| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | AUSTIN |
| Highway |
CR |
| From |
AT DRAW CR 5200 |
| To |
(ZETTEL RD) STR # AA03-00-001 |
| CSJ |
0913-20-079 |
| Proj ID |
BR 2008(612) |
| Work Type |
REPLACE BRIDGE |
| |
|
0.071 |
196643.67 |
4884.50 |
193969.04 |
100.0 |
| Work Order |
10-12-12 |
| Work Began |
11-12-12 |
| Work Completed |
04-26-13 |
| Time Computed |
10-28-12 |
| Contract Working Days |
62 |
| Addl Days Granted |
0 |
| Working Days Charged |
58 |
| Percent Time Used |
93 |
| Contractor(s) |
| L.C. JORDAN & SON |
SUBCONTRACTOR(S) FOR CCSJ: 0913-20-079 HEMPHILL PILE DRIVING CO., A CORP. (9.17%) ODUM SERVICES, L.P.(6.87%) HOUSTON SAWING & DRILLING(0.56%) KOSSMAN CONTRACTING CO., INC.(0.60%)
|
| Contract # |
09123006 |
|
Totals |
196643.67 |
4884.50 |
193969.04 |
100.0 |
|
| County | AUSTIN |
| Highway |
CR |
| From |
AT WEST FORK MILL CREEK CR 5178 |
| To |
(MAREK ROAD) AA02-37-002 |
| CSJ |
0913-20-082 |
| Proj ID |
BR 2010(405) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.075 |
225407.70 |
0.00 |
196508.76 |
96.0 |
| Work Order |
01-18-12 |
| Work Began |
05-29-12 |
| Work Completed |
|
| Time Computed |
09-03-12 |
| Contract Working Days |
60 |
| Addl Days Granted |
0 |
| Working Days Charged |
94 |
| Percent Time Used |
156 |
| Contractor(s) |
| CONSTAR CONSTRUCTION |
SUBCONTRACTOR(S) FOR CCSJ: 0913-20-082 LONE STAR TRAFFIC SERVICE, INC.(0.88%) HEMPHILL PILE DRIVING CO., A CORP. (7.15%) CWA CONSTRUCTION, INC. (2.77%) CEN TEX HYDROSEED, INC.(0.48%)
|
| Contract # |
12113003 |
|
Totals |
225407.70 |
0.00 |
196508.76 |
96.0 |
|
| County | AUSTIN |
| Highway |
CS |
| From |
VARIOUS SCHOOL LOCATIONS |
| To |
IN CITY OF SEALY |
| CSJ |
0913-20-083 |
| Proj ID |
STP 1102(301)SRS |
| Work Type |
CONSTRUCT SIDEWALKS, CROSSWALKS |
| |
|
1.338 |
564758.53 |
6359.78 |
544739.45 |
96.4 |
| Work Order |
05-16-12 |
| Work Began |
09-28-12 |
| Work Completed |
|
| Time Computed |
09-13-12 |
| Contract Working Days |
120 |
| Addl Days Granted |
0 |
| Working Days Charged |
106 |
| Percent Time Used |
88 |
| Contractor(s) |
| TRIPLE B SERVICES, L.L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 0913-20-083 STRIPES & STOPS COMPANY, INC.(0.54%) CHAPA"S CONSTRUCTION ( 32.49%) SILVA CONTRACTING COMPANY, INC.(5.38%) RICE ENVIRONMENTAL SERVICES(5.12%) AMERICAN DRILLING & SAWING (0.38%) CURB PLANET INC. (0.22%) JASSO"S SAWING & SEALING (1.09%)
|
| Contract # |
04123029 |
|
Totals |
564758.53 |
6359.78 |
544739.45 |
96.4 |
|
| County | MATAGORDA |
| Highway |
CS |
| From |
SIDEWALKS CONNECTING ELEM. SCHOOLS |
| To |
IN PALACIOS |
| CSJ |
0913-21-044 |
| Proj ID |
STP 1102(321)SRS |
| Work Type |
CONSTRUCT SIDEWALKS |
| |
|
1.736 |
363182.49 |
0.00 |
293135.89 |
88.1 |
| Work Order |
09-14-11 |
| Work Began |
01-20-12 |
| Work Completed |
|
| Time Computed |
01-11-12 |
| Contract Working Days |
121 |
| Addl Days Granted |
0 |
| Working Days Charged |
175 |
| Percent Time Used |
144 |
| Contractor(s) |
| CONSTAR CONSTRUCTION |
SUBCONTRACTOR(S) FOR CCSJ: 0913-21-044 LONE STAR TRAFFIC SERVICE, INC.(1.65%) D & P COASTAL MARINE CONSTRUCTION(1.26%) BATTERSON,LLP(3.09%)
|
| Contract # |
08113252 |
|
Totals |
363182.49 |
0.00 |
293135.89 |
88.1 |
|
| County | GONZALES |
| Highway |
CR |
| From |
AT LIVE OAK CREEK |
| To |
(CR 354) AA03-54-001 |
| CSJ |
0913-22-034 |
| Proj ID |
BR 2010(525) |
| Work Type |
STRUCTRUAL, GR, SURFACING |
| |
|
0.066 |
244980.00 |
0.00 |
224289.00 |
96.1 |
| Work Order |
06-21-12 |
| Work Began |
08-20-12 |
| Work Completed |
|
| Time Computed |
08-20-12 |
| Contract Working Days |
43 |
| Addl Days Granted |
0 |
| Working Days Charged |
62 |
| Percent Time Used |
144 |
| Contractor(s) |
| CONSTAR CONSTRUCTION |
SUBCONTRACTOR(S) FOR CCSJ: 0913-22-034 W. W. FOUNDATION DRILLING, LTD.(5.50%) C. W. & A.,INC (1.42%)
|
| Contract # |
05123021 |
|
Totals |
244980.00 |
0.00 |
224289.00 |
96.1 |
|
| County | GONZALES |
| Highway |
CR |
| From |
AT FIVE MILE CREEK CR 298 |
| To |
(CR 298) STR # AA02-98-002 |
| CSJ |
0913-22-038 |
| Proj ID |
BR 2011(597) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.139 |
426647.41 |
51024.54 |
172423.81 |
40.4 |
| Work Order |
02-05-13 |
| Work Began |
03-12-13 |
| Work Completed |
|
| Time Computed |
03-12-13 |
| Contract Working Days |
75 |
| Addl Days Granted |
0 |
| Working Days Charged |
27 |
| Percent Time Used |
36 |
| Contractor(s) |
| AARON, DAVID CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0913-22-038 HEMPHILL PILE DRIVING CO., A CORP. (8.10%) ROADWAY SPECIALTIES, INC.(4.97%) O & S TRAFFIC SUPPLIES (0.45%)
|
| Contract # |
12123016 |
|
Totals |
426647.41 |
51024.54 |
172423.81 |
40.4 |
|
| County | GONZALES |
| Highway |
PW |
| From |
PARKING LOTS AND RV PULLOUTS |
| To |
WITHIN PALMETTO STATE PARK |
| CSJ |
0913-22-045 |
| Proj ID |
C 913-22-45 |
| Work Type |
WIDEN AND OVERLAY RV PULLOUTS |
| |
|
0.001 |
330812.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
07-09-13 |
| Contract Working Days |
35 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| RAMMING PAVING COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0913-22-045 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05133016 |
|
Totals |
330812.00 |
0.00 |
0.00 |
0.0 |
|
| County | VICTORIA |
| Highway |
CR |
| From |
AT DRAW CR 39 |
| To |
(NURSERY RD) #AA0146002 |
| CSJ |
0913-27-051 |
| Proj ID |
BR 2010(179) |
| Work Type |
REP. STRUCTURE, BASE, GRADING |
| |
|
0.061 |
264835.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
05-08-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
45 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| EASTER CONSTRUCTION INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0913-27-051 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
02133228 |
|
Totals |
264835.00 |
0.00 |
0.00 |
0.0 |
|
| County | VICTORIA |
| Highway |
CR |
| From |
ON CR 139 (ARNOLD ROAD) |
| To |
AT DRAW STR # AA01-20-002 |
| CSJ |
0913-27-052 |
| Proj ID |
BR 2011(294) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.064 |
348225.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
03-22-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
60 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| CONSTAR CONSTRUCTION |
SUBCONTRACTOR(S) FOR CCSJ: 0913-27-052 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
01133027 |
|
Totals |
348225.00 |
0.00 |
0.00 |
0.0 |
|
| County | LAVACA |
| Highway |
CR |
| From |
AT SANDY CREEK |
| To |
(CR 14A) STR # AA05-63-001 |
| CSJ |
0913-29-032 |
| Proj ID |
BR 2007(371) |
| Work Type |
STRUCTURES, BASE, SURFACING |
| |
|
0.197 |
674856.10 |
110568.14 |
614987.75 |
91.1 |
| Work Order |
06-28-12 |
| Work Began |
08-25-12 |
| Work Completed |
|
| Time Computed |
08-27-12 |
| Contract Working Days |
105 |
| Addl Days Granted |
0 |
| Working Days Charged |
85 |
| Percent Time Used |
80 |
| Contractor(s) |
| A GREATER AUSTIN DEVELOPMENT CONCRETE CONSTRUCTION, L.L.C. |
SUBCONTRACTOR(S) FOR CCSJ: 0913-29-032 DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (4.80%) ENVIRONMENTAL SAFETY SERVICES, INC.(0.76%) HOUSTON SAWING & DRILLING(0.21%) LONE STAR TRAFFIC SERVICE, INC.(0.57%) SHINN & GREGORY, INC.(7.16%) EE CONSTRUCTION, LLC ( 13.75%) CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.( 14.60%)
|
| Contract # |
05123224 |
|
Totals |
674856.10 |
110568.14 |
614987.75 |
91.1 |
|
| County | LAVACA |
| Highway |
CR |
| From |
AT WILLOW CREEK CR 444 |
| To |
(CR 122) STR # AA04-44-002 |
| CSJ |
0913-29-041 |
| Proj ID |
BR 2011(164) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.068 |
242125.14 |
24436.53 |
197736.22 |
81.6 |
| Work Order |
10-18-12 |
| Work Began |
12-12-12 |
| Work Completed |
|
| Time Computed |
12-12-12 |
| Contract Working Days |
60 |
| Addl Days Granted |
0 |
| Working Days Charged |
51 |
| Percent Time Used |
85 |
| Contractor(s) |
| BPI ENVIRONMENTAL SERVICES INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0913-29-041 HIGHWAY TECHNOLOGIES, INC. (0.80%) M & D FOUNDATION DRILLING INDUSTRIES, INC. (0.00%) LARGE & SONS_FOUNDATION DRILLING,INC.(9.47%)
|
| Contract # |
09123032 |
|
Totals |
242125.14 |
24436.53 |
197736.22 |
81.6 |
|
| County | DEWITT |
| Highway |
FM 952 |
| From |
AT THOMAS CREEK |
| To |
STR # 0941-02-002 |
| CSJ |
0941-02-014 |
| Proj ID |
BR 2013(702) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.197 |
739543.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
105 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HILL COUNTRY BRIDGE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0941-02-014 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05133011 |
|
Totals |
739543.00 |
0.00 |
0.00 |
0.0 |
|
| County | LAVACA |
| Highway |
FM 532 |
| From |
MAIN STREET |
| To |
DEPOT STREET IN MOULTON |
| CSJ |
1007-03-019 |
| Proj ID |
STP 2013(350) |
| Work Type |
LANDSCAPE PROJECT |
| |
|
0.001 |
79102.00 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
03-06-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
41 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ENCINO LANDSCAPE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1007-03-019 HIGHWAY BARRICADES AND SERVICES, LLC (2.71%)
|
| Contract # |
01133225 |
|
Totals |
79102.00 |
0.00 |
0.00 |
0.0 |
|
| County | AUSTIN |
| Highway |
FM 949 |
| From |
0.4 MI. NORTH OF FM 1094 |
| To |
SH 36 |
| CSJ |
1106-02-020 |
| Proj ID |
STP 2013(595)HES |
| Work Type |
WIDEN ROADWAY |
| |
|
8.259 |
3120993.47 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
150 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| KNIFE RIVER CORPORATION - SOUTH |
SUBCONTRACTOR(S) FOR CCSJ: 1106-02-020 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133204 |
|
Totals |
3120993.47 |
0.00 |
0.00 |
0.0 |
|
| County | WHARTON |
| Highway |
FM 1161 |
| From |
FM 102 |
| To |
SH 60 |
| CSJ |
1303-01-017 |
| Proj ID |
STP 2013(486)HES |
| Work Type |
WIDEN ROADWAY |
| |
|
10.413 |
2257894.57 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
120 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| JAMES CONSTRUCTION GROUP, L.L.C. |
SUBCONTRACTOR(S) FOR CCSJ: 1303-01-017 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03133033 |
|
Totals |
2257894.57 |
0.00 |
0.00 |
0.0 |
|
| County | WHARTON |
| Highway |
FM 1162 |
| From |
0.1 MI. EAST OF US 59 |
| To |
0.07 MI. SOUTH OF CR 422 |
| CSJ |
1304-01-018 |
| Proj ID |
STP 2013(245)HES |
| Work Type |
WIDEN ROADWAY |
| |
|
9.350 |
1812780.35 |
415204.23 |
565975.23 |
31.2 |
| Work Order |
01-18-13 |
| Work Began |
02-18-13 |
