The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Corpus Christi District (FY 2020)
Aransas | Bee | Jim Wells | Karnes | Kleberg | Live Oak | Nueces | Refugio | San Patricio |

Aransas County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0507-04-045FM 1069TentativeFeb 2020$1,560,7018WIDEN PAVED SHOULDERS TO >5FT, SAFETY TREAT FIXED OBJECTS0.0

Bee County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1119-01-013FM 797TentativeJan 2020$1,209,6728INSTALL ADVANCE CURVE SIGNALS, INSTALL CHEVRONS, SAFETY TRT0.0

Jim Wells County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1087-01-014FM 738TentativeSep 2019$657,2341PROVIDE ADDITIONAL PAVED SURFACE WIDTH0.0
0086-11-051SH 44TentativeJun 2020$1,122,4468INSTALL FLASHING BEACON0.0
1086-01-019FM 2044TentativeJan 2020$198,0006REPLACE BRIDGE AND APPROACHES0.0

Karnes County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1552-01-011FM 1020TentativeApr 2020$466,4006REPLACE BRIDGE AND APPROACHES0.0
0100-05-001US 181TentativeMar 2020$394,8606BRIDGE MAINTENANCE0.0
1422-01-009FM 1354TentativeFeb 2020$966,0006REPLACE BRIDGE AND APPROACHES0.0

Kleberg County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0102-04-099US 77TentativeMar 2020$45,000,0001CONSTRUCT MAINLANES, FRONTAGE ROADS AND STRUCTURES0.0

Live Oak County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0073-07-064IH 37TentativeNov 2019$5,400,0001REHAB & OVERLAY WEST FRONTAGE RD; REHAB & WIDEN EAST0.0
0916-29-013CRTentativeNov 2019$3,824,8296REPLACE BRIDGE AND APPROACHES0.0
1206-01-019FM 1358TentativeNov 2019$606,1006REPLACE BRIDGE AND APPROACHES0.0
0073-07-062IH 37TentativeOct 2019$3,293,9008IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0254-01-001US 281TentativeSep 2019$139,7256BRIDGE MAINTENANCE0.0

Nueces County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0102-03-087US 77TentativeMay 2020$9,000,0001CONSTRUCT EXIT AND ENTRANCE RAMPS0.0
0373-02-001SH 44TentativeSep 2019$324,3406BRIDGE MAINTENANCE0.0
2263-02-089SH 361TentativeDec 2019$11,000,00011FERRY OPERATION PROJECTS0.0
0074-06-001IH 37TentativeJun 2020$600,0006INSTALLATION OF CRASH WALL0.0
0916-35-195VATentativeJun 2020$1,200,0007CONSTRUCT PEDESTRIAN AND BIKE FACILITIES0.0
0916-00-090VATentativeApr 2020$1,000,0001DISTRICT WIDE PAVEMENT MARKINGS AND MARKERS-PLANNING CSJ0.0
2263-02-095SH 361TentativeOct 2019$3,122,15210REMOVE AND REPLACE RAMP HINGES0.0
1742-01-026FM 1694TentativeJan 2020$243,1668SAFETY TREAT FIXED OBJECTS, ADD LEFT TURN LANE0.0
0916-00-220VATentativeOct 2019$4,000,0001DISTRICT WIDE HOT RUBBER SEAL 2020 PLAN CSJ0.0
0916-00-091VATentativeMar 2020$1,500,0001DISTRICT WIDE SMALL SIGN REPLACEMENT0.0
0916-00-089VATentativeOct 2019$6,000,0001DISTRICT WIDE SEAL COAT PROGRAM 2020 PLANNING CSJ0.0
0074-06-227IH 37TentativeAug 2020$1,198,7008IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0916-35-224CSTentativeAug 2020$08IMPROVE TRAFFIC SIGNALS, IMPROVE PEDESTRIAN SIGNALS0.0
0916-35-223CSTentativeAug 2020$08IMPROVE TRAFFIC SIGNALS, SAFETY LIGHTING AT INTERSECTION0.0
0916-35-222CSTentativeAug 2020$08IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS0.0
0916-35-196VATentativeJun 2020$4,800,0003PARK MITIGATION FOR HARBOR BRIDGE0.0
0074-06-230IH 37TentativeJul 2020$6,500,0001MILL, UNDERSEAL AND OVERLAY0.0

Refugio County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0447-05-075FM 774TentativeAug 2020$08SAFETY TREAT FIXED OBJECTS, PROVIDE ADDITIONAL PAVED SURFACE0.0
0371-03-131US 77TentativeAug 2020$08INSTALL MEDIAN BARRIER0.0
0738-01-001FM 136TentativeSep 2019$279,3816BRIDGE MAINTENANCE0.0
0738-01-065FM 136TentativeAug 2020$08SAFETY TREAT FIXED OBJECTS, PROVIDE ADDITIONAL PAVED SURFACE0.0

San Patricio County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0916-28-069VATentativeNov 2019$359,8789CONSTRUCT ONE WAY CYCLE TRACK AND BUFFERED BICYCLE LANES0.0
0180-10-081SH 361TentativeOct 2019$30,0001PRELIMINATY ENG. FOR PREEMPTION OF TRAFFIC SIGNAL AT INTERS.0.0
0916-28-073CSTentativeOct 2019$777,6303INSTALLATION OF SIDEWALKS IN TAFT0.0
0101-04-117US 181TentativeFeb 2020$3,500,0001OVERLAY ROADWAY NB SB FTRG LANES ONLY0.0
0074-03-047IH 37TentativeJul 2020$1,703,4748INSTALL ILLUMINATION0.0
1209-01-030FM 893TentativeMay 2020$7,000,0001UPGRADE TO 5-LANE URBAN ROADWAY BY CONSTRUCTING ADDTNL 20.0
0371-05-020FM 2046TentativeJan 2020$559,6378SAFETY TREAT FIXED OBJECTS0.0
0074-05-098IH 37TentativeJul 2020$70,000,0001WIDEN ROAD - ADD LANES0.0
0087-06-030BS 359BTentativeOct 2019$648,0003INSTALLATION OF SIDEWALKS AND BIKE LANES IN MATHIS0.0
0101-04-114US 181TentativeFeb 2020$10,000,0002MREVERSE ENTRANCE AND EXIT RAMPS IN NORTHBOUND DIRECTION0.0