Detail Letting Schedule for Coryell County (FY 2013)
Coryell County (FY 2013) |
CCSJ: 0184-01-059 | |||
District: | Waco | Let Date: | OCT 2012 |
Highway: | SH 81 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0014-05-036 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | JOHNSON CO LINE | Fund Cat: | 1 |
Limits To: | 0.6 MI N OF FM 934 | Estimate: | $251,863 |
Length: | 5.7 Miles | Actual: | $246,054 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | NH 2013(094) | CSJ: | 0049-02-017 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | MCLENNAN CO LIN | Fund Cat: | 1 |
Limits To: | FM 2307 (NB LNS ONLY) | Estimate: | $286,730 |
Length: | 6.0 Miles | Actual: | $277,711 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | NH 2013(094) | CSJ: | 0049-03-066 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 2307 | Fund Cat: | 1 |
Limits To: | BS 6N (NB LNS ONLY) | Estimate: | $142,679 |
Length: | 3.0 Miles | Actual: | $138,346 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | SH 36 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0183-03-048 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 22 | Fund Cat: | 1 |
Limits To: | CORYELL CO LINE | Estimate: | $984,512 |
Length: | 15.1 Miles | Actual: | $821,093 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | SH 36 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0183-04-048 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | HAMILTON CO LINE | Fund Cat: | 1 |
Limits To: | FM 215 | Estimate: | $491,469 |
Length: | 12.7 Miles | Actual: | $484,863 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | SH 36 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0184-01-059 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | LEON RIVER | Fund Cat: | 1 |
Limits To: | BELL CO LINE | Estimate: | $1,065,578 |
Length: | 14.3 Miles | Actual: | $1,210,404 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | SH 36 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0184-02-052 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | CORYELL CO LINE | Fund Cat: | 1 |
Limits To: | BELTON LAKE BRIDGE | Estimate: | $195,312 |
Length: | 3.9 Miles | Actual: | $192,570 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | US 190 | Let Status: | Actual |
Project ID: | NH 2013(094) | CSJ: | 0185-01-037 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | HIGHLAND SCHOOL RD | Fund Cat: | 1 |
Limits To: | MILAM CO LINE | Estimate: | $298,829 |
Length: | 5.3 Miles | Actual: | $296,567 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0258-06-038 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 22 | Fund Cat: | 1 |
Limits To: | FM 219 | Estimate: | $375,847 |
Length: | 11.1 Miles | Actual: | $367,927 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0258-07-043 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 219 | Fund Cat: | 1 |
Limits To: | FM 217 | Estimate: | $373,038 |
Length: | 10.7 Miles | Actual: | $365,754 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0258-08-031 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | BOSQUE CO LINE | Fund Cat: | 1 |
Limits To: | 0.749 MI E OF FM 185 | Estimate: | $596,649 |
Length: | 11.4 Miles | Actual: | $590,540 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 927 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0422-01-021 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 6 | Fund Cat: | 1 |
Limits To: | SH 144 | Estimate: | $285,518 |
Length: | 9.4 Miles | Actual: | $276,198 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 27 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0456-05-011 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 171 | Fund Cat: | 1 |
Limits To: | FREESTONE CO LINE | Estimate: | $260,138 |
Length: | 7.2 Miles | Actual: | $254,338 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 1602 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0550-06-012 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 281 | Fund Cat: | 1 |
Limits To: | FM 219 | Estimate: | $309,058 |
Length: | 9.6 Miles | Actual: | $280,611 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 39 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0643-03-029 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 14 | Fund Cat: | 1 |
Limits To: | FM 1953 | Estimate: | $328,701 |
Length: | 8.9 Miles | Actual: | $321,847 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 147 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0752-06-023 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FALLS CO LINE | Fund Cat: | 1 |
Limits To: | SH 14 | Estimate: | $252,361 |
Length: | 10.0 Miles | Actual: | $249,662 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 1602 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0774-03-013 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 219 | Fund Cat: | 1 |
Limits To: | SH 22 | Estimate: | $169,540 |
Length: | 7.9 Miles | Actual: | $154,571 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 927 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0779-03-014 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 144 | Fund Cat: | 1 |
Limits To: | SH 174 | Estimate: | $263,222 |
Length: | 9.0 Miles | Actual: | $256,204 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 927 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0779-04-023 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 174 | Fund Cat: | 1 |
Limits To: | 0.423 MI E OF FM 56 | Estimate: | $241,519 |
Length: | 7.6 Miles | Actual: | $232,994 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 1860 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0831-03-012 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 164 | Fund Cat: | 1 |
Limits To: | SH 6 | Estimate: | $222,371 |
Length: | 7.3 Miles | Actual: | $216,891 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 1860 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0831-04-028 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 6 SHAW CRK | Fund Cat: | 1 |
Limits To: | SH 6 | Estimate: | $345,839 |
Length: | 10.2 Miles | Actual: | $333,014 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 932 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0867-01-016 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1241 | Fund Cat: | 1 |
Limits To: | CORYELL CO LINE | Estimate: | $312,756 |
Length: | 13.5 Miles | Actual: | $307,297 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 932 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0867-02-018 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | HAMILTON CO LINE | Fund Cat: | 1 |
Limits To: | 0.4 MI S OF FM 1241 | Estimate: | $162,363 |
Length: | 6.9 Miles | Actual: | $148,078 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 932 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0867-03-025 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 0.4 MI S OF FM 1241 | Fund Cat: | 1 |
Limits To: | US 84 | Estimate: | $35,706 |
Length: | 1.2 Miles | Actual: | $34,646 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 221 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 0936-01-021 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 218 | Fund Cat: | 1 |
Limits To: | FM 2005 | Estimate: | $106,008 |
Length: | 4.9 Miles | Actual: | $96,647 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 929 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 1187-01-027 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | BS 36E | Fund Cat: | 1 |
Limits To: | FM 185 | Estimate: | $447,316 |
Length: | 14.0 Miles | Actual: | $436,580 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 1365 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 1326-01-013 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | MEXIA CITY LIMITS | Fund Cat: | 1 |
Limits To: | FREESTONE CO LINE | Estimate: | $266,244 |
Length: | 5.9 Miles | Actual: | $261,818 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 185 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 1969-02-015 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 6 | Fund Cat: | 1 |
Limits To: | FM 1637 | Estimate: | $192,380 |
Length: | 4.2 Miles | Actual: | $187,423 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 1304 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 2059-01-014 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 933 | Fund Cat: | 1 |
Limits To: | IH 35 | Estimate: | $322,822 |
Length: | 9.1 Miles | Actual: | $316,370 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 485 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 2133-01-010 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 53 | Fund Cat: | 1 |
Limits To: | MILAM CO LINE | Estimate: | $233,462 |
Length: | 6.1 Miles | Actual: | $229,625 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 2271 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 2137-01-017 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 2305 | Fund Cat: | 1 |
Limits To: | FM 439 | Estimate: | $85,674 |
Length: | 1.8 Miles | Actual: | $83,646 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 2311 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 2174-01-015 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 31 | Fund Cat: | 1 |
Limits To: | FM 2114 | Estimate: | $367,054 |
Length: | 12.1 Miles | Actual: | $357,428 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 2410 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 2304-02-037 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 3481 EAST | Fund Cat: | 1 |
Limits To: | US 190 | Estimate: | $266,547 |
Length: | 6.7 Miles | Actual: | $259,338 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 1713 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 2547-01-011 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SPUR 1713 | Fund Cat: | 1 |
Limits To: | FM 933 | Estimate: | $124,982 |
Length: | 3.8 Miles | Actual: | $121,377 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | SP 1713 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 2547-01-012 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | CR 1241 | Fund Cat: | 1 |
Limits To: | FM 1713 | Estimate: | $15,499 |
Length: | 0.5 Miles | Actual: | $13,977 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 1330 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 2675-01-011 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 31 | Fund Cat: | 1 |
Limits To: | US 84 | Estimate: | $67,396 |
Length: | 2.2 Miles | Actual: | $65,772 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | SP 1330 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 2680-01-007 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1330 | Fund Cat: | 1 |
Limits To: | TO 5TH ST. | Estimate: | $19,389 |
Length: | 0.6 Miles | Actual: | $18,923 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 1713 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 3228-02-012 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 56 | Fund Cat: | 1 |
Limits To: | HILL COUNTY LINE | Estimate: | $200,795 |
Length: | 5.4 Miles | Actual: | $196,409 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 1713 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 3228-03-008 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | BOSQUE CO LINE | Fund Cat: | 1 |
Limits To: | SPUR 1713 | Estimate: | $20,679 |
Length: | 0.6 Miles | Actual: | $20,006 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 3148 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 3233-01-010 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | IH 35 | Fund Cat: | 1 |
Limits To: | US 77 | Estimate: | $208,716 |
Length: | 5.7 Miles | Actual: | $204,221 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 3149 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 3234-01-012 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1858 | Fund Cat: | 1 |
Limits To: | FM 2311 | Estimate: | $242,836 |
Length: | 8.0 Miles | Actual: | $235,824 |
District: | Waco | Let Date: | OCT 2012 |
Highway: | FM 3481 | Let Status: | Actual |
Project ID: | STP 2013(093) | CSJ: | 3409-01-003 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 2410 | Fund Cat: | 1 |
Limits To: | FM 2484 | Estimate: | $244,130 |
Length: | 5.1 Miles | Actual: | $239,953 |
Back... |
Totals for 0184-01-059 | ||
---|---|---|---|
Length: | 304.6 Miles | ||
Estimate: | $11,683,527 | ||
Actual: | $11,403,517 | ||
CCSJ: 0774-07-014 | |||
District: | Waco | Let Date: | APR 2013 |
Highway: | FM 930 | Let Status: | Actual |
Project ID: | BR 2013(551) | CSJ: | 0774-07-014 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | @ CAMP BRANCH | Fund Cat: | 6 |
Limits To: | (STR #002) | Estimate: | $388,447 |
Length: | 0.1 Miles | Actual: | $442,852 |
District: | Waco | Let Date: | APR 2013 |
Highway: | FM 708 | Let Status: | Actual |
Project ID: | BR 2013(551) | CSJ: | 1054-03-014 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | @ CHILDRESS CREEK | Fund Cat: | 6 |
Limits To: | (STR #006) | Estimate: | $539,725 |
Length: | 0.1 Miles | Actual: | $583,297 |
Back... |
Totals for 0774-07-014 | ||
Length: | 0.2 Miles | ||
Estimate: | $928,172 | ||
Actual: | $1,026,149 | ||
CCSJ: 0909-39-123 | |||
District: | Waco | Let Date: | MAY 2013 |
Highway: | PW | Let Status: | Actual |
Project ID: | C 909-39-123 | CSJ: | 0909-39-123 |
Description: | CONSTRUCT ACCESS ROADS, PARKING LOTS, CAMPSITE PULLOUTS AND | Handling Code: |
|
Limits From: | @ MOTHER NEFF STATE PARK | Fund Cat: | 10 |
Limits To: | . | Estimate: | $1,751,113 |
Length: | 4.8 Miles | Actual: | $1,385,145 |
Back... |
Totals for 0909-39-123 | ||
Length: | 4.8 Miles | ||
Estimate: | $1,751,113 | ||
Actual: | $1,385,145 | ||
CCSJ: 1187-01-025 | |||
District: | Waco | Let Date: | FEB 2013 |
Highway: | FM 929 | Let Status: | Actual |
Project ID: | BR 2013(398) | CSJ: | 1187-01-025 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | @ CORYELL CREEK | Fund Cat: | 1 |
Limits To: | (STR #001) | Estimate: | $1,098,128 |
Length: | 0.0 Miles | Actual: | $1,088,334 |
Back... |
Totals for 1187-01-025 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,098,128 | ||
Actual: | $1,088,334 |
|