Detail Letting Schedule for Harris County (FY 2021)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Harris County (FY 2021) |
CCSJ: 0027-13-240 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | IH 69 | Let Status: | Actual |
Project ID: | F 2021(835) | CSJ: | 0027-13-240 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | AT SB EXIT TO BEECHNUT NEAR TOURS ST | Fund Cat: | 11 |
Limits To: | . | ESTIMATE: | $495,929 |
Length: | 0.0 | Actual | $544,151 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0027-13-240 | ||
---|---|---|---|
Length: | 0 | ||
Estimate: | $495,929 | ||
Actual: | $544,151 | ||
CCSJ: 0050-06-094 |
|||
District: | HOUSTON | Let Date: | May 2021 |
Highway: | BU 290H | Let Status: | Actual |
Project ID: | STP 2021(331)HES | CSJ: | 0050-06-094 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.25 MI NW OF KICKAPOO RD | Fund Cat: | 8 |
Limits To: | 0.25 MI SE OF KICKAPOO RD | ESTIMATE: | $117,718 |
Length: | 0.5 | Actual | $78,734 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0050-06-094 | ||
Length: | 0.5 | ||
Estimate: | $117,718 | ||
Actual: | $78,734 | ||
CCSJ: 0110-05-130 |
|||
District: | HOUSTON | Let Date: | Jan 2021 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | STP 2021(259)HES | CSJ: | 0110-05-130 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT FM 1960 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $500,251 |
Length: | 0.2 | Actual | $474,659 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0110-05-130 | ||
Length: | 0.2 | ||
Estimate: | $500,251 | ||
Actual: | $474,659 | ||
CCSJ: 0110-06-144 |
|||
District: | HOUSTON | Let Date: | Dec 2020 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | STP 2021(187)HES | CSJ: | 0110-06-144 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT GREENS ROAD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $731,630 |
Length: | 0.2 | Actual | $632,695 |
District: | HOUSTON | Let Date: | Dec 2020 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | STP 2021(187)HES | CSJ: | 0110-06-145 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT SL 8 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $520,732 |
Length: | 0.2 | Actual | $483,195 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0110-06-144 | ||
Length: | 0.4 | ||
Estimate: | $1,252,363 | ||
Actual: | $1,115,890 | ||
CCSJ: 0111-01-095 |
|||
District: | HOUSTON | Let Date: | Feb 2021 |
Highway: | FM 521 | Let Status: | Actual |
Project ID: | C 111-1-95 | CSJ: | 0111-01-095 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | 0.35 MI. NORTH OF IH 610 | Fund Cat: | 1 |
Limits To: | 0.106 MI. SOUTH OF US 90A | ESTIMATE: | $1,397,202 |
Length: | 0.9 | Actual | $969,114 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0111-01-095 | ||
Length: | 0.9 | ||
Estimate: | $1,397,202 | ||
Actual: | $969,114 | ||
CCSJ: 0177-07-001 |
|||
District: | HOUSTON | Let Date: | Sep 2020 |
Highway: | IH 69 | Let Status: | Actual |
Project ID: | C 177-7-1 | CSJ: | 0177-07-001 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | WILL CLAYTON | Fund Cat: | 1 |
Limits To: | BF 1960A | ESTIMATE: | $426,275 |
Length: | 1.7 | Actual | $395,975 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0177-07-001 | ||
Length: | 1.7 | ||
Estimate: | $426,275 | ||
Actual: | $395,975 | ||
CCSJ: 0177-07-113 |
|||
District: | HOUSTON | Let Date: | Nov 2020 |
Highway: | IH 69 | Let Status: | Actual |
Project ID: | C 177-7-113 | CSJ: | 0177-07-113 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | 0.27 MILES S OF WILL CLAYTON PARKWAY | Fund Cat: | 1 |
Limits To: | 0.35 MILES SOUTH OF RANKIN ROAD | ESTIMATE: | $502,655 |
Length: | 1.3 | Actual | $520,925 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0177-07-113 | ||
Length: | 1.3 | ||
Estimate: | $502,655 | ||
Actual: | $520,925 | ||
CCSJ: 0178-01-037 |
|||
District: | HOUSTON | Let Date: | Dec 2020 |
Highway: | SH 35 | Let Status: | Actual |
Project ID: | STP 2021(188)HES | CSJ: | 0178-01-037 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT BELFORT AVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $321,468 |
Length: | 0.2 | Actual | $313,438 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0178-01-037 | ||
Length: | 0.2 | ||
Estimate: | $321,468 | ||
Actual: | $313,438 | ||
CCSJ: 0178-01-039 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | SH 35 | Let Status: | Tentative |
Project ID: | ER 1802(746) | CSJ: | 0178-01-039 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT SAM HOUSTON PKWY | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $30,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0178-01-039 | ||
Length: | 0 | ||
Estimate: | $30,000 | ||
Actual: | |||
CCSJ: 0271-15-097 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | F 2021(836) | CSJ: | 0271-15-097 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | AT HOUSTON SHIP CHANNEL BRIDGE | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $4,475,523 |
Length: | 1.2 | Actual | $3,481,497 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0271-15-097 | ||
Length: | 1.2 | ||
Estimate: | $4,475,523 | ||
Actual: | $3,481,497 | ||
CCSJ: 0271-16-160 |
|||
District: | HOUSTON | Let Date: | Jan 2021 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | NH 2021(163) | CSJ: | 0271-16-160 |
Description: | REHABILITATE BRIDGE | Handling Code: | |
Limits From: | AT HOLMES RD/UPRR | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $850,626 |
Length: | 0.2 | Actual | $645,779 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0271-16-160 | ||
Length: | 0.2 | ||
Estimate: | $850,626 | ||
Actual: | $645,779 | ||
CCSJ: 0271-17-178 |
|||
District: | HOUSTON | Let Date: | Jul 2021 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | C 271-17-178 | CSJ: | 0271-17-178 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | IH 69 WEST | Fund Cat: | 10 |
Limits To: | IH 10 WEST | ESTIMATE: | $2,024,562 |
Length: | 3.6 | Actual | $1,794,234 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0271-17-178 | ||
Length: | 3.6 | ||
Estimate: | $2,024,562 | ||
Actual: | $1,794,234 | ||
CCSJ: 0389-05-087 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | SH 146 | Let Status: | Actual |
Project ID: | C 389-5-87 | CSJ: | 0389-05-087 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | |
Limits From: | N OF FAIRMONT PARKWAY | Fund Cat: | 1 |
Limits To: | S OF RED BLUFF | ESTIMATE: | 111,775,548 |
Length: | 4.5 | Actual | $99,797,757 |
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | SH 146 | Let Status: | Actual |
Project ID: | C 389-5-127 | CSJ: | 0389-05-127 |
Description: | ADVANCED TRAFFIC MANAGEMENT SYSTEM | Handling Code: | |
Limits From: | NORTH OF FAIRMONT PARKWAY | Fund Cat: | 1 |
Limits To: | NORTH OF NASA 1 | ESTIMATE: | $2,102,829 |
Length: | 6.1 | Actual | $2,691,717 |
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | SH 146 | Let Status: | Actual |
Project ID: | C 389-5-129 | CSJ: | 0389-05-129 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | |
Limits From: | S OF SPENCER HWY | Fund Cat: | 1 |
Limits To: | N OF FAIRMONT PARKWAY | ESTIMATE: | $10,054,831 |
Length: | 0.9 | Actual | $8,276,763 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0389-05-087 | ||
Length: | 11.5 | ||
Estimate: | $123,933,207 | ||
Actual: | $110,766,238 | ||
CCSJ: 0500-03-625 |
|||
District: | HOUSTON | Let Date: | Dec 2020 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | C 500-3-625 | CSJ: | 0500-03-625 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | BEATTY ST | Fund Cat: | 1 |
Limits To: | CULLEN BLVD | ESTIMATE: | $3,603,275 |
Length: | 0.0 | Actual | $2,822,019 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0500-03-625 | ||
Length: | 0 | ||
Estimate: | $3,603,275 | ||
Actual: | $2,822,019 | ||
CCSJ: 0500-03-641 |
|||
District: | HOUSTON | Let Date: | Mar 2021 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | CC 500-3-641 | CSJ: | 0500-03-641 |
Description: | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TURN LANES | Handling Code: | |
Limits From: | AT BAY AREA BLVD | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $1,100,767 |
Length: | 0.0 | Actual | $925,572 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0500-03-641 | ||
Length: | 0 | ||
Estimate: | $1,100,767 | ||
Actual: | $925,572 | ||
CCSJ: 0500-03-642 |
|||
District: | HOUSTON | Let Date: | Oct 2020 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | STP 2021(301)MM | CSJ: | 0500-03-642 |
Description: | ENGINEERING DESIGN/STUDY | Handling Code: | XX |
Limits From: | IH 10 | Fund Cat: | 3 |
Limits To: | IH 610 | ESTIMATE: | $1,500,000 |
Length: | 2.6 | Actual | $0 |
Back... | Totals for 0500-03-642 | ||
Length: | 2.6 | ||
Estimate: | $1,500,000 | ||
Actual: | |||
CCSJ: 0502-01-222 |
|||
District: | HOUSTON | Let Date: | Jun 2021 |
Highway: | SH 225 | Let Status: | Actual |
Project ID: | C 502-1-222 | CSJ: | 0502-01-222 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | S RICHEY ST | Fund Cat: | 1 |
Limits To: | WEST OF RED BLUFF RD | ESTIMATE: | $1,709,474 |
Length: | 1.3 | Actual | $1,710,940 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0502-01-222 | ||
Length: | 1.3 | ||
Estimate: | $1,709,474 | ||
Actual: | $1,710,940 | ||
CCSJ: 0508-01-345 |
|||
District: | HOUSTON | Let Date: | Oct 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 508-1-345 | CSJ: | 0508-01-345 |
Description: | CONSTRUCT RAMPS | Handling Code: | |
Limits From: | SPUR 330 | Fund Cat: | 11 |
Limits To: | THOMPSON ROAD | ESTIMATE: | $11,038,726 |
Length: | 0.8 | Actual | $9,260,797 |
District: | HOUSTON | Let Date: | Oct 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 508-1-361 | CSJ: | 0508-01-361 |
Description: | ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDED CAPACITY | Handling Code: | |
Limits From: | S MAIN ST | Fund Cat: | 11 |
Limits To: | SS 330 | ESTIMATE: | $4,996,990 |
Length: | 0.0 | Actual | $5,048,477 |
District: | HOUSTON | Let Date: | Oct 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | ROW 508-1-380 | CSJ: | 0508-01-380 |
Description: | RIGHT OF WAY | Handling Code: | |
Limits From: | SPUR 330 | Fund Cat: | ROW |
Limits To: | THOMPSON ROAD | ESTIMATE: | |
Length: | 0.8 | Actual | $289,022 |
List Showing Order Proposal Request Bid List Bid Tabulations Award Status Back... | Totals for 0508-01-345 | ||
Length: | 1.6 | ||
Estimate: | $16,035,716 | ||
Actual: | $14,598,296 | ||
CCSJ: 0508-01-370 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | IH 10 | Let Status: | Tentative |
Project ID: | ER ( ) | CSJ: | 0508-01-370 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT LYNCHBURG FERRY | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $57,468 |
Length: | 0.1 | Actual | $0 |
Back... | Totals for 0508-01-370 | ||
Length: | 0.1 | ||
Estimate: | $57,468 | ||
Actual: | |||
CCSJ: 0508-01-381 |
|||
District: | HOUSTON | Let Date: | May 2021 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 508-1-381 | CSJ: | 0508-01-381 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | HOGAN STEET | Fund Cat: | 10 |
Limits To: | CHAMBERS C/L | ESTIMATE: | $428,189 |
Length: | 28.4 | Actual | $306,325 |
District: | HOUSTON | Let Date: | May 2021 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | C 28-2-102 | CSJ: | 0028-02-102 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | 0.05 MILES SOUTH OF OATES ROAD | Fund Cat: | 10 |
Limits To: | HUNTING BAYOU | ESTIMATE: | $6,731 |
Length: | 1.0 | Actual | $8,300 |
District: | HOUSTON | Let Date: | May 2021 |
Highway: | IH 69 | Let Status: | Actual |
Project ID: | C 177-5-121 | CSJ: | 0177-05-121 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | HARRIS / MONTGOMERY COUNTY LINE | Fund Cat: | 10 |
Limits To: | FOSTORIA ROAD | ESTIMATE: | $80,772 |
Length: | 17.4 | Actual | $99,600 |
District: | HOUSTON | Let Date: | May 2021 |
Highway: | IH 69 | Let Status: | Actual |
Project ID: | C 177-6-92 | CSJ: | 0177-06-092 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | FM 1960B | Fund Cat: | 10 |
Limits To: | HARRIS / MONTGOMERY CO LINE | ESTIMATE: | $13,462 |
Length: | 2.6 | Actual | $16,600 |
District: | HOUSTON | Let Date: | May 2021 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | C 271-14-241 | CSJ: | 0271-14-241 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | US 290 | Fund Cat: | 10 |
Limits To: | IH 10 EAST | ESTIMATE: | $147,748 |
Length: | 13.0 | Actual | $191,000 |
District: | HOUSTON | Let Date: | May 2021 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | C 271-15-98 | CSJ: | 0271-15-098 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | IH 10 | Fund Cat: | 10 |
Limits To: | SHIP CHANNEL BRIDGE | ESTIMATE: | $20,193 |
Length: | 3.4 | Actual | $24,900 |
District: | HOUSTON | Let Date: | May 2021 |
Highway: | SS 548 | Let Status: | Actual |
Project ID: | C 2483-1-15 | CSJ: | 2483-01-015 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | IH 610 LOOP NORTH | Fund Cat: | 10 |
Limits To: | CROSSTIMBERS STREET | ESTIMATE: | $6,731 |
Length: | 1.4 | Actual | $8,300 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0508-01-381 | ||
Length: | 67.2 | ||
Estimate: | $703,825 | ||
Actual: | $655,025 | ||
CCSJ: 0912-00-526 |
|||
District: | HOUSTON | Let Date: | Oct 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-00-526 | CSJ: | 0912-00-526 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $323,642 |
Length: | 0.0 | Actual | $149,950 |
District: | HOUSTON | Let Date: | Oct 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-00-516 | CSJ: | 0912-00-516 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $101,521 |
Length: | 0.0 | Actual | $141,422 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0912-00-526 | ||
Length: | 0 | ||
Estimate: | $425,163 | ||
Actual: | $291,372 | ||
CCSJ: 0912-00-558 |
|||
District: | HOUSTON | Let Date: | Dec 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2021(390) | CSJ: | 0912-00-558 |
Description: | REGIONAL TRAVEL MANAGEMENT PROGRAM | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $10,391,000 |
Length: | 0.0 | Actual | $8,000,000 |
Back... | Totals for 0912-00-558 | ||
Length: | 0 | ||
Estimate: | $10,391,000 | ||
Actual: | $8,000,000 | ||
CCSJ: 0912-00-575 |
|||
District: | HOUSTON | Let Date: | Feb 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | F 2021(444) | CSJ: | 0912-00-575 |
Description: | UPGRADE DYNAMIC MESSAGE SIGN BOARDS | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $2,750,000 |
Length: | 0.0 | Actual | $2,750,000 |
Back... | Totals for 0912-00-575 | ||
Length: | 0 | ||
Estimate: | $2,750,000 | ||
Actual: | $2,750,000 | ||
CCSJ: 0912-00-576 |
|||
District: | HOUSTON | Let Date: | Feb 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | F 2021(437) | CSJ: | 0912-00-576 |
Description: | ADVANCED TRAFFIC MANAGEMENT SYSTEM | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,300,000 |
Length: | 0.0 | Actual | $1,300,000 |
Back... | Totals for 0912-00-576 | ||
Length: | 0 | ||
Estimate: | $1,300,000 | ||
Actual: | $1,300,000 | ||
CCSJ: 0912-00-579 |
|||
District: | HOUSTON | Let Date: | May 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | F 2021(856) | CSJ: | 0912-00-579 |
Description: | ADVANCED TRAFFIC MANAGEMENT SYSTEM | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,170,400 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-00-579 | ||
Length: | 0 | ||
Estimate: | $1,170,400 | ||
Actual: | |||
CCSJ: 0912-00-580 |
|||
District: | HOUSTON | Let Date: | Oct 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2019(659)TAPS | CSJ: | 0912-00-580 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | |
Limits From: | FARR ST: WALLER ST TO S OF TAYLOR ST. & | Fund Cat: | 3 |
Limits To: | WALLER ST: FM 362 TO FARR ST | ESTIMATE: | $1,013,928 |
Length: | 0.0 | Actual | $877,513 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0912-00-580 | ||
Length: | 0 | ||
Estimate: | $1,013,928 | ||
Actual: | $877,513 | ||
CCSJ: 0912-00-590 |
|||
District: | HOUSTON | Let Date: | Nov 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-00-590 | CSJ: | 0912-00-590 |
Description: | INSTALL ADVANCED TRAFFIC MANAGEMENT SYSTEM | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | , | ESTIMATE: | $2,035,137 |
Length: | 0.0 | Actual | $2,193,801 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0912-00-590 | ||
Length: | 0 | ||
Estimate: | $2,035,137 | ||
Actual: | $2,193,801 | ||
CCSJ: 0912-00-591 |
|||
District: | HOUSTON | Let Date: | Sep 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-00-591 | CSJ: | 0912-00-591 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $2,335,959 |
Length: | 0.0 | Actual | $2,517,992 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0912-00-591 | ||
Length: | 0 | ||
Estimate: | $2,335,959 | ||
Actual: | $2,517,992 | ||
CCSJ: 0912-00-592 |
|||
District: | HOUSTON | Let Date: | Dec 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-00-592 | CSJ: | 0912-00-592 |
Description: | SIGNAL IMPROVEMENTS,LEDS & GPS CLOCKS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $2,476,494 |
Length: | 0.0 | Actual | $2,644,233 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0912-00-592 | ||
Length: | 0 | ||
Estimate: | $2,476,494 | ||
Actual: | $2,644,233 | ||
CCSJ: 0912-00-593 |
|||
District: | HOUSTON | Let Date: | Jan 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | F 2021(436) | CSJ: | 0912-00-593 |
Description: | ADVANCED TRAFFIC MANAGEMENT SYSTEM | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $5,000,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-00-593 | ||
Length: | 0 | ||
Estimate: | $5,000,000 | ||
Actual: | |||
CCSJ: 0912-00-623 |
|||
District: | HOUSTON | Let Date: | Dec 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2020(302) | CSJ: | 0912-00-623 |
Description: | TRANSPORTATION NON-ROADWAY | Handling Code: | TR |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 5 |
Limits To: | . | ESTIMATE: | $2,344,000 |
Length: | 0.0 | Actual | $2,344,000 |
Back... | Totals for 0912-00-623 | ||
Length: | 0 | ||
Estimate: | $2,344,000 | ||
Actual: | $2,344,000 | ||
CCSJ: 0912-00-624 |
|||
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2021(520)MM | CSJ: | 0912-00-624 |
Description: | ENGINEERING DESIGN/STUDY | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 7 |
Limits To: | . | ESTIMATE: | $1,700,000 |
Length: | 0.0 | Actual | $1,700,000 |
Back... | Totals for 0912-00-624 | ||
Length: | 0 | ||
Estimate: | $1,700,000 | ||
Actual: | $1,700,000 | ||
CCSJ: 0912-00-625 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | F 2021(838) | CSJ: | 0912-00-625 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS ON SH 36 & SH 3 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $617,559 |
Length: | 0.0 | Actual | $592,164 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0912-00-625 | ||
Length: | 0 | ||
Estimate: | $617,559 | ||
Actual: | $592,164 | ||
CCSJ: 0912-00-626 |
|||
District: | HOUSTON | Let Date: | May 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | F 2021(855) | CSJ: | 0912-00-626 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $2,383,720 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-00-626 | ||
Length: | 0 | ||
Estimate: | $2,383,720 | ||
Actual: | |||
CCSJ: 0912-00-641 |
|||
District: | HOUSTON | Let Date: | Jul 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | F 2021(730) | CSJ: | 0912-00-641 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | VARIOUS LOCATIONS IN HARRIS/BRAZORIA CO | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $618,593 |
Length: | 0.0 | Actual | $611,636 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0912-00-641 | ||
Length: | 0 | ||
Estimate: | $618,593 | ||
Actual: | $611,636 | ||
CCSJ: 0912-00-642 |
|||
District: | HOUSTON | Let Date: | May 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | F 2021(899) | CSJ: | 0912-00-642 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS IN HARRIS & FB COUNTY | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $1,085,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-00-642 | ||
Length: | 0 | ||
Estimate: | $1,085,000 | ||
Actual: | |||
CCSJ: 0912-00-644 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | F 2021(817) | CSJ: | 0912-00-644 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $1,503,546 |
Length: | 70.0 | Actual | $1,273,418 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0912-00-644 | ||
Length: | 70 | ||
Estimate: | $1,503,546 | ||
Actual: | $1,273,418 | ||
CCSJ: 0912-70-147 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Tentative |
Project ID: | ER 1802(422) | CSJ: | 0912-70-147 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | NORTH P STREET | Fund Cat: | 10 |
Limits To: | 0.8 MILES EAST OF UNDERWOOD ROAD | ESTIMATE: | $21,185 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-70-147 | ||
Length: | 0 | ||
Estimate: | $21,185 | ||
Actual: | |||
CCSJ: 0912-70-149 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Tentative |
Project ID: | ER 1802(425) | CSJ: | 0912-70-149 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | EL CAMINO REAL | Fund Cat: | 10 |
Limits To: | AT NASA BAY | ESTIMATE: | $25,169 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-70-149 | ||
Length: | 0 | ||
Estimate: | $25,169 | ||
Actual: | |||
CCSJ: 0912-70-150 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Tentative |
Project ID: | ER 1802(428) | CSJ: | 0912-70-150 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | C E KING PKWY SATELLITE BUILDING | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $8,283 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-70-150 | ||
Length: | 0 | ||
Estimate: | $8,283 | ||
Actual: | |||
CCSJ: 0912-70-151 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Tentative |
Project ID: | ER 1802(432) | CSJ: | 0912-70-151 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | CLAY SATELLITE BUILDING | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $133,317 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-70-151 | ||
Length: | 0 | ||
Estimate: | $133,317 | ||
Actual: | |||
CCSJ: 0912-70-152 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CR | Let Status: | Tentative |
Project ID: | ER 1802(430) | CSJ: | 0912-70-152 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | KINGSLAND SATELLITE BUILDING | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $31,682 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-70-152 | ||
Length: | 0 | ||
Estimate: | $31,682 | ||
Actual: | |||
CCSJ: 0912-70-153 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Tentative |
Project ID: | ER 1802(429) | CSJ: | 0912-70-153 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | KLEIN CHURCH SATELLITE BUILDING | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $80,944 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-70-153 | ||
Length: | 0 | ||
Estimate: | $80,944 | ||
Actual: | |||
CCSJ: 0912-70-154 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Tentative |
Project ID: | ER 1802(431) | CSJ: | 0912-70-154 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | HHW FACILITY SATELLITE BUILDING | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $58,447 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-70-154 | ||
Length: | 0 | ||
Estimate: | $58,447 | ||
Actual: | |||
CCSJ: 0912-72-299 |
|||
District: | HOUSTON | Let Date: | May 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | TCSP 2015(443) | CSJ: | 0912-72-299 |
Description: | HIKE AND/OR BIKE | Handling Code: | LC |
Limits From: | EXISTING MKT TRAIL | Fund Cat: | 3 |
Limits To: | HERITAGE WEST TRAIL | ESTIMATE: | $1,261,447 |
Length: | 0.2 | Actual | $1,035,890 |
Back... | Totals for 0912-72-299 | ||
Length: | 0.2 | ||
Estimate: | $1,261,447 | ||
Actual: | $1,035,890 | ||
CCSJ: 0912-72-352 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2019(251) | CSJ: | 0912-72-352 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | LEE RD AT HCFCD DITCH | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $509,882 |
Length: | 0.1 | Actual | $599,801 |
List Showing Order Proposal Request Bid List Bid Tabulations Award Status Back... | Totals for 0912-72-352 | ||
Length: | 0.1 | ||
Estimate: | $509,882 | ||
Actual: | $599,801 | ||
CCSJ: 0912-72-360 |
|||
District: | HOUSTON | Let Date: | Nov 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1702(818)MM | CSJ: | 0912-72-360 |
Description: | RECONSTRUCT EXISTING ROADWAY | Handling Code: | |
Limits From: | BUFFALO SPEEDWAY; BISSONNET | Fund Cat: | 3 |
Limits To: | HOLCOMBE | ESTIMATE: | $27,881,655 |
Length: | 0.0 | Actual | $23,186,629 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0912-72-360 | ||
Length: | 0 | ||
Estimate: | $27,881,655 | ||
Actual: | $23,186,629 | ||
CCSJ: 0912-72-436 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Tentative |
Project ID: | ER 1802(026) | CSJ: | 0912-72-436 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | CLAY ROAD AT | Fund Cat: | 10 |
Limits To: | SCONE STEET | ESTIMATE: | $17,252 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-436 | ||
Length: | 0 | ||
Estimate: | $17,252 | ||
Actual: | |||
CCSJ: 0912-72-437 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Tentative |
Project ID: | ER 1802(027) | CSJ: | 0912-72-437 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | CLAY ROAD AT | Fund Cat: | 10 |
Limits To: | STACY ROAD / PINE FOREST LANE | ESTIMATE: | $28,268 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-437 | ||
Length: | 0 | ||
Estimate: | $28,268 | ||
Actual: | |||
CCSJ: 0912-72-443 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CR | Let Status: | Tentative |
Project ID: | ER 1802(033) | CSJ: | 0912-72-443 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | CYPRESSWOOD DRIVE AT | Fund Cat: | 10 |
Limits To: | MEYER PARK ENTRANCE | ESTIMATE: | $28,268 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-443 | ||
Length: | 0 | ||
Estimate: | $28,268 | ||
Actual: | |||
CCSJ: 0912-72-451 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CR | Let Status: | Tentative |
Project ID: | ER 1802(041) | CSJ: | 0912-72-451 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | GRANT ROAD AT | Fund Cat: | 10 |
Limits To: | LAKEWOOD FOREST DRIVE | ESTIMATE: | $28,268 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-451 | ||
Length: | 0 | ||
Estimate: | $28,268 | ||
Actual: | |||
CCSJ: 0912-72-458 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Tentative |
Project ID: | ER 1802(048) | CSJ: | 0912-72-458 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | EAST LITTLE YORK AT | Fund Cat: | 10 |
Limits To: | SHADY LANE | ESTIMATE: | $28,528 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-458 | ||
Length: | 0 | ||
Estimate: | $28,528 | ||
Actual: | |||
CCSJ: 0912-72-459 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CR | Let Status: | Tentative |
Project ID: | ER 1802(049) | CSJ: | 0912-72-459 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | NORMANDY STREET AT | Fund Cat: | 10 |
Limits To: | WALLISVILLE ROAD | ESTIMATE: | $17,201 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-459 | ||
Length: | 0 | ||
Estimate: | $17,201 | ||
Actual: | |||
CCSJ: 0912-72-460 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CR | Let Status: | Tentative |
Project ID: | ER 1802(050) | CSJ: | 0912-72-460 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | NORMANDY STREET AT | Fund Cat: | 10 |
Limits To: | WOODFOREST BLVD | ESTIMATE: | $17,201 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-460 | ||
Length: | 0 | ||
Estimate: | $17,201 | ||
Actual: | |||
CCSJ: 0912-72-530 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CR | Let Status: | Tentative |
Project ID: | ER 1802(227) | CSJ: | 0912-72-530 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | FRY RD AT | Fund Cat: | 10 |
Limits To: | WARNER SMITH BLVD/LAKELAND VILLAGE | ESTIMATE: | $28,269 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-530 | ||
Length: | 0 | ||
Estimate: | $28,269 | ||
Actual: | |||
CCSJ: 0912-72-531 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Tentative |
Project ID: | ER 1802(228) | CSJ: | 0912-72-531 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | ANTOINE DR AT GREENS BAYOU | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $55,801 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-531 | ||
Length: | 0 | ||
Estimate: | $55,801 | ||
Actual: | |||
CCSJ: 0912-72-532 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CR | Let Status: | Tentative |
Project ID: | ER 1802(229) | CSJ: | 0912-72-532 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | KUYKENDAHL RD AT CYPRESS CREEK | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $82,109 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-532 | ||
Length: | 0 | ||
Estimate: | $82,109 | ||
Actual: | |||
CCSJ: 0912-72-547 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CR | Let Status: | Tentative |
Project ID: | ER 1802(770) | CSJ: | 0912-72-547 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | ADDICKS-SATSUMA RD AT LANGHAM CREEK | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $52,246 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-547 | ||
Length: | 0 | ||
Estimate: | $52,246 | ||
Actual: | |||
CCSJ: 0912-72-548 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Tentative |
Project ID: | ER 1802(771) | CSJ: | 0912-72-548 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | WALLISVILLE RD AT SAN JACINTO RIVER | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $32,250 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-548 | ||
Length: | 0 | ||
Estimate: | $32,250 | ||
Actual: | |||
CCSJ: 0912-72-549 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Tentative |
Project ID: | ER 1802(772) | CSJ: | 0912-72-549 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | VA LOCATIONS ON WALLISVILLE ROAD | Fund Cat: | 10 |
Limits To: | NEAR SAN JACINTO RIVER | ESTIMATE: | $68,672 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-549 | ||
Length: | 0 | ||
Estimate: | $68,672 | ||
Actual: | |||
CCSJ: 0912-72-550 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Tentative |
Project ID: | ER 1802(773) | CSJ: | 0912-72-550 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | CLAY RD AT SOUTH MAYDE CREEK | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $310,586 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-550 | ||
Length: | 0 | ||
Estimate: | $310,586 | ||
Actual: | |||
CCSJ: 0912-72-551 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CR | Let Status: | Tentative |
Project ID: | ER 1803(774) | CSJ: | 0912-72-551 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | COLONIAL PKWAY AT MASON CREEK | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $72,605 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-551 | ||
Length: | 0 | ||
Estimate: | $72,605 | ||
Actual: | |||
CCSJ: 0912-72-552 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Tentative |
Project ID: | ER 1802(778) | CSJ: | 0912-72-552 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | LOUETTA RD AT SEALS GULLY | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $147,046 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-552 | ||
Length: | 0 | ||
Estimate: | $147,046 | ||
Actual: | |||
CCSJ: 0912-72-554 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | VA | Let Status: | Tentative |
Project ID: | ER 1802(775) | CSJ: | 0912-72-554 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | VARIOUS LOCATION IN HARRIS COUNTY | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $60,566 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-554 | ||
Length: | 0 | ||
Estimate: | $60,566 | ||
Actual: | |||
CCSJ: 0912-72-555 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | VA | Let Status: | Tentative |
Project ID: | ER 1802(776) | CSJ: | 0912-72-555 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | VARIOUS LOCATION IN HARRIS COUNTY | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $52,283 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-555 | ||
Length: | 0 | ||
Estimate: | $52,283 | ||
Actual: | |||
CCSJ: 0912-72-556 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | VA | Let Status: | Tentative |
Project ID: | ER 1802(777) | CSJ: | 0912-72-556 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | VARIOUS LOCATION IN HARRIS COUNTY | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $15,883 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-556 | ||
Length: | 0 | ||
Estimate: | $15,883 | ||
Actual: | |||
CCSJ: 0912-72-594 |
|||
District: | HOUSTON | Let Date: | Jul 2021 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2021(930) | CSJ: | 0912-72-594 |
Description: | PARK & RIDE | Handling Code: | TR |
Limits From: | AT WEST BELLFORT PARK AND RIDE | Fund Cat: | 5 |
Limits To: | . | ESTIMATE: | $33,143,469 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-594 | ||
Length: | 0 | ||
Estimate: | $33,143,469 | ||
Actual: | |||
CCSJ: 0912-72-610 |
|||
District: | HOUSTON | Let Date: | Jun 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | F 2021(575) | CSJ: | 0912-72-610 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $3,214,098 |
Length: | 0.0 | Actual | $2,391,849 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0912-72-610 | ||
Length: | 0 | ||
Estimate: | $3,214,098 | ||
Actual: | $2,391,849 | ||
CCSJ: 1062-02-009 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | FM 2100 | Let Status: | Actual |
Project ID: | F 2021(840) | CSJ: | 1062-02-009 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | |
Limits From: | HUFFMAN-CLEVELAND RD (NORTH) | Fund Cat: | 1 |
Limits To: | FM 1960 | ESTIMATE: | $53,244,882 |
Length: | 4.4 | Actual | $54,799,230 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 1062-02-009 | ||
Length: | 4.4 | ||
Estimate: | $53,244,882 | ||
Actual: | $54,799,230 | ||
CCSJ: 1685-01-110 |
|||
District: | HOUSTON | Let Date: | Feb 2021 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | C 1685-1-110 | CSJ: | 1685-01-110 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | 0.203 MI WEST OF N ELDRIDGE PKWY | Fund Cat: | 1 |
Limits To: | SH 249 | ESTIMATE: | $5,117,781 |
Length: | 5.1 | Actual | $3,598,843 |
Bid List Proposal Request List Showing Order Bid Tabulations Award Status Back... | Totals for 1685-01-110 | ||
Length: | 5.1 | ||
Estimate: | $5,117,781 | ||
Actual: | $3,598,843 | ||
CCSJ: 1685-03-098 |
|||
District: | HOUSTON | Let Date: | Sep 2020 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | C 1685-3-98 | CSJ: | 1685-03-098 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | |
Limits From: | E OF TWIGSWORTH LN | Fund Cat: | 1 |
Limits To: | W OF SAN JACINTO RIVER BRIDGE | ESTIMATE: | $67,465,589 |
Length: | 2.8 | Actual | $67,186,567 |
District: | HOUSTON | Let Date: | Sep 2020 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | ROW 1685-3-101 | CSJ: | 1685-03-101 |
Description: | RIGHT OF WAY | Handling Code: | |
Limits From: | E OF TWIGSWORTH LN | Fund Cat: | ROW |
Limits To: | W OF SAN JACINTO RIVER BRIDGE | ESTIMATE: | $3,724,586 |
Length: | 2.8 | Actual | $2,856,160 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 1685-03-098 | ||
Length: | 5.6 | ||
Estimate: | $71,190,175 | ||
Actual: | $70,042,726 | ||
CCSJ: 1685-05-115 |
|||
District: | HOUSTON | Let Date: | Jan 2021 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | C 1685-5-115 | CSJ: | 1685-05-115 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | 0.106 MILES NORTH OF BELLAIRE BOULEVARD | Fund Cat: | 1 |
Limits To: | HARRIS/FORT BEND COUNTY LINE | ESTIMATE: | $2,130,442 |
Length: | 1.4 | Actual | $1,616,650 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 1685-05-115 | ||
Length: | 1.4 | ||
Estimate: | $2,130,442 | ||
Actual: | $1,616,650 | ||
CCSJ: 1685-05-116 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | C 1685-5-116 | CSJ: | 1685-05-116 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | US 290 | Fund Cat: | 1 |
Limits To: | ASPENGLEN DR | ESTIMATE: | $6,246,651 |
Length: | 5.4 | Actual | $5,811,998 |
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | C 1685-5-117 | CSJ: | 1685-05-117 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | ASPENGLEN DR | Fund Cat: | 1 |
Limits To: | N OF PARK ROW | ESTIMATE: | $3,047,367 |
Length: | 3.2 | Actual | $3,170,213 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 1685-05-116 | ||
Length: | 8.6 | ||
Estimate: | $9,294,018 | ||
Actual: | $8,982,211 | ||
CCSJ: 1685-05-126 |
|||
District: | HOUSTON | Let Date: | Jan 2021 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | STP 2021(261)HES | CSJ: | 1685-05-126 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT YORKTOWN CROSSING PKWY | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $355,073 |
Length: | 0.2 | Actual | $220,918 |
District: | HOUSTON | Let Date: | Jan 2021 |
Highway: | FM 1488 | Let Status: | Actual |
Project ID: | STP 2021(261)HES | CSJ: | 0523-04-020 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.268 MILES SW OF JOSEPH ROAD | Fund Cat: | 8 |
Limits To: | 0.403 MILES N OF JOSEPH ROAD | ESTIMATE: | $13,619 |
Length: | 0.7 | Actual | $9,710 |
District: | HOUSTON | Let Date: | Jan 2021 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | STP 2021(261)HES | CSJ: | 1685-05-124 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT HUFFMEISTER | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $267,024 |
Length: | 0.2 | Actual | $253,901 |
District: | HOUSTON | Let Date: | Jan 2021 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | STP 2021(261)HES | CSJ: | 1685-05-125 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT WILLOW RIVER DRIVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $189,808 |
Length: | 0.2 | Actual | $177,478 |
District: | HOUSTON | Let Date: | Jan 2021 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | STP 2021(261)HES | CSJ: | 1685-06-037 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT VOSS ROAD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $236,063 |
Length: | 0.2 | Actual | $220,561 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 1685-05-126 | ||
Length: | 1.5 | ||
Estimate: | $1,061,588 | ||
Actual: | $882,567 | ||
CCSJ: 2941-02-062 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | FM 2920 | Let Status: | Actual |
Project ID: | CM 2021(842) | CSJ: | 2941-02-062 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | WILLOW STREET | Fund Cat: | 7 |
Limits To: | IH 45 | ESTIMATE: | $765,291 |
Length: | 11.1 | Actual | $706,050 |
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | FM 2920 | Let Status: | Actual |
Project ID: | STP 2021(841)HES | CSJ: | 2941-01-029 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT BU 290H | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $125,500 |
Length: | 0.1 | Actual | $135,820 |
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | FM 2920 | Let Status: | Actual |
Project ID: | STP 2021(841)HES | CSJ: | 2941-02-058 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT ALVIN KLEIN DRIVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $124,104 |
Length: | 0.2 | Actual | $170,590 |
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | FM 2920 | Let Status: | Actual |
Project ID: | STP 2021(841)HES | CSJ: | 2941-02-059 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT FALVEL | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $203,556 |
Length: | 0.2 | Actual | $249,724 |
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | FM 2920 | Let Status: | Actual |
Project ID: | STP 2021(841)HES | CSJ: | 2941-02-060 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.625 MILES WEST OF SH 99 | Fund Cat: | 8 |
Limits To: | 0.95 MILES WEST OF IH 45 | ESTIMATE: | $2,951,778 |
Length: | 0.0 | Actual | $2,353,339 |
List Showing Order Proposal Request Bid List Addenda Bid Tabulations Award Status Back... | Totals for 2941-02-062 | ||
Length: | 11.6 | ||
Estimate: | $4,170,229 | ||
Actual: | $3,615,523 | ||
CCSJ: 3256-01-121 |
|||
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | SL 8 | Let Status: | Actual |
Project ID: | C 3256-1-121 | CSJ: | 3256-01-121 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | NORTH GARDEN STREET | Fund Cat: | 10 |
Limits To: | HOLLISTER ROAD | ESTIMATE: | $1,518,268 |
Length: | 0.0 | Actual | $1,613,247 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | UA 90 | Let Status: | Actual |
Project ID: | C 27-8-183 | CSJ: | 0027-08-183 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | IH 69 | Fund Cat: | 10 |
Limits To: | GESSNER ROAD | ESTIMATE: | $77,315 |
Length: | 3.6 | Actual | $56,023 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | IH 69 | Let Status: | Actual |
Project ID: | C 27-12-161 | CSJ: | 0027-12-161 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | US 90A | Fund Cat: | 10 |
Limits To: | HARRIS COUNTY LINE | ESTIMATE: | $418,996 |
Length: | 1.9 | Actual | $243,526 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | IH 69 | Let Status: | Actual |
Project ID: | C 27-13-239 | CSJ: | 0027-13-239 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | FORT BEND / HARRIS C/L | Fund Cat: | 10 |
Limits To: | CLAY ROAD | ESTIMATE: | $511,830 |
Length: | 15.6 | Actual | $386,799 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | SS 527 | Let Status: | Actual |
Project ID: | C 27-15-29 | CSJ: | 0027-15-029 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | IH 69 | Fund Cat: | 10 |
Limits To: | ELGIN STREET | ESTIMATE: | $32,429 |
Length: | 0.9 | Actual | $30,372 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | C 89-9-89 | CSJ: | 0089-09-089 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | 0.2 MILES SOUTH OF FM 2919 | Fund Cat: | 10 |
Limits To: | 0.2 MILES NORTH OF ISLEIB ROAD | ESTIMATE: | $5,429 |
Length: | 6.7 | Actual | $9,515 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | SS 261 | Let Status: | Actual |
Project ID: | C 110-6-150 | CSJ: | 0110-06-150 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | RITTENHOUSE ROAD | Fund Cat: | 10 |
Limits To: | WEST LITTLE YORK ROAD | ESTIMATE: | $987 |
Length: | 0.3 | Actual | $1,730 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | IH 69 | Let Status: | Actual |
Project ID: | C 177-11-157 | CSJ: | 0177-11-157 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | CLAY STREET | Fund Cat: | 10 |
Limits To: | IH 10 | ESTIMATE: | $12,140 |
Length: | 1.9 | Actual | $31,705 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 271-5-51 | CSJ: | 0271-05-051 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | AT THE DETENTION POND EAST OF PIN OAK | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $494 |
Length: | 0.1 | Actual | $865 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 271-6-132 | CSJ: | 0271-06-132 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | FROM FORT BEND C/L | Fund Cat: | 10 |
Limits To: | SH 6 | ESTIMATE: | $404,998 |
Length: | 10.2 | Actual | $264,713 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 271-7-328 | CSJ: | 0271-07-328 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | SH 6 | Fund Cat: | 10 |
Limits To: | HOGAN STREET | ESTIMATE: | $191,449 |
Length: | 16.9 | Actual | $193,386 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | C 720-3-148 | CSJ: | 0720-03-148 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | TIMBERTECH LANE | Fund Cat: | 10 |
Limits To: | HOLLISTER ROAD | ESTIMATE: | $275,805 |
Length: | 9.0 | Actual | $192,751 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | C 720-6-3 | CSJ: | 0720-06-003 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | SH 249B NORTH | Fund Cat: | 10 |
Limits To: | SH 249B SOUTH END | ESTIMATE: | $10,364 |
Length: | 2.5 | Actual | $18,165 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | FM 529 | Let Status: | Actual |
Project ID: | C 1006-1-81 | CSJ: | 1006-01-081 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | ENCHANTED CREEK | Fund Cat: | 10 |
Limits To: | CHARLES ROAD | ESTIMATE: | $194,873 |
Length: | 8.4 | Actual | $91,835 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | FM 1093 | Let Status: | Actual |
Project ID: | C 1258-2-42 | CSJ: | 1258-02-042 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | BOWSER ROAD | Fund Cat: | 10 |
Limits To: | WATERFORD CROSSING DRIVE | ESTIMATE: | $119,323 |
Length: | 0.8 | Actual | $54,976 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | FM 1464 | Let Status: | Actual |
Project ID: | C 1415-2-52 | CSJ: | 1415-02-052 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | WEST AIRPORT | Fund Cat: | 10 |
Limits To: | SH 99 | ESTIMATE: | $794,117 |
Length: | 0.0 | Actual | $320,129 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | C 1685-5-135 | CSJ: | 1685-05-135 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | FM 529 | Fund Cat: | 10 |
Limits To: | COPPER GROVE BOULEVARD | ESTIMATE: | $196,796 |
Length: | 2.6 | Actual | $63,068 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | SL 8 | Let Status: | Actual |
Project ID: | C 3256-2-108 | CSJ: | 3256-02-108 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | HOLLISTER STREET | Fund Cat: | 10 |
Limits To: | MESA ROAD | ESTIMATE: | $67,610 |
Length: | 4.4 | Actual | $118,505 |
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | SL 8 | Let Status: | Actual |
Project ID: | C 3256-4-79 | CSJ: | 3256-04-079 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | FM 521 | Fund Cat: | 10 |
Limits To: | NORTH GARDEN STREET | ESTIMATE: | $30,597 |
Length: | 3.1 | Actual | $53,630 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 3256-01-121 | ||
Length: | 88.9 | ||
Estimate: | $4,863,816 | ||
Actual: | $3,744,941 | ||
CCSJ: 3256-03-101 |
|||
District: | HOUSTON | Let Date: | Aug 2021 |
Highway: | SL 8 | Let Status: | Tentative |
Project ID: | ER 1802(427) | CSJ: | 3256-03-101 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | IH 45 SOUTH COMMUNICATION CABINET | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $20,982 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 3256-03-101 | ||
Length: | 0 | ||
Estimate: | $20,982 | ||
Actual: | |||
CCSJ: 3256-04-076 |
|||
District: | HOUSTON | Let Date: | Nov 2020 |
Highway: | SL 8 | Let Status: | Actual |
Project ID: | STP 2021(098)HES | CSJ: | 3256-04-076 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT ROCKWELL BLVD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $469,022 |
Length: | 0.2 | Actual | $415,823 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 3256-04-076 | ||
Length: | 0.2 | ||
Estimate: | $469,022 | ||
Actual: | $415,823 | ||
CCSJ: 3510-06-026 |
|||
District: | HOUSTON | Let Date: | Apr 2021 |
Highway: | SH 99 | Let Status: | Actual |
Project ID: | C 3510-6-26 | CSJ: | 3510-06-026 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | BOUDREAUX | Fund Cat: | 3 |
Limits To: | SPRING CREEK (HARRIS/MONTGOMERY C/L) | ESTIMATE: | $3,600,122 |
Length: | 11.3 | Actual | $2,373,434 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 3510-06-026 | ||
Length: | 11.3 | ||
Estimate: | $3,600,122 | ||
Actual: | $2,373,434 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |