Detail Letting Schedule for Bexar County (FY 2019)

Last Update: Monday, December 11, 2017
Bexar County (FY 2019)

CCSJ: 0016-08-037

District:SAN ANTONIOLet Date:Sep 2018
Highway:SL 368Let Status:Tentative
Project ID:STP ( )HESCSJ:0016-08-037
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT CASA BLANCAFund Cat:8
Limits To:.ESTIMATE:$218,364
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:SL 368Let Status:Tentative
Project ID:STP ( )HESCSJ:0016-08-038
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT ELEANORFund Cat:8
Limits To:.ESTIMATE:$193,261
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:SH 132Let Status:Tentative
Project ID:STP ( )HESCSJ:0017-13-010
Description:IMPROVE TRAFFIC SIGNAL AND SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT SOMERSET STREETFund Cat:8
Limits To:.ESTIMATE:$204,841
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:US 181Let Status:Tentative
Project ID:STP ( )HESCSJ:0073-12-012
Description:IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS AND SAFETYHandling
Code:
 
Limits From:AT OLD CORPUS CHRISTI HWYFund Cat:8
Limits To:.ESTIMATE:$229,079
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:US 181Let Status:Tentative
Project ID:STP ( )HESCSJ:0100-03-078
Description:IMPROVE TRAF SIGNALS, INSTALL ADV INTERSEC WARNING SIGNAL/Handling
Code:
 
Limits From:AT FM 775Fund Cat:8
Limits To:.ESTIMATE:$254,862
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:US 87Let Status:Tentative
Project ID:STP ( )HESCSJ:0143-01-056
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT FM 1628Fund Cat:8
Limits To:.ESTIMATE:$218,364
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 117Let Status:Tentative
Project ID:STP ( )HESCSJ:0236-04-025
Description:INSTALL INTERSECTION FLASHING BEACON, ADVANCE WARNINGHandling
Code:
 
Limits From:AT FM 1581Fund Cat:8
Limits To:.ESTIMATE:$95,889
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:SH 16Let Status:Tentative
Project ID:STP ( )HESCSJ:0291-10-104
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT GILBEAU RDFund Cat:8
Limits To:.ESTIMATE:$240,201
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:SH 16Let Status:Tentative
Project ID:STP ( )HESCSJ:0291-10-105
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT TEXEL RDFund Cat:8
Limits To:.ESTIMATE:$218,364
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:SH 16Let Status:Tentative
Project ID:STP ( )HESCSJ:0291-10-106
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT MAINLAND DRFund Cat:8
Limits To:.ESTIMATE:$218,364
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:SL 13Let Status:Tentative
Project ID:STP ( )HESCSJ:0521-02-040
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT SOMERSET ROADFund Cat:8
Limits To:.ESTIMATE:$218,364
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 471Let Status:Tentative
Project ID:STP ( )HESCSJ:0849-01-052
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT HEATH ROADFund Cat:8
Limits To:.ESTIMATE:$214,545
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 471Let Status:Tentative
Project ID:STP ( )HESCSJ:0849-02-040
Description:INSTALL TRAFFIC SIGNAL & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT SH 211Fund Cat:8
Limits To:.ESTIMATE:$196,700
Length:0.1Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 463Let Status:Tentative
Project ID:STP ( )HESCSJ:0849-03-020
Description:INSTALL INTERSECTION FLASHING BEACON & SAFETY LIGHTING ATHandling
Code:
 
Limits From:AT CR 6612Fund Cat:8
Limits To:.ESTIMATE:$63,377
Length:0.2Actual$0
 
Back...
Totals for 0016-08-037
Length:2.7
Estimate:$2,784,575
Actual:

CCSJ: 0017-10-277

District:SAN ANTONIOLet Date:Sep 2018
Highway:IH 35Let Status:Tentative
Project ID:STP ( )HESCSJ:0017-10-277
Description:WRONG WAY DRIVER ADVANCED TECHNOLOGIESHandling
Code:
 
Limits From:SL 353 (NOGALITOS)Fund Cat:8
Limits To:MCCULLOUGH AVEESTIMATE:$141,920
Length:3.0Actual$0
 
Back...
Totals for 0017-10-277
Length:3
Estimate:$141,920
Actual:

