Detail Letting Schedule for Bexar County (FY 2019)
Bid Tabulations Dashboard
This report will no longer be updated, please access links on the Contract Letting page. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Bexar County (FY 2019) |
CCSJ: 0016-08-037 |
|||
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | SL 368 | Let Status: | Actual |
Project ID: | STP 2019(037)HES | CSJ: | 0016-08-037 |
Description: | IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT CASA BLANCA | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $462,657 |
Length: | 0.2 | Actual | $335,310 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | SL 368 | Let Status: | Actual |
Project ID: | STP 2019(037)HES | CSJ: | 0016-08-038 |
Description: | IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT ELEANOR | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $200,964 |
Length: | 0.2 | Actual | $180,070 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | FM 78 | Let Status: | Actual |
Project ID: | STP 2019(037)HES | CSJ: | 0025-09-077 |
Description: | IMPROVE TRAFFIC SIGNAL & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT FOSTER/RITTIMAN | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $316,947 |
Length: | 0.2 | Actual | $305,291 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | STP 2019(037)HES | CSJ: | 0072-14-029 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT SH 46 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $36,573 |
Length: | 0.2 | Actual | $34,271 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2019(042)HES | CSJ: | 0073-04-048 |
Description: | INSTALL FLASHING BEACON & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT CR 429 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $68,882 |
Length: | 0.2 | Actual | $62,738 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2019(042)HES | CSJ: | 0073-04-049 |
Description: | INSTALL FLASHING BEACON & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT EUROSTAR DR | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $65,464 |
Length: | 0.2 | Actual | $59,519 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | US 181 | Let Status: | Actual |
Project ID: | STP 2019(037)HES | CSJ: | 0073-12-012 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS AND SAFETY | Handling Code: | |
Limits From: | AT OLD CORPUS CHRISTI HWY | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $183,291 |
Length: | 0.2 | Actual | $171,865 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | US 181 | Let Status: | Actual |
Project ID: | STP 2019(037)HES | CSJ: | 0100-03-078 |
Description: | IMPROVE TRAF SIGNALS, INSTALL ADV INTERSEC WARNING SIGNAL/ | Handling Code: | |
Limits From: | AT FM 775 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $359,110 |
Length: | 0.2 | Actual | $327,864 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | STP 2019(037)HES | CSJ: | 0143-01-056 |
Description: | IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT FM 1628 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $287,146 |
Length: | 0.2 | Actual | $265,691 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | SH 46 | Let Status: | Actual |
Project ID: | STP 2019(037)HES | CSJ: | 0215-01-048 |
Description: | INSTALL FLASHING BEACON & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT CRANES MILL | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $66,742 |
Length: | 0.1 | Actual | $59,648 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | BS 123B | Let Status: | Actual |
Project ID: | STP 2019(042)HES | CSJ: | 0366-12-029 |
Description: | INSTALL INTERSECTION FLASHING BEACON & SAFETY LIGHTING AT | Handling Code: | |
Limits From: | AT CONTINENTAL DRIVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $65,861 |
Length: | 0.0 | Actual | $59,219 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | RM 32 | Let Status: | Actual |
Project ID: | STP 2019(042)HES | CSJ: | 0511-02-021 |
Description: | INSTALL FLASHING BEACON & SAFETY ILLUMINATION AT | Handling Code: | |
Limits From: | AT RM 484 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $69,428 |
Length: | 0.2 | Actual | $62,421 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 2019(042)HES | CSJ: | 0517-02-041 |
Description: | INSTALL FLASHING BEACON AND SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT TYLER ROAD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $63,392 |
Length: | 0.2 | Actual | $57,190 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | SL 13 | Let Status: | Actual |
Project ID: | STP 2019(037)HES | CSJ: | 0521-02-040 |
Description: | IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT SOMERSET ROAD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $264,799 |
Length: | 0.2 | Actual | $247,042 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | FM 1535 | Let Status: | Actual |
Project ID: | STP 2019(042)HES | CSJ: | 0658-01-041 |
Description: | IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT WEST AVENUE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $252,745 |
Length: | 0.2 | Actual | $246,292 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | FM 1535 | Let Status: | Actual |
Project ID: | STP 2019(042)HES | CSJ: | 0658-01-042 |
Description: | IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT LOCKHILL SELMA | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $298,982 |
Length: | 0.2 | Actual | $285,865 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | FM 463 | Let Status: | Actual |
Project ID: | STP 2019(042)HES | CSJ: | 0849-03-020 |
Description: | INSTALL INTERSECTION FLASHING BEACON & SAFETY LIGHTING AT | Handling Code: | |
Limits From: | AT CR 6612 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $43,297 |