| Work Completed |
|
| Time Computed |
02-03-13 |
| Contract Working Days |
105 |
| Addl Days Granted |
0 |
| Working Days Charged |
47 |
| Percent Time Used |
44 |
| Contractor(s) |
| BRANNAN PAVING CO., LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 1304-01-018 MURRAY CONSTRUCTION(1.36%) WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(3.06%) INTERSTATE BARRICADES & MARKINGS, INC. (4.17%) STAFF CONCRETE (5.87%)
|
| Contract # |
12123031 |
|
Totals |
1812780.35 |
415204.23 |
565975.23 |
31.2 |
|
| County | CALHOUN |
| Highway |
FM 1289 |
| From |
SH 238 |
| To |
4.2 MI NORTH OF SH 185 |
| CSJ |
1438-01-022 |
| Proj ID |
STP 2012(378) |
| Work Type |
BASE, GR., SURFACING |
| |
|
6.879 |
3292866.80 |
3303.63 |
2909788.96 |
88.5 |
| Work Order |
06-01-12 |
| Work Began |
06-11-12 |
| Work Completed |
|
| Time Computed |
06-11-12 |
| Contract Working Days |
150 |
| Addl Days Granted |
0 |
| Working Days Charged |
156 |
| Percent Time Used |
104 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 1438-01-022 ENVIRONMENTAL SAFETY SERVICES, INC.(0.79%) MURRAY CONSTRUCTION(0.22%) ROADSAFE TRAFFIC SYSTEMS, INC. (2.31%) RAMI MATERIALS TRANSPORT, LLC(1.51%) JUAN DEANDA TRUCKING, LLC DBA JUAN DEANDA TRUCKING (1.51%)
|
| Contract # |
03123003 |
|
Totals |
3292866.80 |
3303.63 |
2909788.96 |
88.5 |
|
| County | CALHOUN |
| Highway |
FM 1289 |
| From |
4.2 MI. NORTH OF SH 185 |
| To |
0.42 MI. NORTH OF SH 185 |
| CSJ |
1438-01-023 |
| Proj ID |
STP 2012(650)HES |
| Work Type |
SET FIXED OBJECTS & CONST. SHLDS. |
| |
|
3.241 |
1648606.49 |
245453.57 |
245453.57 |
14.8 |
| Work Order |
09-13-12 |
| Work Began |
04-16-13 |
| Work Completed |
|
| Time Computed |
11-12-12 |
| Contract Working Days |
90 |
| Addl Days Granted |
0 |
| Working Days Charged |
8 |
| Percent Time Used |
8 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 1438-01-023 D&S TEXAS ICON CONSTRUCTION, LLC (0.61%) ROADSAFE TRAFFIC SYSTEMS, INC. (2.38%)
|
| Contract # |
08123007 |
|
Totals |
1648606.49 |
245453.57 |
245453.57 |
14.8 |
|
| County | CALHOUN |
| Highway |
FM 1289 |
| From |
AT MONKEY SLOUGH |
| To |
STR # 1438-01-003 |
| CSJ |
1438-01-024 |
| Proj ID |
BR 2012(528) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.109 |
942515.30 |
28475.07 |
28475.07 |
3.0 |
| Work Order |
06-18-12 |
| Work Began |
08-25-12 |
| Work Completed |
|
| Time Computed |
08-17-12 |
| Contract Working Days |
90 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| REXCO CONSTRUCTION SERVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1438-01-024 HOUSTON SAWING & DRILLING(0.00%) ENVIRONMENTAL SAFETY SERVICES, INC.(0.42%) KL DURHAM CONSTRUCTION, LLC(0.00%) ODUM SERVICES, L.P.(3.16%) HEMPHILL PILE DRIVING CO., A CORP. (0.00%) ROADSAFE TRAFFIC SYSTEMS, INC. (1.28%)
|
| Contract # |
05123010 |
|
Totals |
942515.30 |
28475.07 |
28475.07 |
3.0 |
|
| County | MATAGORDA |
| Highway |
FM 1728 |
| From |
FM 1301 |
| To |
SH 35 |
| CSJ |
1686-01-013 |
| Proj ID |
STP 2011(780)HRR |
| Work Type |
SAFETY TREAT FIXED OBJECTS |
| |
|
9.516 |
376154.50 |
0.00 |
354579.74 |
94.2 |
| Work Order |
02-15-11 |
| Work Began |
04-05-11 |
| Work Completed |
|
| Time Computed |
04-05-11 |
| Contract Working Days |
105 |
| Addl Days Granted |
12 |
| Working Days Charged |
117 |
| Percent Time Used |
100 |
| Contractor(s) |
| STONERIDGE CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1686-01-013 HIGHWAY TECHNOLOGIES, INC. (1.73%)
|
| Contract # |
01113218 |
|
Totals |
376154.50 |
0.00 |
354579.74 |
94.2 |
|