Letting Schedule for Dallas District (FY 2014)

Last Update: Monday, April 14, 2014
Dallas District (FY 2014)
Collin | Dallas | Denton | Ellis | Kaufman | Navarro | Rockwall

Collin County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0047-05-053 SH 5 Approved JUL 2014 $1,321,597 1 BASE REPAIR AND OVERLAY
0047-06-139 US 75 Actual DEC 2013 $47,531,667 3 WIDEN AND RECONSTRUCT 6 LANE FREEWAY TO 8 LANES; IMPROVE 2 / 3
0047-14-077 US 75 Actual MAR 2014 $253,212 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND
0091-04-058 SH 289 Actual MAR 2014 $376,485 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING &
0091-04-059 SH 289 Approved JUN 2014 $700,000 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING &
0135-02-044 US 380 Approved JUN 2014 $19,539,325 3 WIDEN EXISTING FOUR LANE DIVIDED TO SIX LANE DIVIDED
0135-02-054 US 380 Actual FEB 2014 $917,409 1 FULL DEPTH CONCRETE REPAIR
0549-03-018 SH 121 Actual NOV 2013 $38,276,054 3 WIDEN TWO LANE RURAL HIGHWAY TO FOUR LANE DIVIDED ROADWAY
0549-03-023 SH 121 Actual OCT 2013 $3,039,939 1 BASE REPAIR, MILL, AND OVERLAY
0816-04-047 FM 455 Actual APR 2014 $5,536,032 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0918-24-177 CS Approved JUL 2014 $849,501 8 REDESIGN CROSSWALK AND TRAFFIC CALMING DEVICES
1016-02-017 FM 1138 Actual SEP 2013 $3,337,173 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1392-01-035 FM 1378 Approved JUL 2014 $1,223,042 1 REPLACE BRIDGE AND APPROACHES
2461-01-008 FM 2170 Approved JUN 2014 $360,000 3 INTERSECTION IMPROVEMENTS
2678-01-009 FM 428 Approved JUN 2014 $2,443,859 1 SHOULDER WIDENING, BASE REPAIR, UNDERSEAL AND LEVEL - UP

Dallas County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0009-02-061 SH 78 Approved JUN 2014 $1,047,820 1 FDR, MILL, ACP OVERLAY AND PVMNT MARKINGS
0009-02-062 SH 78 Actual MAR 2014 $2,579,907 3 CONSTRUCT UNDERGROUND WALKWAY
0009-11-230 IH 30 Actual MAR 2014 $638,199 1 CONCRETE FULL DEPTH REPAIR ON FRONTAGE ROADS
0047-07-206 US 75 Approved JUN 2014 $952,932 7 MOBILITY AND SAFETY INTERSECTION IMPROVEMENTS; CONSTRUCT
0048-01-062 SH 342 Actual OCT 2013 $7,850,200 1 SEAL COAT, PVMT MKGS
0196-03-267 IH 35E Approved MAY 2014 $363,522 1 INSTALLATION OF FIBER OPTIC CABLE
0196-06-028 LP 354 Approved JUL 2014 $4,381,588 ROW PEDESTRIAN STRUCTURES AND SIDEWALKS (ON - SYSTEM)
0197-02-110 US 175 Actual FEB 2014 $380,242 1 REPAIR WB TO SB CONNECTOR RAMP
0197-02-111 US 175 Actual JAN 2014 $207,035 1 REPAIR DAMAGED 33" STORM DRAIN RCP
0197-02-112 US 175 Approved JUN 2014 $3,243,008 1 MILL, CONCRETE FULL DEPTH REPAIR AND ACP OVERLAY ON FRONTAGE
0197-02-114 US 175 Actual APR 2014 $617,720 1 INSTALL SAFETY LIGHTING
0261-03-065 US 67 Approved MAY 2014 $253,516 8 INSTALL PROTECTION
0442-02-148 IH 35E Actual DEC 2013 $948,487 1 INSTALL HIGH MAST ILLUMINATION
0442-02-156 IH 35E Actual APR 2014 $328,569 1 INSTALL SIGNING FOR TRUCK LANE RESTRICTIONS
0581-02-139 LP 12 Actual APR 2014 $253,576 1 BRIDGE DECK AND JOINT REPAIRS
0581-02-140 LP 12 Approved MAY 2014 $3,022,909 1 FULL DEPTH REPAIR, MILL AND OVERLAY
0918-00-192 VA Actual MAR 2014 $3,300,000 7 PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY
0918-00-228 VA Actual FEB 2014 $479,587 1 NON - SITE SPECIFIC INSTALLATION OF GUIDE SIGNS ON NEW
0918-00-231 VA Tentative AUG 2014 $2,384,999 5 FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2014 FUNDING;
0918-00-234 VA Actual JAN 2014 $714,066 3 WRONG WAY DRIVING PROGRAM; PILOT STUDY & IMPLEMENTATION TO
0918-00-235 VA Actual DEC 2013 $311,000 5 NCTCOG - - 511 TRAVELER INFORMATION SYSTEM; DEVELOP 511 SYSTEM
0918-00-236 VA Tentative AUG 2014 $622,000 5 NCTCOG - - 511 TRAVELER INFORMATION SYSTEM; DEVELOP 511 SYSTEM
0918-45-731 CS Approved JUL 2014 $2,101,722 6 REPLACE BRIDGE AND APPROACHES
0918-45-761 CS Approved JUN 2014 $1,745,959 ROW REPLACE BRIDGE AND APPROACHES
0918-45-864 CS Approved JUL 2014 $2,495,268 3 RECONSTRUCT 4 LANE UNDIVIDED TO FOUR LANE DIVIDED
0918-45-898 CS Approved MAY 2014 $700,819 9 TRAFFIC CONTROL & SAFETY TREATMENTS FOR TRAIL / ROAD CROSSINGS
0918-47-012 CS Actual OCT 2013 $896,210 3 PEDESTRIAN WALKWAY IMPROVEMENTS
0918-47-052 VA Approved JUN 2014 $1,969,965 10 CONSTRUCT CURB RAMPS ON IH 635, SH 114, SH 161, SH 183,
0918-47-076 VA Tentative AUG 2014 $22,382,585 3 DFW INTERNATIONAL AIRPORT LIGHT RAIL TRANSIT CONNECTION
0918-47-078 VA Actual JAN 2014 $15,075,000 5 LIGHT RAIL BED, TRACK, VEHICLES, OVERHEADS AND FACILITIES
0918-47-084 CS Tentative AUG 2014 $1,000,000 12 IMPLEMENT PROGRAM TO RECRUIT, TRAIN, & CERTIFY DISADVANTAGED
1047-03-063 FM 1382 Actual NOV 2013 $1,893,194 3 WIDEN FROM 4 LANES TO 6 LANES AND UPGRADE TRAFFIC SIGNALS
1068-04-154 IH 30 Approved JUL 2014 $9,656,480 3 CONSTRUCT TWO LANE WESTBOUND FRONTAGE ROAD
2374-03-076 IH 20 Actual SEP 2013 $1,858,920 1 INSTALLATION OF FULL ITS SYSTEM
2374-07-058 IH 635 Approved JUN 2014 $1,626,584 3 CONSTRUCT 0 TO 2 LANE WB FRONTAGE ROAD
2374-07-067 IH 635 Actual APR 2014 $2,938,210 1 FULL DEPTH REPAIR AND MILL AND OVERLAY MAINLANES AND
2964-01-022 SH 161 Actual JAN 2014 $3,796,615 3 INTERIM OPERATIONAL BOTTLENECK IMPROVEMENT
2964-01-045 SH 161 Actual MAR 2014 $866,004 3 INSTALL CCTV CAMERAS AND ARTERIAL DIRECTIONAL CMS AT MAJOR

Denton County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0081-06-029 US 377 Actual JAN 2014 $7,501,347 3 CONSTRUCT CONTINUOUS 2 - WAY LEFT TURN LANE
0816-02-053 FM 455 Approved JUN 2014 $3,294,650 1 REPLACE EXISTING BRIDGE AND APPROACHES
0918-46-255 CS Actual OCT 2013 $912,023 3 CONSTRUCT SIDEWALKS, INSTALL SCHOOL ZONE SIGNS, INSTALL
0918-46-259 CS Approved MAY 2014 $2,814,456 9 CONSTRUCT BIKE TRAIL WITHIN RAIL ROW CONNECTING HEBRON,
1315-02-009 FM 423 Actual SEP 2013 $29,826,070 3 WIDEN 2 LANE RURAL UNDIVIDED TO 6 LANE DIVIDED URBAN
1567-01-025 FM 720 Actual FEB 2014 $15,597,320 3 WIDEN TWO LANE RURAL TO SIX LANES URBAN DIVIDED
1567-02-032 FM 423 Approved MAY 2014 $48,536,809 ROW SH 121 TO COUGAR ALLEY;WIDEN 4 TO 8 LN DIVIDED URBAN;COUGAR
2250-02-016 LP 288 Approved MAY 2014 $5,194,684 1 FULL DEPTH CONCRETE PAVEMENT REPAIR
2681-01-012 FM 2499 Approved JUL 2014 $32,290,166 3 CONSTRUCT 6 LANE DIVIDED URBAN FACILITY

Ellis County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0048-03-084 US 77 Actual JAN 2014 $569,367 8 PROFILE PAVEMENT MARKINGS
0048-08-048 IH 35E Actual JAN 2014 $1,574,119 1 REHABILITATE FRONTAGE ROAD PAVEMENT
0092-11-003 LP 561 Actual JAN 2014 $681,040 1 MILL, REPAIR AND RESURFACE
0918-22-143 CR Actual MAR 2014 $602,706 6 REPLACE BRIDGE AND APPROACHES
1451-01-024 FM 55 Approved JUL 2014 $4,000,000 1 REHABILITATE EXISTING PAVEMENT

Kaufman County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0095-03-088 US 80 Approved JUL 2014 $10,208,251 1 REHABILITATE FRONTAGE ROADS AND RAMPS
0095-14-020 IH 20 Actual APR 2014 $2,619,188 3 NEW LOCATION FRONTAGE ROAD
0173-02-070 SH 34 Approved MAY 2014 $1,661,508 8 PROFILE PAVEMENT MARKINGS
0173-03-015 SH 34 Actual MAR 2014 $23,009,385 1 CONSTRUCT 4 LNS OF ULTIMATE 6 LN URBAN ROADWAY WITH
0173-03-038 SH 34 Approved MAY 2014 $13,084,957 3 CONSTRUCT FOUR LANE HIGHWAY ON NEW LOCATION
0751-01-044 FM 148 Actual FEB 2014 $1,820,532 3 WIDEN EXISTING 2 LANE FACILITY TO 4 LANES
0751-02-023 FM 148 Approved MAY 2014 $11,152,867 1 REHABILITATION OF EXISTING ROADWAY
2512-01-011 FM 2728 Approved JUN 2014 $10,500,000 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
3089-01-010 FM 3039 Approved JUN 2014 $3,307,902 1 REHABILITATE EXISTING ROADWAY

Navarro County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0092-06-100 IH 45 Actual JAN 2014 $227,139 1 INSTALL GUIDE SIGNS

Rockwall County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0451-04-020 SH 205 Approved JUL 2014 $1,853,237 1 REHABILITATION OF EXISTING ROADWAY
1016-01-027 FM 551 Approved JUN 2014 $3,672,509 1 REHABILITATE EXISTING ROADWAY
3148-01-006 FM 3097 Approved JUL 2014 $7,579,735 7 RECONSTRUCT AND WIDEN 2 LANE UNDIVIDED TO 4 LANE DIVIDED


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract