1106-02-020 | Austin/ Yoakum |
FM 949 | Actual | $3,120,993 | 8 | WIDEN ROADWAY |
0914-18-093 | Bastrop/ Austin |
VA | Actual | $552,250 | 7 | EROSION CNTRL, TREE REMOVAL & GRINDING |
0025-02-194 | Bexar/ San Antonio |
IH 10 | Actual | $12,027,793 | 3 | IMPROVE VERTICAL CLEARANCE AT S. NEW BRAUNFELS, GEVERS, AND |
0072-08-136 | Bexar/ San Antonio |
LP 345 | Actual | $13,883,097 | ROW | GRADE SEPARATION @ MEDICAL & OPERATIONAL IMPVMNTS ON MEDICAL |
0915-12-481 | Bexar/ San Antonio |
CS | Actual | $10,662,561 | 3 | RECONSTRUCT EXISTING 4 LANES WITH SIDEWALKS, CURBS, DRAINAGE |
0178-03-145 | Brazoria/ Houston |
SH 35 | Actual | $1,405,314 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12020017803025) |
0912-31-211 | Brazoria/ Houston |
VA | Actual | $422,144 | 1 | MBGF UPGRADES |
0917-29-112 | Brazos/ Bryan |
CS | Actual | $813,471 | 3 | SAFETY WORK CONSISTING OF CONSTRUCTING SIDEWALKS, BIKE / PED |
2377-01-039 | Brown/ Brownwood |
FM 2524 | Actual | $4,694,757 | ROW | RECONSTRUCT EXISTING ROADWAY INCLUDING ACP, CURB & GUTTER, |
0152-03-053 | Caldwell/ Austin |
US 183 | Actual | $7,526,710 | 1 | PAVEMENT REPAIR, MILL, SEAL & OVERLAY |
0921-06-243 | Cameron/ Pharr |
VA | Actual | $1,485,304 | 3 | 25 TH STREET PEDESTRIAN AND BICYCLE TRAIL |
0281-02-069 | Collin/ Dallas |
SH 78 | Actual | $595,395 | 1 | FULL DEPTH REPAIR |
0774-07-014 | Coryell/ Waco |
FM 930 | Actual | $1,026,149 | 6 | REPLACE BRIDGE AND APPROACHES |
0233-01-043 | Culberson/ El Paso |
US 62 | Actual | $609,720 | 1 | SEAL COAT |
0094-07-041 | Dallas/ Dallas |
SH 183 | Actual | $2,164,097 | 1 | MILL AND INLAY MAIN LANES, SHOULDERS, AND RAMPS, FULL DEPTH |
0281-03-045 | Dallas/ Dallas |
SH 78 | Actual | $739,924 | 1 | CONCRETE FULL DEPTH REPAIR AND PAVEMENT MARKINGS |
0918-00-186 | Dallas/ Dallas |
VA | Actual | $1,598,000 | 1 | NON - SITE SPECIFIC SIGNAL CONTRACT ON NEW LOCATIONS |
0918-00-200 | Dallas/ Dallas |
VA | Actual | $278,458 | 1 | UPGRADE VIDEO DETECTION FOR HIGH SPEED APPROACHES |
2374-01-170 | Dallas/ Dallas |
IH 635 | Actual | $417,260 | 1 | FULL DEPTH CONCRETE PAVEMENT REPAIR |
0399-03-034 | Delta/ Paris |
FM 64 | Actual | $1,399,777 | 1 | REHABILITATION OF EXISTING ROAD |
0081-13-052 | Denton/ Dallas |
IH 35W | Actual | $1,297,695 | 1 | INSTALL PAVEMENT MARKINGS |
0001-02-054 | El Paso/ El Paso |
SH 20 | Actual | $9,843,771 | 3 | RAPID TRANSIT_SYSTEM (RTS) |
0374-02-098 | El Paso/ El Paso |
US 62 | Actual | $1,672,456 | 1 | MILL AND INLAY |
0924-06-384 | El Paso/ El Paso |
VA | Actual | $994,386 | 3 | CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS, INSTALL SCHOOL ZONE |
1046-01-029 | El Paso/ El Paso |
FM 659 | Actual | $273,307 | 11 | CONSTRUCTION OF SIDEWALK |
0048-03-080 | Ellis/ Dallas |
US 77 | Actual | $1,755,232 | 1 | INSTALL RAISED MEDIAN |
0092-05-049 | Ellis/ Dallas |
IH 45 | Actual | $439,634 | 1 | IH 45 TRUCK LANE RESTRICTIONS EXPANSION (FY 2013) |
1394-02-023 | Ellis/ Dallas |
FM 1387 | Actual | $4,091,255 | 3 | REALIGN EXISTING HIGHWAY IN CITY OF MIDLOTHIAN |
0079-07-015 | Erath/ Fort Worth |
BU 377J | Actual | $1,220,001 | 1 | FLEX BASE REPAIR & HMAC OVERLAY |
0909-38-053 | Falls/ Waco |
CR | Actual | $704,077 | 6 | REPLACE BRIDGE AND APPROACHES |
0549-01-034 | Fannin/ Paris |
SH 121 | Actual | $3,739,246 | 1 | HEAVY OVERLAY |
0908-23-032 | Fisher/ Abilene |
CR | Actual | $276,104 | 6 | REPLACE BRIDGE |
0908-23-033 | Fisher/ Abilene |
CR | Actual | $254,269 | 6 | REPLACE BRIDGE AND APPROACHES |
0912-34-146 | Fort Bend/ Houston |
CS | Actual | $4,836,269 | 3 | CONSTRUCT 4 - LANE ROADWAY |
0456-01-044 | Freestone/ Bryan |
FM 27 | Actual | $2,127,943 | 6 | REPLACEMENT OF AN EXISTING BRIDGE FACILITY CONSISTING OF |
0978-02-068 | Galveston/ Houston |
FM 646 | Actual | $847,434 | 1 | BASE REPAIR, PLANNING AND ACP OVERLAY |
0027-10-069 | Harris/ Houston |
US 90A | Actual | $2,433,337 | 1 | RECONSTRUCT INTERSECTION AT IH45, FLEXIBLE PAVEMENT REPAIR, |
0050-08-087 | Harris/ Houston |
US 290 | Actual | 135,455,756 | 5 | RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE |
0050-09-070 | Harris/ Houston |
US 290 | Actual | 153,351,431 | ROW | RECONST & WIDEN TO 8 MAIN LNS, 3 REVERSIBLE MANAGED LNS, AUX |
0912-00-413 | Harris/ Houston |
VA | Actual | $1,456,617 | 1 | NEW TRAFFIC SIGNALS |
0912-70-077 | Harris/ Houston |
VA | Actual | $1,525,267 | 3 | 10 - FOOT WIDE SHARED USE PATH ON SOUTH BANK OF BRAYS BAYOU W / |
0914-33-062 | Hays/ Austin |
VA | Actual | $458,262 | 8 | SIDEWALKS, BIKEPATH & PEDESTRIAN BRIDGE |
0164-01-068 | Henderson/ Tyler |
SH 31 | Actual | $4,945,961 | 1 | REPAIR PAVEMENT & RESURFACE ROADWAY |
0921-02-170 | Hidalgo/ Pharr |
CS | Actual | $5,474,037 | 7 | RECONSTRUCT & WIDEN TO 2 LN RDWY WITH SHOULDERS |
0909-37-052 | Hill/ Waco |
CS | Actual | $260,748 | 3 | CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF |
0937-02-029 | Houston/ Lufkin |
FM 227 | Actual | $4,278,381 | 11 | PROVIDE ADDITIONAL PAVED SURFAC WIDTH |
1155-03-009 | Howard/ Abilene |
FM 1785 | Actual | $633,634 | 6 | REPLACE BRIDGE AND APPROACHES |
0028-13-132 | Jefferson/ Beaumont |
IH 10 | Actual | $952,217 | 1 | REPAIR EXISTING PAVEMENT AND DIAMOND GRIND |
0508-04-161 | Jefferson/ Beaumont |
SH 73 | Actual | $5,990,047 | 1 | OVERLAY EXISTING ROADWAY AND ADD SHOULDER TEXTURING |
0087-01-103 | Jim Wells/ Corpus Christi |
SH 44 | Actual | $8,536,934 | 1 | OVERLAY, SEAL & FULL - DEPTH REPAIR |
1091-01-019 | Kaufman/ Dallas |
FM 740 | Actual | $5,599,999 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0269-03-033 | Lavaca/ Yoakum |
US 77A | Actual | $2,314,921 | 1 | ACP OVERLAY |
0085-01-044 | Morris/ Atlanta |
US 259 | Actual | $7,975,983 | 1 | REHABILITATE 4 - LANE UNDIVIDED HIGHWAY |
0166-01-047 | Navarro/ Dallas |
IH 45 | Actual | $2,218,765 | 1 | OVERLAY FRONTAGE ROADS |
0006-02-109 | Nolan/ Abilene |
IH 20 | Actual | $1,564,230 | 6 | REPLACE BRIDGE |
1557-01-037 | Nueces/ Corpus Christi |
FM 43 | Actual | $9,863,126 | 11 | CONSTRUCT ADDITIONAL TRAVEL LANES |
0883-02-074 | Orange/ Beaumont |
FM 105 | Actual | $4,197,094 | 1 | PROVIDE ADDITIONAL PAVEMENT |
0539-04-035 | Palo Pinto/ Fort Worth |
SH 254 | Actual | $2,066,986 | 1 | HMAC OVERLAY AND BASE REPAIR |
1068-05-009 | Parker/ Fort Worth |
IH 30 | Actual | $14,593,118 | 3 | CONSTRUCT INTERCHANGE AT WALSH RANCH PARKWAY |
0911-04-053 | Polk/ Lufkin |
VA | Actual | $819,807 | 10 | REPAIR AND RESURFACE PAVEMENT, PARKING LOTS, CAMPSITE |
0901-27-044 | Red River/ Paris |
CR | Actual | $488,685 | 10 | MISCELLANEOUS CONSTRUCTION TO INCLUDE PAVING, BASE WORK, AND |
0911-29-036 | Sabine/ Lufkin |
CR | Actual | $436,865 | 6 | REPLACE BRIDGE AND APPROACHES |
0107-03-013 | Shackelford/ Abilene |
FM 601 | Actual | $545,125 | 6 | REHABILITATE BRIDGE |
0492-01-039 | Smith/ Tyler |
FM 14 | Actual | $931,556 | 1 | WIDEN ROADWAY FOR CENTER TURN LANE |
0902-48-239 | Tarrant/ Fort Worth |
VA | Actual | $2,693,007 | 3 | CONSTRUCT PEDESTRIAN AND BIKE TRAIL |
0902-48-694 | Tarrant/ Fort Worth |
CS | Actual | $150,729 | 3 | RR X - ING IMPRO. @ UP / AYERS DOT794988N; BNSF / SEMINARY / GAMBREL |
0114-02-098 | Travis/ Austin |
US 290 | Actual | $769,882 | 3 | ADD EASTBOUND RIGHT TURN AND EASTBOUND & WESTBOUND LEFT TURN |
0914-00-324 | Travis/ Austin |
VA | Actual | $870,432 | 1 | FY 2013 SITE - SPECIFIC SIGNALS |
0914-04-191 | Travis/ Austin |
VA | Actual | $5,643,326 | 3 | CONSTRUCT TRAIL |
3417-03-017 | Travis/ Austin |
FM 734 | Actual | $1,481,100 | 3 | ADD LEFT AND RIGHT TURN LANES |
1745-01-019 | Waller/ Houston |
FM 1887 | Actual | $5,083,866 | 1 | FULL DEPTH RECLAMATION, SEAL COAT, LEVEL - UP, ACP |
0089-06-028 | Wharton/ Yoakum |
US 59 | Actual | $663,365 | 1 | PAVEMENT REPAIR & SURFACING (NB ONLY) |
0266-06-044 | Wharton/ Yoakum |
SH 71 | Actual | $1,218,476 | 6 | REPLACE BRIDGE AND APPROACHES |
0913-09-049 | Wharton/ Yoakum |
CS | Actual | $374,166 | 3 | REPLACE NON - ADA COMPLIANT SIDEWALKS |
0134-12-004 | Wise/ Fort Worth |
BU 380F | Actual | $544,183 | 1 | ADD RT TURN BAY EB AT BU 380 @ US 81 |
0352-02-050 | Wise/ Fort Worth |
SH 114 | Actual | $1,630,083 | 1 | ULTRA THIN BONDED HOT MIX WEARING COURSE |
|