CCSJ: 0024-09-024

District:SAN ANTONIOLet Date:Feb 2019
Highway:SS 371Let Status:Tentative
Project ID:NH ( )CSJ:0024-09-024
Description:OVERLAY & PAVEMENT MARKINGSHandling
Code:
 
Limits From:BILLY MITCHELL ROADFund Cat:1
Limits To:US 90ESTIMATE:$2,090,928
Length:1.8Actual$0
 
District:SAN ANTONIOLet Date:Feb 2019
Highway:SS 421Let Status:Tentative
Project ID:NH ( )CSJ:0291-10-103
Description:SURFACE & PAVEMENT MARKINGSHandling
Code:
 
Limits From:IH 410Fund Cat:1
Limits To:SUNSHINE DRIVEESTIMATE:$3,382,752
Length:1.9Actual$0
 
Back...
Totals for 0024-09-024
Length:3.7
Estimate:$5,473,680
Actual:

CCSJ: 0025-09-077

District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 78Let Status:Tentative
Project ID:STP ( )HESCSJ:0025-09-077
Description:IMPROVE TRAFFIC SIGNAL & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT FOSTER/RITTIMANFund Cat:8
Limits To:.ESTIMATE:$222,184
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:SL 345Let Status:Tentative
Project ID:STP ( )HESCSJ:0072-08-140
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT CINNAMON CREEK DRFund Cat:8
Limits To:.ESTIMATE:$222,854
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:US 87Let Status:Tentative
Project ID:STP ( )HESCSJ:0072-14-029
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT SH 46Fund Cat:8
Limits To:.ESTIMATE:$49,589
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:SH 46Let Status:Tentative
Project ID:STP ( )HESCSJ:0215-01-047
Description:INSTALL FLASHING BEACON & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT FM 311Fund Cat:8
Limits To:.ESTIMATE:$63,377
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:SH 46Let Status:Tentative
Project ID:STP ( )HESCSJ:0215-01-048
Description:INSTALL FLASHING BEACON & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT CRANES MILLFund Cat:8
Limits To:.ESTIMATE:$63,377
Length:0.1Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 1535Let Status:Tentative
Project ID:STP ( )HESCSJ:0658-01-041
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT WEST AVENUEFund Cat:8
Limits To:.ESTIMATE:$227,766
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 1535Let Status:Tentative
Project ID:STP ( )HESCSJ:0658-01-042
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT LOCKHILL SELMAFund Cat:8
Limits To:.ESTIMATE:$242,448
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 1535Let Status:Tentative
Project ID:STP ( )HESCSJ:0658-01-043
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT LOOP1604Fund Cat:8
Limits To:.ESTIMATE:$394,964
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 1102Let Status:Tentative
Project ID:STP ( )HESCSJ:1273-01-036
Description:INSTALL FLASHING BEACON & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT HUNTER RDFund Cat:8
Limits To:.ESTIMATE:$63,376
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 1283Let Status:Tentative
Project ID:STP ( )HESCSJ:1730-01-042
Description:INSTALL FLASHING BEACON & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT LAKEWOOD DRFund Cat:8
Limits To:.ESTIMATE:$63,377
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 1976Let Status:Tentative
Project ID:STP ( )HESCSJ:1890-01-047
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT BENTLY DRFund Cat:8
Limits To:.ESTIMATE:$218,364
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 1976Let Status:Tentative
Project ID:STP ( )HESCSJ:1890-01-049
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT MONTGOMERY RD/EAGLE CREST BLVDFund Cat:8
Limits To:.ESTIMATE:$222,184
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 1516Let Status:Tentative
Project ID:STP ( )HESCSJ:1890-02-008
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT FM 1976Fund Cat:8
Limits To:.ESTIMATE:$49,589
Length:0.1Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 1044Let Status:Tentative
Project ID:STP ( )HESCSJ:2021-01-014
Description:INSTALL FLASHING BEACON & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:AT SCHMIDT AVEFund Cat:8
Limits To:.ESTIMATE:$63,377
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:FM 1957Let Status:Tentative
Project ID:STP ( )HESCSJ:2104-02-034
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT RICHLAND HILLSFund Cat:8
Limits To:.ESTIMATE:$222,184
Length:0.2Actual$0
 
Back...
Totals for 0025-09-077
Length:2.8
Estimate:$2,389,010
Actual:

CCSJ: 0072-12-191

District:SAN ANTONIOLet Date:Feb 2019
Highway:IH 10Let Status:Tentative
Project ID:NH ( )CSJ:0072-12-191
Description:MILL, SEAL COAT, OVERLAY AND PAVEMENT MARKINGSHandling
Code:
 
Limits From:0.1 MI EAST OF HILDERBRANDFund Cat:1
Limits To:IH 35ESTIMATE:$6,159,325
Length:2.9Actual$0
 
Back...
Totals for 0072-12-191
Length:2.9
Estimate:$6,159,325
Actual:

CCSJ: 0143-01-055

District:SAN ANTONIOLet Date:Sep 2018
Highway:US 87Let Status:Tentative
Project ID:NH ( )CSJ:0143-01-055
Description:RESTORE EXISTING ROADWAYHandling
Code:
 
Limits From:IH 10Fund Cat:1
Limits To:RIGSBYESTIMATE:$2,867,700
Length:0.6Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:US 87Let Status:Tentative
Project ID:ROW 143-1-57CSJ:0143-01-057
Description:UTILITY ONLYHandling
Code:
 
Limits From:IH 10Fund Cat:ROW
Limits To:RIGSBYESTIMATE:
Length:0.6Actual$0
 
Back...
Totals for 0143-01-055
Length:1.2
Estimate:$2,867,700
Actual:

CCSJ: 0291-10-110

District:SAN ANTONIOLet Date:Oct 2018
Highway:SH 16Let Status:Tentative
Project ID:NH ( )CSJ:0291-10-110
Description:RECONSTRUCT EXISTING CULVERTHandling
Code:
 
Limits From:AT CEDAR TRAILFund Cat:11
Limits To:.ESTIMATE:$660,000
Length:0.1Actual$0
 
Back...
Totals for 0291-10-110
Length:0.1
Estimate:$660,000
Actual:

CCSJ: 0291-11-021

District:SAN ANTONIOLet Date:Jan 2019
Highway:SS 421Let Status:Tentative
Project ID:STP ( )HESCSJ:0291-11-021
Description:INSTALL RAISED MEDIANS WITH ACTUATED PED SYMBOLSHandling
Code:
 
Limits From:0.1 MI WEST OF GOODRICHFund Cat:8
Limits To:0.1 MI EAST OF HAMILTONESTIMATE:$411,384
Length:0.6Actual$0
 
Back...
Totals for 0291-11-021
Length:0.6
Estimate:$411,384
Actual:

CCSJ: 0465-02-026

District:SAN ANTONIOLet Date:Feb 2019
Highway:FM 1518Let Status:Tentative
Project ID:STP ( )CSJ:0465-02-026
Description:OVERLAY & PAVEMENT MARKINGS ON MAINLANESHandling
Code:
 
Limits From:FM 78Fund Cat:1
Limits To:SCHAEFER ROADESTIMATE:$1,642,284
Length:1.8Actual$0
 
District:SAN ANTONIOLet Date:Feb 2019
Highway:FM 2252Let Status:Tentative
Project ID:STP ( )CSJ:1433-01-027
Description:OVERLAY & PAVEMENT MARKINGSHandling
Code:
 
Limits From:EVANS RD.Fund Cat:1
Limits To:STAHL ROADESTIMATE:$2,578,842
Length:2.0Actual$0
 
District:SAN ANTONIOLet Date:Feb 2019
Highway:FM 1518Let Status:Tentative
Project ID:STP ( )CSJ:1542-01-019
Description:OVERLAY & PAVEMENT MARKINGSHandling
Code:
 
Limits From:MASKE ROADFund Cat:1
Limits To:FM 78ESTIMATE:$1,501,164
Length:1.7Actual$0
 
Back...
Totals for 0465-02-026
Length:5.5
Estimate:$5,722,290
Actual:

CCSJ: 0521-03-060

District:SAN ANTONIOLet Date:Feb 2019
Highway:SL 13Let Status:Tentative
Project ID:NH ( )CSJ:0521-03-060
Description:BASE REPAIR, MILL, SEAL COAT, OVERLAY AND PAVEMENT MARKINGSHandling
Code:
 
Limits From:US 90Fund Cat:1
Limits To:LEON CREEKESTIMATE:$5,497,910
Length:3.8Actual$0
 
Back...
Totals for 0521-03-060
Length:3.8
Estimate:$5,497,910
Actual:

CCSJ: 0915-00-191

District:SAN ANTONIOLet Date:Feb 2019
Highway:VALet Status:Tentative
Project ID:STP ( )CSJ:0915-00-191
Description:DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2019Handling
Code:
 
Limits From:DISTRICTWIDE TRAFFIC CNTRL FY 2019Fund Cat:1
Limits To:.ESTIMATE:$3,000,000
Length:0.0Actual$0
 
Back...
Totals for 0915-00-191
Length:0
Estimate:$3,000,000
Actual:

CCSJ: 0915-00-192

District:SAN ANTONIOLet Date:Apr 2019
Highway:VALet Status:Tentative
Project ID:STP ( )CSJ:0915-00-192
Description:DISTRICTWIDE GUIDESIGNS FY19Handling
Code:
 
Limits From:DISTRICTWIDE GUIDESIGNS FY19Fund Cat:1
Limits To:.ESTIMATE:$2,500,000
Length:0.0Actual$0
 
Back...
Totals for 0915-00-192
Length:0
Estimate:$2,500,000
Actual:

CCSJ: 0915-00-200

District:SAN ANTONIOLet Date:May 2019
Highway:VALet Status:Tentative
Project ID:STP ( )CSJ:0915-00-200
Description:DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 2019Handling
Code:
 
Limits From:DISTRICTWIDE ITS FY 2019Fund Cat:1
Limits To:.ESTIMATE:$2,000,000
Length:0.0Actual$0
 
Back...
Totals for 0915-00-200
Length:0
Estimate:$2,000,000
Actual:

CCSJ: 0915-12-514

District:SAN ANTONIOLet Date:Jan 2019
Highway:CSLet Status:Tentative
Project ID:STP 1502(065)MMCSJ:0915-12-514
Description:CONSTRUCTION OF A HIKE AND BIKE TRAIL ALONG HUEBNER CREEKHandling
Code:
LC
Limits From:SH 16 - BANDERA RDFund Cat:3
Limits To:CRYSTAL HILLS PARKESTIMATE:$933,000
Length:1.6Actual$0
 
Back...
Totals for 0915-12-514
Length:1.6
Estimate:$933,000
Actual:

CCSJ: 0915-12-546

District:SAN ANTONIOLet Date:Aug 2019
Highway:NRLet Status:Tentative
Project ID:STP ( )MMCSJ:0915-12-546
Description:ALAMO AREA COMMUTE SOLUTION PGM-FY 2019Handling
Code:
XX
Limits From:ALAMO AREA MPO: IN BEXAR, COMAL,Fund Cat:3
Limits To:GUADALUPE & PARTIAL KENDALL COUNTYESTIMATE:$267,000
Length:0.0Actual$0
 
Back...
Totals for 0915-12-546
Length:0
Estimate:$267,000
Actual:

CCSJ: 0915-12-562

District:SAN ANTONIOLet Date:Jan 2019
Highway:CRLet Status:Tentative
Project ID:STP ( )CSJ:0915-12-562
Description:EXPAND FROM 2 TO 4 LANES, INCLUDING DRAINAGE IMPROVEMENTS,Handling
Code:
LC
Limits From:ON WATSON RD FROM FM 2790-SOMERSETFund Cat:3
Limits To:0.8 MI EAST TO WATSON RD.ESTIMATE:$4,886,116
Length:0.8Actual$0
 
Back...
Totals for 0915-12-562
Length:0.8
Estimate:$4,886,116
Actual:

CCSJ: 0915-12-566

District:SAN ANTONIOLet Date:Sep 2018
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0915-12-566
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:ON CALLAGHAN ROADFund Cat:8
Limits To:AT INGRAM ROADESTIMATE:$222,183
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0915-12-567
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:MARBACH ROADFund Cat:8
Limits To:AT HORAL DRIVEESTIMATE:$222,184
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0915-12-569
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:ON NEW BRAUNFELS AVEFund Cat:8
Limits To:AT STEVES AVEESTIMATE:$209,460
Length:0.2Actual$0
 
District:SAN ANTONIOLet Date:Sep 2018
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0915-12-571
Description:IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTIONHandling
Code:
 
Limits From:ON WURZBACHFund Cat:8
Limits To:AT BLUEMEL RDESTIMATE:$222,184
Length:0.2Actual$0
 
Back...
Totals for 0915-12-566
Length:0.8
Estimate:$876,011
Actual:

CCSJ: 0915-12-579

District:SAN ANTONIOLet Date:Jan 2019
Highway:VALet Status:Tentative
Project ID:ST ( )MMCSJ:0915-12-579
Description:CONSTRUCT CITYWIDE PEDESTRIAN AND BICYCLE IMPROVEMENTSHandling
Code:
LC
Limits From:IN CITY OF SAN ANTONIOFund Cat:3
Limits To:.ESTIMATE:$2,000,000
Length:0.0Actual$0
 
Back...
Totals for 0915-12-579
Length:0
Estimate:$2,000,000
Actual:

CCSJ: 0915-12-580

District:SAN ANTONIOLet Date:May 2019
Highway:VALet Status:Tentative
Project ID:ST ( )MMCSJ:0915-12-580
Description:INTELLIGENT TRANSPORTATION SYSTEMS - ENHANCEMENTSHandling
Code:
LC
Limits From:IN CITY OF SAN ANTONIOFund Cat:3
Limits To:.ESTIMATE:$1,500,000
Length:0.0Actual$0
 
Back...
Totals for 0915-12-580
Length:0
Estimate:$1,500,000
Actual:

CCSJ: 0915-12-585

District:SAN ANTONIOLet Date:Jul 2019
Highway:CRLet Status:Tentative
Project ID:ST ( )MMCSJ:0915-12-585
Description:EXPAND FROM 2 TO 4 LANE DIVIDED ROADWAY WITH RAISED MEDIAN,Handling
Code:
LC
Limits From:IN BEXAR COUNTY, ON BLANCO RD.Fund Cat:3
Limits To:FROM WEST OAK ESTATES TO BORGFELDESTIMATE:$14,661,235
Length:3.1Actual$0
 
Back...
Totals for 0915-12-585
Length:3.1
Estimate:$14,661,235
Actual:

CCSJ: 0915-12-602

District:SAN ANTONIOLet Date:May 2019
Highway:VALet Status:Tentative
Project ID:STP ( )MMCSJ:0915-12-602
Description:UPGRADE TRANSGUIDE FACILITYHandling
Code:
XX
Limits From:IN SAN ANTONIOFund Cat:1
Limits To:AT TRANSGUIDE CENTERESTIMATE:$4,000,000
Length:0.0Actual$0
 
Back...
Totals for 0915-12-602
Length:0
Estimate:$4,000,000
Actual:

CCSJ: 0915-12-604

District:SAN ANTONIOLet Date:May 2019
Highway:CSLet Status:Tentative
Project ID:STP ( )MMCSJ:0915-12-604
Description:BIKE AND PEDESTRIAN CORRIDOR ENHANCEMENTS TO IMPLEMENTHandling
Code:
LC
Limits From:IN SAN ANTONIO ON PRESA STREETFund Cat:3
Limits To:FROM W. BOYER TO SE MILITARY (LP13)ESTIMATE:$10,000,000
Length:3.8Actual$0
 
Back...
Totals for 0915-12-604
Length:3.8
Estimate:$10,000,000
Actual:

CCSJ: 1890-01-046

District:SAN ANTONIOLet Date:Oct 2018
Highway:FM 1976Let Status:Tentative
Project ID:STP ( )CSJ:1890-01-046
Description:REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERSHandling
Code:
 
Limits From:WOODLAKE PARKWAYFund Cat:1
Limits To:LP 1604ESTIMATE:$11,000,000
Length:5.2Actual$0
 
Back...
Totals for 1890-01-046
Length:5.2
Estimate:$11,000,000
Actual:

Handling CodeDefinition
XXProject not processed through statewide letting
TRTransfer of funds
LCProject let through local entity
LCProject not charged against district apportionment



Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract