Letting Schedule for Atlanta District (FY 2019)

Last Update: Monday, December 17, 2018
Atlanta District (FY 2019)
Bowie | Camp | Cass | Harrison | Marion | Morris | Panola | Titus | Upshur |

Bowie County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0046-05-050US 82ActualNov 2018$470,8671RESURFACE EXISTING 2-LANE HIGHWAY0.0
0919-19-081CSTentativeAug 2019$250,0008RAILROAD CROSSING UPGRADES0.0
0010-11-072US 67ActualOct 2018$7,808,1571SEAL COAT0.0
0010-13-092US 67ActualDec 2018$705,0541RESURFACE EXISTING 3-LANE ROADWAY0.0
0218-01-096US 59ActualNov 2018$4,788,9101RESURFACE EXSTING 4-LANE ROADWAY0.0
0330-01-033SH 98TentativeMay 2019$2,805,0726REHABILITATE BRIDGES AND APPROACHES0.0
0945-01-043SH 93TentativeJun 2019$400,00010CONSTRUCT SIDEWALKS0.0
1020-01-055FM 559TentativeJun 2019$140,00010CONSTRUCT SIDEWALKS0.0
1231-01-071FM 989TentativeAug 2019$250,0008RAILROAD CROSSING UPGRADES0.0
0945-01-042SH 93TentativeJun 2019$400,00010CONSTRUCT SIDEWALKS0.0

Camp County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0083-07-044SH 11ActualOct 2018$849,8138IMPROVE GUARDRAIL TO DESIGN STANDARDS5.0
0083-08-053SH 11TentativeJun 2019$744,2148IMPROVE TRAFFIC SIGNALS, INSTALL PEDESTRIAN CROSSWALK0.0
0083-07-043SH 11ActualDec 2018$1,143,4748INSTALL LED FLASHING CHEVRONS ON CURVE0.0

Cass County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0919-00-079VATentativeJul 2019$1,731,00012019 DISTRICT SEAL COAT PAVEMENT MARKINGS0.0
0062-03-042SH 8ActualSep 2018$1,844,4098PROFILE EDGELINE MARKINGS0.0
0919-14-027CRTentativeAug 2019$08RAILROAD CROSSING UPGRADES0.0

Harrison County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0495-08-116IH 20TentativeMay 2019$1,700,0001REHABILITATE SOUTH FRONTAGE ROAD0.0
0208-02-045SH 43TentativeMay 2019$7,425,0001REHABILITATION & WIDEN EXISTING 2-LANE ROADWAY0.0
0495-08-117IH 20TentativeAug 2019$1,011,6316BRIDGE PREVENTATIVE MAINTENANCE0.0
0919-03-061CRTentativeAug 2019$250,0008RAILROAD CROSSING UPGRADES0.0
0632-04-032FM 451ApprovedMar 2019$5,086,3488PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE0.0
0632-04-034FM 9ActualDec 2018$3,069,2821REHABILITATE EXISTING 2-LANE HIGHWAY4.0
1575-04-017SL 390ApprovedJan 2019$310,8498INSTALL TRAF SIG, INST ADV WARNING SIG (INTERSECTION0.0
0096-09-077US 80ApprovedMar 2019$473,3758IMPROVE TRAFIC SIGNAL0.0

Marion County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0222-05-048SH 49TentativeJun 2019$108,6488SAFETY LIGHTING AT INTERSECTION0.0
0062-05-062US 59TentativeJun 2019$6,434,9371REHABILITATE EXISTING 4 LANE DIVIDED HIGHWAY0.0
0062-06-057US 59TentativeAug 2019$50,0003CONSTRUCT RIGHT TURN/DECELLERATION LANE0.0

Morris County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0010-08-055US 67ActualNov 2018$417,1878SAFETY LIGHTING0.0
0010-08-056US 67ApprovedApr 2019$5,031,0008IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0

Panola County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0247-01-057US 79ApprovedApr 2019$9,965,60011RESURFACE EXISTING 4-LANE HIGHWAY0.0
0247-03-032US 79ApprovedMar 2019$5,045,2938INSTALL CONTINUOUS TURN LANE, MILLED EDGELINE RUMBLE STRIPS0.0

Titus County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0222-01-058SH 49TentativeMay 2019$8,883,3351REHABILITATE EXISTING 4-LANE HIGHWAY0.0
0010-06-042US 67ApprovedMar 2019$2,126,5698SAFETY TREAT FIXED OBJECTS0.0

Upshur County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0520-05-050SH 155ApprovedFeb 2019$4,119,4981RESTORE EXISTING 2-LANE HIGHWAY0.0
0392-02-096US 259ApprovedJan 2019$10,823,3471REHABILITATION OF EXISTING 4-LANE ROADWAY0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract