Letting Schedule for Houston District (FY 2021)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Houston District (FY 2021) |
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller | | |||||||
Brazoria County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0179-02-085 | BS 35-E | Actual | Feb 2021 | $946,362 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0598-02-118 | SH 288 | Actual | Mar 2021 | $11,074,796 | 11 | SURFACING/ROADWAY RESTORATION | 0.0 |
1413-01-018 | FM 1459 | Actual | Sep 2020 | $1,632,447 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
2524-02-025 | FM 2611 | Actual | Mar 2021 | $12,859,714 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
2524-02-022 | FM 2611 | Actual | Jan 2021 | $11,460,496 | 6 | BRIDGE REPLACEMENT | 9.0 |
0598-02-119 | SH 288 | Actual | Oct 2020 | $5,856,903 | 3 | CONSTRUCT FRONTAGE ROADS | 0.0 |
0912-31-286 | CR | Actual | Apr 2021 | $523,683 | 10 | SURFACING/ROADWAY RESTORATION | 0.0 |
1043-01-011 | FM 655 | Actual | Nov 2020 | $121,746 | 1 | SEAL COAT | 0.0 |
0179-11-004 | SH 35 | Actual | Jan 2021 | $482,848 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
2523-02-068 | FM 2004 | Actual | Dec 2020 | $32,419,999 | 1 | HIGHWAY IMPROVEMENT | 7.0 |
0976-02-095 | FM 518 | Actual | Aug 2021 | $277,241 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0111-08-100 | SH 36 | Actual | Aug 2021 | $7,638,229 | 11 | WIDEN ROAD - ADD LANES | 0.0 |
0192-02-059 | SH 6 | Actual | Jul 2021 | $6,009,004 | 1 | SURFACING/ROADWAY RESTORATION | 3.0 |
0188-05-027 | SH 36 | Actual | Aug 2021 | $91,239,425 | 1 | WIDEN ROAD - ADD LANES | 10.0 |
0587-01-060 | FM 1495 | Actual | Aug 2021 | $24,916,222 | 1 | BRIDGE REPLACEMENT | 8.0 |
2523-02-073 | FM 2004 | Actual | Jun 2021 | $706,416 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
2523-02-069 | FM 2004 | Actual | Apr 2021 | $1,620,858 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
Fort Bend County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
3422-01-012 | PR 72 | Actual | Mar 2021 | $347,020 | 10 | STATE PARK IMPROVEMENTS | 0.0 |
0912-34-206 | VA | Actual | May 2021 | $2,340,717 | 3 | UPGRADES TO EXISTING COMPUTERIZED TRANSPORTATION MANAGEMENT | 0.0 |
0027-12-152 | IH 69 | Actual | Dec 2020 | $4,613,352 | 1 | ADVANCED TRAFFIC MANAGEMENT SYSTEM | 0.0 |
1415-03-012 | FM 2759 | Actual | Sep 2020 | $1,599,659 | 11 | INSTALL NOISE BARRIER | 0.0 |
0188-10-021 | FM 1463 | Actual | Aug 2021 | $102,375,985 | 1 | WIDEN ROAD - ADD LANES | 12.0 |
1685-06-036 | SH 6 | Actual | Feb 2021 | $2,219,345 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0027-12-159 | IH 69 | Actual | Aug 2021 | $1,132,011 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
1257-01-053 | FM 1092 | Actual | Aug 2021 | $2,675,945 | 8 | HIGHWAY IMPROVEMENT | 7.0 |
Galveston County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0912-73-212 | CS | Actual | Jul 2021 | $429,837 | 6 | BRIDGE REPLACEMENT | 4.0 |
0976-03-105 | FM 518 | Actual | Mar 2021 | $4,518,475 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
2523-01-026 | FM 2004 | Actual | Aug 2021 | $7,104,633 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0976-03-112 | FM 518 | Actual | Mar 2021 | $3,909,452 | 6 | BRIDGE MAINTENANCE | 0.0 |
3312-02-017 | FM 270 | Actual | Oct 2020 | $521,331 | 1 | HIGHWAY IMPROVEMENT | 0.0 |
0367-06-062 | SH 87 | Tentative | Aug 2021 | $6,655 | 10 | EMERGENCY RELIEF | 0.0 |
0976-03-111 | FM 518 | Actual | Feb 2021 | $2,935,761 | 10 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 7.0 |
Harris County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0912-72-532 | CR | Tentative | Aug 2021 | $82,109 | 3 | EMERGENCY RELIEF | 0.0 |
0912-72-555 | VA | Tentative | Aug 2021 | $52,283 | 10 | EMERGENCY RELIEF | 0.0 |
0508-01-345 | IH 10 | Actual | Oct 2020 | $16,035,716 | 11 | CONSTRUCT RAMPS | 0.0 |
0177-07-113 | IH 69 | Actual | Nov 2020 | $502,655 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0500-03-642 | IH 45 | Actual | Oct 2020 | $1,500,000 | 3 | ENGINEERING DESIGN/STUDY | 0.0 |
0912-72-549 | CS | Tentative | Aug 2021 | $68,672 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-550 | CS | Tentative | Aug 2021 | $310,586 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-548 | CS | Tentative | Aug 2021 | $32,250 | 10 | EMERGENCY RELIEF | 0.0 |
0912-00-526 | VA | Actual | Oct 2020 | $425,163 | 1 | INSTALL/UPGRADE ROADWAY LIGHTING | 0.0 |
0912-72-551 | CR | Tentative | Aug 2021 | $72,605 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-554 | VA | Tentative | Aug 2021 | $60,566 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-547 | CR | Tentative | Aug 2021 | $52,246 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-552 | CS | Tentative | Aug 2021 | $147,046 | 10 | EMERGENCY RELIEF | 0.0 |
0912-00-580 | VA | Actual | Oct 2020 | $1,013,928 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 4.0 |
0912-72-451 | CR | Tentative | Aug 2021 | $28,268 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-443 | CR | Tentative | Aug 2021 | $28,268 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-458 | CS | Tentative | Aug 2021 | $28,528 | 10 | EMERGENCY RELIEF | 0.0 |
0912-70-151 | CS | Tentative | Aug 2021 | $133,317 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-459 | CR | Tentative | Aug 2021 | $17,201 | 10 | EMERGENCY RELIEF | 0.0 |
0912-70-152 | CR | Tentative | Aug 2021 | $31,682 | 10 | EMERGENCY RELIEF | 0.0 |
0912-70-153 | CS | Tentative | Aug 2021 | $80,944 | 10 | EMERGENCY RELIEF | 0.0 |
0912-70-154 | CS | Tentative | Aug 2021 | $58,447 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-352 | CS | Actual | Aug 2021 | $509,882 | 6 | BRIDGE REPLACEMENT | 3.5 |
0912-72-437 | CS | Tentative | Aug 2021 | $28,268 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-436 | CS | Tentative | Aug 2021 | $17,252 | 10 | EMERGENCY RELIEF | 0.0 |
1685-03-098 | FM 1960 | Actual | Sep 2020 | $71,190,175 | 1 | WIDEN ROAD - ADD LANES | 0.0 |
0912-00-591 | VA | Actual | Sep 2020 | $2,335,959 | 1 | TRAFFIC SIGNAL IMPROVEMENTS | 0.0 |
0912-72-460 | CR | Tentative | Aug 2021 | $17,201 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-531 | CS | Tentative | Aug 2021 | $55,801 | 3 | EMERGENCY RELIEF | 0.0 |
0912-72-530 | CR | Tentative | Aug 2021 | $28,269 | 10 | EMERGENCY RELIEF | 0.0 |
0177-07-001 | IH 69 | Actual | Sep 2020 | $426,275 | 1 | HIGHWAY IMPROVEMENT | 0.0 |
0912-70-149 | CS | Tentative | Aug 2021 | $25,169 | 10 | EMERGENCY RELIEF | 0.0 |
0912-70-150 | CS | Tentative | Aug 2021 | $8,283 | 10 | EMERGENCY RELIEF | 0.0 |
0912-70-147 | CS | Tentative | Aug 2021 | $21,185 | 10 | EMERGENCY RELIEF | 0.0 |
0912-00-625 | VA | Actual | Aug 2021 | $617,559 | 8 | TRAFFIC SIGNAL IMPROVEMENTS | 0.0 |
0912-00-644 | VA | Actual | Aug 2021 | $1,503,546 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
3256-01-121 | SL 8 | Actual | Apr 2021 | $4,863,816 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0912-00-624 | VA | Actual | Apr 2021 | $1,700,000 | 7 | ENGINEERING DESIGN/STUDY | 0.0 |
3510-06-026 | SH 99 | Actual | Apr 2021 | $3,600,122 | 3 | LANDSCAPE DEVELOPMENT | 0.0 |
0508-01-381 | IH 10 | Actual | May 2021 | $703,825 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0050-06-094 | BU 290H | Actual | May 2021 | $117,718 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0271-15-097 | IH 610 | Actual | Aug 2021 | $4,475,523 | 6 | BRIDGE MAINTENANCE | 0.0 |
3256-03-101 | SL 8 | Tentative | Aug 2021 | $20,982 | 10 | EMERGENCY RELIEF | 0.0 |
0912-00-576 | VA | Actual | Feb 2021 | $1,300,000 | 1 | ADVANCED TRAFFIC MANAGEMENT SYSTEM | 0.0 |
1685-01-110 | FM 1960 | Actual | Feb 2021 | $5,117,781 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0508-01-370 | IH 10 | Tentative | Aug 2021 | $57,468 | 10 | EMERGENCY RELIEF | 0.0 |
0500-03-641 | IH 45 | Actual | Mar 2021 | $1,100,767 | 3 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TURN LANES | 0.0 |
0912-00-579 | VA | Actual | May 2021 | $1,170,400 | 1 | ADVANCED TRAFFIC MANAGEMENT SYSTEM | 0.0 |
0912-00-641 | VA | Actual | Jul 2021 | $618,593 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0271-17-178 | IH 610 | Actual | Jul 2021 | $2,024,562 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0912-72-594 | CS | Actual | Jul 2021 | $33,143,469 | 5 | PARK & RIDE | 0.0 |
0178-01-039 | SH 35 | Tentative | Aug 2021 | $30,000 | 10 | EMERGENCY RELIEF | 0.0 |
0027-13-240 | IH 69 | Actual | Aug 2021 | $495,929 | 11 | HIGHWAY IMPROVEMENT | 3.0 |
0389-05-087 | SH 146 | Actual | Aug 2021 | $123,933,207 | 1 | WIDEN ROAD - ADD LANES | 0.0 |
0912-00-642 | VA | Actual | May 2021 | $1,085,000 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0912-00-626 | VA | Actual | May 2021 | $2,383,720 | 8 | HIGHWAY IMPROVEMENT | 0.0 |
0912-72-299 | VA | Actual | May 2021 | $1,261,447 | 3 | HIKE AND/OR BIKE | 0.0 |
0912-72-610 | VA | Actual | Jun 2021 | $3,214,098 | 8 | HIGHWAY IMPROVEMENT | 0.0 |
0502-01-222 | SH 225 | Actual | Jun 2021 | $1,709,474 | 1 | REHABILITATE EXISTING ROADWAY | 0.0 |
2941-02-062 | FM 2920 | Actual | Aug 2021 | $4,170,229 | 7 | HIGHWAY IMPROVEMENT | 8.0 |
0912-00-592 | VA | Actual | Dec 2020 | $2,476,494 | 1 | SIGNAL IMPROVEMENTS,LEDS & GPS CLOCKS | 0.0 |
0912-00-623 | VA | Actual | Dec 2020 | $2,344,000 | 5 | TRANSPORTATION NON-ROADWAY | 0.0 |
0500-03-625 | IH 45 | Actual | Dec 2020 | $3,603,275 | 1 | INSTALL/UPGRADE ROADWAY LIGHTING | 0.0 |
0912-00-558 | VA | Actual | Dec 2020 | $10,391,000 | 3 | REGIONAL TRAVEL MANAGEMENT PROGRAM | 0.0 |
1062-02-009 | FM 2100 | Actual | Aug 2021 | $53,244,882 | 1 | WIDEN ROAD - ADD LANES | 11.5 |
0271-16-160 | IH 610 | Actual | Jan 2021 | $850,626 | 1 | REHABILITATE BRIDGE | 3.0 |
0110-05-130 | IH 45 | Actual | Jan 2021 | $500,251 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
1685-05-115 | SH 6 | Actual | Jan 2021 | $2,130,442 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0912-00-593 | VA | Actual | Jan 2021 | $5,000,000 | 1 | ADVANCED TRAFFIC MANAGEMENT SYSTEM | 0.0 |
0178-01-037 | SH 35 | Actual | Dec 2020 | $321,468 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0111-01-095 | FM 521 | Actual | Feb 2021 | $1,397,202 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0912-72-360 | CS | Actual | Nov 2020 | $27,881,655 | 3 | RECONSTRUCT EXISTING ROADWAY | 10.0 |
0912-00-575 | VA | Actual | Feb 2021 | $2,750,000 | 1 | UPGRADE DYNAMIC MESSAGE SIGN BOARDS | 0.0 |
0912-00-590 | VA | Actual | Nov 2020 | $2,035,137 | 1 | INSTALL ADVANCED TRAFFIC MANAGEMENT SYSTEM | 0.0 |
1685-05-116 | SH 6 | Actual | Aug 2021 | $9,294,018 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
1685-05-126 | SH 6 | Actual | Jan 2021 | $1,061,588 | 8 | HAZARD ELIMINATION & SAFETY | 3.0 |
0912-72-556 | VA | Tentative | Aug 2021 | $15,883 | 10 | EMERGENCY RELIEF | 0.0 |
0110-06-144 | IH 45 | Actual | Dec 2020 | $1,252,363 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
3256-04-076 | SL 8 | Actual | Nov 2020 | $469,022 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
Montgomery County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
1986-01-065 | FM 1314 | Actual | Sep 2020 | $3,429,851 | 3 | INSTALL/UPGRADE DRAINAGE STRUCTURE(S) | 0.0 |
3538-01-055 | SH 242 | Actual | Aug 2021 | $31,303,598 | 1 | WIDEN ROAD - ADD LANES | 8.5 |
1416-02-015 | FM 1486 | Actual | Sep 2020 | $117,092 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
0523-10-042 | FM 1488 | Actual | Sep 2020 | $1,618,993 | 1 | INTERSECTION IMPROVEMENT | 0.0 |
1259-01-043 | FM 1097 | Actual | Oct 2020 | $16,350,800 | 1 | WIDEN ROAD - ADD LANES | 6.0 |
0338-03-089 | SH 105 | Actual | Jul 2021 | $12,641,479 | 8 | HIGHWAY IMPROVEMENT | 6.0 |
0523-09-009 | FM 1488 | Actual | Aug 2021 | $48,732,194 | 1 | WIDEN ROAD - ADD LANES | 0.0 |
0720-02-097 | FM 149 | Actual | Apr 2021 | $462,569 | 1 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TURN LANES | 0.0 |
1259-01-044 | FM 1097 | Actual | Aug 2021 | $14,647,689 | 1 | WIDEN ROAD - ADD LANES | 7.0 |
Waller County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
1687-01-017 | FM 1736 | Actual | Oct 2020 | $190,440 | 1 | SEAL COAT | 0.0 |
1687-01-018 | FM 1736 | Actual | Aug 2021 | $54,240 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
0114-11-082 | US 290 | Actual | Sep 2020 | $4,725,918 | 1 | HIGHWAY IMPROVEMENT | 9.0 |
0912-56-056 | CR | Actual | Jul 2021 | $554,885 | 6 | BRIDGE REPLACEMENT | 0.0 |
0050-04-027 | SH 6 | Actual | Feb 2021 | $5,968,402 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
|