Letting Schedule for February, 2013 (FY 2013)

Last Update: Thursday, November 14, 2013
February, 2013 (FY 2013) (see Links)
SEP 2012 | OCT 2012 | NOV 2012 | DEC 2012 | JAN 2013 | FEB 2013 | MAR 2013 | APR 2013 | MAY 2013 | JUN 2013 | JUL 2013 | AUG 2013
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0109-01-056 Anderson/
Tyler
US 84 Actual $1,122,812 1 PLANE & RESURFACE ROADWAY
0200-01-075 Angelina/
Lufkin
US 69 Actual $3,577,574 1 INTERSECTION IMPROVEMENTS FOR EMERGENCY EVACUATIONS
0016-07-132 Bexar/
San Antonio
IH 35 Actual $287,875 10 LANDSCAPE DEVELOPMENT
0073-08-172 Bexar/
San Antonio
IH 37 Actual $6,991,145 1 MILL, OVERLAY, & PAVEMENT MARKINGS (SB MAINLANES ONLY)
0915-00-160 Bexar/
San Antonio
VA Actual $1,179,951 1 DISTRICTWIDE NON - SITE SPECIFIC TRAFFIC SIGNALS
0915-00-164 Bexar/
San Antonio
VA Actual $1,218,087 1 DISTRICTWIDE NON - SITE SPECIFIC TRAFFIC SIGNALS
0915-12-528 Bexar/
San Antonio
VA Actual $92,000,000 3 MODERN STREET CAR, BUS RAPID TRANSIT, PARK & RIDE FACILITIES
2016-01-010 Calhoun/
Yoakum
FM 2143 Actual $724,622 6 REPLACE BRIDGE AND APPROACHES
0919-00-072 Cass/
Atlanta
VA Actual $1,373,908 10 REMOVE BARRIERS TO COMPLY WITH ADA
0739-01-045 Chambers/
Beaumont
IH 10 Actual $4,686,807 1 MILL AND OVERLAY EXISTING ROADWAY
1039-01-033 Comanche/
Brownwood
FM 1476 Actual $948,319 6 REPLACE BRIDGE AND APPROACHES
0045-01-056 Cooke/
Wichita Falls
US 82 Actual $1,434,093 6 REPLACE BRIDGE AND APPROACHES
1187-01-025 Coryell/
Waco
FM 929 Actual $1,088,334 1 REPLACE BRIDGE AND APPROACHES
0095-02-109 Dallas/
Dallas
US 80 Actual $256,468 1 REPAIR SLOPE WITH HEADWALL
0196-02-122 Denton/
Dallas
IH 35E Actual $158,400 1 INSTALL SAFETY LIGHTING
0918-46-263 Denton/
Dallas
VA Actual $1,930,244 10 SEGMENTS 4 & 5 CURB RAMP IMPROVEMENT FOR ADA UPGRADES
0154-04-030 Dewitt/
Yoakum
US 183 Actual $9,614,975 3 CONSTRUCT AUX. LANES FOR SUPER 2
0924-06-397 El Paso/
El Paso
VA Actual $1,873,937 3 INSTALL SCHOOL ZONE FLASHERS
3628-01-001 El Paso/
El Paso
SS 1966 Actual $30,958,882 ROW CONSTRUCTION OF SPUR
2926-01-011 Erath/
Fort Worth
FM 988 Actual $1,276,567 1 MILL, ADD FLEX BASE, SEAL AND HMAC OVERLAY
0909-38-054 Falls/
Waco
CR Actual $1,024,493 6 REPLACE BRIDGE AND APPROACHES
2139-03-019 Fannin/
Paris
SH 11 Actual $4,938,297 1 WIDEN ROADWAY
1135-01-026 Gillespie/
Austin
RM 783 Actual $5,106,864 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0500-03-577 Harris/
Houston
IH 45 Actual $24,847,758 3 TRANSPORTATION MANAGEMENT SYSTEM IMPROVEMENTS CONSTRUCT
0508-07-281 Harris/
Houston
SP 330 Actual $1,510,503 1 FULL DEPTH REPAIR, MILLING, CURB REPAIR AND ASPHALTIC
0912-71-688 Harris/
Houston
CS Actual $13,480,682 3 RECONSTRUCT AND WIDEN TO 6 LANE DIVIDED (WITH RAISED MEDIAN)
0912-72-293 Harris/
Houston
CS Actual $3,559,738 3 BASE REPAIR, PLANING, 2" OVERLAY AND STRIPING
0157-04-045 Haskell/
Abilene
US 277 Actual $3,020,842 1 MILLING, SPOT BASE REPAIR AND SURFACING
0561-02-035 Henderson/
Tyler
SH 274 Actual $3,239,484 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0921-02-147 Hidalgo/
Pharr
CR Actual $991,582 6 REPLACE BRIDGE & RECONST APPROACHES
1190-01-035 Hill/
Waco
FM 933 Actual $7,928,731 11 WIDEN FROM TWO TO FOUR LANES WITH CONTINUOUS LEFT TURN
1676-02-015 Houston/
Lufkin
FM 1280 Actual $4,387,078 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0356-01-091 Hutchinson/
Amarillo
SH 136 Actual $2,716,537 6 REPLACE BRIDGE AND APPROACHES
0095-03-086 Kaufman/
Dallas
US 80 Actual $247,839 1 REHABILITATION OF TRAFFIC SIGNALS
0914-21-027 Lee/
Austin
PW Actual $725,104 10 PAVE VARIOUS ROADS / PARK AREAS & UPGRADE VARIOUS AREAS FOR AD
0380-01-081 Lubbock/
Lubbock
US 62 Actual $22,428,062 1 NEW INTERCHANGE
0905-00-063 Lubbock/
Lubbock
VA Actual $2,755,904 11 DISTRICT WIDE STRIPING
0905-00-067 Lubbock/
Lubbock
VA Actual $334,626 11 MISCELLANEOUS CONSTRUCTION
0049-10-003 McLennan/
Waco
LP 574 Actual $14,436,151 1 CONSTRUCT 4 - LANE DIVIDED ROADWAY WITH RAISED MEDIAN
0909-22-160 McLennan/
Waco
CS Actual $2,064,741 3 CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF
1188-02-082 Midland/
Odessa
LP 250 Actual $1,803,561 11 ROADWAY REHABILITATION
0185-02-034 Milam/
Bryan
US 190 Actual $5,587,876 8 REHABILITATE EXISTING ROADWAY CONSISTING OF GRADING,
0903-28-049 Montague/
Wichita Falls
CR Actual $616,010 6 REPLACE BRIDGE AND APPROACHES
0264-01-036 Nolan/
Abilene
BS 70-G Actual $6,493,251 1 REHABILITATION, ACP, SIDEWALKS
0264-02-026 Nolan/
Abilene
SH 70 Actual $2,989,281 1 ASPHALT CONCRETE PAVEMENT OVERLAY
0007-10-055 Palo Pinto/
Fort Worth
US 180 Actual $905,835 1 MILL AND OVERLAY
0140-03-045 Pecos/
Odessa
IH 10 Actual $2,984,382 1 UPGRADE TO FREEWAY STANDARDS
0177-01-097 Polk/
Lufkin
US 59 Actual $3,822,937 11 REHABILITATE EXISTING PAVEMENT
0041-07-100 Potter/
Amarillo
US 87 Actual $1,688,123 6 REPLACE BRIDGE AND APPROACHES
0904-00-144 Potter/
Amarillo
VA Actual $1,074,591 1 THERMOPLASTIC STRIPING
0074-05-094 San Patricio/
Corpus Christi
IH 37 Actual $3,666,948 1 MILL, SEAL AND OVERLAY (NB MAINLANES ONLY) ON IH 37
0008-06-049 Tarrant/
Fort Worth
SH 180 Actual $3,066,579 1 HMAC OVERLAY
0094-02-120 Tarrant/
Fort Worth
SH 10 Actual $306,882 3 CENTER MEDIAN MODIFCATION AND INSTALLATION OF NEW TRAFFIC
0172-06-081 Tarrant/
Fort Worth
US 287 Actual $3,466,499 6 REPLACE BRIDGE FOR NB STRUCTURE WITH SOME ROADWAY WORK AND
0902-48-790 Tarrant/
Fort Worth
CS Actual $1,284,299 3 TRAILS CONNECT 3 SCHOOL, TWO PARKS AND MULTIPLE NEIGHORHOODS
0006-18-051 Taylor/
Abilene
BI 20-R Actual $2,400,617 1 BRIDGE REPLACEMENT
2398-01-046 Taylor/
Abilene
LP 322 Actual $3,787,565 1 SPOT BASE REPAIR; UNDERSEAL, OVERLAY, MBGF
1226-04-001 Titus/
Atlanta
FM 1000 Actual $18,846,843 3 CONSTRUCT 2 - LANE HIGHWAY ON NEW LOCATION FROM US 271 RELIEF
0070-02-085 Tom Green/
San Angelo
US 87 Actual $1,372,506 1 ACP OVERLAY
0113-08-076 Travis/
Austin
US 290 Actual $6,523,372 1 INNOVATIVE INTERSECTION IMPROVEMENT
0914-00-326 Travis/
Austin
VA Actual $397,507 3 CONSTRUCT SIDEWALKS
0914-00-359 Travis/
Austin
VA Actual $71,654 7 DOWNTOWN AUSTIN TRANSP.MGMT.ASSOC.
0914-00-362 Travis/
Austin
VA Actual $71,654 7 DOWNTOWN AUSTIN TRANSP.MGMT.ASSOC.
1378-01-032 Travis/
Austin
RM 1431 Actual $494,228 3 ADD LEFT TURN LANE
0913-27-051 Victoria/
Yoakum
CR Actual $264,835 6 REPLACE BRIDGE AND APPROACHES
0015-08-128 Williamson/
Austin
IH 35 Actual $18,690,162 3 CONSTRUCT A THREE LANE FRONTAGE ROAD AND ASSOCIATED RAMPS
0013-08-126 Wise/
Fort Worth
US 81 Actual $940,341 1 HMAC OVERLAY


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract