Item No Description Units July 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
530 2002 INTERSECTIONS (ACP) EA     34.000 2,000.00000 1
530 2004 INTERSECTIONS (CONC) SY     8,745.000 69.00000 1
530 2005 INTERSECTIONS (ACP) SY     5,357.200 23.64145 4
530 2007 DRIVEWAYS (CONC) EA     16.000 3,162.50000 2
530 2008 DRIVEWAYS (ACP) EA     211.000 1,157.79621 3
530 2010 DRIVEWAYS (CONC) SY     19,452.300 56.21415 10
530 2011 DRIVEWAYS (ACP) SY     7,865.300 35.85319 7
530 2014 TURNOUTS (ACP) EA     119.000 877.94118 3
530 2038 DRIVEWAYS (CONC) (HES) SY     7,197.000 68.13428 2
530 2056 INTERSECTIONS (CONC) (HES) SY     1,124.000 76.00000 1
530 6001 INTERSECTIONS (CONC) SY 300.000 151.00000 1,320.000 127.04545 2
530 6002 INTERSECTIONS (ACP) SY 702.000 68.05014 9,607.000 23.72035 7
530 6004 DRIVEWAYS (CONC) SY 549.000 141.71475 18,379.600 67.48813 11
530 6005 DRIVEWAYS (ACP) SY 1,353.000 45.02897 19,504.600 35.84609 12
531 2004 CONC SIDEWALKS (6") SY     22,990.000 48.85451 4
531 2005 CURB RAMPS (TY 1) EA     194.000 1,358.43335 10
531 2006 CURB RAMPS (TY 2) EA     61.000 1,791.56656 7
531 2007 CURB RAMPS (TY 3) EA     101.000 1,413.20762 4
531 2009 CURB RAMPS (TY 6) EA     83.000 1,372.77108 3
531 2010 CURB RAMPS (TY 7) EA     325.000 1,498.44492 9
531 2013 CURB RAMPS (TY 20) EA     30.000 1,896.66667 3
531 2014 CURB RAMPS (TY 22) EA     29.000 2,199.09138 9
531 2017 CURB RAMPS (TY 21) EA     63.000 1,418.75619 9
531 2024 CONC SIDEWALK (5") SY     4,724.000 50.25000 1
531 2034 CONC SIDEWALK (DRAIN) LF     84.000 200.00000 1
531 2040 CURB RAMPS (TY 5) EA     55.000 1,697.74109 7
531 2041 CURB RAMPS (TY 10) EA     161.000 1,291.95304 8
531 2044 CURB RAMPS (TY 10) EA     20.000 1,470.00000 1
531 2046 CURB RAMPS (TY 11) EA     2.000 1,272.72500 2
531 2123 CONC SIDEWALKS (BRIDGE) (SPECIAL) LF     12.000 500.00000 1
531 6001 CONC SIDEWALKS (4") SY     26,009.000 38.77175 2
531 6002 CONC SIDEWALKS (5") SY 884.000 58.00000 9,123.000 39.09953 3
531 6003 CONC SIDEWALKS (6") SY 8.000 200.00000 13.500 206.11111 2
531 6004 CURB RAMPS (TY 1) EA 11.000 1,600.00000 103.000 1,277.33825 5
531 6005 CURB RAMPS (TY 2) EA 2.000 1,500.00000 4.000 1,400.00000 2
531 6008 CURB RAMPS (TY 5) EA 3.000 1,750.00000 4.000 1,762.50000 2
531 6010 CURB RAMPS (TY 7) EA 4.000 1,750.00000 93.000 1,158.02043 4
531 6013 CURB RAMPS (TY 10) EA     41.000 1,576.21951 2
531 6016 CURB RAMPS (TY 21) EA     21.000 1,203.32857 2
531 6017 CURB RAMPS (TY 22) EA 2.000 1,900.00000 2.000 1,900.00000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     434,114.710 .20408 4
533 6001 RUMBLE STRIPS (SHOULDER) LF 222,565.000 1.25494 352,625.000 .85883 4
533 6002 RUMBLE STRIPS (CENTERLINE) LF 17,639.000 .25000 88,670.000 .20886 3
536 2002 CONC MEDIAN SY     15,627.800 48.10427 7
536 2004 CONC DIRECTIONAL ISLAND SY     1,154.600 78.95895 3
536 2005 CONC MEDIAN (DOWEL) (2') SY     461.000 170.00000 1
536 2006 CONC MEDIAN (MONO NOSE) SY     285.700 167.78089 3
536 6001 CONC MEDIAN LF     853.000 17.00000 1
536 6002 CONC MEDIAN SY     3,869.000 49.74515 4
536 6006 CONC MEDIAN (MONO NOSE) SY     939.900 37.89377 2
538 2001 RIGHT OF WAY MARKERS EA     8.000 300.00000 1
538 6001 RIGHT OF WAY MARKERS EA     234.000 372.75000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF     10,173.500 17.54937 12
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF     1,772.750 18.54497 3
540 2005 TERMINAL ANCHOR SECTION EA     2.000 625.00000 1
540 2009 TERMINAL ANCHOR SECTION ADJUSTMENT EA     1.000 863.97000 1
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     91.000 1,346.63769 14
540 2022 MTL W - BEAM GD FEN (STL POST) RADIUS RAIL LF     32.000 21.18000 1
540 2024 RADIAL TERMINAL ANCHOR SECTION (DRWY) EA     1.000 430.00000 1
540 2036 DRIVEWAY TERMINAL ANCHOR SECTION EA     2.000 500.00000 1
540 2037 MTL W - BEAM GD FEN (CRT POST) (SHRT RAD LF     62.000 19.00000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     46.000 1,042.35739 9
540 2045 MTL BM GD FEN (LONG SPAN SYSTEM) LF     250.000 19.30000 2
540 2046 MTL BM GD FEN TRANS (NON - SYM) EA     1.000 448.38000 1
540 6001 MTL W - BEAM GD FEN (TIM POST) LF 2,475.000 19.44242 35,959.500 16.97744 19
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF 25,340.500 16.73244 25,340.500 16.73244 2
540 6005 TERMINAL ANCHOR SECTION EA     1.000 755.00000 1
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 25.000 1,251.60000 80.000 1,325.33200 8
540 6007 MTL BEAM GD FEN TRANS (TL2) EA     5.000 650.00000 1
540 6014 SHORT RADIUS LF     1,096.250 24.67268 7
540 6015 DRIVEWAY TERMINAL ANCHOR SECTION EA     23.000 615.10435 6
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 24.000 725.00000 100.000 965.08110 8
540 6017 MTL BM GD FEN (LONG SPAN SYSTEM) LF 200.000 24.50000 1,600.000 20.20125 7
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA     3.000 475.00000 1
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 600.000 65.50000 750.000 65.40000 2
542 2001 REMOVING METAL BEAM GUARD FENCE LF     28,615.000 2.07633 13
542 2002 REMOVING TERMINAL ANCHOR SECTION EA     15.000 176.84400 7
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA     5.000 223.00000 2
542 2005 RM MTL BM GD FENCE TRANS (T101) EA     8.000 132.00000 1
542 6001 REMOVE METAL BEAM GUARD FENCE LF 23,577.000 1.57516 39,000.000 1.89075 10
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 15.000 109.33333 25.000 113.80000 5
542 6004 RM MTL BM GD FENCE TRANS (THRIE - BEAM) EA 45.000 138.33333 47.000 140.95745 3
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA     114.000 1,952.39070 15
544 2002 GUARDRAIL END TREATMENT (MOVE & RESET) EA     3.000 1,089.31333 2
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA     66.000 264.26970 11
544 2004 GDRAIL END TRT (INST) (WOOD POST) (TY I) EA     8.000 1,800.00000 1
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 75.000 1,882.93333 330.000 1,876.30033 18
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 82.000 210.00000 147.000 227.74912 8
544 6004 GDRAIL END TRT (INST) (WOOD POST) (TY I) EA     19.000 2,044.73684 2
545 2008 CRASH CUSH ATTEN (MOVE & RESET) (TRACC) EA     16.000 1,337.50000 2
545 2009 CRASH CUSH ATTEN (REMOVE) (TRACC) EA     16.000 700.00000 2
545 2030 CRASH CUSH ATTEN (REMOVE) (QUAD) (N) EA     1.000 1,051.43000 1
545 2049 CRASH CUSH ATTEN (INSTL) (WORK ZONE) EA     20.000 6,343.50000 1
545 2050 CRASH CUSH ATTEN (MOV & RESET) (WORK ZONE) EA     26.000 905.06385 2
545 2051 CRASH CUSH ATTEN (REMOVE) (WORK ZONE) EA     29.000 501.58069 2
545 2083 CRASH CUSH ATTEN (INSTL) (L) (N) (TL3) EA     6.000 17,000.00000 1
545 2088 CRASH CUSH ATTEN (INSTL) (R) (N) (TL2) EA     1.000 10,000.00000 1
545 2089 CRASH CUSH ATTEN (INSTL) (R) (N) (TL3) EA     7.000 12,912.97714 3
545 2092 CRASH CUSH ATTEN (INSTL) (R) (W) (TL3) EA     3.000 18,000.00000 1
545 2094 CRASH CUSH ATTEN (INSTL) (S) (N) (TL2) EA     15.000 5,700.00000 3