Length: | 0.2 | Actual | $38,585 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | FM 1102 | Let Status: | Actual |
Project ID: | STP 2019(042)HES | CSJ: | 1273-01-036 |
Description: | INSTALL FLASHING BEACON & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT HUNTER RD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $64,433 |
Length: | 0.2 | Actual | $57,400 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | FM 1976 | Let Status: | Actual |
Project ID: | STP 2019(037)HES | CSJ: | 1890-01-047 |
Description: | IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT BENTLY DR | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $241,976 |
Length: | 0.2 | Actual | $228,374 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | FM 1976 | Let Status: | Actual |
Project ID: | STP 2019(037)HES | CSJ: | 1890-01-049 |
Description: | IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT MONTGOMERY RD/EAGLE CREST BLVD | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $306,648 |
Length: | 0.2 | Actual | $311,584 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | FM 1516 | Let Status: | Actual |
Project ID: | STP 2019(042)HES | CSJ: | 1890-02-008 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT FM 1976 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $58,541 |
Length: | 0.1 | Actual | $56,591 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | FM 1044 | Let Status: | Actual |
Project ID: | STP 2019(042)HES | CSJ: | 2021-01-014 |
Description: | INSTALL FLASHING BEACON & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | AT SCHMIDT AVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $68,164 |
Length: | 0.2 | Actual | $61,139 |
Back... | Totals for 0016-08-037 | ||
---|---|---|---|
Length: | 4 | ||
Estimate: | $3,846,041 | ||
Actual: | $3,513,969 | ||
CCSJ: 0017-09-105 |
|||
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | IH 35 | Let Status: | Approved |
Project ID: | NH 1902(205) | CSJ: | 0017-09-105 |
Description: | Landscape Development | Handling Code: | |
Limits From: | 0.9 MILES N OF IH 410 | Fund Cat: | 10 |
Limits To: | 0.3 MILES N OF IH 410 | ESTIMATE: | $723,272 |
Length: | 0.6 | Actual | $0 |
Back... | Totals for 0017-09-105 | ||
Length: | 0.6 | ||
Estimate: | $723,272 | ||
Actual: | |||
CCSJ: 0017-10-277 |
|||
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 2019(040)HES | CSJ: | 0017-10-277 |
Description: | WRONG WAY DRIVER ADVANCED TECHNOLOGIES | Handling Code: | |
Limits From: | SL 353 (NOGALITOS) | Fund Cat: | 8 |
Limits To: | MCCULLOUGH AVE | ESTIMATE: | $118,704 |
Length: | 3.0 | Actual | $83,095 |
Back... | Totals for 0017-10-277 | ||
Length: | 3 | ||
Estimate: | $118,704 | ||
Actual: | $83,095 | ||
CCSJ: 0017-10-288 |
|||
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | IH 35 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 0017-10-288 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | N SANTA ROSA ST | Fund Cat: | 8 |
Limits To: | N FLORES ST | ESTIMATE: | $77,985 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | US 90 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 0029-02-051 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | AT SH 130 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $122,768 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | IH 10 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 0072-05-088 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | AT US 87 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $146,458 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | SH 39 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 0193-02-045 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | EASY ST | Fund Cat: | 8 |
Limits To: | OAK LEAF ST | ESTIMATE: | $75,766 |
Length: | 4.0 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | SH 46 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 0215-01-053 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | AT RAINBOW DR | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $80,250 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | SH 46 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 0215-06-042 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | AT JOE KLAR RD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $80,721 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | SH 16 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 0291-03-072 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | AT FAIRWAY DR/ROYAL OAKS LP | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $88,845 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | SH 16 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 0291-06-057 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | AT CIELO RIO DR | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $86,142 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | SH 16 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 0291-06-058 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | AT ROHRBUCH RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $90,714 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | SH 16 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 0291-07-036 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | AT ITLL DO LN | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $81,055 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | RM 32 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 0511-02-024 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | AT RM 484 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $81,563 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | FM 306 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 0857-01-036 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | PARKVIEW DR. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $82,386 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | FM 306 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 0857-01-037 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | AT JACOB CREEK PARK RD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $79,899 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | FM 306 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 1728-02-061 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | AT EDGEGROVE/SPRING MOUNTAIN DR | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $80,906 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | FM 1283 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 1730-01-044 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | AT ENGLISH CROSSING RD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $87,517 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | FM 306 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 3106-01-018 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | AT MYSTIC CANYON/EAGLE ROCK RD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $82,247 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | FM 306 | Let Status: | Approved |
Project ID: | STP 1902(206)HES | CSJ: | 3106-01-019 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | AT QUEST AVE/STARR GRASS | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $81,209 |
Length: | 0.2 | Actual | $0 |
Back... | Totals for 0017-10-288 | ||
Length: | 7.2 | ||
Estimate: | $1,506,430 | ||
Actual: | |||
CCSJ: 0024-09-024 |
|||
District: | SAN ANTONIO | Let Date: | Feb 2019 |
Highway: | SS 371 | Let Status: | Actual |
Project ID: | C 24-9-24 | CSJ: | 0024-09-024 |
Description: | OVERLAY & PAVEMENT MARKINGS | Handling Code: | |
Limits From: | BILLY MITCHELL ROAD | Fund Cat: | 1 |
Limits To: | US 90 | ESTIMATE: | $3,458,517 |
Length: | 1.8 | Actual | $3,620,526 |
District: | SAN ANTONIO | Let Date: | Feb 2019 |
Highway: | SS 421 | Let Status: | Actual |
Project ID: | C 291-10-103 | CSJ: | 0291-10-103 |
Description: | SURFACE & PAVEMENT MARKINGS | Handling Code: | |
Limits From: | IH 410 | Fund Cat: | 1 |
Limits To: | CHERYL DR. | ESTIMATE: | $2,564,381 |
Length: | 3.0 | Actual | $2,622,395 |
Back... | Totals for 0024-09-024 | ||
Length: | 4.8 | ||
Estimate: | $6,022,898 | ||
Actual: | $6,242,921 | ||
CCSJ: 0025-02-217 |
|||
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | BR 2019(035) | CSJ: | 0025-02-217 |
Description: | CLEAN AND PAINT STEEL TRUSS, BRIDGE REPAIR, MILL, OVERLAY | Handling Code: | |
Limits From: | IH 10 NFR AT CIBOLO CREEK | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $2,061,727 |
Length: | 0.2 | Actual | $1,479,046 |
Back... | Totals for 0025-02-217 | ||
Length: | 0.2 | ||
Estimate: | $2,061,727 | ||
Actual: | $1,479,046 | ||
CCSJ: 0025-02-219 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | IH 10 | Let Status: | Approved |
Project ID: | NH ( ) | CSJ: | 0025-02-219 |
Description: | Widen Road - Add Lanes | Handling Code: | |
Limits From: | LOOP 1604 | Fund Cat: | 1 |
Limits To: | GRAYTOWN RD | ESTIMATE: | $55,000,000 |
Length: | 6.9 | Actual | $0 |
Back... | Totals for 0025-02-219 | ||
Length: | 6.9 | ||
Estimate: | $55,000,000 | ||
Actual: | |||
CCSJ: 0025-02-223 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | IH 10 | Let Status: | Approved |
Project ID: | CSJ: | 0025-02-223 | |
Description: | Landscape Development | Handling Code: | |
Limits From: | 0.1 MILES WEST OF OF S. WALTERS | Fund Cat: | 10 |
Limits To: | AMANDA | ESTIMATE: | $1,220,000 |
Length: | 1.2 | Actual | $0 |
Back... | Totals for 0025-02-223 | ||
Length: | 1.2 | ||
Estimate: | $1,220,000 | ||
Actual: | |||
CCSJ: 0025-09-079 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | FM 78 | Let Status: | Approved |
Project ID: | STP ( )HES | CSJ: | 0025-09-079 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | 2.939 MI W OF FM 1516 | Fund Cat: | 8 |
Limits To: | 2.325 MI W OF FM 1516 | ESTIMATE: | $571,655 |
Length: | 0.6 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | SH 46 | Let Status: | Approved |
Project ID: | STP ( )HES | CSJ: | 0215-06-043 |
Description: | RESURFACING | Handling Code: | |
Limits From: | CORDILLERA TRCE | Fund Cat: | 8 |
Limits To: | FM 3351 | ESTIMATE: | $201,512 |
Length: | 0.8 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | SH 16 | Let Status: | Approved |
Project ID: | STP ( )HES | CSJ: | 0291-10-112 |
Description: | SAFETY LIGHTING | Handling Code: | |
Limits From: | BRAUN RD | Fund Cat: | 8 |
Limits To: | MYSTIC PARK | ESTIMATE: | $700,822 |
Length: | 0.5 | Actual | $0 |
Back... | Totals for 0025-09-079 | ||
Length: | 1.9 | ||
Estimate: | $1,473,989 | ||
Actual: | |||
CCSJ: 0073-02-071 |
|||
District: | SAN ANTONIO | Let Date: | Dec 2018 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | NH 2019(273) | CSJ: | 0073-02-071 |
Description: | INTERSECTION OPERATIONAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT FM 1937/DEL LAGO PKWY | Fund Cat: | 11 |
Limits To: | . | ESTIMATE: | $2,071,166 |
Length: | 0.6 | Actual | $1,936,000 |
Back... | Totals for 0073-02-071 | ||
Length: | 0.6 | ||
Estimate: | $2,071,166 | ||
Actual: | $1,936,000 | ||
CCSJ: 0073-08-195 |
|||
District: | SAN ANTONIO | Let Date: | Oct 2018 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | NH 2019(109) | CSJ: | 0073-08-195 |
Description: | REPAIR SLOPE FAILURE | Handling Code: | |
Limits From: | HACKBERRY | Fund Cat: | 1 |
Limits To: | IH 10 | ESTIMATE: | $2,815,159 |
Length: | 0.6 | Actual | $2,967,147 |
Back... | Totals for 0073-08-195 | ||
Length: | 0.6 | ||
Estimate: | $2,815,159 | ||
Actual: | $2,967,147 | ||
CCSJ: 0143-01-055 |
|||
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | NH 2019(036) | CSJ: | 0143-01-055 |
Description: | RESTORE EXISTING ROADWAY | Handling Code: | |
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | RIGSBY | ESTIMATE: | $2,839,974 |
Length: | 0.6 | Actual | $2,805,914 |
District: | SAN ANTONIO | Let Date: | Sep 2018 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | ROW 143-1-57 | CSJ: | 0143-01-057 |
Description: | UTILITY ONLY | Handling Code: | |
Limits From: | IH 10 | Fund Cat: | ROW |
Limits To: | RIGSBY | ESTIMATE: | $880,000 |
Length: | 0.6 | Actual | $645,086 |
Back... | Totals for 0143-01-055 | ||
Length: | 1.2 | ||
Estimate: | $3,719,974 | ||
Actual: | $3,451,000 | ||
CCSJ: 0253-04-158 |
|||
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | US 281 | Let Status: | Approved |
Project ID: | NH 1902(213) | CSJ: | 0253-04-158 |
Description: | Advanced Traffic Management System | Handling Code: | |
Limits From: | LP 1604 | Fund Cat: | 1 |
Limits To: | NAKOMA | ESTIMATE: | $2,000,000 |
Length: | 4.3 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | SL 1604 | Let Status: | Approved |
Project ID: | NH 1902(213) | CSJ: | 2452-02-123 |
Description: | Advanced Traffic Management System | Handling Code: | |
Limits From: | IH 10 W | Fund Cat: | 1 |
Limits To: | US 281 | ESTIMATE: | $310,582 |
Length: | 8.0 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | SL 1604 | Let Status: | Approved |
Project ID: | NH 1902(213) | CSJ: | 2452-03-124 |
Description: | Advanced Traffic Management System | Handling Code: | |
Limits From: | US 281 | Fund Cat: | 1 |
Limits To: | IH 35 N | ESTIMATE: | $1,080,000 |
Length: | 9.5 | Actual | $0 |
Back... | Totals for 0253-04-158 | ||
Length: | 21.8 | ||
Estimate: | $3,390,582 | ||
Actual: | |||
CCSJ: 0291-10-110 |
|||
District: | SAN ANTONIO | Let Date: | Feb 2019 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | NH 2019(511) | CSJ: | 0291-10-110 |
Description: | RECONSTRUCT EXISTING CULVERT | Handling Code: | |
Limits From: | AT CEDAR TRAIL | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,997,741 |
Length: | 0.1 | Actual | $1,957,753 |
District: | SAN ANTONIO | Let Date: | Feb 2019 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | ROW 291-10-111 | CSJ: | 0291-10-111 |
Description: | ROW UTILITIES_ADJUSTMENTS | Handling Code: | |
Limits From: | AT CEDAR TRAIL | Fund Cat: | ROW |
Limits To: | . | ESTIMATE: | $287,661 |
Length: | 0.1 | Actual | $150,209 |
Back... | Totals for 0291-10-110 | ||
Length: | 0.2 | ||
Estimate: | $2,285,402 | ||
Actual: | $2,107,962 | ||
CCSJ: 0291-11-021 |
|||
District: | SAN ANTONIO | Let Date: | Oct 2018 |
Highway: | SS 421 | Let Status: | Actual |
Project ID: | STP 2019(067)HES | CSJ: | 0291-11-021 |
Description: | INSTALL RAISED MEDIANS WITH ACTUATED PED SYMBOLS | Handling Code: | |
Limits From: | 0.1 MI WEST OF GOODRICH | Fund Cat: | 8 |
Limits To: | 0.1 MI EAST OF HAMILTON | ESTIMATE: | $208,583 |
Length: | 0.6 | Actual | $320,840 |
Back... | Totals for 0291-11-021 | ||
Length: | 0.6 | ||
Estimate: | $208,583 | ||
Actual: | $320,840 | ||
CCSJ: 0465-02-026 |
|||
District: | SAN ANTONIO | Let Date: | Feb 2019 |
Highway: | FM 1518 | Let Status: | Actual |
Project ID: | C 465-2-26 | CSJ: | 0465-02-026 |
Description: | OVERLAY & PAVEMENT MARKINGS ON MAINLANES | Handling Code: | |
Limits From: | FM 78 | Fund Cat: | 1 |
Limits To: | SCHAEFER ROAD | ESTIMATE: | $514,546 |
Length: | 1.8 | Actual | $351,365 |
District: | SAN ANTONIO | Let Date: | Feb 2019 |
Highway: | FM 2252 | Let Status: | Actual |
Project ID: | C 1433-1-27 | CSJ: | 1433-01-027 |
Description: | OVERLAY & PAVEMENT MARKINGS | Handling Code: | |
Limits From: | EVANS RD. | Fund Cat: | 1 |
Limits To: | 0.1 MI.E OF JUDSON RD. | ESTIMATE: | $1,458,512 |
Length: | 3.3 | Actual | $1,282,531 |
District: | SAN ANTONIO | Let Date: | Feb 2019 |
Highway: | FM 1518 | Let Status: | Actual |
Project ID: | C 1542-1-19 | CSJ: | 1542-01-019 |
Description: | OVERLAY & PAVEMENT MARKINGS | Handling Code: | |
Limits From: | WEIDERSTEIN RD. | Fund Cat: | 1 |
Limits To: | FM 78 | ESTIMATE: | $657,714 |
Length: | 3.3 | Actual | $587,100 |
Back... | Totals for 0465-02-026 | ||
Length: | 8.4 | ||
Estimate: | $2,630,772 | ||
Actual: | $2,220,997 | ||
CCSJ: 0521-03-060 |
|||
District: | SAN ANTONIO | Let Date: | Feb 2019 |
Highway: | SL 13 | Let Status: | Actual |
Project ID: | C 521-3-60 | CSJ: | 0521-03-060 |
Description: | BASE REPAIR, MILL, SEAL COAT, OVERLAY AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | US 90 | Fund Cat: | 1 |
Limits To: | LEON CREEK | ESTIMATE: | $3,388,793 |
Length: | 3.8 | Actual | $3,075,679 |
Back... | Totals for 0521-03-060 | ||
Length: | 3.8 | ||
Estimate: | $3,388,793 | ||
Actual: | $3,075,679 | ||
CCSJ: 0521-04-204 |
|||
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | IH 410 | Let Status: | Approved |
Project ID: | NH 1902(215) | CSJ: | 0521-04-204 |
Description: | Widen Road - Add Lanes | Handling Code: | |
Limits From: | INGRAM RD. | Fund Cat: | 1 |
Limits To: | US 90 | ESTIMATE: | 100,000,000 |
Length: | 6.3 | Actual | $0 |
Back... | Totals for 0521-04-204 | ||
Length: | 6.3 | ||
Estimate: | $100,000,000 | ||
Actual: | |||
CCSJ: 0915-00-191 |
|||
District: | SAN ANTONIO | Let Date: | Feb 2019 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 915-00-191 | CSJ: | 0915-00-191 |
Description: | DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2019 | Handling Code: | |
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2019 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,499,971 |
Length: | 0.0 | Actual | $1,540,868 |
Back... | Totals for 0915-00-191 | ||
Length: | 0 | ||
Estimate: | $1,499,971 | ||
Actual: | $1,540,868 | ||
CCSJ: 0915-00-192 |
|||
District: | SAN ANTONIO | Let Date: | Apr 2019 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2019(777) | CSJ: | 0915-00-192 |
Description: | SCHOOL FLASHER UPGRADES | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,581,617 |
Length: | 0.0 | Actual | $817,876 |
Back... | Totals for 0915-00-192 | ||
Length: | 0 | ||
Estimate: | $1,581,617 | ||
Actual: | $817,876 | ||
CCSJ: 0915-00-195 |
|||
District: | SAN ANTONIO | Let Date: | Apr 2019 |
Highway: | NR | Let Status: | Actual |
Project ID: | STP 1902(099)MM | CSJ: | 0915-00-195 |
Description: | Commute Solutions Program | Handling Code: | XX |
Limits From: | ALAMO AREA MPO: IN BEXAR, COMAL, | Fund Cat: | 3 |
Limits To: | GUADALUPE & PARTIAL KENDALL COUNTY | ESTIMATE: | $300,000 |
Length: | 0.0 | Actual | $301,243 |
Back... | Totals for 0915-00-195 | ||
Length: | 0 | ||
Estimate: | $300,000 | ||
Actual: | $301,243 | ||
CCSJ: 0915-00-199 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | VA | Let Status: | Tentative |
Project ID: | STP 1809(759) | CSJ: | 0915-00-199 |
Description: | DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 2018 | Handling Code: | XX |
Limits From: | DISTRICTWIDE ITS FY 2018 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $2,000,000 |
Length: | 0.0 | Actual | $0 |
Bid Tabulations Back... | Totals for 0915-00-199 | ||
Length: | 0 | ||
Estimate: | $2,000,000 | ||
Actual: | |||
CCSJ: 0915-00-200 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | VA | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0915-00-200 |
Description: | DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 2019 | Handling Code: | XX |
Limits From: | DISTRICTWIDE ITS FY 2019 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $2,000,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-00-200 | ||
Length: | 0 | ||
Estimate: | $2,000,000 | ||
Actual: | |||
CCSJ: 0915-00-207 |
|||
District: | SAN ANTONIO | Let Date: | Nov 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2019(169) | CSJ: | 0915-00-207 |
Description: | IMPROVEMENTS TO PEDESTRIAN CROSSINGS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $441,854 |
Length: | 0.1 | Actual | $533,808 |
Back... | Totals for 0915-00-207 | ||
Length: | 0.1 | ||
Estimate: | $441,854 | ||
Actual: | $533,808 | ||
CCSJ: 0915-00-209 |
|||
District: | SAN ANTONIO | Let Date: | May 2019 |
Highway: | VA | Let Status: | Approved |
Project ID: | STP 2019(902) | CSJ: | 0915-00-209 |
Description: | Highway Improvement | Handling Code: | |
Limits From: | VARIOUS LOCATIONS-RURAL | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,650,273 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-00-209 | ||
Length: | 0 | ||
Estimate: | $1,650,273 | ||
Actual: | |||
CCSJ: 0915-00-210 |
|||
District: | SAN ANTONIO | Let Date: | May 2019 |
Highway: | VA | Let Status: | Approved |
Project ID: | STP 2019(903) | CSJ: | 0915-00-210 |
Description: | Highway Improvement | Handling Code: | |
Limits From: | VARIOUS LOCATIONS-URBAN | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $2,580,382 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-00-210 | ||
Length: | 0 | ||
Estimate: | $2,580,382 | ||
Actual: | |||
CCSJ: 0915-00-211 |
|||
District: | SAN ANTONIO | Let Date: | Jun 2019 |
Highway: | VA | Let Status: | Approved |
Project ID: | STP 2019(796)MM | CSJ: | 0915-00-211 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS IN COMAL AND | Fund Cat: | 7 |
Limits To: | BEXAR COUNTIES | ESTIMATE: | $1,693,158 |
Length: | 0.0 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jun 2019 |
Highway: | VA | Let Status: | Approved |
Project ID: | STP 2019(796)MM | CSJ: | 0915-17-069 |
Description: | INSTALL ADVANCED SIGNAL CONTROLLERS, NETWORKING EQUIPMENT | Handling Code: | |
Limits From: | VARIOUS LOCATIONS IN NEW BRAUNFELS | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $113,401 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-00-211 | ||
Length: | 0 | ||
Estimate: | $1,806,559 | ||
Actual: | |||
CCSJ: 0915-00-212 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | VA | Let Status: | Tentative |
Project ID: | STP ( )MM | CSJ: | 0915-00-212 |
Description: | SAFETY SERVICE PATROL ON CONTROLLED ACCESS HIGHWAYS IN | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS WITHIN | Fund Cat: | 1 |
Limits To: | BEXAR, COMAL AND KENDALL COUNTIES | ESTIMATE: | $2,500,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-00-212 | ||
Length: | 0 | ||
Estimate: | $2,500,000 | ||
Actual: | |||
CCSJ: 0915-00-220 |
|||
District: | SAN ANTONIO | Let Date: | Jun 2019 |
Highway: | VA | Let Status: | Approved |
Project ID: | STP 1902(062) | CSJ: | 0915-00-220 |
Description: | Construct Pedestrian Infrastructure | Handling Code: | |
Limits From: | VARIOUS LOCATIONS IN GUADALUPE | Fund Cat: | 10 |
Limits To: | AND WILSON COUNTIES | ESTIMATE: | $2,000,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-00-220 | ||
Length: | 0 | ||
Estimate: | $2,000,000 | ||
Actual: | |||
CCSJ: 0915-00-221 |
|||
District: | SAN ANTONIO | Let Date: | Apr 2019 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2019(684) | CSJ: | 0915-00-221 |
Description: | DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2019 | Handling Code: | |
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2019 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,512,016 |
Length: | 0.0 | Actual | $1,539,906 |
Back... | Totals for 0915-00-221 | ||
Length: | 0 | ||
Estimate: | $1,512,016 | ||
Actual: | $1,539,906 | ||
CCSJ: 0915-00-222 |
|||
District: | SAN ANTONIO | Let Date: | May 2019 |
Highway: | VA | Let Status: | Approved |
Project ID: | STP 2019(904) | CSJ: | 0915-00-222 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,505,637 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-00-222 | ||
Length: | 0 | ||
Estimate: | $1,505,637 | ||
Actual: | |||
CCSJ: 0915-00-223 |
|||
District: | SAN ANTONIO | Let Date: | May 2019 |
Highway: | VA | Let Status: | Approved |
Project ID: | STP 2019(905) | CSJ: | 0915-00-223 |
Description: | Highway Improvement | Handling Code: | |
Limits From: | VARIOUS LOCATIONS-RURAL | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $3,616,027 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-00-223 | ||
Length: | 0 | ||
Estimate: | $3,616,027 | ||
Actual: | |||
CCSJ: 0915-12-520 |
|||
District: | SAN ANTONIO | Let Date: | May 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 1402(235)MM | CSJ: | 0915-12-520 |
Description: | REHAB AND REALIGN ROADWAY, INTERSECTION AND FLOOD CONTROL | Handling Code: | LC |
Limits From: | ON QUINTANA RD FROM HARMON AVE | Fund Cat: | 3 |
Limits To: | MCKENNA AVE | ESTIMATE: | $7,800,000 |
Length: | 0.8 | Actual | $0 |
Back... | Totals for 0915-12-520 | ||
Length: | 0.8 | ||
Estimate: | $7,800,000 | ||
Actual: | |||
CCSJ: 0915-12-543 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | NR | Let Status: | Tentative |
Project ID: | STP ( )MM | CSJ: | 0915-12-543 |
Description: | ALAMO AREA COMMUTE SOLUTION PGM-FY 2018 | Handling Code: | XX |
Limits From: | ALAMO AREA MPO: IN BEXAR, COMAL, | Fund Cat: | 7 |
Limits To: | GUADALUPE & PARTIAL KENDALL COUNTY | ESTIMATE: | $100,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-12-543 | ||
Length: | 0 | ||
Estimate: | $100,000 | ||
Actual: | |||
CCSJ: 0915-12-547 |
|||
District: | SAN ANTONIO | Let Date: | Nov 2018 |
Highway: | NR | Let Status: | Actual |
Project ID: | STP 2019(345)MM | CSJ: | 0915-12-547 |
Description: | ALAMO AREA COMMUTE SOLUTION PGM-FY 2017 | Handling Code: | XX |
Limits From: | ALAMO AREA MPO: IN BEXAR, COMAL, | Fund Cat: | 3 |
Limits To: | GUADALUPE & PARTIAL KENDALL COUNTY | ESTIMATE: | $100,000 |
Length: | 0.0 | Actual | $100,000 |
Back... | Totals for 0915-12-547 | ||
Length: | 0 | ||
Estimate: | $100,000 | ||
Actual: | $100,000 | ||
CCSJ: 0915-12-550 |
|||
District: | SAN ANTONIO | Let Date: | May 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 2019(898)MM | CSJ: | 0915-12-550 |
Description: | CONSTRUCT ENTRANCE & EXIT RAMPS BETWEEN HARRY WURZBACH AND | Handling Code: | LC |
Limits From: | HARRY WURZBACH | Fund Cat: | 3 |
Limits To: | AT AUSTIN HIGHWAY | ESTIMATE: | $17,177,000 |
Length: | 0.1 | Actual | $0 |
Back... | Totals for 0915-12-550 | ||
Length: | 0.1 | ||
Estimate: | $17,177,000 | ||
Actual: | |||
CCSJ: 0915-12-566 |
|||
District: | SAN ANTONIO | Let Date: | May 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 2019(899)HES | CSJ: | 0915-12-566 |
Description: | IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | ON CALLAGHAN ROAD | Fund Cat: | 3 |
Limits To: | AT INGRAM ROAD | ESTIMATE: | $402,983 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | May 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 2019(899)HES | CSJ: | 0915-12-567 |
Description: | IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | MARBACH ROAD | Fund Cat: | 3 |
Limits To: | AT HORAL DRIVE | ESTIMATE: | $285,506 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | May 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 2019(899)HES | CSJ: | 0915-12-569 |
Description: | IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | ON NEW BRAUNFELS AVE | Fund Cat: | 3 |
Limits To: | AT STEVES AVE | ESTIMATE: | $267,440 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | May 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 2019(899)HES | CSJ: | 0915-12-571 |
Description: | IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION | Handling Code: | |
Limits From: | ON WURZBACH | Fund Cat: | 3 |
Limits To: | AT BLUEMEL RD | ESTIMATE: | $284,091 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | May 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 2019(899)HES | CSJ: | 0915-12-587 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: | |
Limits From: | ON PLEASANTON ROAD | Fund Cat: | 3 |
Limits To: | AT FORMOSA BLVD | ESTIMATE: | $252,209 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | May 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 2019(899)HES | CSJ: | 0915-12-588 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: | |
Limits From: | ON VANCE JACKSON | Fund Cat: | 3 |
Limits To: | AT LA MANDA BLVD | ESTIMATE: | $246,075 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | May 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 2019(899)HES | CSJ: | 0915-12-608 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | MILITARY DR AT BROWNLEAF | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $273,720 |
Length: | 0.2 | Actual | $0 |
Back... | Totals for 0915-12-566 | ||
Length: | 1.4 | ||
Estimate: | $2,012,024 | ||
Actual: | |||
CCSJ: 0915-12-578 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 2018(867)MM | CSJ: | 0915-12-578 |
Description: | Highway Improvement | Handling Code: | LC |
Limits From: | IN UNIVERSAL CITY, ON E. AVIATION | Fund Cat: | 3 |
Limits To: | FROM HOUSTON DRIVE TO AZTEC WAY | ESTIMATE: | $8,632,561 |
Length: | 1.1 | Actual | $0 |
Back... | Totals for 0915-12-578 | ||
Length: | 1.1 | ||
Estimate: | $8,632,561 | ||
Actual: | |||
CCSJ: 0915-12-580 |
|||
District: | SAN ANTONIO | Let Date: | May 2019 |
Highway: | VA | Let Status: | Approved |
Project ID: | STP 2019(906)MM | CSJ: | 0915-12-580 |
Description: | INTELLIGENT TRANSPORTATION SYSTEMS - ENHANCEMENTS | Handling Code: | LC |
Limits From: | IN CITY OF SAN ANTONIO | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $1,500,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-12-580 | ||
Length: | 0 | ||
Estimate: | $1,500,000 | ||
Actual: | |||
CCSJ: 0915-12-585 |
|||
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | CR | Let Status: | Approved |
Project ID: | STP 1902(209)MM | CSJ: | 0915-12-585 |
Description: | Widen Road - Add Lanes | Handling Code: | LC |
Limits From: | IN BEXAR COUNTY, ON BLANCO RD. | Fund Cat: | 3 |
Limits To: | FROM WEST OAK ESTATES TO BORGFELD | ESTIMATE: | $14,661,235 |
Length: | 3.1 | Actual | $0 |
Back... | Totals for 0915-12-585 | ||
Length: | 3.1 | ||
Estimate: | $14,661,235 | ||
Actual: | |||
CCSJ: 0915-12-595 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | VA | Let Status: | Approved |
Project ID: | STP ( )TP | CSJ: | 0915-12-595 |
Description: | Hike And/Or Bike | Handling Code: | LC |
Limits From: | IN SAN ANTONIO, FROM LOMBRANO ST | Fund Cat: | 3 |
Limits To: | LAREDO ST | ESTIMATE: | $6,000,000 |
Length: | 2.8 | Actual | $0 |
Back... | Totals for 0915-12-595 | ||
Length: | 2.8 | ||
Estimate: | $6,000,000 | ||
Actual: | |||
CCSJ: 0915-12-601 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | VA | Let Status: | Tentative |
Project ID: | STP ( )MM | CSJ: | 0915-12-601 |
Description: | INTELLIGENT TRANSPORTATION SYSTEMS - ENHANCEMENTS; | Handling Code: | XX |
Limits From: | IN CITY OF SAN ANTONIO | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $1,500,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-12-601 | ||
Length: | 0 | ||
Estimate: | $1,500,000 | ||
Actual: | |||
CCSJ: 0915-12-603 |
|||
District: | SAN ANTONIO | Let Date: | Jun 2019 |
Highway: | VA | Let Status: | Approved |
Project ID: | STP 1902(065)MM | CSJ: | 0915-12-603 |
Description: | Construct Pedestrian Infrastructure | Handling Code: | LC |
Limits From: | IN CITY OF SAN ANTONIO ON JUDSON RD | Fund Cat: | 3 |
Limits To: | FROM INDEPENDENCE TO IH 35 | ESTIMATE: | $1,000,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-12-603 | ||
Length: | 0 | ||
Estimate: | $1,000,000 | ||
Actual: | |||
CCSJ: 0915-12-605 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | CS | Let Status: | Tentative |
Project ID: | STP ( )FRS1 | CSJ: | 0915-12-605 |
Description: | INSTALL RAILROAD SIGNAL WITH GATES ON FRATT RD AT UPRR DOT | Handling Code: | XX |
Limits From: | IH 35 SB FR | Fund Cat: | 8 |
Limits To: | 0.1 MI W OF IH 35 SB FR | ESTIMATE: | $250,000 |
Length: | 0.1 | Actual | $0 |
Back... | Totals for 0915-12-605 | ||
Length: | 0.1 | ||
Estimate: | $250,000 | ||
Actual: | |||
CCSJ: 0915-12-606 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | CS | Let Status: | Tentative |
Project ID: | STP ( )FRS1 | CSJ: | 0915-12-606 |
Description: | REPLACE RAILROAD SIGNAL AND CANTILEVER GATE ON EISENHAUER | Handling Code: | XX |
Limits From: | IH 35 SBFR | Fund Cat: | 8 |
Limits To: | 0.1 MI W OF IH 35 SBFR | ESTIMATE: | $250,000 |
Length: | 0.1 | Actual | $0 |
Back... | Totals for 0915-12-606 | ||
Length: | 0.1 | ||
Estimate: | $250,000 | ||
Actual: | |||
CCSJ: 0915-12-607 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | CS | Let Status: | Tentative |
Project ID: | STP ( )FRS1 | CSJ: | 0915-12-607 |
Description: | RELOCATE RAIL SIGNALS ON STAHL AT UPRR DOT 432 491U | Handling Code: | XX |
Limits From: | WETMORE/BULVERDE ROAD | Fund Cat: | 8 |
Limits To: | 0.1 MI E OF WETMORE/BULVERDE RD | ESTIMATE: | $250,000 |
Length: | 0.1 | Actual | $0 |
Back... | Totals for 0915-12-607 | ||
Length: | 0.1 | ||
Estimate: | $250,000 | ||
Actual: | |||
CCSJ: 0915-12-609 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | CS | Let Status: | Tentative |
Project ID: | STP ( )MM | CSJ: | 0915-12-609 |
Description: | MULTIMODAL PLANNING STUDY ON ONE ARTERIAL TO ACCOMMODATE | Handling Code: | XX |
Limits From: | IN SAN ANTONIO | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $1,000,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-12-609 | ||
Length: | 0 | ||
Estimate: | $1,000,000 | ||
Actual: | |||
CCSJ: 0915-12-612 |
|||
District: | SAN ANTONIO | Let Date: | Feb 2019 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2019(771)MM | CSJ: | 0915-12-612 |
Description: | RAPID TRANSIT CORRIDOR STUDY | Handling Code: | TR |
Limits From: | RAPID TRANSIT CORRIDOR STUDY | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $10,000,000 |
Length: | 0.0 | Actual | $10,000,000 |
Back... | Totals for 0915-12-612 | ||
Length: | 0 | ||
Estimate: | $10,000,000 | ||
Actual: | $10,000,000 | ||
CCSJ: 0915-12-622 |
|||
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 1902(200)HES | CSJ: | 0915-12-622 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | ON BULVERDE RD AT TPC PKWY | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $94,867 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 1902(200)HES | CSJ: | 0915-12-620 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | ON BINZ-ENGLEMAN AT WOODLAKE PKWY | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $63,852 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 1902(200)HES | CSJ: | 0915-12-623 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | ON CANYON GOLF RD | Fund Cat: | 8 |
Limits To: | AT WILDERNESS OAKS | ESTIMATE: | $129,200 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 1902(200)HES | CSJ: | 0915-12-627 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | ON COTTONWOOD WAY AT WISEMAN BLVD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $84,794 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 1902(200)HES | CSJ: | 0915-12-628 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | ON CRESTWAY RD AT NEW WORLD DR | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $219,111 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 1902(200 )HES | CSJ: | 0915-12-632 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | ON FOSTER RD AT SIERRA SUNSET | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $205,530 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 1902(200)HES | CSJ: | 0915-12-640 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | ON MONTGOMERY DR AT NEW WORLD DR | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $168,465 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 1902(200)HES | CSJ: | 0915-12-643 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | ON NEW WORLD DR AT O'CONNOR RD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $63,894 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 1902(200)HES | CSJ: | 0915-12-644 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | ON N FOSTER RD AT BINZ-ENGLEMAN RD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $220,182 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 1902(200)HES | CSJ: | 0915-12-645 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | ON N FOSTER RD AT SUMMER FEST | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $234,392 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 1902(200)HES | CSJ: | 0915-12-646 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | ON N FOSTER RD | Fund Cat: | 8 |
Limits To: | AT SOUTH OF LAKE VIEW DR | ESTIMATE: | $231,219 |
Length: | 0.2 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Jul 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 1902(200)HES | CSJ: | 0915-12-658 |
Description: | Hazard Elimination & Safety | Handling Code: | |
Limits From: | ALAMO RANCH PARKWAY | Fund Cat: | 8 |
Limits To: | AT LONESTAR PKWY | ESTIMATE: | $110,029 |
Length: | 0.2 | Actual | $0 |
Back... | Totals for 0915-12-622 | ||
Length: | 2.4 | ||
Estimate: | $1,825,534 | ||
Actual: | |||
CCSJ: 1890-01-046 |
|||
District: | SAN ANTONIO | Let Date: | Oct 2018 |
Highway: | FM 1976 | Let Status: | Actual |
Project ID: | STP 2019(111) | CSJ: | 1890-01-046 |
Description: | REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERS | Handling Code: | |
Limits From: | WOODLAKE PARKWAY | Fund Cat: | 1 |
Limits To: | LP 1604 | ESTIMATE: | $16,419,315 |
Length: | 5.2 | Actual | $14,631,412 |
District: | SAN ANTONIO | Let Date: | Oct 2018 |
Highway: | FM 1976 | Let Status: | Actual |
Project ID: | ROW 1890-1-50 | CSJ: | 1890-01-050 |
Description: | UTILITY ADJUSTMENTS | Handling Code: | |
Limits From: | WOODLAKE PARKWAY | Fund Cat: | ROW |
Limits To: | LP 1604 | ESTIMATE: | $2,168,201 |
Length: | 5.2 | Actual | $1,851,981 |
Back... | Totals for 1890-01-046 | ||
Length: | 10.4 | ||
Estimate: | $18,587,516 | ||
Actual: | $16,483,393 | ||
CCSJ: 2452-03-123 |
|||
District: | SAN ANTONIO | Let Date: | Mar 2019 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | C 2452-3-123 | CSJ: | 2452-03-123 |
Description: | BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON | Handling Code: | |
Limits From: | 0.4 MI E OF GREEN MOUNTAIN | Fund Cat: | 1 |
Limits To: | IH 35 | ESTIMATE: | $3,967,436 |
Length: | 3.0 | Actual | $4,014,717 |
Back... | Totals for 2452-03-123 | ||
Length: | 3 | ||
Estimate: | $3,967,436 | ||
Actual: | $4,014,717 | ||
CCSJ: 2452-04-016 |
|||
District: | SAN ANTONIO | Let Date: | Feb 2019 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | STP 2019(510) | CSJ: | 2452-04-016 |
Description: | EXPAND FROM 2 LANES TO 4 LANE DIVIDED | Handling Code: | |
Limits From: | IH 10 E | Fund Cat: | 2M |
Limits To: | MARTINEZ CREEK | ESTIMATE: | $22,325,439 |
Length: | 3.0 | Actual | $19,587,431 |
District: | SAN ANTONIO | Let Date: | Feb 2019 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | ROW 2452-4-19 | CSJ: | 2452-04-019 |
Description: | ROW UTILITY ADJUSTMENTS | Handling Code: | |
Limits From: | IH 10 E | Fund Cat: | ROW |
Limits To: | MARTINEZ CREEK | ESTIMATE: | $268,728 |
Length: | 3.0 | Actual | $185,471 |
Back... | Totals for 2452-04-016 | ||
Length: | 6 | ||
Estimate: | $22,594,167 | ||
Actual: | $19,772,902 | ||
CCSJ: 3544-04-002 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | SH 211 | Let Status: | Approved |
Project ID: | PTF 1702(682) | CSJ: | 3544-04-002 |
Description: | Widen Road - Add Lanes | Handling Code: | LC |
Limits From: | FM 1957 (POTRANCO RD), N 2.9 MI | Fund Cat: | 3 |
Limits To: | MEDINA C/L | ESTIMATE: | $7,000,001 |
Length: | 2.9 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | SH 211 | Let Status: | Tentative |
Project ID: | PTF 1702(682) | CSJ: | 3544-03-002 |
Description: | CONSTRUCT TWO LANE RURAL HIGHWAY ON NEW LOCATION | Handling Code: | LC |
Limits From: | BEXAR C/L, 2.0 MI S OF FM 471, N | Fund Cat: | 3 |
Limits To: | FM 471 (CULEBRA RD) | ESTIMATE: | $4,400,000 |
Length: | 2.0 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | SH 211 | Let Status: | Tentative |
Project ID: | PTF 1702(682) | CSJ: | 3544-05-001 |
Description: | CONSTRUCT TWO LANE RURAL HIGHWAY ON NEW LOCATION | Handling Code: | LC |
Limits From: | MEDINA C/L, 4.5 MI N OF FM 1957, N | Fund Cat: | 3 |
Limits To: | MEDINA C/L, 2.0 MI S OF FM 471 | ESTIMATE: | $2,600,001 |
Length: | 1.1 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Aug 2019 |
Highway: | SH 211 | Let Status: | Tentative |
Project ID: | PTF 1702(682) | CSJ: | 3544-06-001 |
Description: | CONSTRUCT TWO LANE RURAL HIGHWAY ON NEW LOCATION | Handling Code: | LC |
Limits From: | BEXAR C/L, 2.9 MI N OF FM 1957, N | Fund Cat: | 3 |
Limits To: | BEXAR C/L, 4.5 MI N OF FM 1957 | ESTIMATE: | $4,100,000 |
Length: | 1.6 | Actual | $0 |
Back... | Totals for 3544-04-002 | ||
Length: | 7.6 | ||
Estimate: | $18,100,001 | ||
Actual: |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |