Item No Description Units February 28, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2002 JT / CRCK SEAL (POLY MOD ASPH EMULSION) LMI     688.628 609.98999 1
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,545.630 309.80949 2
720 2003 SPALLING REPAIR (POLYMERIC) (SEMIRIGID) GAL     5,000.000 33.25000 1
730 2003 SPOT MOWING AC     1,210.000 16.90434 8
730 2114 FULL - WIDTH MOWING - (RURAL) AC     105,083.088 23.71206 16
730 2115 FULL - WIDTH MOWING - (URBAN) AC     21,909.624 27.41800 8
730 6003 SPOT MOWING AC     129.000 5.06977 6
730 6104 FULL - WIDTH MOWING (RURAL) AC     53,107.914 23.59102 8
730 6105 FULL - WIDTH MOWING (URBAN) AC     11,259.354 28.71894 4
734 2001 LITTER REMOVAL AC     20,904.290 7.40959 7
734 2003 LITTER REMOVAL (SPOT) AC     2,000.000 6.39750 4
734 6001 LITTER REMOVAL AC     16,189.830 7.95630 6
734 6003 LITTER REMOVAL (SPOT) AC     2,000.000 6.37500 4
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI     1,034.526 102.22197 2
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI     1,328.790 106.50687 2
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     392.112 102.77745 2
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI     105.770 126.57994 2
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI     135.000 2.78222 2
738 2010 CLEANING / SWEEPING (SPOT) MI     70.000 40.71429 2
738 2011 CLEANING / SWEEPING (HANDWORK) SY     27,100.000 0.15000 2
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     391.248 1,349.38055 8
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     63.430 2,424.11320 8
752 2022 TREE REMOVAL (4" - 12" DIA) EA     1,480.000 73.80743 8
752 2023 TREE REMOVAL (12" - 18" DIA) EA     836.000 96.83014 8
752 2024 TREE REMOVAL (18" - 24" DIA) EA     467.000 130.31049 8
752 2025 TREE REMOVAL (24" - 30" DIA) EA     151.000 193.97351 8
752 2026 TREE REMOVAL (30" - 36" DIA) EA     66.000 463.71212 8
752 2027 TREE REMOVAL (36" - 42" DIA) EA     64.000 566.16844 7
752 2028 TREE REMOVAL (42" - 48" DIA) EA     26.000 628.84615 6
752 2029 TREE REMOVAL (48" - 60" DIA) EA     26.000 807.69231 8
752 2030 TREE REMOVAL (60" - 72" DIA) EA     18.000 755.83333 6
752 2055 STUMP REMOVAL (GREATER THAN 12") EA     37.000 185.37541 7
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF     200.000 9.50000 2
764 2001 DRAIN INLET CLEANING EA     30.000 84.99000 1
764 2005 SUMP CLEANING EA     3.000 700.00000 1
764 2006 STORM SEWER CLEANING (PIPE) (12" - 18" DIA LF     2,200.000 7.53000 1
764 2007 STORM SEWER CLEANING (PIPE) (19" - 24" DIA LF     500.000 7.80000 1
764 2009 STORM SEWER CLEANING (PIPE) (31" - 36" DIA LF     269.000 9.00000 1
764 2017 STORM SEWER CLEAN (BOX CULV) (24 - <48 SF) LF     500.000 25.27000 1
764 2018 STORM SEWER CLEAN (BOX CULV) (48 - <96 SF) LF     125.000 32.29000 1
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     800.000 12.00000 1
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     50.000 1.00000 1
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     5.000 1.00000 1
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     160.000 40.00000 1
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     25.000 40.00000 1
770 2006 REALIGN POSTS EA     80.000 5.00000 1
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     20.000 2,000.00000 1
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     2.000 700.00000 1
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     280.000 20.00000 1
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     5.000 30.00000 1
770 2022 REM & RESET SGT IMPACT HEAD EA     10.000 10.00000 1
770 2023 REPLACE SGT OBJECT MARKER EA     1.000 1.00000 1
770 2024 REPLACE SGT CABLE ANCHOR EA     3.000 1.00000 1
770 2025 REPLACE SGT CABLE ASSEMBLY EA     3.000 1.00000 1
770 2026 REPLACE SGT STRUT EA     2.000 1.00000 1
770 2027 REMOVE & REPLACE BLOCKOUT EA     300.000 5.00000 1
770 2028 REPLACE HINGED TOP SGT STEEL POST EA     3.000 50.00000 1
770 2030 REPAIR RAIL ELEMENT (W - BEAM) (FURNISHED LF     985.000 5.00000 1
770 2040 RAISE RAIL ELEMENT LF     1,000.000 1.00000 1
772 2001 POST AND CABLE FENCE (REMOVAL) LF     100.000 1.00000 1
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF     1,200.000 4.00000 1
772 2004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA     10.000 10.00000 1
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA     10.000 10.00000 1
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF     55.000 5.00000 1
774 2001 REMOVE AND REPLACE (TRACC) EA     1.000 10,000.00000 1
774 2005 RMV / REPL (VIA - SAND FILL PLASTIC BARRELS EA     10.000 180.00000 1
776 2001 REPAIR (STEEL POST W / W - BEAM - T101) LF     2.000 50.00000 1
776 2003 REP (CON PARAPET W / ALUM POST / RAIL - T4 (A) LF     5.000 50.00000 1
776 2004 REPAIR (STL POST W / DOUBLED W - BEAMS - T6) LF     30.000 20.00000 1
776 2013 REP METAL POST W / BASE PLATE (T4 (A) RAIL EA     1.000 1.00000 1
776 2014 REP METAL POST W / BASE PLATE (T6 RAIL) EA     1.000 1.00000 1
776 2020 REPAIR (TY T101RC) LF     1.000 10.00000 1
776 2021 REPAIR (TY T1 - 101R) LF     1.000 10.00000 1
776 2024 REP MTL PST W / BASE PLATE (TY T101RC) EA     35.000 25.00000 1
776 2025 REP MTL PST W / BASE PLATE (TY T1 - 101R) EA     1.000 10.00000 1
776 2031 REPAIR (ALUMINUM RAIL) LF     10.000 50.00000 1
776 2032 REPAIR (STEEL POST W / CHANNEL IRON RAIL LF     115.000 25.00000 1