Letting Schedule for Atlanta District (FY 2019)

Last Update: Monday, December 16, 2019

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Atlanta District (FY 2019)
Bowie | Camp | Cass | Harrison | Marion | Morris | Panola | Titus | Upshur |

Bowie County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0046-05-050US 82ActualNov 2018$470,8671RESURFACE EXISTING 2-LANE HIGHWAY0.0
0062-01-035SH 8ActualApr 2019$1,966,0506BRIDGE REPLACEMENT8.0
0010-13-092US 67ActualDec 2018$705,0541RESURFACE EXISTING 3-LANE ROADWAY0.0
0218-01-096US 59ActualNov 2018$4,788,9101RESURFACE EXSTING 4-LANE ROADWAY0.0
0919-19-081CSActualJun 2019$250,0008RAILROAD CROSSING IMPROVEMENTS0.0
0010-11-072US 67ActualOct 2018$8,030,7091SEAL COAT0.0

Camp County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0083-07-043SH 11ActualDec 2018$1,143,4748INSTALL LED FLASHING CHEVRONS ON CURVE0.0
0083-08-053SH 11ActualJun 2019$555,6281TRAFFIC SIGNAL IMPROVEMENTS0.0
0083-07-044SH 11ActualOct 2018$849,8138IMPROVE GUARDRAIL TO DESIGN STANDARDS5.0

Cass County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0062-03-042SH 8ActualSep 2018$1,844,4098PROFILE EDGELINE MARKINGS0.0
0919-00-079VAActualJul 2019$1,272,9201HIGHWAY IMPROVEMENT0.0

Harrison County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0096-09-077US 80ActualMar 2019$427,8248IMPROVE TRAFIC SIGNAL0.0
0632-04-032FM 451ActualMar 2019$5,283,8821PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE0.0
0632-04-034FM 9ActualDec 2018$3,069,2821REHABILITATE EXISTING 2-LANE HIGHWAY4.0
1575-04-017SL 390ActualJan 2019$310,8498INSTALL TRAF SIG, INST ADV WARNING SIG (INTERSECTION0.0
0208-02-045SH 43ActualMay 2019$4,921,0591SURFACING/ROADWAY RESTORATION4.0
0919-03-059CRActualAug 2019$371,8286BRIDGE REPLACEMENT5.5
0495-08-116IH 20ActualMay 2019$2,128,2411SURFACING/ROADWAY RESTORATION0.0
0495-08-117IH 20ActualAug 2019$293,5506BRIDGE MAINTENANCE0.0

Marion County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0062-06-058US 59ActualAug 2019$1,776,2241HAZARD ELIMINATION & SAFETY0.0
0222-05-048SH 49ActualJun 2019$100,5821INSTALL/UPGRADE ROADWAY LIGHTING0.0

Morris County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0010-08-056US 67ActualApr 2019$5,716,9608IMPROVE GUARDRAIL TO DESIGN STANDARDS3.0
0010-08-055US 67ActualNov 2018$417,1878SAFETY LIGHTING0.0
0010-08-057US 67ActualAug 2019$1,553,6141HAZARD ELIMINATION & SAFETY0.0

Panola County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0247-01-057US 79ActualApr 2019$9,887,68511RESURFACE EXISTING 4-LANE HIGHWAY0.0
0247-03-032US 79ActualMay 2019$4,709,5811HAZARD ELIMINATION & SAFETY0.0
0063-04-060US 59ActualJul 2019$4,913,59711SURFACING/ROADWAY RESTORATION3.5

Titus County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1176-02-019FM 899ActualMar 2019$1,275,4646REPLACE BRIDGE AND APPROACHES3.0
0010-06-042US 67ActualMar 2019$3,235,8318SAFETY TREAT FIXED OBJECTS0.0
0222-01-058SH 49ActualMay 2019$13,494,5131SURFACING/ROADWAY RESTORATION1.5

Upshur County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0392-02-096US 259ActualJan 2019$10,828,8671REHABILITATION OF EXISTING 4-LANE ROADWAY0.0
0520-05-050SH 155ActualFeb 2019$4,133,4481RESTORE EXISTING 2-LANE HIGHWAY0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract