AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - TYLER DISTRICT

Last Update: Thursday, July 14, 2016
ITEMS 500 6001 TO 560 6009
Items Items Bid Code Range
0100 - 0193
0247 - 0275
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0688
0712 - 0780
3002 - 3002
4014 - 4045
5017 - 5040
6001 - 6120
9051 - 9054
500 6001 - 560 6009
Item No Description Units June 30, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 6001 MOBILIZATION LS 1.000 1,150,000.00000 21.000 396,201.60524 21
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 25.000 5,000.00000 233.000 3,735.33047 21
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 877.000 30.25000 4,245.000 29.45153 5
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     9,769.000 30.55139 9
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 91.000 56.00000 91.000 56.00000 1
506 6011 ROCK FILTER DAMS (REMOVE) LF 968.000 6.60000 14,105.000 6.26890 11
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 415.000 24.00000 2,887.000 19.07863 3
506 6024 CONSTRUCTION EXITS (REMOVE) SY 415.000 6.60000 2,887.000 3.30135 3
506 6025 EXCAV (EROSN & SEDMT CONT, IN PLACE) CY     2,000.000 16.00000 1
506 6027 EXCAV (EROSN & SEDMT CONT, IN VEH) CY     200.000 25.00000 1
506 6029 EARTHWORK (EROSN & SEDMT CONT, IN VEH) CY 1,080.000 25.00000 2,510.000 26.16733 9
506 6030 BACKHOE WORK (EROSION & SEDMT CONT) HR 166.000 250.00000 1,127.000 127.56433 10
506 6033 BULLDOZER WORK (EROSION & SEDMT CONT) HR 67.000 250.00000 267.000 145.13109 2
506 6034 CONSTRUCTION PERIMETER FENCE LF     1,000.000 4.00000 1
506 6035 SANDBAGS FOR EROSION CONTROL EA 1,000.000 7.00000 1,260.000 9.06349 2
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 12,380.000 3.10000 59,348.000 3.22177 13
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 12,380.000 .95000 59,348.000 1.09504 13
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF     1,185.000 3.50000 1
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 3,310.000 4.95000 9,896.000 4.39051 3
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF     2,960.000 8.83108 2
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF     8,771.000 .59919 3
508 6001 CONSTRUCTING DETOURS SY 27,116.000 65.00000 42,251.000 72.36572 4
512 6005 PORT CTB (FUR & INST) (F - SHAPE) (TY 1) LF     1,410.000 50.00000 1
512 6009 PORT CTB (FUR & INST) (LOW PROF) (TY 1) LF     3,900.000 40.00000 1
512 6010 PORT CTB (FUR & INST) (LOW PROF) (TY 2) LF     640.000 40.00000 1
512 6021 PORT CTB (DES SOURCE) (LOW PROF) (TY 1) LF     80.000 55.00000 1
512 6022 PORT CTB (DES SOURCE) (LOW PROF) (TY 2) LF     40.000 65.00000 1
512 6029 PORT CTB (MOVE) (F - SHAPE) (TY 1) LF     720.000 18.00000 1
512 6033 PORT CTB (MOVE) (LOW PROF) (TY 1) LF     3,880.000 12.26804 2
512 6034 PORT CTB (MOVE) (LOW PROF) (TY 2) LF     520.000 13.76923 2
512 6045 PORT CTB (STKPL) (LOW PROF) (TY 1) LF     80.000 55.00000 1
512 6046 PORT CTB (STKPL) (LOW PROF) (TY 2) LF     40.000 65.00000 1
512 6053 PORT CTB (REMOVE) (F - SHAPE) (TY 1) LF     1,410.000 12.00000 1
512 6057 PORT CTB (REMOVE) (LOW PROF) (TY 1) LF     3,800.000 12.00000 1
512 6058 PORT CTB (REMOVE) (LOW PROF) (TY 2) LF     640.000 12.00000 1
512 6065 PORT CTB (DES SOURCE) (SAFETY SH) (TY 2 LF     4,200.000 18.00000 1
512 6079 PORT CTB (STKPL) (SAFETY SH) LF     4,200.000 18.00000 1
529 6008 CONC CURB & GUTTER (TY II) LF 21,592.000 17.50000 66,560.000 16.63388 4
530 6002 INTERSECTIONS (ACP) SY     1,413.000 40.00000 1
530 6004 DRIVEWAYS (CONC) SY 1,875.000 85.00000 1,875.000 85.00000 1
530 6005 DRIVEWAYS (ACP) SY     21,920.200 34.54916 5
530 6008 TURNOUTS (ACP) SY     967.000 42.00000 1
530 6017 DRIVEWAYS (CONC) (HES) SY     5,348.000 84.95438 7
531 6001 CONC SIDEWALKS (4") SY     4,765.000 40.00000 1
531 6002 CONC SIDEWALKS (5") SY 2,995.000 54.00000 2,995.000 54.00000 1
531 6004 CURB RAMPS (TY 1) EA 1.000 3,000.00000 4.000 1,575.00000 2
531 6005 CURB RAMPS (TY 2) EA     1.000 1,100.00000 1
531 6010 CURB RAMPS (TY 7) EA     18.000 1,322.22222 2
531 6013 CURB RAMPS (TY 10) EA 22.000 2,800.00000 22.000 2,800.00000 1
533 6001 RUMBLE STRIPS (SHOULDER) LF     129,992.000 .16401 3
533 6002 RUMBLE STRIPS (CENTERLINE) LF     39,330.000 .19000 1
540 6001 MTL W - BEAM GD FEN (TIM POST) LF 500.000 20.50000 16,251.000 18.86370 9
540 6002 MTL W - BEAM GD FEN (STEEL POST) LF 100.000 42.50000 100.000 42.50000 1
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     26.000 1,384.61538 3
540 6007 MTL BEAM GD FEN TRANS (TL2) EA     40.000 983.15000 4
540 6014 SHORT RADIUS LF     200.000 34.00000 1
540 6015 DRIVEWAY TERMINAL ANCHOR SECTION EA     5.000 1,075.00000 1
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA     16.000 995.62500 2
540 6021 MTL THRIE - BEAM GD FEN (TIM POST) EA     8.000 1,500.00000 1
542 6001 REMOVE METAL BEAM GUARD FENCE LF 300.000 3.30000 13,990.000 3.10347 6
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 4.000 192.50000 27.000 206.44444 4
542 6004 RM MTL BM GD FENCE TRANS (THRIE - BEAM) EA     16.000 300.00000 1
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA     117.000 2,145.26496 10
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA     65.000 220.61538 4
544 6004 GDRAIL END TRT (INST) (WOOD POST) (TY I) EA     2.000 1,700.00000 1
544 6006 GDRAIL END TRT (INST) (WOOD POST) (TY III EA 4.000 2,150.00000 4.000 2,150.00000 1
545 6001 CRASH CUSH ATTEN (INSTL) EA     13.000 9,038.46154 2
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA     6.000 1,700.00000 1
545 6005 CRASH CUSH ATTEN (REMOVE) EA     13.000 630.76923 2
552 6001 WIRE FENCE (TY A) LF     1,860.000 6.28495 3
556 6006 PIPE UNDERDRAINS (TY 6) (6") LF     170.000 50.00000 1
556 6008 PIPE UNDERDRAINS (TY 8) (6") LF 1,000.000 30.00000 3,500.000 30.71429 4
560 6001 MAILBOX INSTALL - S (TWG - POST) TY 1 EA     11.000 220.00000 1
560 6002 MAILBOX INSTALL - D (TWG - POST) TY 1 EA     2.000 270.00000 1
560 6003 MAILBOX INSTALL - M (TWG - POST) TY 1 EA     5.000 387.60000 3
560 6004 MAILBOX INSTALL - S (TWG - POST) TY 2 EA     105.000 247.21905 5
560 6005 MAILBOX INSTALL - D (TWG - POST) TY 2 EA     12.000 275.50000 4
560 6006 MAILBOX INSTALL - M (TWG - POST) TY 2 EA     4.000 353.25000 2
560 6009 MAILBOX INSTALL - S (RR - POST) TY 4 EA 11.000 215.00000 11.000 215.00000 1