AVERAGE LOW BID UNIT PRICE - MAINTENANCE - STATEWIDE

Last Update: Tuesday, November 4, 2014
ITEMS 764 2001 TO 774 2035
Items Items Bid Code Range
0100 - 0169
0204 - 0292
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0700 - 0788
1004 - 1122
2144 - 2303
3035 - 3288
4003 - 4581
5049 - 5935
6005 - 6986
7008 - 7658
8020 - 8999
700 2001 - 735 2070
735 2071 - 738 2178
738 2179 - 760 2002
764 2001 - 774 2035
774 2036 - 788 2004
Item No Description Units October 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
764 2001 DRAIN INLET CLEANING EA     7,698.000 34.56569 14
764 2002 PUMP STATION WELL CLEANING EA     182.000 1,252.08791 7
764 2003 BASKET AND INLET PIPE CLEANING EA     112.000 401.42857 6
764 2004 DOWNSPOUT CLEANING EA     331.000 213.95770 5
764 2005 SUMP CLEANING EA     43.000 290.69767 6
764 2006 STORM SEWER CLEANING (PIPE) (12" - 18" DIA LF     72,751.000 3.21092 12
764 2007 STORM SEWER CLEANING (PIPE) (19" - 24" DIA LF     76,727.000 3.44025 11
764 2008 STORM SEWER CLEANING (PIPE) (25" - 30" DIA LF     36,777.000 3.76057 9
764 2009 STORM SEWER CLEANING (PIPE) (31" - 36" DIA LF     21,418.000 5.38197 11
764 2010 STORM SEWER CLEANING (PIPE) (37" - 42" DIA LF     4,826.000 5.40510 7
764 2011 STORM SEWER CLEANING (PIPE) (43" - 54" DIA LF     6,636.000 6.35790 11
764 2012 STORM SEWER CLEANING (PIPE) (55" - 74" DIA LF     1,450.000 7.68966 4
764 2013 STORM SEWER CLEANING (PIPE) (75" - 96" DIA LF     20.000 7.00000 1
764 2014 STORM SEWER CLEAN (BOX CULV) (<6 SF) LF     800.000 8.00000 3
764 2015 STORM SEWER CLEAN (BOX CULV) (6 - <12 SF) LF     3,635.000 13.00550 7
764 2016 STORM SEWER CLEAN (BOX CULV) (12 - <24 SF) LF     9,316.000 12.07578 8
764 2017 STORM SEWER CLEAN (BOX CULV) (24 - <48 SF) LF     14,111.060 16.33992 10
764 2018 STORM SEWER CLEAN (BOX CULV) (48 - <96 SF) LF     3,890.000 17.11517 5
764 2020 SLOTTED DRAIN CLEANING LF     37,475.000 3.11605 7
764 2023 STORM SEWER CLEAN (PIPE) (18" OR LESS) LF     45,882.000 1.76000 1
764 2024 STORM SEWER CLEAN (PIPE) (19" TO 30") LF     20,337.000 2.86000 1
764 2025 STORM SEWER CLEAN (PIPE) (31" TO 42") LF     1,303.000 7.15000 1
764 2026 STORM SEWER CLEAN (PIPE) (43" TO 48") LF     90.000 16.50000 1
764 2028 STORM SEWER CLEANING (PIPE) (<12"DIA) LF     1,000.000 2.60000 3
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF 2,000.000 11.50000 313,815.000 11.96466 54
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 50.000 10.00000 3,721.000 10.20331 49
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF 25.000 10.00000 3,159.000 12.51906 50
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA 15.000 35.00000 18,489.000 26.91116 43
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA 200.000 40.00000 4,231.000 34.74116 42
770 2006 REALIGN POSTS EA 50.000 6.00000 12,396.000 13.59476 49
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA 2.000 5.00000 467.000 4.47585 37
770 2008 REPLACE TERMINAL ANCHOR POSTS EA 2.000 5.00000 324.000 18.84052 39
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA 2.000 2,300.00000 914.000 1,726.49280 47
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 20.000 750.00000 1,391.000 572.32880 52
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 2,000.000 14.00000 97,426.000 15.02315 52
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA 200.000 29.00000 12,101.000 24.43947 52
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA     935.000 7.37005 8
770 2014 REPAIR STEEL POST WITH BASE PLATE EA 10.000 45.00000 1,004.000 56.15718 39
770 2016 REPAIR SINGLE GUARDRAIL TERMINAL EA     20.000 490.00000 2
770 2017 REPAIR RAIL ELEMENT (T4S) LF     425.000 10.00000 2
770 2018 REM / REPL TIMBER POST W / O CONC FND EA     11,180.000 14.15474 12
770 2019 REM / REPL STEEL POST W / O CONC FND EA     750.000 58.08000 10
770 2020 REM / REPL TIMBER POST W / CONC FND EA     363.000 14.46832 9
770 2021 REM / REPL STEEL POST W / CONC FND EA     653.000 93.37366 10
770 2022 REM & RESET SGT IMPACT HEAD EA 32.000 80.00000 1,735.000 170.56634 35
770 2023 REPLACE SGT OBJECT MARKER EA 18.000 25.00000 746.000 27.26475 41
770 2024 REPLACE SGT CABLE ANCHOR EA 10.000 75.00000 687.990 56.24820 40
770 2025 REPLACE SGT CABLE ASSEMBLY EA 10.000 25.00000 880.000 78.63818 43
770 2026 REPLACE SGT STRUT EA 5.000 25.00000 385.990 40.90119 45
770 2027 REMOVE & REPLACE BLOCKOUT EA     8,255.000 6.55147 36
770 2028 REPLACE HINGED TOP SGT STEEL POST EA     241.000 105.50622 8
770 2029 REPAIR RAIL ELEMENT (W - BEAM FURNISHED) LF     6,935.000 4.69474 11
770 2030 REPAIR RAIL ELEMENT (W - BEAM) (FURNISHED LF     210.000 5.19143 2
770 2031 INSTALL BLOCKOUT EA     135.000 19.90963 7
770 2032 REMOVE AND RESET SGT IMPACT HEAD EA     24.000 50.00000 1
770 2033 INSTALL BLOCKOUT EA     1,313.000 10.98123 8
770 2034 REMOVE AND RESET SGT IMPACT HEAD EA     413.000 185.12654 14
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF 300.000 15.00000 5,012.000 14.07869 32
770 2036 REPL SGT IMPACT HEAD (FURNISHED) EA     35.000 128.17143 5
770 2037 REM / REPL TIM POST W / O CONC FND (FURN) EA     98.000 10.05102 5
770 2038 INSTALL BLOCKOUTS (FURNISHED) EA     62.000 2.60000 3
770 2040 RAISE RAIL ELEMENT LF 200.000 7.00000 2,487.000 3.50101 15
770 2050 REM / REP TIM / STL POST W / O CONC FND (FURN EA     20.000 40.00000 1
770 2051 RESET HINGED TOP SGT STL POST EA     80.000 50.00000 2
772 2001 POST AND CABLE FENCE (REMOVAL) LF     1,280.000 3.05109 5
772 2002 POST AND CABLE FENCE (REMV CONC ANCHOR) EA     13.000 41.38462 4
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF     49,162.000 3.27309 7
772 2004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA     54.000 35.27778 4
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA     585.000 31.45299 8
772 2006 POST AND CABLE FENCE (RMV / REPL CNC ANCH EA     96.000 10.00000 5
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF     13,400.000 2.12694 8
772 2009 POST AND CABLE FENCE (REPAIR) LF     125.000 7.00000 1
774 2001 REMOVE AND REPLACE (TRACC) EA     24.000 3,025.00000 8
774 2002 REMOVE AND REPLACE (WIDE TRACC) EA     12.000 5,000.00000 4
774 2003 REMOVE AND REPLACE (NARROW REACT 350) EA 1.000 19,400.00000 17.000 10,636.22353 10
774 2004 REMOVE AND REPLACE (WIDE REACT 350) EA 1.000 27,500.00000 6.000 15,886.31833 5
774 2005 RMV / REPL (VIA - SAND FILL PLASTIC BARRELS EA     191.000 301.91058 10
774 2006 REPAIR (TRACC) EA     33.000 1,166.66667 7
774 2007 REPAIR (TRACC) LF 100.000 55.00000 463.000 133.85529 6
774 2008 REPAIR (WIDE TRACC) EA     2.000 500.00000 1
774 2009 REPAIR (WIDE TRACC) LF     81.000 320.98765 4
774 2010 REPAIR (REACT) EA     75.000 240.00000 2
774 2011 REPAIR (CATCB - FRNT SECT) EA     12.000 300.00000 3
774 2012 REPAIR (CATCB - REAR SECT) EA     6.000 175.00000 2
774 2014 REMOVE AND REPLACE (NARROW QUAD) EA     8.000 4,943.75000 4
774 2015 REPAIR (NARROW QUAD) EA     17.000 458.82353 6
774 2016 REMOVE AND REPLACE (WIDE QUAD) EA     1.000 15,000.00000 1
774 2017 REPAIR (WIDE QUAD) EA     11.000 1,063.81818 6
774 2018 REPAIR (CATGR - FRONT SECTION) EA     4.000 2,625.00000 4
774 2019 REPAIR (CATGR - END SECTION) EA     4.000 937.50000 4
774 2022 REMOVE AND REPLACE (CATGR) EA     3.000 3,866.66667 3
774 2023 REPAIR REACT (N) (MISC HARDWARE) EA 10.000 900.00000 96.000 488.64583 7
774 2024 REPAIR REACT (N) (REAR SEC "S") EA     17.000 111.76471 5
774 2025 REPAIR REACT (N) (REAR SEC "B") EA     5.000 120.00000 3
774 2026 REPAIR REACT (N) (FRONT SECTION) EA     47.000 118.08511 6
774 2027 REPAIR REACT (N) (CYLINDERS) EA 12.000 2,370.00000 102.000 1,504.31373 7
774 2028 REPAIR (QUAD) (N) (BAY) EA 2.000 1,800.00000 113.000 550.04425 12
774 2029 REPAIR (QUAD) (W) (BAY) EA 2.000 1,800.00000 109.000 324.95413 10
774 2033 REPAIR (GREAT SYS) (BAY) EA     6.000 700.00000 1
774 2035 REPAIR REACT (CYLINDERS) EA     63.000 722.22222 5