AVERAGE LOW BID UNIT PRICE - MAINTENANCE - WACO DISTRICT

Last Update: Thursday, July 24, 2014
ITEMS 712 2002 TO 776 2032
Items Items Bid Code Range
0104 - 0168
0216 - 0247
0310 - 0361
0400 - 0496
0500 - 0556
0618 - 0688
0712 - 0776
1122 - 1122
3224 - 3271
5369 - 5369
6005 - 6834
7126 - 7602
8094 - 8835
712 2002 - 776 2032
Item No Description Units June 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2002 JT / CRCK SEAL (POLY MOD ASPH EMULSION) LMI     468.540 507.76999 1
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,545.630 309.80949 2
720 2003 SPALLING REPAIR (POLYMERIC) (SEMIRIGID) GAL     5,000.000 33.25000 1
730 2003 SPOT MOWING AC     1,210.000 16.90434 8
730 2114 FULL - WIDTH MOWING - (RURAL) AC     105,083.088 23.71206 16
730 2115 FULL - WIDTH MOWING - (URBAN) AC     21,909.624 27.41800 8
734 2001 LITTER REMOVAL AC     20,904.290 7.40959 7
734 2003 LITTER REMOVAL (SPOT) AC     2,000.000 6.39750 4
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI 881.280 100.00000 1,034.526 102.22197 2
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI 984.180 100.00000 1,328.790 106.50687 2
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI 253.200 100.00000 392.112 102.77745 2
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI 50.000 100.00000 105.770 126.57994 2
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI 125.000 1.00000 135.000 2.78222 2
738 2010 CLEANING / SWEEPING (SPOT) MI 30.000 75.00000 70.000 40.71429 2
738 2011 CLEANING / SWEEPING (HANDWORK) SY 100.000 0.15000 27,100.000 0.15000 2
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     210.620 1,422.01358 4
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     53.680 2,687.38823 5
752 2022 TREE REMOVAL (4" - 12" DIA) EA     1,612.000 82.44417 6
752 2023 TREE REMOVAL (12" - 18" DIA) EA     1,044.000 99.66475 6
752 2024 TREE REMOVAL (18" - 24" DIA) EA     543.000 130.64457 6
752 2025 TREE REMOVAL (24" - 30" DIA) EA     219.000 201.09589 6
752 2026 TREE REMOVAL (30" - 36" DIA) EA     87.000 593.16092 6
752 2027 TREE REMOVAL (36" - 42" DIA) EA     86.000 597.67442 5
752 2028 TREE REMOVAL (42" - 48" DIA) EA     33.000 628.78788 4
752 2029 TREE REMOVAL (48" - 60" DIA) EA     29.000 668.96552 5
752 2030 TREE REMOVAL (60" - 72" DIA) EA     12.000 875.00000 3
752 2055 STUMP REMOVAL (GREATER THAN 12") EA     26.000 135.57692 4
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF     720.000 6.25000 3
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     1,600.000 11.00000 2
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     100.000 10.50000 2
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     10.000 10.50000 2
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     320.000 44.00000 2
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     50.000 45.00000 2
770 2006 REALIGN POSTS EA     160.000 7.50000 2
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     40.000 1,875.00000 2
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     4.000 700.00000 2
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     560.000 16.00000 2
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     10.000 40.00000 2
770 2022 REM & RESET SGT IMPACT HEAD EA     20.000 55.00000 2
770 2023 REPLACE SGT OBJECT MARKER EA     2.000 13.00000 2
770 2024 REPLACE SGT CABLE ANCHOR EA     6.000 30.50000 2
770 2025 REPLACE SGT CABLE ASSEMBLY EA     6.000 25.50000 2
770 2026 REPLACE SGT STRUT EA     4.000 25.50000 2
770 2027 REMOVE & REPLACE BLOCKOUT EA     600.000 6.00000 2
770 2028 REPLACE HINGED TOP SGT STEEL POST EA     6.000 75.00000 2
770 2030 REPAIR RAIL ELEMENT (W - BEAM) (FURNISHED LF     1,970.000 4.50000 2
770 2040 RAISE RAIL ELEMENT LF     2,000.000 2.00000 2
772 2001 POST AND CABLE FENCE (REMOVAL) LF     100.000 1.00000 1
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF     2,400.000 4.00000 2
772 2004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA     20.000 30.00000 2
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA     20.000 30.00000 2
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF     110.000 5.00000 2
774 2001 REMOVE AND REPLACE (TRACC) EA     2.000 10,500.00000 2
774 2005 RMV / REPL (VIA - SAND FILL PLASTIC BARRELS EA     20.000 240.00000 2
776 2001 REPAIR (STEEL POST W / W - BEAM - T101) LF     4.000 75.00000 2
776 2003 REP (CON PARAPET W / ALUM POST / RAIL - T4 (A) LF     10.000 65.00000 2
776 2004 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) LF     60.000 22.50000 2
776 2013 REP METAL POST W / BASE PLATE (T4 (A) RAIL EA     2.000 50.50000 2
776 2014 REP METAL POST W / BASE PLATE (T6 RAIL) EA     2.000 55.50000 2
776 2020 REPAIR (TY T101RC) LF     1.000 10.00000 1
776 2021 REPAIR (TY T1 - 101R) LF     1.000 10.00000 1
776 2024 REP MTL PST W / BASE PLATE (TY T101RC) EA     70.000 37.50000 2
776 2025 REP MTL PST W / BASE PLATE (TY T1 - 101R) EA     1.000 10.00000 1
776 2031 REPAIR (ALUMINUM RAIL) LF     20.000 75.00000 2
776 2032 REPAIR (STEEL POST W / CHANNEL IRON RAIL LF     230.000 25.00000 2