Letting Schedule for May, 2016 (FY 2016)
| May, 2016 (FY 2016) | (see Links) | 
| SEP 2015 | OCT 2015 | NOV 2015 | DEC 2015 | JAN 2016 | FEB 2016 | MAR 2016 | APR 2016 | MAY 2016 | JUN 2016 | JUL 2016 | AUG 2016 | ||||||
| CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | 
|---|---|---|---|---|---|---|
| 0176-02-113 | Angelina/ Lufkin | US 59 | Actual | $1,438,279 | 1 | RESURFACE EXISTING PAVEMENT | 
| 1009-03-014 | Atascosa/ San Antonio | FM 536 | Actual | $364,904 | 1 | CONSTRUCT INTERSECTION IMPROVEMENTS TO INCLUDE TURN LANES & | 
| 2320-01-010 | Austin/ Yoakum | FM 2429 | Actual | $28,332 | 10 | FLAGGING DURING ROAD CLOSURE AND EDGE REPAIR | 
| 0184-04-046 | Bell/ Waco | SL 363 | Actual | $13,297,595 | ROW | CONSTRUCT AT - GRADE INTERSECTION AND ULTIMATE FRONTAGE ROADS | 
| 0398-04-059 | Bell/ Waco | SH 317 | Actual | $16,887,377 | 1 | RECONSTRUCT AND WIDEN FROM TWO TO FOUR LANES WITH RAISED | 
| 0909-36-150 | Bell/ Waco | CS | Actual | $320,830 | 3 | CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF | 
| 0909-36-154 | Bell/ Waco | VA | Actual | $1,214,606 | 3 | PURCHASE BUSES TO PROVIDE TRANSPORTATION | 
| 0849-01-046 | Bexar/ San Antonio | FM 471 | Actual | $14,483,918 | 3 | EXPAND 2 TO 4 LANE DIVIDED WITH BIKE LANES | 
| 0540-04-072 | Brazos/ Bryan | FM 2154 | Actual | $2,056,099 | 1 | MISCELLANEOUS IMPROVEMENTS CONSISTING OF GRADING, BASE, | 
| 1850-01-015 | Caldwell/ Austin | FM 1966 | Actual | $88,314 | 8 | CENTERLINE TEXTURING | 
| 0630-01-051 | Cameron/ Pharr | SH 345 | Actual | $296,534 | 8 | SAFETY TREAT FIXED OBJECTS | 
| 0508-02-111 | Chambers/ Beaumont | IH 10 | Actual | $131,475 | 8 | TEXTURIZE SHOULDERS (MILLED - IN RUMBLE STRIPS) | 
| 0910-36-127 | Cherokee/ Tyler | CR | Actual | $699,993 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 1013-01-026 | Collin/ Dallas | FM 546 | Actual | $17,391,617 | 3 | REALIGN HIGHWAY - CONSTRUCT FOUR LANE DIVIDED FACILITY | 
| 0716-02-038 | Colorado/ Yoakum | FM 109 | Actual | $533,119 | 6 | WIDEN BRIDGE AND APPROACHES | 
| 0183-04-052 | Coryell/ Waco | SH 36 | Actual | $67,576 | 8 | INSTALL INTERSECTION FLASHING BEACON AND SAFETY LIGHTING | 
| 0918-00-187 | Dallas/ Dallas | VA | Actual | $1,276,600 | 1 | NON - SITE SPECIFIC SIGNAL CONTRACT ON NEW LOCATIONS | 
| 0918-47-016 | Dallas/ Dallas | VA | Actual | $521,561 | 3 | SIGNAL RETIMING AND LOOP DETECTOR REPLACEMENT | 
| 0918-47-120 | Dallas/ Dallas | CS | Actual | $1,300,501 | 3 | IMPROVE TRAFFIC SIGNALS | 
| 2374-04-077 | Dallas/ Dallas | IH 20 | Actual | $1,241,391 | 1 | INTERSECTION IMPROVEMENTS ON EB FRT RD AT WHEATLAND RD; ADD | 
| 0154-03-032 | Dewitt/ Yoakum | US 183 | Actual | $14,210 | 10 | FLAGGING DURING ROAD CLOSURE AND EDGE REPAIR | 
| 0842-01-027 | Dewitt/ Yoakum | FM 236 | Actual | $13,033 | 10 | FLAGGING DURING ROAD CLOSURE AND PAVEMENT REPAIR | 
| 0924-06-458 | El Paso/ El Paso | VA | Actual | $126,795 | 3 | BLUETOOTH WAIT SYSTEMS AT STANTON POE | 
| 0924-06-459 | El Paso/ El Paso | VA | Actual | $126,753 | 3 | BLUETOOTH WAIT SYSTEMS AT PASO DEL NORTE POE | 
| 2552-03-057 | El Paso/ El Paso | SL 375 | Actual | $323,841 | 6 | BRIDGE CULVERT RAIL UPGRADE AND INSTALLATION | 
| 0092-03-049 | Ellis/ Dallas | IH 45 | Actual | $1,185,768 | 5 | INSTALLATION OF WIRELESS ITS | 
| 0211-06-057 | Fayette/ Yoakum | US 77 | Actual | $1,297 | 3 | INSTALL MEMORIAL MARKER SIGNS | 
| 0211-06-058 | Fayette/ Yoakum | US 77 | Actual | $1,490 | 3 | INSTALL MEMORIAL MARKER SIGNS | 
| 0265-08-065 | Fayette/ Yoakum | SH 71 | Actual | $1,780,623 | 1 | ACP OVERLAY | 
| 0265-14-009 | Fayette/ Yoakum | BS 71-E | Actual | $1,481 | 3 | INSTALL MEMORIAL MARKER SIGNS | 
| 0807-03-034 | Fayette/ Yoakum | FM 153 | Actual | $17,715 | 10 | FLAGGING DURING ROAD CLOSURE_AND PAVEMENT REPAIR | 
| 0187-05-060 | Fort Bend/ Houston | SH 36 | Actual | $4,918,132 | 1 | BASE REPAIR AND 1.5" ACP OVERLAY | 
| 0216-03-032 | Guadalupe/ San Antonio | FM 466 | Actual | $1,436,280 | 1 | RESTORE EXISTING ROADWAY | 
| 0308-02-029 | Hansford/ Amarillo | SH 15 | Actual | $9,135,716 | 1 | MINOR REPAIRS AND OVERLAY | 
| 0784-01-046 | Hardin/ Beaumont | FM 418 | Actual | $1,281,591 | 8 | SAFETY TREAT FIXED OBJECTS AND WIDEN PAVED SHOULDERS | 
| 0027-15-026 | Harris/ Houston | SS 527 | Actual | $2,585,958 | 1 | CONCRETE PAVEMENT, ASPHALT STABILIZED BASE, CEMENT TREATED | 
| 0912-72-319 | Harris/ Houston | VA | Actual | $792,115 | 3 | CONSTRUCT MULTI - USE PATH CONNECTORS / MISSING SEGMENTS | 
| 0912-72-327 | Harris/ Houston | VA | Actual | $971,500 | 3 | DESIGN AND CONSTRUCT MULTIMODAL TRANSIT CENTER / PARK & RIDE | 
| 0912-72-377 | Harris/ Houston | CR | Actual | $569,563 | 10 | SINK HOLE REPAIR | 
| 3510-05-036 | Harris/ Houston | SH 99 | Actual | $3,069,960 | 3 | CONSTRUCT SB FRONTAGE ROAD AND U - TURNS | 
| 0805-04-025 | Hays/ Austin | RM 150 | Actual | $849,078 | 3 | CONSTRUCT SIDEWALK & BICYCLE LANES IN KYLE TEXAS | 
| 1693-01-020 | Jim Wells/ Corpus Christi | FM 1931 | Actual | $3,432,309 | 1 | REHAB AND WIDEN EXISTING ROADWAY | 
| 0197-03-071 | Kaufman/ Dallas | US 175 | Actual | $1,913,970 | 1 | SPOT BASE REPAIR, MILL AND OVERLAY ON FRONTAGE ROADS | 
| 0269-02-064 | Lavaca/ Yoakum | US 77 | Actual | $782 | 3 | INSTALL MEMERIAL MARKER SIGNS | 
| 0370-02-021 | Lavaca/ Yoakum | US 77 | Actual | $782 | 3 | INSTALL MEMORIAL MARKER SIGNS | 
| 0388-03-078 | Liberty/ Beaumont | SH 146 | Actual | $2,077,819 | 1 | MILL AND OVERLAY EXISTING ROADWAY | 
| 0254-01-134 | Live Oak/ Corpus Christi | US 281 | Actual | $5,606,795 | 1 | SPOT BASE REPAIR AND OVERALY | 
| 0783-01-099 | Lubbock/ Lubbock | SL 289 | Actual | $7,588,838 | 1 | REHABILITATION OF EXISTING ROADWAY | 
| 0062-06-053 | Marion/ Atlanta | US 59 | Actual | $2,050,586 | 1 | RESURFACE EXISTING 4 - LANE RURAL HIGHWAY | 
| 0071-05-029 | Mason/ Austin | US 87 | Actual | $983,038 | 8 | IMPROVE GUARDRAIL & SAFETY TREAT FIXED OBJECTS | 
| 0480-07-009 | Mills/ Brownwood | FM 45 | Actual | $4,563,804 | 1 | RECONSTRUCT EXISTING 2 LANE HIGHWAY | 
| 0338-03-088 | Montgomery/ Houston | SH 105 | Actual | $3,484,121 | 3 | CONSTRUCT RAISED MEDIAN, SIDEWALKS, PEDESTRIAN / TRANSIT | 
| 1986-01-044 | Montgomery/ Houston | FM 1314 | Actual | $1,385,319 | 3 | RESTRIPE ROADWAY FROM 2 TO 4 LANES | 
| 0176-01-107 | Nacogdoches/ Lufkin | US 59 | Actual | $1,598,523 | 1 | OVERLAY WITH PFC (OCST AND PFC SB LANES ONLY) | 
| 1284-01-072 | Orange/ Beaumont | FM 1130 | Actual | $836,256 | 8 | SAFETY TREAT FIXED OBJECTS | 
| 0902-39-030 | Palo Pinto/ Fort Worth | CR | Actual | $410,120 | 6 | REHABILITATE BRIDGE AND APPROACHES | 
| 1601-01-029 | Parker/ Fort Worth | FM 730 | Actual | $4,868,690 | 8 | PAVEMENT REPAIR AND HMAC OVERLAY | 
| 0292-06-030 | Pecos/ Odessa | SH 18 | Actual | $598,976 | 11 | TRAFFIC SIGNALS | 
| 0911-04-068 | Polk/ Lufkin | CR | Actual | $740,248 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 0168-10-069 | Potter/ Amarillo | US 60 | Actual | $2,147,565 | 3 | CONSTRUCT PED. IMPROVEMENTS, REHAB STREETSCAPE IN ROW PED | 
| 0108-10-024 | Rains/ Paris | SH 19 | Actual | $8,460,154 | 1 | REWORK EXISTING BASE, CEMENT TREAT AND OVERLAY WITH NEW HMAC | 
| 0371-02-069 | Refugio/ Corpus Christi | US 77 | Actual | $5,008,823 | 1 | MILL, SEAL AND OVERLAY SB LANES ONLY | 
| 0371-02-072 | Refugio/ Corpus Christi | US 77 | Actual | $4,610,259 | 1 | MILL, SEAL AND OVERLAY (NB LANES ONLY) | 
| 1016-03-013 | Rockwall/ Dallas | FM 1138 | Actual | $1,956,520 | 1 | RESTORE EXISTING PAVEMENT AND ADD SHOULDERS | 
| 0138-03-142 | Rusk/ Tyler | US 259 | Actual | $4,277,728 | 1 | REPAIR & RESURFACE ROADWAY | 
| 0213-02-043 | San Jacinto/ Lufkin | US 190 | Actual | $2,543,073 | 8 | SAFETY TREAT FIXED OBJECTS | 
| 0923-25-020 | San Saba/ Brownwood | CR | Actual | $968,110 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 0011-08-026 | Stephens/ Brownwood | US 180 | Actual | $13,412,992 | 1 | RECONSTRUCT URBAN ROADWAY | 
| 0747-04-069 | Tarrant/ Fort Worth | FM 157 | Actual | $236,800 | 1 | IMPROVE TRAFFIC SIGNALS | 
| 0908-33-093 | Taylor/ Abilene | CS | Actual | $901,259 | 3 | PROVIDES CORRIDOR ENHANCEMENT FOR WALKING / BIKING BY | 
| 0221-05-088 | Titus/ Atlanta | US 271 | Actual | $2,995,056 | 3 | RESURFACE EXISTING 4 - LANE URBAN HIGHWAY | 
| 0907-00-168 | Tom Green/ San Angelo | VA | Actual | $646,029 | 1 | REPLACE GUARD FENCE, BRIDGE RAIL, AND SAFETY END TREATMENTS | 
| 0340-02-025 | Trinity/ Lufkin | US 287 | Actual | $1,687,891 | 8 | SAFETY TREAT FIXED OBJECTS | 
| 0703-01-059 | Tyler/ Beaumont | FM 92 | Actual | $462,723 | 8 | SAFETY TREAT FIXED OBJECTS | 
| 0370-04-032 | Victoria/ Yoakum | US 77 | Actual | $1,447 | 3 | INSTALL MEMORIAL MARKER SIGNS | 
| 0271-09-022 | Waller/ Houston | US 90 | Actual | $2,321,743 | 3 | CONSTRUCT NEW INTERSECTION, BRIDGE WIDENING, SIGNALS AND A | 
| 0922-00-056 | Webb/ Laredo | VA | Actual | $1,498,321 | 11 | UPGRADE RAIL | 
| 0913-09-076 | Wharton/ Yoakum | CR | Actual | $670,423 | 6 | REPLACE BRIDGE AND APPROACHES | 
| 0913-09-079 | Wharton/ Yoakum | CS | Actual | $780,104 | 3 | CONSTRUST SIDEWALKS, CURB RAMPS, STORM DRAIN INLETS & LIGHTI | 
| 0156-07-107 | Wichita/ Wichita Falls | IH 44 | Actual | $1,445,742 | 1 | REPLACE BRIDGE DECK | 
| 
 |