONSISTING OF THE INSTALLATION OF A
0833-11-030 Burleson/
Bryan
FM 1362 Actual $1,993,785 8 SAFETY IMPROVEMENT WORK CONSISTING OF SUBGRADE WIDENING,
0152-03-055 Caldwell/
Austin
US 183 Actual $3,291,233 1 ADD SHOULDERS, PAVMENT REPAIR, & OVERLAY
0389-02-039 Chambers/
Beaumont
SH 146 Actual $786,639 6 REHABILITATE BRIDGE
0224-01-057 Clay/
Wichita Falls
US 287 Actual $1,208,010 1 MILLING AND HOT MIX OVERLAY
0135-12-025 Collin/
Dallas
FM 3537 Actual $23,788,821 10 WIDEN TWO LANE RURAL TO SIX LANE DIVIDED URBAN HIGHWAY
2056-01-045 Collin/
Dallas
FM 2551 Actual $15,783,469 10 RECONSTRUCT AND WIDEN 2 LANE RURAL TO 6 LANE URBAN DIVIDED
0026-04-043 Colorado/
Yoakum
US 90 Actual $821,368 8 SAFETY TREAT FIXED OBJECTS
0923-17-034 Comanche/
Brownwood
CR Actual $743,520 6 REPLACE BRIDGE AND APPROACHES
0923-17-061 Comanche/
Brownwood
CR Actual $907,096 6 REPLACE BRIDGE AND APPROACHES
0009-11-218 Dallas/
Dallas
IH 30 Actual $899,417 1 PLANING, ACP OVERLAY, PAVEMENT MARKINGS, AND SHOULDER REPAIR
0095-02-108 Dallas/
Dallas
US 80 Actual $109,492 1 REFURBISH GUIDE SIGNS
0095-13-033 Dallas/
Dallas
IH 20 Actual $554,056 1 REFURBISH GUIDE SIGNS
0197-02-102 Dallas/
Dallas
US 175 Actual $174,136 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND
0581-02-111 Dallas/
Dallas
LP 12 Actual $493,438 6 REHABILITATE BRIDGE AND APPROACHES
0918-00-177 Dallas/
Dallas
VA Actual $4,262,500 7 REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN
0918-00-178 Dallas/
Dallas
VA Actual $1,000,000 7 REG AERIAL PHOTO DATA COLLECT / PLAN TO IMPROVE TRAVEL DEMAND
0918-45-863 Dallas/
Dallas
VA Actual $408,721 1 FULL AND PARTIAL DEPTH CONCRETE REPAIR
0918-46-180 Denton/
Dallas
CR Actual $749,276 6 REPLACE BRIDGE AND APPROACHES
0925-10-034 Donley/
Childress
PW Actual $135,000 10 BASE
2224-01-075 Ector/
Odessa
LP 338 Actual $1,415,698 11 PAVEMENT OVERLAY
0167-02-048 El Paso/
El Paso
LP 478 Actual $558,667 8 IMPROVE TRAFFIC SIGNAL
2121-03-143 El Paso/
El Paso
IH 10 Actual $528,700 11 PREVENTATIVE BRIDGE MAINTENANCE
0048-03-083 Ellis/
Dallas
US 77 Actual $1,082,453 8 CONSTRUCT INTERSECTION IMPROVEMENTS
0209-03-046 Falls/
Waco
US 77 Actual $5,127,078 1 REPAIR AND RESURFACE WITH ASPHALT PAVEMENT AND ADD PASSING
0901-32-055 Fannin/
Paris
CR Actual $880,502 6 REPLACE BRIDGE AND APPROACHES
0543-03-069 Fort Bend/
Houston
FM 762 Actual $348,629 8 CENTERLINE RUMBLE STRIPS
0051-03-100 Galveston/
Houston
SH 3 Actual $462,224 1 DRAINAGE IMPROVEMENTS IN GALVESTON CO DRAINAGE DISTRICT 2
0913-22-028 Gonzales/
Yoakum
CR Actual $163,536 6 REPLACE BRIDGE AND APPROACHES
0315-03-050 Grimes/
Bryan
SH 90 Actual $6,758,785 11 REHABILITATE EXISTING ROAD CONSISTING OF GRADING, STRUCTURES
0025-03-094 Guadalupe/
San Antonio
US 90A Actual $1,187,662 1 SEAL COAT, SIGNS & PAVEMENT MARKINGS
0703-02-053 Hardin/
Beaumont
FM 92 Actual $1,120,588 8 SAFETY TREAT FIXED OBJECTS
0389-03-036 Harris/
Houston
SH 146 Actual $1,963,262 1 RICH BOTTOM LAYER REPAIR, SEAL COAT, 1" RICH BOTTOM LAYER
0912-72-058 Harris/
Houston
CR Actual $291,970 6 REPLACE BRIDGE (NBI# 12102AA0725001)
1685-05-089 Harris/
Houston
SH 6 Actual $1,308,626 5 INTERSECTION IMPROVEMENTS
1844-01-026 Harris/
Houston
FM 1959 Actual $654,429 1 OVERLAY, BASE REPAIR, AND SEAL COAT
3058-01-007 Harris/
Houston
FM 2553 Actual $420,331 1 ACP OVERLAY
0096-08-050 Harrison/
Atlanta
US 80 Actual $1,540,210 8 INSTALL LEFT TURN LANE
0157-04-047 Haskell/
Abilene
US 277 Actual $517,536 8 POUROUS FRICTION COURSE
0888-01-015 Hill/
Waco
FM 934 Actual $551,562 6 REPLACE BRIDGE AND APPROACHES
2305-02-012 Hill/
Waco
FM 2114 Actual $5,787,719 1 WIDEN PAVEMENT TO ADD SHOULDERS, PROVIDE SAFETY UPGRADES AND
3524-01-003 Hood/
Fort Worth
SL 567 Actual $4,564,897 11 CONSTRUCT TWO LANE RURAL ROAD ON NEW LOCATION
0901-28-050 Hopkins/
Paris
CR Actual $385,175 6 REPLACE BRIDGE AND APPROACHES
0668-01-016 Howard/
Abilene
FM 700 Actual $83,893 8 INSTALL TRAFFIC SIGNAL
0200-11-096 Jefferson/
Beaumont
US 69 Actual $183,916 8 INSTALLATION OF TRAFFIC SIGNALS
0197-04-076 Kaufman/
Dallas
US 175 Actual $153,653 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND
0697-04-016 Kaufman/
Dallas
FM 90 Actual $1,017,804 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0231-01-050 Lampasas/
Brownwood
US 190 Actual $114,900 8 INSTALL TRAFFIC SIGNAL
0380-01-080 Lubbock/
Lubbock
US 62 Actual $284,452 8 TRAFFIC SIGNAL
0177-14-031 Montgomery/
Houston
LP 494 Actual $749,767 6 REPLACE BRIDGE AND APPROACHES (NBI# 12170017714044)
0523-09-019 Montgomery/
Houston
FM 1488 Actual $2,074,236 1 BASE REPAIR, OCST & ACP OVERLAY
0996-01-015 Navarro/
Dallas
FM 638 Actual $1,287,918 1 REPLACE BRIDGE AND APPROACHES
0030-03-025 Ochiltree/
Amarillo
US 83 Actual $11,848,783 1 REHABILITATE EXISTING ROADWAY
1388-02-021 Panola/
Atlanta
FM 1251 Actual $1,528,625 8 SAFETY TREAT FIXED OBJECTS
0176-06-012 Polk/
Lufkin
BU 59-J Actual $241,677 8 INSTALL TRAFFIC SIGNAL
0041-07-084 Potter/
Amarillo
US 87 Actual $791,190 6 REPLACE BRIDGE & APPROACHES
0045-12-066 Red River/
Paris
US 82 Actual $749,734 6 REPL BR & APPR
0138-05-052 Rusk/
Tyler
US 259 Actual $5,497,236 1 CONSTRUCT GRADE SEPARATED UNDERPASS OF US 259
0911-30-027 San Augustine/
Lufkin
CR Actual $274,395 6 REPLACE BRIDGE AND APPROACHES
0101-04-111 San Patricio/
Corpus Christi
US 181 Actual $188,000 11 SIGNAL INSTALLATION
0916-28-030 San Patricio/
Corpus Christi
CS Actual $798,303 11 REHABILITATION OF EXISTING ROADWAY
1208-03-019 San Patricio/
Corpus Christi
FM 1944 Actual $1,704,686 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0203-08-014 Smith/
Tyler
FM 1253 Actual $1,376,356 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0424-07-009 Smith/
Tyler
FM 2767 Actual $3,944,946 1 REPAIR, WIDEN & RESURFACE RDWY, CONCURRENT W / SAFETY WIDENING
0679-01-010 Smith/
Tyler
FM 757 Actual $2,651,026 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0171-05-087 Tarrant/
Fort Worth
SH 199 Actual $112,000 8 INSTALL TRAFFIC SIGNAL
0902-48-505 Tarrant/
Fort Worth
CS Actual $24,150,158 6 REPLACE BRIDGE AND APPROACHES
1330-02-041 Tarrant/
Fort Worth
FM 1187 Actual $3,679,268 1 WIDEN FROM 2 LANE TO 4 LANE FACILITY
0125-03-041 Throckmorton/
Wichita Falls
US 183 Actual $1,099,044 1 HOT MIX OVERLAY
0069-07-102 Tom Green/
San Angelo
US 87 Actual $204,952 8 REPLACE TRAFFIC SIGNAL
0151-06-135 Travis/
Austin
US 183 Actual $1,912,438 1 MILL, SEAL & OVERLAY FRONTAGE RDS
1186-01-088 Travis/
Austin
FM 969 Actual $398,287 11 ADD DUAL LEFT FROM HUNTERS BEND RD.
0248-05-055 Upshur/
Atlanta
US 271 Actual $20,190,490 10 CONSTRUCT GRADE SEPARATION
0245-19-019 Van Zandt/
Tyler
SH 64 Actual $6,387,594 8 WIDEN ROADWAY TO SUPER - TWO (3 LANE) CRITERIA
0910-12-060 Van Zandt/
Tyler
PW Actual $971,990 10 REPAIR, REPAVE, RESTRIPE CAMP ROADS, CAMPSITES, PARKING LOTS
1687-01-016 Waller/
Houston
FM 1736 Actual $284,214 1 SEAL COAT
0114-10-093 Washington/
Bryan
BU 290F Actual $652,237 8 SAFETY WORK CONSISTING OF MILLING, SMA AND PAVEMENT MARKINGS
0337-01-034 Williamson/
Austin
SH 29 Actual $472,440 8 INSTALL TRAFFIC SIGNAL
0914-05-148 Williamson/
Austin
CS Actual $689,182 7 THE CORRIDOR WILL BE STUDIED FOR THE EFFECTS OF WIDENING
0134-07-068 Wise/
Fort Worth
US 380 Actual $122,535 8 WORK CONSISTING OF INSTALLATION OF A FULL TRAFFIC - ACTUATED
1751-01-017 Wise/
Fort Worth
FM 1655 Actual $3,479,076 1 REPLACE 2 BRIDGES WITH ONE BRIDGE


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract