Letting Schedule for August, 2016 (FY 2016)
| August, 2016 (FY 2016) | (see Links) |
| SEP 2015 | OCT 2015 | NOV 2015 | DEC 2015 | JAN 2016 | FEB 2016 | MAR 2016 | APR 2016 | MAY 2016 | JUN 2016 | JUL 2016 | AUG 2016 | ||||||
| CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
|---|---|---|---|---|---|---|
| 0716-01-045 | Austin/ Yoakum |
FM 109 | Actual | $605,948 | 8 | INCREASE SUPERELEVATION |
| 0913-20-073 | Austin/ Yoakum |
CR | Actual | $538,926 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0913-20-087 | Austin/ Yoakum |
CR | Actual | $314,926 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0914-18-091 | Bastrop/ Austin |
CS | Actual | $529,318 | 6 | REPLACE BRIDGE & APPROACHES |
| 0025-02-210 | Bexar/ San Antonio |
IH 10 | Actual | $4,697,952 | 6 | REPLACE ABUTMENT, APPROACH SLAB, CLEAN & PAINT STRUCTURE |
| 0915-12-555 | Bexar/ San Antonio |
VA | Actual | $5,286,690 | 1 | CONSTRUCT CURB RAMPS, CURBS, SIDEWALKS AND OTHER PEDESTRIAN |
| 2452-01-059 | Bexar/ San Antonio |
SL 1604 | Actual | $64,138,414 | ROW | EXPAND TO 4 LANE EXPRESSWAY - 4 NON - TOLL LANES |
| 0252-03-051 | Blanco/ Austin |
US 281 | Actual | $896,923 | 8 | CNSTRCT PVD SHLDRS, CORRECT SUPRELV |
| 1020-01-052 | Bowie/ Atlanta |
FM 559 | Actual | $208,886 | 10 | PAVEMENT / CULVERT REPAIR |
| 0212-03-057 | Brazos/ Bryan |
FM 158 | Actual | $1,380,692 | 3 | MISCELLANEOUS WORK CONSISTING OF INSTALLATION OF PEDESTRIAN |
| 0540-05-046 | Brazos/ Bryan |
FM 159 | Actual | $2,209,014 | 8 | SAFETY WORK CONSISTING SAFETY TREATING FIXED OBJECTS |
| 0924-35-022 | Brewster/ El Paso |
VA | Actual | $202,104 | 11 | ALPINE BEAUTIFICATION PROJECT |
| 0180-01-080 | Calhoun/ Yoakum |
SH 35 | Actual | $48,128 | 10 | 2016 RAILROAD REPLANKING PROGRAM |
| 0091-05-073 | Collin/ Dallas |
SH 289 | Actual | $474,268 | 10 | LANDSCAPE TREATMENT OF RIGHT OF WAY AND MEDIANS |
| 0918-24-203 | Collin/ Dallas |
VA | Actual | $249,968 | 3 | ON STREET BICYCLE FACILITIES;SIGNAGE;MARKINGS |
| 0918-24-237 | Collin/ Dallas |
VA | Actual | $1,379,874 | 3 | UPDATE HUNT COUNTY TRANS PLAN TO IDENTIFY IMPROVEMENTS TO |
| 0215-02-056 | Comal/ San Antonio |
BS 46-C | Actual | $852,181 | ROW | LANDA STREET PED AND BIKE FACILITY ENHANCEMENTS |
| 1033-04-021 | Comanche/ Brownwood |
FM 1689 | Actual | $2,464,852 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0555-02-020 | Concho/ San Angelo |
FM 380 | Actual | $2,162,111 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0195-01-115 | Cooke/ Wichita Falls |
IH 35 | Actual | $7,574 | 10 | REPAIR ROADWAY DUE TO FLOOD DAMAGE |
| 0312-01-079 | Cooke/ Wichita Falls |
FM 51 | Actual | $9,141 | 10 | REPAIR ROADWAY DUE TO FLOOD DAMAGE |
| 0047-07-229 | Dallas/ Dallas |
US 75 | Actual | $834,794 | 10 | LANDSCAPE MEDIAN AREAS AND BRIDGE AREAS (IN CITY OF DALLAS) |
| 0918-00-208 | Dallas/ Dallas |
VA | Actual | $301,000 | 3 | CONDUCT STATED PREFERENCE SURVEY TO ASSESS POTENTIAL |
| 0918-00-214 | Dallas/ Dallas |
VA | Actual | $2,109,648 | 3 | REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN |
| 0918-00-217 | Dallas/ Dallas |
VA | Actual | $4,151,000 | 3 | REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN |
| 0918-00-256 | Dallas/ Dallas |
VA | Actual | $501,000 | 3 | ALTERNATIVE FUEL VEHICLE DEPLOYMENT INITIATIVES; INCL.INCENT |
| 0918-00-257 | Dallas/ Dallas |
VA | Actual | $501,000 | 3 | IDLE - FREE SCHOOL ZONES; EDUCATION STRATEGIES AND |
| 0918-00-260 | Dallas/ Dallas |
VA | Actual | $1,501,000 | 3 | DART - - 511 TRAVELER INFORMATION SYSTEM; DEVELOP 511 SYSTEM |
| 0918-47-172 | Dallas/ Dallas |
CS | Actual | $221,477 | 10 | REPAIR ROADWAY |
| 2374-02-149 | Dallas/ Dallas |
IH 635 | Actual | $821,756 | 10 | LANDSCAPE TREATMENT FOR RIGHT OF WAY AND MEDIANS |
| 0918-46-288 | Denton/ Dallas |
VA | Actual | $1,056,379 | 3 | VANPOOL SUBSIDY INITIATIVE FOR COMMUTERS TRAVELING LONG DIST |
| 0918-46-293 | Denton/ Dallas |
CS | Actual | $55,663 | 10 | REPLACE CULVERT, REPAIR ROADWAY AND RESURFACE |
| 0037-15-009 | Dimmit/ Laredo |
FM 1917 | Actual | $527,359 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
| 0924-06-457 | El Paso/ El Paso |
CS | Actual | $6,591,275 | 3 | WIDEN ROADWAY TO 4 LANE |
| 0924-06-491 | El Paso/ El Paso |
VA | Actual | $324,899 | 11 | REGIONAL BIKE IMPROVEMENTS (ON STATE) |
| 0924-06-499 | El Paso/ El Paso |
VA | Actual | $3,843,034 | 3 | WIDEN FROM 4 TO 6 LANES DIVIDED |
| 0924-06-500 | El Paso/ El Paso |
VA | Actual | $13,434,149 | 3 | WIDEN FROM 4 TO 6 LANES DIVIDED |
| 0924-06-519 | El Paso/ El Paso |
CS | Actual | $334,750 | 3 | HAWTHORNE STREET PEDESTRIAN AND BICYCLE ENHANCEMENT |
| 0924-06-527 | El Paso/ El Paso |
VA | Actual | $500,000 | 12 | EL PASO COUNTY REGIONAL TRANSIT FEASIBILITY STUDY |
| 0924-06-528 | El Paso/ El Paso |
VA | Actual | $1,791,000 | 3 | ACTIVATE / CUSTOMIZE METROPIA MOBILE AND METROPIA SYNERGY SOLU |
| 0924-06-531 | El Paso/ El Paso |
VA | Actual | $584,000 | 3 | BIKE PROG WILL PROVIDE MORE COMMUTER TRAVEL OPTIONS WITH 8 B |
| 3572-01-005 | El Paso/ El Paso |
SS 6 | Actual | $198,745 | 1 | CONSTRUCTION OF CROSSWALKS, INSTALL OF NEW SCHL ZONE FLASHERS |
| 0092-03-051 | Ellis/ Dallas |
IH 45 | Actual | $494,158 | 10 | REPAIR OF SLOPE FAILURE ON FRONTAGE ROAD |
| 0172-04-045 | Ellis/ Dallas |
US 287 | Actual | $1,138,651 | 10 | REPAIR OF SLOPE FAILURE |
| 0250-03-046 | Erath/ Fort Worth |
US 281 | Actual | $24,891,248 | 1 | UPGRADE TO SUPER 2 DESIGN, EXT CULVERTS, SETS, OVERLAY AND |
| 0902-49-068 | Erath/ Fort Worth |
VA | Actual | $2,150,084 | 3 | CONSTRUCT BICYCLE / PEDESTRIAN PATH |
| 0209-04-031 | Falls/ Waco |
FM 1963 | Actual | $859,638 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0045-20-019 | Fannin/ Paris |
US 82 | Actual | $6,847,235 | 1 | INTERCHANGE IMPROVEMENT |
| 0901-32-099 | Fannin/ Paris |
VA | Actual | $158,520 | 3 | REPLACE CULVERT, WINGWALLS AND APPROACHES |
| 1262-01-014 | Fayette/ Yoakum |
FM 1115 | Actual | $3,558,330 | 1 | RESTORE ROADWAY |
| 0187-05-048 | Fort Bend/ Houston |
SS 10 | Actual | $11,736,891 | 1 | WIDEN TO 4 - LANE DIVIDED RURAL FACILITY (PHASE 2) |
| 0912-73-186 | Galveston/ Houston |
VA | Actual | $625,000 | 3 | PREVENTATIVE MAINTENANCE IN CITY OF GALVESTON (YEAR 3) |
| 0976-03-103 | Galveston/ Houston |
FM 518 | Actual | $227,695 | 10 | LANDSCAPE DEVELOPMENT |
| 0910-07-068 | Gregg/ Tyler |
VA | Actual | $254,159 | 10 | LANDSCAPE & PLANT TREES IN STATE ROW, PROVIDE IRRIGATION |
| 1931-01-017 | Gregg/ Tyler |
FM 2087 | Actual | $3,698,177 | 6 | REPLACE BRIDGE & APPROACHES |
| 0050-03-095 | Grimes/ Bryan |
SH 6 | Actual | $5,968,700 | 1 | MISCELLANEOUS CONSTRUCTION CONSISTING OF GRADING, BASE, |
| 0643-05-027 | Grimes/ Bryan |
FM 3090 | Actual | $2,353,004 | 1 | REPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES, |
| 0917-17-058 | Grimes/ Bryan |
CR | Actual | $417,155 | 6 | REPLACE EXISTING BRIDGE FACILITY CONSISTING OF GRADING, |
| 0271-07-312 | Harris/ Houston |
IH 10 | Actual | $12,293,403 | 3 | DIAMOND GRIND AND GROOVE PAVEMENT SURFACE |
| 0389-13-059 | Harris/ Houston |
SH 146 | Actual | $1,277,108 | 10 | LANDSCAPE DEVELOPMENT |
| 0500-03-606 | Harris/ Houston |
IH 45 | Actual | $66,590,610 | 1 | CONSTRUCT DIRECT CONNECTOR IH 610 EB TO IH 45 NB |
| 0508-01-341 | Harris/ Houston |
IH 10 | Actual | $1,482,326 | 1 | REPLACE EXISTING JOINTED CONCRETE RAMP AND EXISTING ACP WITH |
| 0598-01-090 | Harris/ Houston |
SH 288 | Actual | 690,741,000 | 3 | CONSTRUCT 4 TOLL LANES & RECONSTRUCT DIRECT CONNERS AT IH |
| 0912-00-494 | Harris/ Houston |
VA | Actual | $2,051,000 | 3 | SUBREGIONAL PLANNING INITIATIVE STUDIES |
| 0912-00-502 | Harris/ Houston |
VA | Actual | $1,601,000 | 3 | METRO STAR VANPOOL PROGRAM (FY 2016) |
| 0912-00-508 | Harris/ Houston |
VA | Actual | $5,002,000 | 3 | CLEAN CITIES / CLEAN VEHICLES PROGRAM (ENGINE / VEHICLE |
| 0912-00-510 | Harris/ Houston |
VA | Actual | $3,500,000 | 1 | ITS SUPPORT (NON - LET) (TRANSTAR) |
| 0912-00-538 | Harris/ Houston |
VA | Actual | $4,703,500 | 3 | CAPITAL COSTS FOR EXPANSION OF HOUSTON BIKE SHARE B - CYCLE |
| 0912-70-067 | Harris/ Houston |
CS | Actual | $582,539 | 3 | PEDESTRIAN WAY IMPROVEMENTS / SIDEWALKS, CHANNELVIEW ISD, |
| 0912-70-104 | Harris/ Houston |
CR | Actual | $2,330,232 | 3 | CONSTRUCT UNIVERSITY CONNECTION BIKE / PED PATH |
| 0912-71-003 | Harris/ Houston |
CS | Actual | $11,852,824 | 3 | ROADWAY RECONSTRUCTION |
| 0912-72-324 | Harris/ Houston |
CS | Actual | $32,000,000 | 3 | DESIGN AND RECONSTRUCT ROADWAY WITH TRANSITWAY (YEAR 4) |
| 0912-72-329 | Harris/ Houston |
CS | Actual | $25,000,000 | 3 | DESIGN AND RECONSTRUCT ROADWAY WITH TRANSITWAY (YEAR 3) |
| 2941-01-024 | Harris/ Houston |
FM 2920 | Actual | $3,817,767 | 1 | SEAL COAT, 1.5" ACP OVERLAY AND PAVEMENT MARKINGS |
| 0016-03-116 | Hays/ Austin |
IH 35 | Actual | $58,100 | 10 | MILL AND INLAY, PAVEMENT MARKINGS ON NORTHBOUND FRONTAGE |
| 1754-02-026 | Hays/ Austin |
RM 1826 | Actual | $250,000 | 3 | ADD LEFT TURN LANE |
| 0921-02-324 | Hidalgo/ Pharr |
CS | Actual | $487,777 | 3 | CITY OF PHARR BICYCLE ACCESSIBILITY IMPROVEMENTS |
| 0921-02-325 | Hidalgo/ Pharr |
CS | Actual | $1,273,162 | 3 | CONSTRUCT BENSTSEN ROAD HIKE & BIKE TRAIL |
| 0921-02-347 | Hidalgo/ Pharr |
VA | Actual | $3,174,549 | 2M | REHABILITATION OF EXISTING CONTINUOUS HIGHWAY ILLUMINATION |
| 0009-13-159 | Hunt/ Paris |
IH 30 | Actual | $23,164,561 | 1 | REPLACE EXISTING BRIDGE FACILITIES |
| 0020-04-016 | Jeff Davis/ El Paso |
US 90 | Actual | $11,823,087 | 1 | FULL DEPTH RECLAMATION, SURFACE TREATMENT |
| 0415-03-021 | Jeff Davis/ El Paso |
SH 166 | Actual | $188,280 | 8 | INSTALL GUARDRAIL TO DESIGN STANDARDS |
| 0259-05-075 | Johnson/ Fort Worth |
BU 67-M | Actual | $175,000 | 10 | REPLACE CONCRETE RIP RAP |
| 0260-01-056 | Johnson/ Fort Worth |
US 67 | Actual | $56,820 | 10 | LANDSCAPING AND IRRIGATION |
| 3010-02-014 | Johnson/ Fort Worth |
FM 2738 | Actual | $3,409,657 | 8 | WIDEN PAVEMENT AND ADD SHOULDERS |
| 2721-02-013 | Jones/ Abilene |
FM 3116 | Actual | $1,045,833 | 1 | REPLACE BRIDGE AND APPROACHES |
| 0348-03-027 | Karnes/ Corpus Christi |
SH 80 | Actual | $4,785,955 | 8 | REHAB ROADWAY |
| 0215-06-037 | Kendall/ San Antonio |
SH 46 | Actual | $8,970,344 | 1 | WIDEN ROADWAY TO PROVIDE PASSING LANES |
| 0018-02-064 | La Salle/ Laredo |
IH 35 | Actual | $6,908,417 | 1 | WIDENING AND REHABILITATION OF EXISTING HIGHWAY |
| 1537-01-016 | Lee/ Austin |
FM 1624 | Actual | $1,148,469 | 1 | IMPROVE GUARDRAIL & SAFETY TREAT FIXED OBJECTS |
| 0783-02-091 | Lubbock/ Lubbock |
SL 289 | Actual | $74,935 | 6 | REPLACE GUARD FENCE |
| 0905-06-089 | Lubbock/ Lubbock |
CS | Actual | $874,627 | 3 | LANDSCAPE AND SCENIC ENHANCEMENT |
| 0149-04-016 | Mason/ Austin |
US 377 | Actual | $765,168 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS & SAFETY TREAT FIXED |
| 0056-01-033 | McLennan/ Waco |
US 84 | Actual | $9,405,386 | 1 | REHABILTATE ROADWAY AND ADD PASSING LANES |
| 0398-03-058 | McLennan/ Waco |
SH 317 | Actual | $9,139,074 | 1 | WIDEN PAVEMENT TO ADD SHOULDERS |
| 1400-04-021 | Montgomery/ Houston |
FM 1774 | Actual | $23,247,170 | 1 | CONSTRUCT RR GRADE SEPARATION |
| 0214-03-033 | Newton/ Beaumont |
SH 63 | Actual | $4,383,872 | 6 | REPAIR BRIDGE |
| 2618-01-016 | Newton/ Beaumont |
FM 2626 | Actual | $2,511,553 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0916-35-202 | Nueces/ Corpus Christi |
VA | Actual | $312,500 | 3 | BICYCLE RACKS AND LOCKERS |
| 1557-01-041 | Nueces/ Corpus Christi |
FM 43 | Actual | $3,286,684 | 1 | CONSTRUCT TURN LANES, REHAB SHLDRS, AND OVERLAY |
| 0176-05-179 | Polk/ Lufkin |
US 59 | Actual | $89,790 | 8 | INSTALL ADVANCE WARNING SIGNAL & SIGNS (INTERSECTION) |
| 0917-18-080 | Robertson/ Bryan |
VA | Actual | $8,786 | 3 | MISCELLANEOUS WORK CONSISTING OF INSTALLING SIGNS ALONG |
| 0119-02-020 | Sabine/ Lufkin |
SH 21 | Actual | $684,933 | 8 | PROFILE CENTERLINE MARKINGS |
| 0011-06-045 | Shackelford/ Abilene |
US 180 | Actual | $467,416 | 8 | INSTALL INTERSECTION FLASHING BEACON. |
| 0780-01-018 | Somervell/ Fort Worth |
FM 51 | Actual | $23,312 | 10 | HMAC, CSS1P, STRIPING, RPM'S |
| 0008-13-231 | Tarrant/ Fort Worth |
IH 20 | Actual | $1,187,693 | 1 | REMOVE METAL BEAM GUARD FENCE AND INSTALL CONCRETE TRAFFIC |
| 0014-02-049 | Tarrant/ Fort Worth |
IH 35W | Actual | $6,093,666 | 3 | CONSTRUCT 3 LANE BRIDGE FOR A TOTAL OF 6 LANES AT THIS |
| 0353-03-097 | Tarrant/ Fort Worth |
SH 114 | Actual | $3,654 | 3 | CONVERSION OF EXISTING FREEWAY RAMP TO A TWO / ONE LANE |
| 0902-00-196 | Tarrant/ Fort Worth |
VA | Actual | $401,000 | 3 | TOLLROADS USER SURVEY TO ASSESS POTENTIAL ECONOMIC IMPL OF A |
| 0902-00-197 | Tarrant/ Fort Worth |
VA | Actual | $201,000 | 3 | EMISSIONS REDUCTION STRATEGIES FOR OZONE PRECURSORS INCL VOC |
| 0902-90-023 | Tarrant/ Fort Worth |
VA | Actual | $898,248 | 3 | WESTERN EXTENSION OF TRAILS OF EULESS; SIDEWALK |
| 0902-90-033 | Tarrant/ Fort Worth |
VA | Actual | $2,791,250 | 7 | MOBILITY ASST PATROL THAT PROVIDES ASST TO STRANDED MOTORIST |
| 0902-90-046 | Tarrant/ Fort Worth |
VA | Actual | $1,001,000 | 3 | PE FOR INTERSECTION REALIGNMENT, TRAFFIC SIGNAL, ROUNDABOUT, |
| 0902-90-049 | Tarrant/ Fort Worth |
VA | Actual | $1,702,889 | 3 | MOB ASST, SUST DEVEL, ITS & OTHER IMPLEM INIT / DEVEL AND |
| 0902-90-063 | Tarrant/ Fort Worth |
VA | Actual | $2,000,000 | 7 | VANPOOL PROGRAM FY 16; OPER VANPOOL SUBSIDY INITIATIVE FOR |
| 1068-03-022 | Tarrant/ Fort Worth |
SS 341 | Actual | $282,864 | 3 | LANDSCAPE ENHANCEMENT |
| 0006-05-114 | Taylor/ Abilene |
IH 20 | Actual | $258,629 | 8 | INSTALL ADVANCE WARNING SIGNS (CURVE) , AND CHEVRONS (CURVE) |
| 0114-02-102 | Travis/ Austin |
US 290 | Actual | $2,645,302 | 3 | CONSTRUCT RIGHT TURN LANE ON SB FRONTAGE RD OF SH 130 AND |
| 0151-09-036 | Travis/ Austin |
US 183 | Actual | 629,405,700 | 3 | CONSTRUCT TOLL LANES AND FRONTAGE ROADS |
| 1378-01-036 | Travis/ Austin |
RM 1431 | Actual | $1,136,825 | 1 | IMPRV GRDRAIL & SAFETY TREAT OBJECTS |
| 0315-12-013 | Washington/ Bryan |
FM 1155 | Actual | $204,460 | 8 | SAFETY WORK CONSISTING OF EDGELINE AND CENTERLINE PROFILE |
| 0237-03-030 | Webb/ Laredo |
SH 44 | Actual | $3,538,172 | 6 | FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING BRIDG |
| 0542-01-083 | Webb/ Laredo |
US 59 | Actual | $1,680,644 | 8 | IMPROVE TRAFFIC SIGNALS |
| 0922-33-157 | Webb/ Laredo |
CR | Actual | $597,832 | 6 | FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING |
| 2022-01-013 | Webb/ Laredo |
SH 44 | Actual | $580,285 | 8 | PROFILE EDGELINE MARKINGS PROFILE CENTERLINE MARKINGS |
| 2150-04-067 | Webb/ Laredo |
FM 1472 | Actual | $4,677,326 | 1 | WIDENING OF PAVEMENT TO PROVIDE ADDITIONAL TRAVEL LANE |
| 0043-09-126 | Wichita/ Wichita Falls |
US 287 | Actual | $2,454,759 | 6 | REPLACE BRIDGE AND APPROACHES |
| 1566-01-014 | Williamson/ Austin |
FM 1660 | Actual | $1,511,340 | 3 | CONSTRUCT PEDESTRIAN AND BIKE PATH |
| 2292-01-032 | Wise/ Fort Worth |
FM 730 | Actual | $288,012 | 11 | RAP BACKFILL AT CULVERT ENDS, HMAC, FLEX PAVE REPAIR, |
|