Letting Schedule for February, 2019 County (FY 2019)

Last Update: Tuesday, February 19, 2019
February, 2019 (FY 2019)(see Links)
SEP 2018 | OCT 2018 | NOV 2018 | DEC 2018 | JAN 2019 | FEB 2019 | MAR 2019 | APR 2019 | MAY 2019 | JUN 2019 | JUL 2019 | AUG 2019 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
DescriptionDBE Goal
0180-04-151Aransas/
Corpus Christi
BS 35-LActual$945,81510EMERGENCY WORK REPAIR TRAFFIC SIGNALS0.0
2136-01-015Bell/
Waco
FM 2268Actual$4,229,5036REPLACE BRIDGE AND APPROACHES8.0
0915-12-612Bexar/
San Antonio
VAActual$10,000,0003RAPID TRANSIT CORRIDOR STUDY0.0
2452-04-016Bexar/
San Antonio
SL 1604Actual$22,594,1672MEXPAND FROM 2 LANES TO 4 LANE DIVIDED6.0
0915-00-191Bexar/
San Antonio
VAActual$1,499,9711DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 20190.0
0024-09-024Bexar/
San Antonio
SS 371Actual$6,022,8981OVERLAY & PAVEMENT MARKINGS0.0
0291-10-110Bexar/
San Antonio
SH 16Actual$2,285,4021RECONSTRUCT EXISTING CULVERT7.0
0521-03-060Bexar/
San Antonio
SL 13Actual$3,388,7931BASE REPAIR, MILL, SEAL COAT, OVERLAY AND PAVEMENT MARKINGS0.0
0465-02-026Bexar/
San Antonio
FM 1518Actual$2,630,7721OVERLAY & PAVEMENT MARKINGS ON MAINLANES0.0
0111-08-122Brazoria/
Houston
BS 288BActual$11,00010REMOVE AND INSTALL NEW CABINET0.0
0923-00-060Brown/
Brownwood
VAActual$908,5561THERMOPLASTIC STRIPING0.0
0054-06-104Brown/
Brownwood
US 67Actual$1,245,8688PROFILE CENTER AND EDGELINE MARKINGS0.0
0432-01-065Calhoun/
Yoakum
SH 185Actual$1,011,1851ADD TURN LANES & RESURFACING5.0
0181-03-025Callahan/
Abilene
SH 36Actual$1,958,6158MILLED EDGELINE RUMBLE STRIPS0.0
0169-05-041Carson/
Amarillo
US 60Actual$16,472,60711FULL DEPTH REHAB AND OVERLAY0.0
0508-02-120Chambers/
Beaumont
IH 10Actual$34,941,6717CONSTRUCT OVERPASS AND RECONFIGURE INTERCHANGE6.5
0137-10-022Clay/
Wichita Falls
FM 174Actual$2,112,5178PROVIDE ADDITIONAL PAVED SURFACE WIDTH6.5
0016-05-119Comal/
San Antonio
IH 35Actual$27,604,1652MRAMP REVISIONS, INTERSECTION AND FRONTAGE ROAD OPERATIONAL8.0
1357-01-026Cooke/
Wichita Falls
FM 2896Actual$2,690,0628PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE0.0
0556-02-017Crockett/
Odessa
SH 349Actual$80,9538PROFILE EDGELINE AND CENTERLINE MARKINGS0.0
2451-02-012Culberson/
El Paso
RM 652Actual$22,969,05611FULL DEPTH REHAB3.5
1158-01-009Culberson/
El Paso
FM 2185Actual$2,632,4221ROADWAY REHABILITATION WITH WIDENING0.0
0092-14-092Dallas/
Dallas
IH 345Actual$3,254,3971FULL DEPTH CONCRETE REPAIR ON FRONTAGE ROADS0.0
0047-07-230Dallas/
Dallas
US 75Actual$1,520,2208IMPROVE TRAFFIC SIGNALS6.0
0009-11-243Dallas/
Dallas
IH 30Actual$1,108,1141FULL DEPTH CONCRETE PAVEMENT REPAIR ON EB FRONTAGE ROADS0.0
0195-02-077Denton/
Dallas
IH 35Actual$1,158,7381FULL DEPTH CONCRETE REPAIR0.0
0042-07-066Donley/
Childress
US 287Actual$4,900,16211ASPHALTIC CONCRETE OVERLAY0.0
0924-00-100El Paso/
El Paso
VAActual$2,089,6971FY 2019 STRIPING PROJECT0.0
0092-05-051Ellis/
Dallas
IH 45Actual$1,165,3977CONSTRUCT INTERSECTION IMPROVEMENTS6.0
0257-06-027Erath/
Ft Worth
SH 6Actual$5,363,1581CONSTRUCT SUPER 2 PASSING LANES0.0
0382-02-036Falls/
Waco
SH 7Actual$7,235,2061MILL/OVERLAY2.0
0045-05-048Fannin/
Paris
SH 56Actual$230,4598IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS0.0
0807-03-036Fayette/
Yoakum
FM 153Actual$23,18010EMERGENCY REPAIR-FHWA ER0.0
0057-03-041Freestone/
Bryan
US 84Actual$2,057,17611PROFILE EDGELINE MARKINGS0.0
0915-18-024Frio/
San Antonio
CRActual$560,1926REPLACE BRIDGE & APPROACHES0.0
0976-03-107Galveston/
Houston
FM 518Actual$11,45510REMOVE AND INSTALL NEW CABINET AND RISER0.0
0686-02-028Galveston/
Houston
FM 1765Actual$11,00010REMOVE AND INSTALL NEW CABINET0.0
0978-01-040Galveston/
Houston
FM 517Actual$11,00010REMOVE AND INSTALL NEW CABINET0.0
0976-04-021Galveston/
Houston
FM 2094Actual$11,00010REMOVE AND INSTALL NEW CABINET0.0
0976-03-108Galveston/
Houston
FM 518Actual$11,00010REMOVE AND INSTALL NEW CABINET AND RISER0.0
0686-02-027Galveston/
Houston
FM 1765Actual$11,00010REMOVE AND INSTALL NEW CABINET0.0
0367-03-037Galveston/
Houston
SH 87Actual$7,058,4221BASE REPAIR, MILLING AND 1.5" ACP OVERLAY0.0
0051-09-120Galveston/
Houston
FM 3005Actual$3,307,6571BASE REPAIR, MILLING, SEAL COAT, 3/4 INCH TOM-F, 1 INCH0.0
0686-01-050Galveston/
Houston
FM 1765Actual$11,00010REMOVE AND INSTALL NEW CABINET0.0
0051-03-112Galveston/
Houston
SH 3Actual$11,00010REMOVE AND INSTALL NEW CABINET0.0
1607-01-053Galveston/
Houston
FM 1764Actual$11,00010REMOVE AND INSTALL NEW CABINET0.0
1607-01-052Galveston/
Houston
FM 1764Actual$11,00010REMOVE AND INSTALL NEW CABINET0.0
0978-01-041Galveston/
Houston
FM 517Actual$11,00010REMOVE AND INSTALL NEW CABINET0.0
3049-01-034Galveston/
Houston
FM 646Actual$11,45510REMOVE AND INSTALL NEW CABINET WITH RISER0.0
1844-02-023Galveston/
Houston
FM 2351Actual$11,45510REMOVE AND INSTALL NEW CABINET AND RISER0.0
0047-03-084Grayson/
Paris
SH 5Approved$682,6223CONSTRUCT SHARED USE PATH0.0
0912-72-448Harris/
Houston
CRActual$30,17610REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-445Harris/
Houston
CRActual$29,05610REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-449Harris/
Houston
CRActual$17,25310REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-453Harris/
Houston
CRActual$28,26910REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-450Harris/
Houston
CRActual$20,43610REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0271-15-090Harris/
Houston
IH 610Actual$1,096,6303UPGRADE STORM SEWERS0.0
0912-72-539Harris/
Houston
CRActual$914,45410REPAIR WASHOUT0.0
0027-13-212Harris/
Houston
IH 69Actual$5,319,8841UPGRADE HIGH MAST & UNDERPASS LIGHTING0.0
0366-01-076Hays/
Austin
SL 82Actual$1,006,0231MILL, SEAL AND INLAY0.0
0164-01-072Henderson/
Tyler
SH 31Actual$150,86010RECONSTRUCT PIPE ENTRANCE, ADD LANDSCAPING & LIGHTING0.0
0039-17-201Hidalgo/
Pharr
IH 2Actual$2,388,3681PAVEMENT REHABILITATION_(FRONTAGE RDS.)0.0
0921-02-311Hidalgo/
Pharr
CSApproved$703,0403NEW LOCATION 2-LANE RURAL ROADWAY0.0
0400-02-053Hopkins/
Paris
SH 19Actual$780,38711CREATING A LEFT TURN LANE AND CONTINUES TURN LANE FOR4.0
0009-06-051Hunt/
Paris
SH 66Actual$2,329,8381SFTY TREAT FIXED OBJ, WIDEN PVD SHLD TO 5FT OR LESS, INSTALL5.0
0200-04-024Jasper/
Beaumont
US 69Actual$8,348,39611OVERLAY EXISTING ROADWAY0.0
0172-10-015Johnson/
Ft Worth
US 287Actual$838,2661REPAIR BASE FAILURES, MILL, OVERLAY, PAVEMENT MARKINGS0.0
2815-01-008Kaufman/
Dallas
FM 2757Actual$4,228,0981REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERS0.0
0952-01-060Liberty/
Beaumont
FM 1008Actual$2,889,6331WIDEN/TWO-COURSE SURFACE TREATMENT0.0
0880-04-032Lubbock/
Lubbock
FM 179Actual$19,587,02511WIDEN NON-FREEWAY5.0
0905-00-092Lubbock/
Lubbock
VAActual$4,108,7591TRAFFIC CONTROL DEVICES0.0
0783-01-098Lubbock/
Lubbock
SL 289Actual$12,800,2541RESTORATION0.0
1842-01-016Martin/
Odessa
FM 26Actual$1,241,3241CHANNEL EXCAV, PLACEMENT OF CONCRETE RIP RAP, REPLACEMENT OF0.0
0209-01-063Mclennan/
Waco
SL 2Actual$864,34711MILL AND OVERLAY0.0
2560-01-083Nacogdoches/
Lufkin
SL 224Actual$1,603,3571RESURFACE WITH THIN OVERLAY MIXTURE0.0
2590-02-010Nacogdoches/
Lufkin
FM 2609Actual$3,997,74911RECONSTRUCT AND WIDEN PAVEMENT5.0
1069-01-035Nueces/
Corpus Christi
SH 357Actual$3,769,3208IMPROVE TRAFFIC SIGNALS AND INTERCONNECT SIGNALS0.0
0916-00-068Nueces/
Corpus Christi
VAApproved$1,200,0003PEDESTRIAN & BIKE FACILITIES IMPROVEMENTS0.0
0710-02-068Orange/
Beaumont
FM 105Actual$3,996,1771MILL AND OVERLAY, JOINT SEAL0.0
1601-01-033Parker/
Ft Worth
FM 730Actual$567,8361SIGNAL IMPROVEMENTS INCLUDING CORRIDOR RETIMING &0.0
0177-01-106Polk/
Lufkin
US 59Actual$18,96210REPLACE THRIEBEAM AND REESTABLISH THE SLOPE0.0
0177-01-104Polk/
Lufkin
US 59Actual$23,72410EMERGENCY ROADWAY REPAIRS0.0
1408-01-026Polk/
Lufkin
FM 1276Actual$106,78810REPAVE AND RETREAT FLEX BASE (ROUGHLY 1000 FT LONG)0.0
0041-07-106Potter/
Amarillo
US 87Actual$5,067,1641REPLACE BRIDGE AND APPROACHES7.5
0235-03-034Real/
San Angelo
SH 55Actual$935,5448PROFILE EDGELINE AND CENTERLINE MARKINGS0.0
0180-02-040Refugio/
Corpus Christi
SH 35Actual$12,477,4408SAFETY TRT FIXED OBJECTS, INSTALL PASSING LANES ON 2 LANE RD2.0
0049-14-012Robertson/
Bryan
FM 46Actual$2,054,3881REHABILITATE EXISTING ROAD6.0
0009-04-071Rockwall/
Dallas
SH 66Actual$1,122,1081FULL DEPTH CONCRETE PAVEMENT REPAIR0.0
0158-01-082Runnels/
San Angelo
US 67Actual$14,639,6661ACP OVERLAY0.0
1679-01-016Sabine/
Lufkin
FM 276Actual$7,50910REESTABLISH THE SLOPE AT THE EAST ABUTMENT0.0
1510-01-023Sabine/
Lufkin
FM 1592Actual$23,01610REESTABLISH THE FRONT SLOPE ON THE WEST SIDE OF THE0.0
1510-01-022Sabine/
Lufkin
FM 1592Actual$3,91810EMERGENCY EROSION REPAIRS0.0
0867-07-013San Saba/
Brownwood
RM 501Actual$2,395,6901IMPROVE GUARDRAIL, SAFETY TREAT FIXED OBJECTS, CONSTRUCT8.0
0066-03-041Sherman/
Amarillo
US 287Actual$14,955,7781OVERLAY2.0
0908-00-088Taylor/
Abilene
VAActual$2,554,0571THERMOPLASTIC PAVEMENT MARKINGS AND RAISED PAVEMENT MARKERS0.0
0200-08-056Tyler/
Beaumont
US 69Actual$348,9251SAFETY TREAT FIXED OBJECTS0.0
0200-07-054Tyler/
Beaumont
US 69Actual$3,438,0011MILL AND OVERLAY0.0
0520-05-050Upshur/
Atlanta
SH 155Actual$4,133,4481RESTORE EXISTING 2-LANE HIGHWAY0.0
0910-12-131Van Zandt/
Tyler
CSApproved$271,2123CONSTRUCT SIDEWALKS CONNECTING PUBLIC HOUSING TO EDGEWOOD0.0
3173-01-004Wharton/
Yoakum
FM 3086Actual$3,446,3281RESTORE EXISTING ROADWAY0.0
0440-01-042Williamson/
Austin
SH 138Actual$6,838,4581ADD SHOULDERS AND REHABILITATE ROADWAY8.0
0204-02-032Williamson/
Austin
US 79Approved$600,0003INSTALL CENTER RAISED MEDIAN AND TURN LANES0.0
2211-02-030Williamson/
Austin
FM 1460Actual$197,3383INSTALL MEDIAN BREAK AND LEFT TURN LANE0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract